HomeMy WebLinkAbout2026-04-15; Planning Commission; 02; Planning Commission Work Plan; Request for a recommendation to accept the Fiscal Year 2025-2026 Work Plan Annual Report and adopt a resolution approving the Planning CommMeeting Date: April 15, 2026 Item No. 2
To: Planning Commission
Staff Contact: Eric Lardy, City Planner, 442-224-9595, eric.lardy@carlsbadca.gov
Subject: Planning Commission Work Plan; Request for a recommendation to accept the
Fiscal Year 2025-2026 Work Plan Annual Report and adopt a resolution
approving the Planning Commission Work Plan for Fiscal Year 2026-2027.
Location: Citywide
Case Numbers: N/A
Applicant/Representative: N/A
CEQA Determination: ☒Not a Project ☐ Exempt ☐ IS/ND or IS/MND ☐ EIR
☐Other:
Permit Type(s): ☐SDP ☐ CUP ☐ CDP ☐ TM/TPM ☐ GPA ☐ REZ ☐ LCPA
☒Other: N/A
Commission Action: ☐Decision ☒ Recommendation to City Council ☐ Informational (No Action)
Recommended Actions
That the Planning Commission ADOPT a resolution RECOMMENDING ACCEPTANCE of the Fiscal Year 2025-2026
Work Plan Annual Report and RECOMMENDING APPROVAL of the Fiscal Year 2026-2027 Work Plan
Existing Conditions & Project Description
In 2018 the City Council created uniform policies and procedures related to boards and commissions, requiring
each board or commission to provide the City Council with its approval an annual work plan of activities to be
undertaken in the coming year and to provide a subsequent report of its accomplishments. Carlsbad Municipal
Code, Chapter 2.15, includes the requirements for content and timing. It is typical that this item is completed
before the start of the fiscal year, on July 1 of each year.
The responsibilities and corresponding work of the Planning Commission are well defined in state law and
Titles 19 (Environment), 20 (Subdivisions), and 21 (Zoning) of the Carlsbad Municipal Code. As such, many
of the items on the workplan are projects undertaken to comply with state laws, City Council direction, or
those submitted by private applicants or city departments. Some items in the work plan are multi-year
efforts that will carry over into future years. The Fiscal Year 2025-26 Report was presented to the City Council
on June 10, 2025 (Staff Report is included as Exhibit 2, Minutes are included as Exhibit 3).
April 15, 2026 Item #2 1 of 18
PLANNING COMMISSION
Staff Report .
0
As reflected in the annual report, the Planning Commission is expected to have met 15 times during the current
fiscal year and has acted on multiple significant public and private development projects, including
recommending approval of or approving:
•Avenida Encinias Coastal Rail Trail;
•El Camino Real Widening (Arenal to La Costa);
•Drainage Master Plan;
•Recommendations on Rincon Roosevelt; and,
•Held three informational training sessions with staff.
A number of larger multi-year projects are anticipated to be completed in Fiscal Year 2026-2027 and are
included in the work program
Environmental Review
This action does not require environmental review because it does not constitute a “project” within the meaning
of the California Environmental Quality Act under California Public Resources Code Section 21065 in that it has
no potential to cause either a direct physical change or a reasonably foreseeable indirect physical change in the
environment.
Conclusion
The Planning Division, Community Development, recommends the Planning Commission adopt the resolution
and the information contained within. The Planning Commission could recommend inclusion of other tasks for
completion during the next fiscal year for evaluation for inclusion in future work programs.
Exhibits
1.Planning Commission Resolution with attachments
2.City Council staff report, Annual Work Plans for the Planning Commission and Historic Preservation
Commission (June 10, 2025): 2025-06-10 City Council Annual Work Plans for PC and HPC
3.City Council Minutes (June 10, 2025) 2025-06-10 City Council Minutes
April 15, 2026 Item #2 2 of 18
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
CARLSBAD, CALIFORNIA, RECOMMENDING ACCEPTANCE OF THE FISCAL
YEAR 2025-2026 WORK PLAN ANNUAL REPORT AND APPROVAL OF THE
FISCAL YEAR 2026-2027 PLANNING COMMISSION WORKPLAN.
CASE NAME: PLANNING COMMISSION WORKPLAN FOR FISCAL YEAR
2026-2027
WHEREAS, Chapter 2.15 of the Carlsbad Municipal Code (CMC) requires that each board or
commission provide to the City Council for its approval an annual work plan of activities to be undertaken
by the board or commission and a subsequent report of its accomplishments; and
WHEREAS, the City Planner has prepared a proposed Planning Commission Work Plan for
Fiscal Year 2026-2027 and a report of the items accomplished on the Fiscal Year 2025-2026 Work Plan; and
WHERAS, the Planning Commission has reviewed the documents prepared by the City
Planner, with the attached “Attachment A” containing a report of accomplishments titled as "Fiscal Year
2025-2026 Planning Commission Work Plan Annual Report" and the proposed work plan is shown on
“Attachment B” titled "City of Carlsbad, Planning Commission Work Plan, Fiscal Year 2026-2027"; and
WHEREAS, the Planning Commission did, on April 15, 2026, hold a duly noticed public
meeting as prescribed by law to consider said request; and
WHEREAS; at said public meeting, upon hearing and considering all testimony and
arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to the
work plan and report of accomplishments.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of
Carlsbad as follows:
A) That the foregoing recitations are true and correct.
B) The proposed action is not a “project” as defined by CEQA Section 21065 and does not
require environment review under CEQA Guidelines Section 15060(c)(3) and 15061(b)(3),
because the proposed action to report on the Planning Commission’s Fiscal Year 2026 –
2027 work plan is an organizational or administrative government activity that does not
PLANNING COMMISSION RESOLUTION NO. 7575
Exhibit 1
April 15, 2026 Item #2 3 of 18
ŝŶǀŽůǀĞĂŶLJĐŽŵŵŝƚŵĞŶƚƚŽĂŶLJƐƉĞĐŝĨŝĐƉƌŽũĞĐƚǁŚŝĐŚŵĂLJƌĞƐƵůƚŝŶĂƉŽƚĞŶƚŝĂůůLJƐŝŐŶŝĨŝĐĂŶƚ
ƉŚLJƐŝĐĂůŝŵƉĂĐƚŽŶƚŚĞĞŶǀŝƌŽŶŵĞŶƚ͘ŶLJƐƵďƐĞƋƵĞŶƚĂĐƚŝŽŶŽƌĚŝƌĞĐƚŝŽŶƐƚĞŵŵŝŶŐĨƌŽŵ
ƚŚĞƉƌŽƉŽƐĞĚĂĐƚŝŽŶŵĂLJƌĞƋƵŝƌĞƉƌĞƉĂƌĂƚŝŽŶŽĨĂŶĞŶǀŝƌŽŶŵĞŶƚĂůĚŽĐƵŵĞŶƚŝŶĂĐĐŽƌĚĂŶĐĞ
ǁŝƚŚYŽƌY'ƵŝĚĞůŝŶĞƐ͘
Ϳ dŚĂƚ ďĂƐĞĚ ŽŶ ƚŚĞ ĞǀŝĚĞŶĐĞ ƉƌĞƐĞŶƚĞĚ Ăƚ ƚŚĞ ƉƵďůŝĐ ŵĞĞƚŝŶŐ͕ ƚŚĞ ŽŵŵŝƐƐŝŽŶ ŝƐ
ZKDDE/E'WdEŽĨƚŚĞ&ŝƐĐĂůzĞĂƌϮϬϮϱͲϮϬϮϲtŽƌŬWůĂŶŶŶƵĂůZĞƉŽƌƚĂŶĚ
ZKDDE/E'WWZKs>ŽĨƚŚĞ&ŝƐĐĂůzĞĂƌϮϬϮϲͲϮϬϮϳtŽƌŬWůĂŶ͖^ƵďũĞĐƚƚŽƚŚĞďĞƐƚ
ĞĨĨŽƌƚƐŽĨƚŚĞĐŽŵŵŝƐƐŝŽŶĂŶĚƚŚĞƉŽƐƐŝďŝůŝƚLJŽĨƵŶĨŽƌĞƐĞĞŶĐŝƌĐƵŵƐƚĂŶĐĞƐǁŚŝĐŚŵĂLJ
ŝŵƉĞĚĞŽƌĚĞůĂLJƚŚĞĂĚŽƉƚŝŽŶͬĐŽŵƉůĞƚŝŽŶŽĨƚŚĞŝƚĞŵƐƉƌĞƐĞŶƚĞĚŝŶƚŚĞǁŽƌŬƉůĂŶ͘
W^^͕WWZKs͕EKWdĂƚĂƌĞŐƵůĂƌŵĞĞƚŝŶŐŽĨƚŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶŽĨƚŚĞ
ŝƚLJŽĨĂƌůƐďĂĚ͕ĂůŝĨŽƌŶŝĂ͕ŚĞůĚŽŶƉƌŝůϭϱ͕ϮϬϮϲ͕ďLJƚŚĞĨŽůůŽǁŝŶŐǀŽƚĞ͕ƚŽǁŝƚ͗
z^͗DĞƌnj͕>ĂĨĨĞƌƚLJ͕ƵƌƌŽǁƐ͕&ŽƐƚĞƌ͕DĞĞŶĞƐ͘
Ez^͗EŽŶĞ͘
^Ed͗,ƵďŝŶŐĞƌ͕&ŝƚnjŐĞƌĂůĚ͘
^d/E͗EŽŶĞ͘
ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
ZKzDE^͕ŚĂŝƌƉĞƌƐŽŶ
ĂƌůƐďĂĚWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶ
ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
D/<^dZKE'͕ŝƌĞĐƚŽƌŽĨŽŵŵƵŶŝƚLJ
ĞǀĞůŽƉŵĞŶƚ
April 15, 2026 Item #2 4 of 18
Fiscal Year 2025-26 Planning Commission Work Plan Annual Report Attachment A
I.Mission Statement
The Planning Commission holds regularly scheduled public hearings to consider land use matters, such as the general plan, local
coastal program, growth management program, specific plans, master plans, amendments to the zoning ordinance, zone
changes, special studies, and discretionary development permits for public and private projects.
For some actions, the Planning Commission acts in an advisory role and provides a recommendation to the City Council. In many
cases the City Council has delegated to the Planning Commission the authority to take a final action on the item subject to appeal
to the City Council. Prior to an item being considered by the Planning Commission the Planning Division staff complete its review
of a proposed project for compliance with all applicable plans, policies, and laws and provides a written recommendation.
Planning Commissioners also serve on special committees or task forces as requested by the City Council.
II.Composition
The Planning Commission consists of seven members appointed by the City Council to a four-year term. There are also three ex
officio members who shall be the City Planner, Assistant City Attorney, and City Engineer.
III.Fiscal Year 2025-26 Goals & Tasks
During the FY 2025-26 reporting period, the Planning Commission met a total of 15 times (July 1, 2025 through March 18, 2026).
The following outlines the status of the work plan’s goals and tasks as of the writing of this report:
GOAL/TASK STATUS COMMENTS/RECOMMENDATION
Advance Planning & Special Projects
•Workshop and Recommendations on
amendments to City Council Policy No.
64 (Wireless Facilities)
Staff is completing internal reviews and
document preparation for a public review
period is scheduled for Spring 2026.
Anticipate a workshop with the
Planning Commission in Fall 2026 to
discuss policy options and public
input.
•Zoning Ordinance Amendment:
Accessory Dwelling Units
On-going review of state legislative changes
related to ADUs/JADUs. Identification of
corresponding changes in the Carlsbad
Municipal Code and preparation of adoption
materials.
Anticipate a presentation to Planning
Commission of changes related to
late 2025/2026 legislation in Winter
2026/Spring 2027.
•Tribal, Cultural, Paleontological
Resources Guidelines Update
Staff continue to work with tribes and local
stakeholders in the preparation of materials
Anticipate a presentation to Planning
Commission of the recommended
April 15, 2026 Item #2 5 of 18
GOAL/TASK STATUS COMMENTS/RECOMMENDATION
for consideration by the City Council in 2027. changes in Fall 2026.
• Review and act on permits requested for
city capital improvement projects.
Major projects expected to be
considered by the commission include:
o Avenida Encinas Coastal Rail Trail
o El Camino Real (Arenal to La
Costa)
o Tamarack Maintenance Yard
o Robertson Ranch Park
Avenida Encinias Coastal Rail Trail was
approved by the Planning Commission on
January 21, 2026 and El Camino Real (Arenal
to La Costa) was recommended for approval
on March 18, 2026.
The remaining projects have been subject to
various project updates and have not
progressed to a point where they can be
presented to decision makers. Planning staff
continues to review applications as they are
submitted by project managers.
Avenida Encinias Coastal Rail Trail
and El Camino Real (Arenal to La
Costa) are completed and removed.
The other items are included in the
next fiscal year work program.
Current Planning
• Review and act on permits requested for
private development projects. Major
projects expected to be considered by
the commission include:
o Newage Carlsbad Luxury Resort
o Rincon CVD (Carlsbad Village
Drive)
o Sunny Creek
As of this writing, these projects have not
progressed to a point for consideration this
fiscal year.
An updated list of Projects is included
in the Fiscal Year 2026-27 Work
Program.
Training and City Operations
The Planning Division will work with the
Planning Commission to meet one to two
times each month for efficient and
productive meetings
The Planning Commission is expected to have
met 15 times during the current fiscal year.
Staff will continue to balance the work for
customers of the city along with having
efficient meetings.
This item is retained in the Fiscal Year
2026-27 Work Program.
Review state laws and options related to
Professional Care Facilities, the Regional
Housing Needs Allocation, and Inclusionary
April 15, 2026 Item #2 6 of 18
GOAL/TASK STATUS COMMENTS/RECOMMENDATION
Housing Ordinance for recommendations to
the City Council
Receive quarterly informational and training
presentations related to Planning
Commission operations and this work
program. It is anticipated that the first
presentations will focus on the following:
o The California Environmental
Quality Act process and findings
anticipated to be seen by the
Planning Commission.
o Title 19 of the Carlsbad Municipal
Code.
To date there have been three presentations
to the Planning Commission on informational
items. An overview of the California
Environmental Quality Act in August 2025, an
overview of Vehicle Miles Travelled in
November 2025, and an overview of the
Tribal, Cultural, and Paleontological resources
in March 2026. Additional presentations will
continue to be scheduled.
This item is retained in the Fiscal Year
2026-27 Work Program.
Have one or two members attend the League
of Cities California Conference Receive
Updates on New State Laws and City Council
Actions applicable to the commission
Three Commissioners attended the March
2026 Planning Commissioners Academy.
Commissioners were brought up to date on
recent regulatory & legislative changes and
received guidance and tools to assist them in
their role.
This item is retained in the Fiscal Year
2026-27 Work Program.
Members of the Planning Commission serve
on the following committees:
• Agricultural Conversion Mitigation Fee
Advisory Committee
• Historic Preservation Commission Ex-
Officio Member
This objective continues to be met. This item is retained in the Fiscal Year
2026-27 Work Program.
Other/Misc. Accomplishments
Special projects The Planning Commission approved several
items during the Fiscal Year that were not on
the work program, including:
N/A
April 15, 2026 Item #2 7 of 18
GOAL/TASK STATUS COMMENTS/RECOMMENDATION
• Coastline Church Amendment to original
expansion plans
• So Cal Gas Co. Amendment to Pipe Repairs
• Blvd Beach Commercial, special event
venue
• Baron’s market
• 2025 ADU Zone Code Amendment
• Costco Fuel Expansion Project
• Ave. Encinas Coastal Rail Trail
Improvements
• El Camino Real road widening from Arenal
Rd. and La Costa Ave.
• 2026 Drainage Master Plan
Approved housing project or remodels. The Planning Commission approved several
housing projects during the Fiscal Year that
were not on the work program:
• Yamanaka Residence
• Inns of America Amendment, 98 units
• Forrest Residence
• Carlsbad Estates, Lots 1-3
• Laguna Vida
• Jefferson St. Homes
• ADU Amendment
• Resort View Apartments
• Rincon Roosevelt
• Toll Brothers General Plan Amendment
(Recommended approval to continue
processing)
Approving housing development
projects helps implement a number
of General Plan policies and goals
related to addressing the housing
shortage and improving local
economic conditions.
April 15, 2026 Item #2 8 of 18
Attachment B
City of Carlsbad
Planning Commission Work Plan
Fiscal Year 2026-2027
I.Mission Statement
The Planning Commission holds regularly scheduled public hearings to consider land use
matters, such as the general plan, local coastal program, growth management program, specific
plans, master plans, amendments to the zoning ordinance, zone changes, special studies, and
discretionary development permits for public and private projects.
For some actions, the Planning Commission acts in an advisory role and provides a
recommendation to the City Council. In many cases the City Council has delegated to the
Planning Commission the authority to take a final action on the item subject to appeal to the
City Council. Prior to an item being considered by the Planning Commission the Planning
Division staff complete its review of a proposed project for compliance with all applicable plans,
policies, and laws and provides a written recommendation.
Planning Commissioners also serve on special committees or task forces as requested by the
City Council.
II.Composition
The Planning Commission consists of seven members appointed by the City Council to a four-
year term. There are also three ex officio members who shall be the City Planner, Assistant City
Attorney, and City Engineer.
III.FY 2026-2027 Goals & Tasks
The City of Carlsbad Planning Commission has selected to focus on the following goals and
tasks; covering the period from July 1, 2026, through June 30, 2027. The tasks are divided into
the categories of Advance Planning & Special Projects, Current Planning Projects, and
Training/City Representation:
Advance Planning & Special Projects
•Workshop and Recommendations on amendments to City Council Policy No. 64
(Wireless Facilities)
•Zoning Ordinance 2026 Clean-Up Amendment
•Tribal, Cultural, Paleontological Resources Guidelines Update
•Review and act on permits requested for city capital improvement projects. Major
projects expected to be considered by the commission include:
April 15, 2026 Item #2 9 of 18
o Tamarack Maintenance Yard
o Robertson Ranch Park
o Merwin Drive Stormdrain Improvements
o Orion Center Maintenance and Administrative Facilities
Current Planning Projects
•Review and act on permits requested for private development projects. Major projects
expected to be considered by the commission include:
o Newage Carlsbad Luxury Resort
o The Dewhurst
o Fairfield Apartment Homes at Bressi
o San Diego Gas & Electric Construction and Operations Site Realignment
Training and City Operations
•The Planning Division will work with the Planning Commission to meet one to two times
each month for efficient and productive meetings
•Receive quarterly informational and training presentations related to Planning
Commission operations and this work program.
•Have one or two members attend the League of Cities California Conference Receive
Updates on New State Laws and City Council Actions applicable to the commission
o Members of the Planning Commission serve on the Historic Preservation
Commission Ex-Officio Member
April 15, 2026 Item #2 10 of 18
tŽƌŬWůĂŶŶŶƵĂůZĞƉŽƌƚƚƚĂĐŚŵĞŶƚ
/͘ DŝƐƐŝŽŶ^ƚĂƚĞŵĞŶƚ
dŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶŚŽůĚƐƌĞŐƵůĂƌůLJƐĐŚĞĚƵůĞĚƉƵďůŝĐŚĞĂƌŝŶŐƐƚŽĐŽŶƐŝĚĞƌůĂŶĚƵƐĞŵĂƚƚĞƌƐ͕ƐƵĐŚĂƐƚŚĞŐĞŶĞƌĂůƉůĂŶ͕ůŽĐĂů
ĐŽĂƐƚĂůƉƌŽŐƌĂŵ͕ŐƌŽǁƚŚŵĂŶĂŐĞŵĞŶƚƉƌŽŐƌĂŵ͕ƐƉĞĐŝĨŝĐƉůĂŶƐ͕ŵĂƐƚĞƌƉůĂŶƐ͕ĂŵĞŶĚŵĞŶƚƐƚŽƚŚĞnjŽŶŝŶŐŽƌĚŝŶĂŶĐĞ͕njŽŶĞ
ĐŚĂŶŐĞƐ͕ƐƉĞĐŝĂůƐƚƵĚŝĞƐ͕ĂŶĚĚŝƐĐƌĞƚŝŽŶĂƌLJĚĞǀĞůŽƉŵĞŶƚƉĞƌŵŝƚƐĨŽƌƉƵďůŝĐĂŶĚƉƌŝǀĂƚĞƉƌŽũĞĐƚƐ͘
&ŽƌƐŽŵĞĂĐƚŝŽŶƐ͕ƚŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶĂĐƚƐŝŶĂŶĂĚǀŝƐŽƌLJƌŽůĞĂŶĚƉƌŽǀŝĚĞƐĂƌĞĐŽŵŵĞŶĚĂƚŝŽŶƚŽƚŚĞŝƚLJŽƵŶĐŝů͘/ŶŵĂŶLJ
ĐĂƐĞƐƚŚĞŝƚLJŽƵŶĐŝůŚĂƐĚĞůĞŐĂƚĞĚƚŽƚŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶƚŚĞĂƵƚŚŽƌŝƚLJƚŽƚĂŬĞĂĨŝŶĂůĂĐƚŝŽŶŽŶƚŚĞŝƚĞŵƐƵďũĞĐƚƚŽĂƉƉĞĂů
ƚŽƚŚĞŝƚLJŽƵŶĐŝů͘WƌŝŽƌƚŽĂŶŝƚĞŵďĞŝŶŐĐŽŶƐŝĚĞƌĞĚďLJƚŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶƚŚĞWůĂŶŶŝŶŐŝǀŝƐŝŽŶƐƚĂĨĨĐŽŵƉůĞƚĞŝƚƐƌĞǀŝĞǁ
ŽĨĂƉƌŽƉŽƐĞĚƉƌŽũĞĐƚĨŽƌĐŽŵƉůŝĂŶĐĞǁŝƚŚĂůůĂƉƉůŝĐĂďůĞƉůĂŶƐ͕ƉŽůŝĐŝĞƐ͕ĂŶĚůĂǁƐĂŶĚƉƌŽǀŝĚĞƐĂǁƌŝƚƚĞŶƌĞĐŽŵŵĞŶĚĂƚŝŽŶ͘
WůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶĞƌƐĂůƐŽƐĞƌǀĞŽŶƐƉĞĐŝĂůĐŽŵŵŝƚƚĞĞƐŽƌƚĂƐŬĨŽƌĐĞƐĂƐƌĞƋƵĞƐƚĞĚďLJƚŚĞŝƚLJŽƵŶĐŝů͘
//͘ ŽŵƉŽƐŝƚŝŽŶ
dŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶĐŽŶƐŝƐƚƐŽĨƐĞǀĞŶŵĞŵďĞƌƐĂƉƉŽŝŶƚĞĚďLJƚŚĞŝƚLJŽƵŶĐŝůƚŽĂĨŽƵƌͲLJĞĂƌƚĞƌŵ͘dŚĞƌĞĂƌĞĂůƐŽƚŚƌĞĞĞdž
ŽĨĨŝĐŝŽŵĞŵďĞƌƐǁŚŽƐŚĂůůďĞƚŚĞŝƚLJWůĂŶŶĞƌ͕ƐƐŝƐƚĂŶƚŝƚLJƚƚŽƌŶĞLJ͕ĂŶĚŝƚLJŶŐŝŶĞĞƌ͘
///͘ &ŝƐĐĂůzĞĂƌϮϬϮϱͲϮϲ'ŽĂůƐΘdĂƐŬƐ
ƵƌŝŶŐƚŚĞ&zϮϬϮϱͲϮϲƌĞƉŽƌƚŝŶŐƉĞƌŝŽĚ͕ƚŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶŵĞƚĂƚŽƚĂůŽĨϭϱƚŝŵĞƐ;:ƵůLJϭ͕ϮϬϮϱƚŚƌŽƵŐŚDĂƌĐŚϭϴ͕ϮϬϮϲͿ͘
dŚĞĨŽůůŽǁŝŶŐŽƵƚůŝŶĞƐƚŚĞƐƚĂƚƵƐŽĨƚŚĞǁŽƌŬƉůĂŶ͛ƐŐŽĂůƐĂŶĚƚĂƐŬƐĂƐŽĨƚŚĞǁƌŝƚŝŶŐŽĨƚŚŝƐƌĞƉŽƌƚ͗
'K>ͬd^<^ddh^KDDEd^ͬZKDDEd/KE
Advance Planning & Special Projects
x tŽƌŬƐŚŽƉĂŶĚZĞĐŽŵŵĞŶĚĂƚŝŽŶƐŽŶ
ĂŵĞŶĚŵĞŶƚƐƚŽŝƚLJŽƵŶĐŝůWŽůŝĐLJEŽ͘
ϲϰ;tŝƌĞůĞƐƐ&ĂĐŝůŝƚŝĞƐͿ
^ƚĂĨĨŝƐĐŽŵƉůĞƚŝŶŐŝŶƚĞƌŶĂůƌĞǀŝĞǁƐĂŶĚ
ĚŽĐƵŵĞŶƚƉƌĞƉĂƌĂƚŝŽŶĨŽƌĂƉƵďůŝĐƌĞǀŝĞǁ
ƉĞƌŝŽĚŝƐƐĐŚĞĚƵůĞĚĨŽƌ^ƉƌŝŶŐϮϬϮϲ͘
ŶƚŝĐŝƉĂƚĞĂǁŽƌŬƐŚŽƉǁŝƚŚƚŚĞ
WůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶŝŶ&ĂůůϮϬϮϲƚŽ
ĚŝƐĐƵƐƐƉŽůŝĐLJŽƉƚŝŽŶƐĂŶĚƉƵďůŝĐ
ŝŶƉƵƚ͘
x ŽŶŝŶŐKƌĚŝŶĂŶĐĞŵĞŶĚŵĞŶƚ͗
ĐĐĞƐƐŽƌLJǁĞůůŝŶŐhŶŝƚƐ
KŶͲŐŽŝŶŐƌĞǀŝĞǁŽĨƐƚĂƚĞůĞŐŝƐůĂƚŝǀĞĐŚĂŶŐĞƐ
ƌĞůĂƚĞĚƚŽhƐͬ:hƐ͘/ĚĞŶƚŝĨŝĐĂƚŝŽŶŽĨ
ĐŽƌƌĞƐƉŽŶĚŝŶŐĐŚĂŶŐĞƐŝŶƚŚĞĂƌůƐďĂĚ
DƵŶŝĐŝƉĂůŽĚĞĂŶĚƉƌĞƉĂƌĂƚŝŽŶŽĨĂĚŽƉƚŝŽŶ
ŵĂƚĞƌŝĂůƐ͘
ŶƚŝĐŝƉĂƚĞĂƉƌĞƐĞŶƚĂƚŝŽŶƚŽWůĂŶŶŝŶŐ
ŽŵŵŝƐƐŝŽŶŽĨĐŚĂŶŐĞƐƌĞůĂƚĞĚƚŽ
ůĂƚĞϮϬϮϱͬϮϬϮϲůĞŐŝƐůĂƚŝŽŶŝŶtŝŶƚĞƌ
ϮϬϮϲͬ^ƉƌŝŶŐϮϬϮϳ͘
x dƌŝďĂů͕ƵůƚƵƌĂů͕WĂůĞŽŶƚŽůŽŐŝĐĂů
ZĞƐŽƵƌĐĞƐ'ƵŝĚĞůŝŶĞƐhƉĚĂƚĞ
^ƚĂĨĨĐŽŶƚŝŶƵĞƚŽǁŽƌŬǁŝƚŚƚƌŝďĞƐĂŶĚůŽĐĂů
ƐƚĂŬĞŚŽůĚĞƌƐŝŶƚŚĞƉƌĞƉĂƌĂƚŝŽŶŽĨŵĂƚĞƌŝĂůƐ
ŶƚŝĐŝƉĂƚĞĂƉƌĞƐĞŶƚĂƚŝŽŶƚŽWůĂŶŶŝŶŐ
ŽŵŵŝƐƐŝŽŶŽĨƚŚĞƌĞĐŽŵŵĞŶĚĞĚ
&ŝƐĐĂůzĞĂƌϮϬϮϱͲϮϲWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶ
April 15, 2026 Item #2 11 of 18
'K>ͬd^<^ddh^KDDEd^ͬZKDDEd/KE
ĨŽƌĐŽŶƐŝĚĞƌĂƚŝŽŶďLJƚŚĞŝƚLJŽƵŶĐŝůŝŶϮϬϮϳ͘ĐŚĂŶŐĞƐŝŶ&ĂůůϮϬϮϲ͘
x ZĞǀŝĞǁĂŶĚĂĐƚŽŶƉĞƌŵŝƚƐƌĞƋƵĞƐƚĞĚĨŽƌ
ĐŝƚLJĐĂƉŝƚĂůŝŵƉƌŽǀĞŵĞŶƚƉƌŽũĞĐƚƐ͘
DĂũŽƌƉƌŽũĞĐƚƐĞdžƉĞĐƚĞĚƚŽďĞ
ĐŽŶƐŝĚĞƌĞĚďLJƚŚĞĐŽŵŵŝƐƐŝŽŶŝŶĐůƵĚĞ͗
o ǀĞŶŝĚĂŶĐŝŶĂƐŽĂƐƚĂůZĂŝůdƌĂŝů
o ůĂŵŝŶŽZĞĂů;ƌĞŶĂůƚŽ>Ă
ŽƐƚĂͿ
o dĂŵĂƌĂĐŬDĂŝŶƚĞŶĂŶĐĞzĂƌĚ
o ZŽďĞƌƚƐŽŶZĂŶĐŚWĂƌŬ
ǀĞŶŝĚĂŶĐŝŶŝĂƐŽĂƐƚĂůZĂŝůdƌĂŝůǁĂƐ
ĂƉƉƌŽǀĞĚďLJƚŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶŽŶ
:ĂŶƵĂƌLJϮϭ͕ϮϬϮϲĂŶĚůĂŵŝŶŽZĞĂů;ƌĞŶĂů
ƚŽ>ĂŽƐƚĂͿǁĂƐƌĞĐŽŵŵĞŶĚĞĚĨŽƌĂƉƉƌŽǀĂů
ŽŶDĂƌĐŚϭϴ͕ϮϬϮϲ͘
dŚĞƌĞŵĂŝŶŝŶŐƉƌŽũĞĐƚƐŚĂǀĞďĞĞŶƐƵďũĞĐƚƚŽ
ǀĂƌŝŽƵƐƉƌŽũĞĐƚƵƉĚĂƚĞƐĂŶĚŚĂǀĞŶŽƚ
ƉƌŽŐƌĞƐƐĞĚƚŽĂƉŽŝŶƚǁŚĞƌĞƚŚĞLJĐĂŶďĞ
ƉƌĞƐĞŶƚĞĚƚŽĚĞĐŝƐŝŽŶŵĂŬĞƌƐ͘WůĂŶŶŝŶŐƐƚĂĨĨ
ĐŽŶƚŝŶƵĞƐƚŽƌĞǀŝĞǁĂƉƉůŝĐĂƚŝŽŶƐĂƐƚŚĞLJĂƌĞ
ƐƵďŵŝƚƚĞĚďLJƉƌŽũĞĐƚŵĂŶĂŐĞƌƐ͘
ǀĞŶŝĚĂŶĐŝŶŝĂƐŽĂƐƚĂůZĂŝůdƌĂŝů
ĂŶĚůĂŵŝŶŽZĞĂů;ƌĞŶĂůƚŽ>Ă
ŽƐƚĂͿĂƌĞĐŽŵƉůĞƚĞĚĂŶĚƌĞŵŽǀĞĚ͘
dŚĞŽƚŚĞƌŝƚĞŵƐĂƌĞŝŶĐůƵĚĞĚŝŶƚŚĞ
ŶĞdžƚĨŝƐĐĂůLJĞĂƌǁŽƌŬƉƌŽŐƌĂŵ͘
Current Planning
x ZĞǀŝĞǁĂŶĚĂĐƚŽŶƉĞƌŵŝƚƐƌĞƋƵĞƐƚĞĚĨŽƌ
ƉƌŝǀĂƚĞĚĞǀĞůŽƉŵĞŶƚƉƌŽũĞĐƚƐ͘DĂũŽƌ
ƉƌŽũĞĐƚƐĞdžƉĞĐƚĞĚƚŽďĞĐŽŶƐŝĚĞƌĞĚďLJ
ƚŚĞĐŽŵŵŝƐƐŝŽŶŝŶĐůƵĚĞ͗
o EĞǁĂŐĞĂƌůƐďĂĚ>ƵdžƵƌLJZĞƐŽƌƚ
o ZŝŶĐŽŶs;ĂƌůƐďĂĚsŝůůĂŐĞ
ƌŝǀĞͿ
o ^ƵŶŶLJƌĞĞŬ
ƐŽĨƚŚŝƐǁƌŝƚŝŶŐ͕ƚŚĞƐĞƉƌŽũĞĐƚƐŚĂǀĞŶŽƚ
ƉƌŽŐƌĞƐƐĞĚƚŽĂƉŽŝŶƚĨŽƌĐŽŶƐŝĚĞƌĂƚŝŽŶƚŚŝƐ
ĨŝƐĐĂůLJĞĂƌ͘
ŶƵƉĚĂƚĞĚůŝƐƚŽĨWƌŽũĞĐƚƐŝƐŝŶĐůƵĚĞĚ
ŝŶƚŚĞ&ŝƐĐĂůzĞĂƌϮϬϮϲͲϮϳtŽƌŬ
WƌŽŐƌĂŵ͘
Training and City Operations
dŚĞWůĂŶŶŝŶŐŝǀŝƐŝŽŶǁŝůůǁŽƌŬǁŝƚŚƚŚĞ
WůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶƚŽŵĞĞƚŽŶĞƚŽƚǁŽ
ƚŝŵĞƐĞĂĐŚŵŽŶƚŚĨŽƌĞĨĨŝĐŝĞŶƚĂŶĚ
ƉƌŽĚƵĐƚŝǀĞŵĞĞƚŝŶŐƐ
dŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶŝƐĞdžƉĞĐƚĞĚƚŽŚĂǀĞ
ŵĞƚϭϱƚŝŵĞƐĚƵƌŝŶŐƚŚĞĐƵƌƌĞŶƚĨŝƐĐĂůLJĞĂƌ͘
^ƚĂĨĨǁŝůůĐŽŶƚŝŶƵĞƚŽďĂůĂŶĐĞƚŚĞǁŽƌŬĨŽƌ
ĐƵƐƚŽŵĞƌƐŽĨƚŚĞĐŝƚLJĂůŽŶŐǁŝƚŚŚĂǀŝŶŐ
ĞĨĨŝĐŝĞŶƚŵĞĞƚŝŶŐƐ͘
dŚŝƐŝƚĞŵŝƐƌĞƚĂŝŶĞĚŝŶƚŚĞ&ŝƐĐĂůzĞĂƌ
ϮϬϮϲͲϮϳtŽƌŬWƌŽŐƌĂŵ͘
ZĞǀŝĞǁƐƚĂƚĞůĂǁƐĂŶĚŽƉƚŝŽŶƐƌĞůĂƚĞĚƚŽ
WƌŽĨĞƐƐŝŽŶĂůĂƌĞ&ĂĐŝůŝƚŝĞƐ͕ƚŚĞZĞŐŝŽŶĂů
,ŽƵƐŝŶŐEĞĞĚƐůůŽĐĂƚŝŽŶ͕ĂŶĚ/ŶĐůƵƐŝŽŶĂƌLJ
April 15, 2026 Item #2 12 of 18
'K>ͬd^<^ddh^KDDEd^ͬZKDDEd/KE
,ŽƵƐŝŶŐKƌĚŝŶĂŶĐĞĨŽƌƌĞĐŽŵŵĞŶĚĂƚŝŽŶƐƚŽ
ƚŚĞŝƚLJŽƵŶĐŝů
ZĞĐĞŝǀĞƋƵĂƌƚĞƌůLJŝŶĨŽƌŵĂƚŝŽŶĂůĂŶĚƚƌĂŝŶŝŶŐ
ƉƌĞƐĞŶƚĂƚŝŽŶƐƌĞůĂƚĞĚƚŽWůĂŶŶŝŶŐ
ŽŵŵŝƐƐŝŽŶŽƉĞƌĂƚŝŽŶƐĂŶĚƚŚŝƐǁŽƌŬ
ƉƌŽŐƌĂŵ͘/ƚŝƐĂŶƚŝĐŝƉĂƚĞĚƚŚĂƚƚŚĞĨŝƌƐƚ
ƉƌĞƐĞŶƚĂƚŝŽŶƐǁŝůůĨŽĐƵƐŽŶƚŚĞĨŽůůŽǁŝŶŐ͗
o dŚĞĂůŝĨŽƌŶŝĂŶǀŝƌŽŶŵĞŶƚĂů
YƵĂůŝƚLJĐƚƉƌŽĐĞƐƐĂŶĚĨŝŶĚŝŶŐƐ
ĂŶƚŝĐŝƉĂƚĞĚƚŽďĞƐĞĞŶďLJƚŚĞ
WůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶ͘
o dŝƚůĞϭϵŽĨƚŚĞĂƌůƐďĂĚDƵŶŝĐŝƉĂů
ŽĚĞ͘
dŽĚĂƚĞƚŚĞƌĞŚĂǀĞďĞĞŶƚŚƌĞĞƉƌĞƐĞŶƚĂƚŝŽŶƐ
ƚŽƚŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶŽŶŝŶĨŽƌŵĂƚŝŽŶĂů
ŝƚĞŵƐ͘ŶŽǀĞƌǀŝĞǁŽĨƚŚĞĂůŝĨŽƌŶŝĂ
ŶǀŝƌŽŶŵĞŶƚĂůYƵĂůŝƚLJĐƚŝŶƵŐƵƐƚϮϬϮϱ͕ĂŶ
ŽǀĞƌǀŝĞǁŽĨsĞŚŝĐůĞDŝůĞƐdƌĂǀĞůůĞĚŝŶ
EŽǀĞŵďĞƌϮϬϮϱ͕ĂŶĚĂŶŽǀĞƌǀŝĞǁŽĨƚŚĞ
dƌŝďĂů͕ƵůƚƵƌĂů͕ĂŶĚWĂůĞŽŶƚŽůŽŐŝĐĂůƌĞƐŽƵƌĐĞƐ
ŝŶDĂƌĐŚϮϬϮϲ͘ĚĚŝƚŝŽŶĂůƉƌĞƐĞŶƚĂƚŝŽŶƐǁŝůů
ĐŽŶƚŝŶƵĞƚŽďĞƐĐŚĞĚƵůĞĚ͘
dŚŝƐŝƚĞŵŝƐƌĞƚĂŝŶĞĚŝŶƚŚĞ&ŝƐĐĂůzĞĂƌ
ϮϬϮϲͲϮϳtŽƌŬWƌŽŐƌĂŵ͘
,ĂǀĞŽŶĞŽƌƚǁŽŵĞŵďĞƌƐĂƚƚĞŶĚƚŚĞ>ĞĂŐƵĞ
ŽĨŝƚŝĞƐĂůŝĨŽƌŶŝĂŽŶĨĞƌĞŶĐĞZĞĐĞŝǀĞ
hƉĚĂƚĞƐŽŶEĞǁ^ƚĂƚĞ>ĂǁƐĂŶĚŝƚLJŽƵŶĐŝů
ĐƚŝŽŶƐĂƉƉůŝĐĂďůĞƚŽƚŚĞĐŽŵŵŝƐƐŝŽŶ
dŚƌĞĞŽŵŵŝƐƐŝŽŶĞƌƐĂƚƚĞŶĚĞĚƚŚĞDĂƌĐŚ
ϮϬϮϲWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶĞƌƐĐĂĚĞŵLJ͘
ŽŵŵŝƐƐŝŽŶĞƌƐǁĞƌĞďƌŽƵŐŚƚƵƉƚŽĚĂƚĞŽŶ
ƌĞĐĞŶƚƌĞŐƵůĂƚŽƌLJΘůĞŐŝƐůĂƚŝǀĞĐŚĂŶŐĞƐĂŶĚ
ƌĞĐĞŝǀĞĚŐƵŝĚĂŶĐĞĂŶĚƚŽŽůƐƚŽĂƐƐŝƐƚƚŚĞŵŝŶ
ƚŚĞŝƌƌŽůĞ͘
dŚŝƐŝƚĞŵŝƐƌĞƚĂŝŶĞĚŝŶƚŚĞ&ŝƐĐĂůzĞĂƌ
ϮϬϮϲͲϮϳtŽƌŬWƌŽŐƌĂŵ͘
DĞŵďĞƌƐŽĨƚŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶƐĞƌǀĞ
ŽŶƚŚĞĨŽůůŽǁŝŶŐĐŽŵŵŝƚƚĞĞƐ͗
x ŐƌŝĐƵůƚƵƌĂůŽŶǀĞƌƐŝŽŶDŝƚŝŐĂƚŝŽŶ&ĞĞ
ĚǀŝƐŽƌLJŽŵŵŝƚƚĞĞ
x ,ŝƐƚŽƌŝĐWƌĞƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶdžͲ
KĨĨŝĐŝŽDĞŵďĞƌ
dŚŝƐŽďũĞĐƚŝǀĞĐŽŶƚŝŶƵĞƐƚŽďĞŵĞƚ͘dŚŝƐŝƚĞŵŝƐƌĞƚĂŝŶĞĚŝŶƚŚĞ&ŝƐĐĂůzĞĂƌ
ϮϬϮϲͲϮϳtŽƌŬWƌŽŐƌĂŵ͘
Other/Misc. Accomplishments
^ƉĞĐŝĂůƉƌŽũĞĐƚƐdŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶĂƉƉƌŽǀĞĚƐĞǀĞƌĂů
ŝƚĞŵƐĚƵƌŝŶŐƚŚĞ&ŝƐĐĂůzĞĂƌƚŚĂƚǁĞƌĞŶŽƚŽŶ
ƚŚĞǁŽƌŬƉƌŽŐƌĂŵ͕ŝŶĐůƵĚŝŶŐ͗
Eͬ
April 15, 2026 Item #2 13 of 18
'K>ͬd^<^ddh^KDDEd^ͬZKDDEd/KE
x ŽĂƐƚůŝŶĞŚƵƌĐŚŵĞŶĚŵĞŶƚƚŽŽƌŝŐŝŶĂů
ĞdžƉĂŶƐŝŽŶƉůĂŶƐ
x ^ŽĂů'ĂƐŽ͘ŵĞŶĚŵĞŶƚƚŽWŝƉĞZĞƉĂŝƌƐ
x ůǀĚĞĂĐŚŽŵŵĞƌĐŝĂů͕ƐƉĞĐŝĂůĞǀĞŶƚ
ǀĞŶƵĞ
x ĂƌŽŶ͛ƐŵĂƌŬĞƚ
x ϮϬϮϱhŽŶĞŽĚĞŵĞŶĚŵĞŶƚ
x ŽƐƚĐŽ&ƵĞůdžƉĂŶƐŝŽŶWƌŽũĞĐƚ
x ǀĞ͘ŶĐŝŶĂƐŽĂƐƚĂůZĂŝůdƌĂŝů
/ŵƉƌŽǀĞŵĞŶƚƐ
x ůĂŵŝŶŽZĞĂůƌŽĂĚǁŝĚĞŶŝŶŐĨƌŽŵƌĞŶĂů
ZĚ͘ĂŶĚ>ĂŽƐƚĂǀĞ͘
x ϮϬϮϲƌĂŝŶĂŐĞDĂƐƚĞƌWůĂŶ
ƉƉƌŽǀĞĚŚŽƵƐŝŶŐƉƌŽũĞĐƚŽƌƌĞŵŽĚĞůƐ͘dŚĞWůĂŶŶŝŶŐŽŵŵŝƐƐŝŽŶĂƉƉƌŽǀĞĚƐĞǀĞƌĂů
ŚŽƵƐŝŶŐƉƌŽũĞĐƚƐĚƵƌŝŶŐƚŚĞ&ŝƐĐĂůzĞĂƌƚŚĂƚ
ǁĞƌĞŶŽƚŽŶƚŚĞǁŽƌŬƉƌŽŐƌĂŵ͗
x zĂŵĂŶĂŬĂZĞƐŝĚĞŶĐĞ
x /ŶŶƐŽĨŵĞƌŝĐĂŵĞŶĚŵĞŶƚ͕ϵϴƵŶŝƚƐ
x &ŽƌƌĞƐƚZĞƐŝĚĞŶĐĞ
x ĂƌůƐďĂĚƐƚĂƚĞƐ͕>ŽƚƐϭͲϯ
x >ĂŐƵŶĂsŝĚĂ
x :ĞĨĨĞƌƐŽŶ^ƚ͘,ŽŵĞƐ
x hŵĞŶĚŵĞŶƚ
x ZĞƐŽƌƚsŝĞǁƉĂƌƚŵĞŶƚƐ
x ZŝŶĐŽŶZŽŽƐĞǀĞůƚ
x dŽůůƌŽƚŚĞƌƐ'ĞŶĞƌĂůWůĂŶŵĞŶĚŵĞŶƚ
;ZĞĐŽŵŵĞŶĚĞĚĂƉƉƌŽǀĂůƚŽĐŽŶƚŝŶƵĞ
ƉƌŽĐĞƐƐŝŶŐͿ
ƉƉƌŽǀŝŶŐŚŽƵƐŝŶŐĚĞǀĞůŽƉŵĞŶƚ
ƉƌŽũĞĐƚƐŚĞůƉƐŝŵƉůĞŵĞŶƚĂŶƵŵďĞƌ
ŽĨ'ĞŶĞƌĂůWůĂŶƉŽůŝĐŝĞƐĂŶĚŐŽĂůƐ
ƌĞůĂƚĞĚƚŽĂĚĚƌĞƐƐŝŶŐƚŚĞŚŽƵƐŝŶŐ
ƐŚŽƌƚĂŐĞĂŶĚŝŵƉƌŽǀŝŶŐůŽĐĂů
ĞĐŽŶŽŵŝĐĐŽŶĚŝƚŝŽŶƐ͘
April 15, 2026 Item #2 14 of 18
Attachment B
City of Carlsbad
Planning Commission Work Plan
Fiscal Year 2026-2027
I.Mission Statement
The Planning Commission holds regularly scheduled public hearings to consider land use
matters, such as the general plan, local coastal program, growth management program, specific
plans, master plans, amendments to the zoning ordinance, zone changes, special studies, and
discretionary development permits for public and private projects.
For some actions, the Planning Commission acts in an advisory role and provides a
recommendation to the City Council. In many cases the City Council has delegated to the
Planning Commission the authority to take a final action on the item subject to appeal to the
City Council. Prior to an item being considered by the Planning Commission the Planning
Division staff complete its review of a proposed project for compliance with all applicable plans,
policies, and laws and provides a written recommendation.
Planning Commissioners also serve on special committees or task forces as requested by the
City Council.
II.Composition
The Planning Commission consists of seven members appointed by the City Council to a four-
year term. There are also three ex officio members who shall be the City Planner, Assistant City
Attorney, and City Engineer.
III.FY 2026-2027 Goals & Tasks
The City of Carlsbad Planning Commission has selected to focus on the following goals and
tasks; covering the period from July 1, 2026, through June 30, 2027. The tasks are divided into
the categories of Advance Planning & Special Projects, Current Planning Projects, and
Training/City Representation:
Advance Planning & Special Projects
x Workshop and Recommendations on amendments to City Council Policy No. 64
(Wireless Facilities)
x Zoning Ordinance 2026 Clean-Up Amendment
x Tribal, Cultural, Paleontological Resources Guidelines Update
x Review and act on permits requested for city capital improvement projects. Major
projects expected to be considered by the commission include:
April 15, 2026 Item #2 15 of 18
o Tamarack Maintenance Yard
o Robertson Ranch Park
o Merwin Drive Stormdrain Improvements
o Orion Center Maintenance and Administrative Facilities
Current Planning Projects
x Review and act on permits requested for private development projects. Major projects
expected to be considered by the commission include:
o Newage Carlsbad Luxury Resort
o The Dewhurst
o Fairfield Apartment Homes at Bressi
o San Diego Gas & Electric Construction and Operations Site Realignment
Training and City Operations
x The Planning Division will work with the Planning Commission to meet one to two times
each month for efficient and productive meetings
x Receive quarterly informational and training presentations related to Planning
Commission operations and this work program.
x Have one or two members attend the League of Cities California Conference Receive
Updates on New State Laws and City Council Actions applicable to the commission
o Members of the Planning Commission serve on the Historic Preservation
Commission Ex-Officio Member
April 15, 2026 Item #2 16 of 18
Exhibit 2
City Council Staff Report June 10, 2025
(On file in the Planning Division.)
April 15, 2026 Item #2 17 of 18
Exhibit 3
City Council Minutes, June 10, 2025
(On file in the Planning Division.)
April 15, 2026 Item #2 18 of 18