HomeMy WebLinkAboutCDP 2023-0011; TIMM RESIDENCE; STORM WATER QUALITY MANAGEMENT PLAN - SWQMP; 2023-12-07 CITY OF CARLSBAD PRIORITY DEVELOPMENT PROJECT (PDP) STORM WATER QUALITY MANAGEMENT PLAN (SWQMP) FOR TIMM RESIDENCE CDP2023-0011 (DWG ___- ) GR No. ___ ENGINEER OF WORK: WILLIAM G. MACK P.E. 73620 PREPARED FOR: JENS PETER TIMM 314 DATE AVENUE CARLSBAD, CA 92008 949.278.2716 PREPARED BY: 1911 SAN DIEGO AVENUE, SUITE 100 SAN DIEGO, CA 92110 (858) 259-8212 DATE: DECEMBER 7, 2023 TABLE OF CONTENTS Certification Page Project Vicinity Map FORM E-34 Storm Water Standard Questionnaire Site Information FORM E-36 Standard Project Requirement Checklist Summary of PDP Structural BMPs Attachment 1: Backup for PDP Pollutant Control BMPs Attachment 1a: DMA Exhibit Attachment 1b: Tabular Summary of DMAs and Design Capture Volume Calculations Attachment 1c: Harvest and Use Feasibility Screening (when applicable) Attachment 1d: Infiltration Feasibility Analysis (when applicable) Attachment 1e: Pollutant Control BMP Design Worksheets / Calculations Attachment 1f: Trash Capture BMP Requirements Attachment 2: Backup for PDP Hydromodification Control Measures Attachment 2a: Hydromodification Management Exhibit Attachment 2b: Management of Critical Coarse Sediment Yield Areas Attachment 2c: Geomorphic Assessment of Receiving Channels Attachment 2d: Flow Control Facility Design Attachment 3: Structural BMP Maintenance Thresholds and Actions Attachment 4: Single Sheet BMP (SSBMP) Exhibit Attachment 5: Geotechnical Report CERTIFICATION PAGE Project Name: Timm Residence Project ID: CDP2023-0011 I hereby declare that I am the Engineer in Responsible Charge of design of storm water BMPs for this project, and that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with the requirements of the BMP Design Manual, which is based on the requirements of SDRWQCB Order No. R9-2013-0001 (MS4 Permit) or the current Order. I have read and understand that the City Engineer has adopted minimum requirements for managing urban runoff, including storm water, from land development activities, as described in the BMP Design Manual. I certify that this SWQMP has been completed to the best of my ability and accurately reflects the project being proposed and the applicable source control and site design BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the plan check review of this SWQMP by the City Engineer is confined to a review and does not relieve me, as the Engineer in Responsible Charge of design of storm water BMPs for this project, of my responsibilities for project design. P.E. 73620 Exp. 12/31/2025 Engineer of Work's Signature, PE Number & Expiration Date William G. Mack Print Name Pasco Laret Suiter & Associates Company Date PROJECT VICINITY MAP SITE INFORMATION CHECKLIST Project Summary Information Project Name Timm Residence Project ID CDP2023-0011 Project Address 314 Date Avenue Carlsbad, CA 92008 Assessor's Parcel Number(s) (APN(s)) 206-080-24 Project Watershed (Hydrologic Unit) Carlsbad 904 Parcel Area 0.46 Acres (20,153 Square Feet) Existing Impervious Area (subset of Parcel Area) 0.10 Acres (4,172 Square Feet) Area to be disturbed by the project (Project Area) 0.46 Acres (20,153 Square Feet) Project Proposed Impervious Area (subset of Project Area) 0.33 Acres (14,585 Square Feet) Project Proposed Pervious Area (subset of Project Area) 0.13 Acres (5,568 Square Feet) Note: Proposed Impervious Area + Proposed Pervious Area = Area to be Disturbed by the Project. This may be less than the Parcel Area. STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 442-339-2750 www.carlsbadca.gov To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to ‘STANDARD PROJECT’ requirements, “PRIORITY DEVELOPMENT PROJECT (PDP) requirements or not considered a development project. This questionnaire will also determine if the project is subject to TRASH CAPTURE REQUIREMENTS. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME: APN: ADDRESS: The project is (check one): New Development Redevelopment The total proposed disturbed area is: ft2 ( ) acres The total proposed newly created and/or replaced impervious area is: ft2 ( ) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID SWQMP #: Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. This Box for City Use Only City Concurrence: YES NO Date: Project ID: By: E-34 Page 1 of 4 REV 08/22 INSTRUCTIONS: E-34 Page 2 of 4 REV 08/22 STEP 1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a “development project”, please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered “yes” to the above question, provide justification below then go to Step 6, mark the box stating “my project is not a ‘development project’ and not subject to the requirements of the BMP manual” and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): If you answered “no” to the above question, the project is a ‘development project’, go to Step 2. STEP 2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; OR b) Designed and constructed to be hydraulically disconnected from paved streets or roads; OR c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? If you answered “yes” to one or more of the above questions, provide discussion/justification below, then go to Step 6, mark the second box stating “my project is EXEMPT from PDP …” and complete applicant information. Discussion to justify exemption (e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered “no” to the above questions, your project is not exempt from PDP, go to Step 3. E-34 Page 3 of 4 REV 08/22 STEP 3 TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1)): YES NO 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious street, road, highway, freeway or driveway surface collectively over the entire project site? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? “Discharging Directly to” includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).* 8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes RGO’s that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11. Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC 21.203.040) If you answered “yes” to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, complete the trash capture question. If you answered “no” to all of the above questions, your project is a ‘STANDARD PROJECT’. Go to step 5, complete the trash capture question. * Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. E-34 Page 4 of 4 REV 08/22 STEP 4 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = sq. ft. Total proposed newly created or replaced impervious area (B) = sq. ft. Percent impervious area created or replaced (B/A)*100 = % If you answered “yes”, the structural BMPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, complete the trash capture question. If you answered “no,” the structural BMP’s required for PDP apply to the entire development. Go to step 5, complete the trash capture question. STEP 5 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS Complete the question below regarding your Project (SDRWQCB Order No. 2017-0077): YES NO Is the Project within any of the following Priority Land Use (PLU) categories and not exempt from trash capture requirements per section 4.4.2.2 of the BMP Manual? R-23 (15-23 du/ac), R-30 (23-30 du/ac), PI (Planned Industrial), CF (Community Facilities), GC (General Commercial), L (Local Shopping Center), R (Regional Commercial), V-B (Village-Barrio), VC (Visitor Commercial), O (Office), VC/OS (Visitor Commercial/Open Space), PI/O (Planned Industrial/Office), or Public Transportation Station If you answered “yes”, the ‘PROJECT’ is subject to TRASH CAPTURE REQUIREMENTS. Go to step 6, check the first box stating, “My project is subject to TRASH CAPTURE REQUIREMENTS …” and the second or third box as determined in step 3. If you answered “no”, Go to step 6, check the second or third box as determined in step 3. List exemption if applicable for ‘no’ answer here: STEP 6 CHECK THE APPROPRIATE BOX(ES) AND COMPLETE APPLICANT INFORMATION My project is subject to TRASH CAPTURE REQUIREMENTS and must comply with TRASH CAPTURE REQUIREMENTS of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP). My project is a ‘STANDARD PROJECT’ OR EXEMPT from PDP and must only comply with ‘STANDARD PROJECT’ stormwater requirements of the BMP Manual. I will submit a “Standard Project Requirement Checklist Form E-36”. If my project is subject to TRASH CAPTURE REQUIREMENTS, I will submit a TRASH CAPTURE Storm Water Quality Management Plan (TCSWQMP) per E-35A. My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) per E-35 template for submittal at time of application. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if ‘STANDARD PROJECT’ stormwater requirements apply. My project is NOT a ‘development project’ and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Applicant Name: Applicant Title: Applicant Signature: Date: Description of Existing Site Condition and Drainage Patterns Current Status of the Site (select all that apply):  Existing development Previously graded but not built out Agricultural or other non-impervious use Vacant, undeveloped/natural Description / Additional Information: Existing single-family residence Existing Land Cover Includes (select all that apply):  Vegetative Cover Non-Vegetated Pervious Areas  Impervious Areas Description / Additional Information: Underlying Soil belongs to Hydrologic Soil Group (select all that apply): NRCS Type A NRCS Type B  NRCS Type C NRCS Type D Approximate Depth to Groundwater (GW): GW Depth < 5 feet 5 feet < GW Depth < 10 feet 10 feet < GW Depth < 20 feet GW Depth > 20 feet Existing Natural Hydrologic Features (select all that apply): Watercourses Seeps Springs Wetlands  None Description / Additional Information: Description of Existing Site Topography and Drainage [How is storm water runoff conveyed from the site? At a minimum, this description should answer (1) whether existing drainage conveyance is natural or urban; (2) describe existing constructed storm water conveyance systems, if applicable; and (3) is runoff from offsite conveyed through the site? if so, describe]: The 0.46-acre project site is moderately sloped, and sheets flows drainage in a north easterly direction towards the adjacent property and away from Date Avenue. Runoff flows across the adjacent lots to the northeast direction and toward the railroad tracks. Storm water then collects and is conveyed in the PCC ditch in a southeasterly direction before it is picked up by a storm drain inlet. The storm water ultimately discharges to the Agua Hedionda Lagoon. The existing single-family dwelling roof drains to the ground which sheet flows across the site and then outlets at the northeast corner of the site. There is no offsite runoff conveyed through this site. Description of Proposed Site Development and Drainage Patterns Project Description / Proposed Land Use and/or Activities: New single-family residence, pool cabana (unit 2), and studio (unit 3) List/describe proposed impervious features of the project (e.g., buildings, roadways, parking lots, courtyards, athletic courts, other impervious features): Buildings, courtyards, driveways List/describe proposed pervious features of the project (e.g., landscape areas): Landscape areas Does the project include grading and changes to site topography?  Yes No Description / Additional Information: Grading associated with the construction of a new single-family residence, pool cabana (unit 2), studio (unit 3), driveway, and biofiltration basins Does the project include changes to site drainage (e.g., installation of new storm water conveyance systems)?  Yes No Description / Additional Information: New private storm drain system, storm water biofiltration basins, and infiltration dry wells. Identify whether any of the following features, activities, and/or pollutant source areas will be present (select all that apply):  On-site storm drain inlets Interior floor drains and elevator shaft sump pumps Interior parking garages Need for future indoor & structural pest control  Landscape/Outdoor Pesticide Use  Pools, spas, ponds, decorative fountains, and other water features Food service Refuse areas Industrial processes Outdoor storage of equipment or materials Vehicle and Equipment Cleaning Vehicle/Equipment Repair and Maintenance Fuel Dispensing Areas Loading Docks Fire Sprinkler Test Water Miscellaneous Drain or Wash Water Plazas, sidewalks, and parking lots Identification of Receiving Water Pollutants of Concern Describe path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable): Runoff flows across the adjacent lots to the northeast direction and toward the railroad tracks. Storm water then collects and is conveyed in the PCC ditch in a southeasterly direction before it is picked up by a storm drain inlet. The storm water ultimately discharges to the Agua Hedionda Lagoon, which then outlets to the Pacific Ocean. List any 303(d) impaired water bodies within the path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable), identify the pollutant(s)/stressor(s) causing impairment, and identify any TMDLs for the impaired water bodies: 303(d) Impaired Water Body Pollutant(s)/Stressor(s) TMDLs Agua Hedionda Creek Bethnic Community Effects, Bifenthrin, Chlorpyrifos, Cypermethrin, Indicator Bacteria, Malathion, Manganese, Nitrogen, Phosphorus, Selenium, Total Dissolved Solids, Toxicity Agua Hedionda Lagoon Toxicity Pacific Ocean Shoreline, Los Monos HAS, Carlsbad State Beach at Tamarack Ave Trash Identification of Project Site Pollutants Identify pollutants anticipated from the project site based on all proposed use(s) of the site (see Table B.6-1 below): Pollutant Not Applicable to the Project Site Anticipated from the Project Site Also a Receiving Water Pollutant of Concern Sediment X Nutrients X Heavy Metals X Organic Compounds X Trash & Debris X Oxygen Demanding Substances X Oil & Grease X Bacteria & Viruses X Pesticides X TABLE B.6-1: Anticipated and Potential Pollutants Generated by Land Use Type Priority Project Categories General Pollutant Categories Sediment Nutrients Heavy Metals Organic Compounds Trash & Debris Oxygen Demanding Substances Oil & Grease Bacteria & Viruses Pesticides Detached Residential Development X X X X X X X Attached Residential Development X X X P(1) P(2) P X Commercial Development >one acre P(1) P(1) X P(2) X P(5) X P(3) P(5) Heavy Industry X X X X X X Automotive Repair Shops X X(4)(5) X X Restaurants X X X X P(1) Hillside Development >5,000 ft2 X X X X X X Parking Lots P(1) P(1) X X P(1) X P(1) Retail Gasoline Outlets X X X X X Streets, Highways & Freeways X P(1) X X(4) X P(5) X X P(1) X = anticipated P = potential (1) A potential pollutant if landscaping exists onsite. (2) A potential pollutant if the project includes uncovered parking areas. (3) A potential pollutant if land use involves food or animal waste products. (4) Including petroleum hydrocarbons. (5) Including solvents. Trash Capture BMP Requirements The project must meet the following Trash Capture BMP Requirements (see Section 4.4 of the BMP Design Manual): 1) The trash capture BMP is sized for a one-year, one-hour storm event or equivalent storm drain system, and 2) the trash capture BMP captures trash equal or greater to 5mm. Description / Discussion of Trash Capture BMPs: Not Applicable per form E-34 Hydromodification Management Requirements Do hydromodification management requirements apply (see Section 1.6 of the BMP Design Manual)? Yes, hydromodification management flow control structural BMPs required. No, the project will discharge runoff directly to existing underground storm drains discharging directly to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. No, the project will discharge runoff directly to conveyance channels whose bed and bank are concrete-lined all the way from the point of discharge to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. No, the project will discharge runoff directly to an area identified as appropriate for an exemption by the WMAA for the watershed in which the project resides. Description / Additional Information (to be provided if a 'No' answer has been selected above): Critical Coarse Sediment Yield Areas* *This Section only required if hydromodification management requirements apply Based on the maps provided within the WMAA, do potential critical coarse sediment yield areas exist within the project drainage boundaries? Yes No, no critical coarse sediment yield areas to be protected based on WMAA maps If yes, have any of the optional analyses presented in Appendix H of the manual been performed? H.6.1 Site-Specific GLU Analysis H.7 Downstream Systems Sensitivity to Coarse Sediment H.7.3 Coarse Sediment Source Area Verification No optional analyses performed, the project will avoid critical coarse sediment yield areas identified based on WMAA maps If optional analyses were performed, what is the final result? No critical coarse sediment yield areas to be protected based on verification of GLUs onsite. Critical coarse sediment yield areas exist but additional analysis has determined that protection is not required. Documentation attached in Attachment 8 of the SWQMP. Critical coarse sediment yield areas exist and require protection. The project will implement management measures described in Sections H.2, H.3, and H.4 as applicable, and the areas are identified on the SWQMP Exhibit. Discussion / Additional Information: Flow Control for Post-Project Runoff* *This Section only required if hydromodification management requirements apply List and describe point(s) of compliance (POCs) for flow control for hydromodification management (see Section 6.3.1). For each POC, provide a POC identification name or number correlating to the project's HMP Exhibit and a receiving channel identification name or number correlating to the project's HMP Exhibit. Runoff from the project discharges at a point of compliance at the project boundary. The POC for flow control analysis will be analyzed at the point of discharge from the site. Has a geomorphic assessment been performed for the receiving channel(s)? No, the low flow threshold is 0.1Q2 (default low flow threshold) Yes, the result is the low flow threshold is 0.1Q2 Yes, the result is the low flow threshold is 0.3Q2 Yes, the result is the low flow threshold is 0.5Q2 If a geomorphic assessment has been performed, provide title, date, and preparer: Discussion / Additional Information: (optional) Other Site Requirements and Constraints When applicable, list other site requirements or constraints that will influence storm water management design, such as zoning requirements including setbacks and open space, or City codes governing minimum street width, sidewalk construction, allowable pavement types, and drainage requirements. Optional Additional Information or Continuation of Previous Sections As Needed This space provided for additional information or continuation of information from previous sections as needed. E-36 Page 1 of 4 Revised 02/22 Development Services Land Development Engineering 1635 Faraday Avenue 442-339-2750 www.carlsbadca.gov STANDARD PROJECT REQUIREMENT CHECKLIST E-36 Project Information Project Name: Project ID: DWG No. or Building Permit No.: Baseline BMPs for Existing and Proposed Site Features Complete the Table 1 - Site Design Requirement to document existing and proposed site features and the BMPs to be implemented for them. All BMPs must be implemented where applicable and feasible. Applicability is generally assumed if a feature exists or is proposed. BMPs must be implemented for site design features where feasible. Leaving the box for a BMP unchecked means it will not be implemented (either partially or fully) either because it is inapplicable or infeasible. Explanations must be provided in the area below. The table provides specific instructions on when explanations are required. Table 1 - Site Design Requirement A. Existing Natural Site Features (see Fact Sheet BL-1) 1. Check the boxes below for each existing feature on the site. 1. Select the BMPs to be implemented for each identified feature. Explain why any BMP not selected is infeasible in the area below. SD-G Conserve natural features SD-H Provide buffers around waterbodies Natural waterbodies Natural storage reservoirs & drainage corridors -- Natural areas, soils, & vegetation (incl. trees) -- B. BMPs for Common Impervious Outdoor Site Features (see Fact Sheet BL-2) 1. Check the boxes below for each proposed feature. 2. Select the BMPs to be implemented for each proposed feature. If neither BMP SD-B nor SD-I is selected for a feature, explain why both BMPs are infeasible in the area below. SD-B Direct runoff to pervious areas SD-I Construct surfaces from permeable materials Minimize size of impervious areas Streets and roads Check this box to confirm that all impervious areas on the site will be minimized where feasible. If this box is not checked, identify the surfaces that cannot be minimized in area below, and explain why it is Sidewalks & walkways Parking areas & lots Driveways Patios, decks, & courtyards Hardcourt recreation areas E-36 Page 2 of 4 Revised 02/22 Other: _______________ infeasible to do so. C. BMPs for Rooftop Areas: Check this box if rooftop areas are proposed and select at least one BMP below. If no BMPs are selected, explain why they are infeasible in the area below. (see Fact Sheet BL-3) SD-B Direct runoff to pervious areas SD-C Install green roofs SD-E Install rain barrels D. BMPs for Landscaped Areas: Check this box if landscaping is proposed and select the BMP below SD-K Sustainable Landscaping If SD-K is not selected, explain why it is infeasible in the area below. (see Fact Sheet BL-4) Provide discussion/justification for site design BMPs that will not be implemented (either partially or fully): Baseline BMPs for Pollutant-generating Sources All development projects must complete Table 2 - Source Control Requirement to identify applicable requirements for documenting pollutant-generating sources/ features and source control BMPs. BMPs must be implemented for source control features where feasible. Leaving the box for a BMP unchecked means it will not be implemented (either partially or fully) either because it is inapplicable or infeasible. Explanations must be provided in the area below. The table provides specific instructions on when explanations are required. Table 2 - Source Control Requirement A. Management of Storm Water Discharges 1. Identify all proposed outdoor work areas below Check here if none are proposed 2. Which BMPs will be used to prevent materials from contacting rainfall or runoff? (See Fact Sheet BL-5) Select all feasible BMPs for each work area 3. Where will runoff from the work area be routed? (See Fact Sheet BL-6) Select one or more option for each work area SC-A Overhead covering SC-B Separation flows from adjacent areas SC-C Wind protection SC-D Sanitary sewer SC-E Containment system Other Trash & Refuse Storage Materials & Equipment Storage E-36 Page 3 of 4 Revised 02/22 Loading & Unloading Fueling Maintenance & Repair Vehicle & Equipment Cleaning Other: _________________ B. Management of Storm Water Discharges (see Fact Sheet BL-7) Select one option for each feature below: • Storm drain inlets and catch basins … are not proposed will be labeled with stenciling or signage to discourage dumping (SC-F) • Interior work surfaces, floor drains & sumps … are not proposed will not discharge directly or indirectly to the MS4 or receiving waters • Drain lines (e.g. air conditioning, boiler, etc.) … are not proposed will not discharge directly or indirectly to the MS4 or receiving waters • Fire sprinkler test water … are not proposed will not discharge directly or indirectly to the MS4 or receiving waters Provide discussion/justification for source control BMPs that will not be implemented (either partially or fully): E-36 Page 4 of 4 Revised 02/22 Form Certification This E-36 Form is intended to comply with applicable requirements of the city’s BMP Design Manual. I certify that it has been completed to the best of my ability and accurately reflects the project being proposed and the applicable BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the review of this form by City staff is confined to a review and does not relieve me as the person in charge of overseeing the selection and design of storm water BMPs for this project, of my responsibilities for project design. Preparer Signature: Date: Print preparer name: SUMMARY OF PDP STRUCTURAL BMPS PDP Structural BMPs All PDPs must implement structural BMPs for storm water pollutant control (see Chapter 5 of the BMP Design Manual). Selection of PDP structural BMPs for storm water pollutant control must be based on the selection process described in Chapter 5. PDPs subject to hydromodification management requirements must also implement structural BMPs for flow control for hydromodification management (see Chapter 6 of the BMP Design Manual). Both storm water pollutant control and flow control for hydromodification management can be achieved within the same structural BMP(s). PDP structural BMPs must be verified by the City at the completion of construction. This may include requiring the project owner or project owner's representative to certify construction of the structural BMPs (see Section 1.12 of the BMP Design Manual). PDP structural BMPs must be maintained into perpetuity, and the City must confirm the maintenance (see Section 7 of the BMP Design Manual). Use this form to provide narrative description of the general strategy for structural BMP implementation at the project site in the box below. Then complete the PDP structural BMP summary information sheet for each structural BMP within the project (copy the BMP summary information page as many times as needed to provide summary information for each individual structural BMP). Describe the general strategy for structural BMP implementation at the site. This information must describe how the steps for selecting and designing storm water pollutant control BMPs presented in Section 5.1 of the BMP Design Manual were followed, and the results (type of BMPs selected). For projects requiring hydromodification flow control BMPs, indicate whether pollutant control and flow control BMPs are integrated together or separate. For the purpose of this report, the proposed site condition has been divided into five (5) Drainage Management Areas (DMAs) all of which ultimately discharge as sheet flow through a riprap energy dissipation area in the northeast corner of the site (POC-1). DMA 1 is draining to Biofiltration BMP 1 and then gravity draining via storm drain to POC-1, DMA-2 is draining to Biofiltration BMP 2 and then gravity draining via storm drain to POC-1, DMA-3 is draining to Biofiltration BMP 3 and then gravity draining via storm drain to POC-1, DMA-4 is draining to a series of one (1) pre-treatment BMP-4 into two (2) Infiltration Dry-Wells BMP-5 into a Pipe Storage Tank with an HMP orifice BMP-6, and then will be pumped to POC-1. DMA-5 is a self- mitigating DMA and consists of only landscaped areas that drains directly offsite and meets all characteristics listed in section 5.2.1 of the Carlsbad BMP Design Manual. The DMAs have been delineated based on onsite drainage patterns and proposed BMP locations. The type of structural BMP chosen for the project was based on the flow chart presented in Figures 5-1 and 5-2 of the City of Carlsbad BMP Design Manual. Using Form K-7 to gauge the feasibility of implementing capture and use techniques for the project site, it was determined that Harvest and Use BMPs are considered infeasible. After determining Harvest and Use BMPs are infeasible, the infiltration feasibility analysis was performed by Engineering Design Group and is included in their “Preliminary Geotechnical Investigation and Recommendations Report 226818- 1” included as attachment 1D in this report. Infiltration was considered feasible for BMP 4 – Infiltration Drywells and an infiltration rate of 0.125 in/hr was recommended in the Geotechnical Investigation Report Appendix E. Biofiltration BMPs 1, 2, & 3 were considered “Restricted” for infiltration per Table B.2-1 which is included in attachment 1D of this report. The Biofiltration BMPs 1, 2, and 3 have been adequately sized to treat and retain the required DCV for their respective DMAs. Each biofiltration BMP has been designed with restrictor plates on the outlet of the detention structure to restrict post-project flows to meet Hydromodification Management criteria. Each detention outlet control structure also has an overflow riser built into it. DMA 4 is designed to drain to a series of BMPs to handle all water quantity, quality, and hydromodification requirements. The entire DMA will be routed via sheet flow and curb inlets to a landscaped area. From there it is routed via storm drain to a pre-treatment BMP-4, which is responsible for mitigating debris, sediment, and hydrocarbons from stormwater runoff. Silt and heavy particles will settle at the bottom and then the system is drained as water rises under the debris shield and spills into the top of the overflow pipe, conveying clean water to the dry well vertical pits. The type of pre-treatment BMP is a CDS hydrodynamic separator, manufactured by Contech. The CDS unit has a certification for “pre-treatment” based on 50 percent removal of TSS, which provides moderate levels of pre-treatment according to the Washington State Technology Acceptance Protocol-Ecology (TAPE). The CDS unit is considered an “offline BMP”. The diversion flow rate for the offline BMP has been sized to convey the maximum flow rate of runoff produced from a rainfall intensity of 0.2 inches per hour. See diversion flow rate calculations in Attachment 1e. The pre-treatment BMP-4 is routed via storm pipe to two (2) infiltration dry wells BMP-5, which are located beneath the driveway near the garage entrance for the Main residence. The drywells are responsible for handling water quality requirements for DMA-4. Each Drywell is 4-ft in diameter and has a total depth of 24 feet including a 2-foot cap depth/settling chamber at the top for overflow storage purposes. The bottom 22 feet of the dry wells have a 3’ diameter gravity-fed pit, lined with 4” thick concrete perforated casing, and is backfilled with gravel on the outside for a total diameter of 4 feet. The calculations for the Drywells total volumes, DCV drawdown times, and total infiltration surface areas are included in Attachment 1e. Flows will enter the drywells and infiltrate through the bottom and side walls of the facilities. The overflow outlets have been constructed at the bottom of the top 2-foot overflow chambers, such that peak flows can be safely discharged to the receiving Pipe Storage Tank with an HMP orifice (BMP-6). The downstream Pipe Storage Tank was adequately sized to handle water quantity and hydromodification requirements for DMA-4. The tank is located under the proposed driveway and is designed to be a 40-foot long, 42” diameter pipe. The end of the storage tank is designed with a restrictor plate on the outlet of the detention structure to restrict post-project flows to meet Hydromodification Management criteria. It also has an overflow weir for peak flow conditions. The controlled flow from the storage tank will then be routed to an underground stormwater pump station and a series of pumps that will be designed to adequately pump stormwater up to an above ground enclosed stormwater detention area with a similar HMP outlet orifice to the underground pipe storage tank BMP-6 to control the pumps flow rate out and will ultimately discharge into the riprap energy dissipation area or POC-1. The biofiltration, drywells, and pipe storage tank BMPs have been modeled using the Storm Water Management Model (SWMM) version 5.2. The model uses continuous model simulation to determine if the proposed HMP facilities are sufficient to meet current HMP requirements for the Q2 to Q10 return periods. Flow duration curves were generated to analyze the differences between pre-developed and post-project peak flow frequencies and durations at POC-1. Since a geomorphic channel assessment analysis has not been performed for the receiving water body, the receiving water body is assumed to have a high susceptibility to erosion. Therefore, the default 0.1 Q2 low-flow threshold was selected. As the flow duration curve (FDC) comparison demonstrates, the proposed flow control facilities mitigates post-project peak flow frequencies and durations at or below 110% of the pre- developed condition; therefore, the additional storm water generated by the site development will be detained and released at a rate that will not exceed the pre-developed peak flow frequencies and durations for the gynomorphically significant range of flows. The SWMM report for POC-1 is included in Attachment 2d of this report. Structural BMP Summary Information [Copy this page as needed to provide information for each individual proposed structural BMP] Structural BMP ID No. BMP-1 DWG Sheet No. Type of structural BMP: Retention by harvest and use (HU-1) Retention by infiltration basin (INF-1) Retention by bioretention (INF-2) Retention by permeable pavement (INF-3) Dry Wells (INF-4) Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) Proprietary Biofiltration (BF-3) Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) Detention pond or vault for hydromodification management Other (describe in discussion section below) Purpose: Pollutant control only Hydromodification control only Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP Other (describe in discussion section below) Discussion (as needed): Structural BMP Summary Information [Copy this page as needed to provide information for each individual proposed structural BMP] Structural BMP ID No. DWG Sheet No. Type of structural BMP: Retention by harvest and use (HU-1) Retention by infiltration basin (INF-1) Retention by bioretention (INF-2) Retention by permeable pavement (INF-3) Dry Wells (INF-4) Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) Proprietary Biofiltration (BF-3) Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) Detention pond or vault for hydromodification management Other (describe in discussion section below) Purpose: Pollutant control only Hydromodification control only Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP Other (describe in discussion section below) Discussion (as needed): Structural BMP Summary Information [Copy this page as needed to provide information for each individual proposed structural BMP] Structural BMP ID No. DWG Sheet No. Type of structural BMP: Retention by harvest and use (HU-1) Retention by infiltration basin (INF-1) Retention by bioretention (INF-2) Retention by permeable pavement (INF-3) Dry Wells (INF-4) Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) Proprietary Biofiltration (BF-3) Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) Detention pond or vault for hydromodification management Other (describe in discussion section below) Purpose: Pollutant control only Hydromodification control only Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP Other (describe in discussion section below) Discussion (as needed): Structural BMP Summary Information [Copy this page as needed to provide information for each individual proposed structural BMP] Structural BMP ID No. DWG Sheet No. Type of structural BMP: Retention by harvest and use (HU-1) Retention by infiltration basin (INF-1) Retention by bioretention (INF-2) Retention by permeable pavement (INF-3) Dry Wells (INF-4) Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) Proprietary Biofiltration (BF-3) Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) Detention pond or vault for hydromodification management Other (describe in discussion section below) Purpose: Pollutant control only Hydromodification control only Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP Other (describe in discussion section below) Discussion (as needed): Structural BMP Summary Information [Copy this page as needed to provide information for each individual proposed structural BMP] Structural BMP ID No. DWG Sheet No. Type of structural BMP: Retention by harvest and use (HU-1) Retention by infiltration basin (INF-1) Retention by bioretention (INF-2) Retention by permeable pavement (INF-3) Dry Wells (INF-4) Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) Proprietary Biofiltration (BF-3) Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) Detention pond or vault for hydromodification management Other (describe in discussion section below) Purpose: Pollutant control only Hydromodification control only Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP Other (describe in discussion section below) Discussion (as needed): Structural BMP Summary Information [Copy this page as needed to provide information for each individual proposed structural BMP] Structural BMP ID No. DWG Sheet No. Type of structural BMP: Retention by harvest and use (HU-1) Retention by infiltration basin (INF-1) Retention by bioretention (INF-2) Retention by permeable pavement (INF-3) Dry Wells (INF-4) Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) Proprietary Biofiltration (BF-3) Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) Detention pond or vault for hydromodification management Other (describe in discussion section below) Purpose: Pollutant control only Hydromodification control only Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP Other (describe in discussion section below) Discussion (as needed): ATTACHMENT 1 BACKUP FOR PDP POLLUTANT CONTROL BMPS This is the cover sheet for Attachment 1. Check which Items are Included behind this cover sheet: Attachment Sequence Contents Checklist Attachment 1a DMA Exhibit (Required) See DMA Exhibit Checklist on the back of this Attachment cover sheet. (24”x36” Exhibit typically required)  Included Attachment 1b Tabular Summary of DMAs Showing DMA ID matching DMA Exhibit, DMA Area, and DMA Type (Required)* *Provide table in this Attachment OR on DMA Exhibit in Attachment 1a  Included on DMA Exhibit in Attachment 1a Included as Attachment 1b, separate from DMA Exhibit Attachment 1c Form K-7, Harvest and Use Feasibility Screening Checklist (Required unless the entire project will use infiltration BMPs) Refer to Appendix B of the BMP Design Manual to complete Form K-7. Included Not included because the entire project will use infiltration BMPs Attachment 1d Infiltration Feasibility Analysis (Required unless the project will use harvest and use BMPs) Refer to Appendix D of the BMP Design Manual. Included Not included because the entire project will use harvest and use BMPs Attachment 1e Pollutant Control BMP Design Worksheets / Calculations (Required) Refer to Appendices B, E, and I of the BMP Design Manual for structural pollutant control and significant site design BMP design guidelines  Included Attachment 1f Trash Capture BMP Design Calculations (Required unless the entire project will use permanent storm water quality basins) Refer to Appendices J of the BMP Design Manual for Trash capture BMP design guidelines Included Not included because the entire project will use permanent storm water quality basins (i.e. infiltration, biofiltration BMPs) Use this checklist to ensure the required information has been included on the DMA Exhibit: The DMA Exhibit must identify:  Underlying hydrologic soil group  Approximate depth to groundwater  Existing natural hydrologic features (watercourses, seeps, springs, wetlands)  Critical coarse sediment yield areas to be protected (if present)  Existing topography and impervious areas  Existing and proposed site drainage network and connections to drainage offsite  Proposed grading  Proposed impervious features  Proposed design features and surface treatments used to minimize imperviousness  Drainage management area (DMA) boundaries, DMA ID numbers, and DMA areas (square footage or acreage), and DMA type (i.e., drains to BMP, self-retaining, or self-mitigating)  Structural BMPs (identify location and type of BMP)  Tabular DMA Summary 314 Date Ave J-3811 December 2023 BMP Location BMP Description Total Area (sq-ft) Impervious Area (sq-ft) Pervious Area (sq-ft) % Impervious % Pervious C Weighted Runoff Factor Min 4% Treatment Area (sq-ft) BMP Area Provided (sf) DCV Required (Cu-Ft) BMP Volume Provided (cf) DMA-1 Biofiltration 4146 2553 1593 62% 38%0.64 107 211 129 646 DMA-2 Biofiltration 6069 4708 1361 78% 22%0.75 182 248 221 744 DMA-3 Biofiltration 4760 2777 1983 58% 42%0.62 118 120 144 220 DMA-4 Infiltration Drywells 4522 4522 0 100% 0%0.90 - - 197 347 SM A Self-Mitigating 631 0 631 0% 100%0.23 - --- DM A DEMINIMIS 25 25 0 100% 0%0.90 - --- TOTAL DMA AREA:20153 14585 5568 72% 28%0.71 407 579 690 1956 NOTE: Weighted runoff factor based on percent of impervious, pervious, and paver area in each respective DMA C =(Impervious % * Impervious Runoff Factor)+(Pervious % * Landscape Runoff Factor)+(Pavers % * Permeable Pavers Runoff Factor) Runoff Factor P85th Parameters 0.9 Intensity: 0.20 in/hr 0.23 Precip: 0.58 in BMP Sizing and DCV Summary Table Landscape Impervious J:\ACTIVE JOBS\3811 TIMM DATE AVENUE\CIVIL\REPORTS\SWQMP\3811_WQ-CALCS - 1.6.23 Timm Residence Page No. 15 314 Date Avenue, Carlsbad, California Job No. 226818-1 ENGINEERING DESIGN GROUP GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS recommendations should be reviewed in consideration of proposed finishes and usage, performance expectations and budget. 14.11 If deemed necessary by the project owner, based on the above analysis, and waterproofing systems can be upgraded to include slab under drains and enhanced waterproofing elements. 14.12 In moisture sensitive areas (i.e., interior living space where vapor emission is a concern), in our experience poured-in-place concrete provides a surface with higher performance-repairability of below grade waterproofing systems. The developer should consider the cost-benefit of utilizing cast in place building retaining walls in lieu of masonry as part of the overall construction of the structures. Waterproofing at any basement floors is recommended in areas of moisture sensitive floor finishes. 15.0 POOL At the time of this report, specific pool plans were not available. Depending upon proposed pool depth and final configuration, undercutting may be required. We anticipate proposed pool to be placed on competent recompacted fill or paralic deposit material. The following general pool design parameters are provided below. • Pool and spa should be founded on a uniform building pad as outlined in the Earthworks / Transitions and the Foundations section of this report. • Vanishing edge type pools or other pool designs that do not allow for ½”-1” differential, may require a deepened/specialty foundation system. • Flatwork around the proposed pool should be designed to be impervious and slope away from the pool to an area drain system. • Additional recommendations may be necessary upon review of specific pool plans. 16.0 INFILTRATION We understand new infiltration/ bioretention facilities, and a drywell system are proposed for this project. Infiltration testing was conducted as part of field investigations for the preparation of this report. Timm Residence Page No. 16 314 Date Avenue, Carlsbad, California Job No. 226818-1 ENGINEERING DESIGN GROUP GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS Infiltration testing was performed using the Borehole Percolation Test Method of the City of Carlsbad BMP Design Manual. Findings of our infiltration tests and calculations, show design infiltration rates for Type C soils at the location and depth tested. (Please see Appendices/Appendix E/Infiltration). Infiltration/bioretention facilities and drywell systems, shall be designed to maintain sufficient horizontal and vertical offset to the structures so as not to create a groundwater condition. Infiltration/bioretention facilities proposed within a 10-foot horizontal distance to a moisture sensitive structure should be lined with an impervious barrier, within the 10-foot zone. Drywell systems proposed within a 10-foot horizontal distance to a moisture sensitive structure shall maintain an infiltration depth below finish pad depth of the structure. In cases where there is a vertical offset, wherein the bottom of the infiltration basin is detailed above the finish floor of the building, the impervious barrier should line the bottom of the basin or paver subgrade, such that the cumulative distance of the horizontal and vertical offset equal at a minimum the depth of the subterranean finish pad. Infiltration/bioretention facilities should be offset from the top and toes of any slopes steeper than a 3:1 or lined with an impervious barrier, or in the case of a drywell system, the infiltration depth shall be maintained below the toe of slope elevation. At tops of slopes minimum horizontal distance of 10 feet or a horizontal distance equal to the height of the slope, measured from the edge of infiltration basin to slope, up to a maximum of 40 horizontal feet. At the toe of new fill slopes infiltration facilities shall maintain a minimum 10 feet horizontal offset to not undermine the stability of the slope. New retaining walls to support proposed slope might be necessary where infiltration/retention basins are located at toes of slopes. Although not proposed at the time of this report, should pervious pavers be proposed, where pervious paver subgrade is located adjacent to the building, paver subgrade shall be sloped away at 2% should be lined with an impervious liner a minimum horizontal distance of 5 feet from building. Permeable paver subgrade shall be sloped 2% minimum to a perforated subdrain, gravel filled (1cf/ft), wrapped in a filter fabric, permeable pavers shall be detailed with reinforced concrete edge restraints that extend minimum 4 inches below reservoir depth, and horizontal restraints. Where permeable paver driveways are utilized in sloped driveway conditions, cut-off wall detailing should also be anticipated. In addition to the above details, specific paver detailing should be detailed and constructed per the minimum recommendations of the specific paver manufacturer as well as the Interlocking Concrete Paver Institute including minimum bedding specifications, base and subgrade requirements, installation tolerances, and drainage, etc. Where runoff and storm water are directed over permeable pavements and water is anticipated to flow through pavers into an aggregate base near and adjacent to foundations, basements or other structures, additional detailing shall include systems to control and to prevent subsurface flow beneath the building. Generally, these systems, detailed as part of the specific building construction plans, may include the cut-off walls Timm Residence Page No. 17 314 Date Avenue, Carlsbad, California Job No. 226818-1 ENGINEERING DESIGN GROUP GEOTECHNICAL, CIVIL, STRUCTURAL CONSULTANTS and underdrains. Proper surface drainage and irrigation practices will play a significant role in the future performance of the project. Please note in the Corrosion and Vapor Emission section of this report for specific recommendations regarding water to cement ratio for moisture sensitive areas should be adhered. The project architect and/or waterproofing consultant shall specifically address waterproofing details. 17.0 SURFACE DRAINAGE Adequate drainage precautions at this site are imperative and will play a critical role on the future performance of the proposed improvements. Under no circumstances should water be allowed to pond against or adjacent to tops of slopes and/or foundation walls. The ground surface surrounding proposed improvements should be relatively impervious in nature, and slope to drain away from the structure in all directions, with a minimum slope of 2% for a horizontal distance of 10 feet (where possible). Area drains or surface swales should then be provided in low spots to accommodate runoff and avoid any ponding of water. Any french drains, backdrains and/or slab underdrains shall not be tied to surface area drain systems. Roof gutters and downspouts shall be installed on the new and existing structures and tightlined to the area drain system. All drains should be kept clean and unclogged, including gutters and downspouts. Area drains should be kept free of debris to allow for proper drainage. Over watering can adversely affect site improvements and cause perched groundwater conditions. Irrigation should be limited to only the amount necessary to sustain plant life. Low flow irrigation devices as well as automatic rain shut-off devices should be installed to reduce over watering. Irrigation practices and maintenance of irrigation and drainage systems are an important component to the performance of onsite improvements. During periods of heavy rain, the performance of all drainage systems should be inspected. Problems such as gullying or ponding should be corrected as soon as possible. Any leakage from sources such as water lines should also be repaired as soon as possible. In addition, irrigation of planter areas, lawns, or other vegetation, located adjacent to the foundation or exterior flat work improvements should be strictly controlled or avoided. 18.0 LABORATORY TESTING 1 26 feet 0.125 C APPENDIX E EDG Infiltration Test Location Test Hole Depth Below Adjacent Grade (ft.) Design Infiltration Rate (in/hr) Soil Type Design Infiltration Rates Timm Residence - 314 Date Ave. Carlsbad Category #Description i ii iii iv v vi vii viii ix x Units 1 Drainage Basin ID or Name 1 2 3 4 unitless 2 85th Percentile 24-hr Storm Depth 0.58 0.58 0.58 0.58 inches 3 Impervious Surfaces Not Directed to Dispersion Area (C=0.90) 2,553 4,708 2,777 4,522 sq-ft 4 Semi-Pervious Surfaces Not Serving as Dispersion Area (C=0.30)sq-ft 5 Engineered Pervious Surfaces Not Serving as Dispersion Area (C=0.10)sq-ft 6 Natural Type A Soil Not Serving as Dispersion Area (C=0.10)sq-ft 7 Natural Type B Soil Not Serving as Dispersion Area (C=0.14)sq-ft 8 Natural Type C Soil Not Serving as Dispersion Area (C=0.23) 1,593 1,361 1,983 0 sq-ft 9 Natural Type D Soil Not Serving as Dispersion Area (C=0.30)sq-ft 10 Does Tributary Incorporate Dispersion, Tree Wells, and/or Rain Barrels? No No No No No No No No No No yes/no 11 Impervious Surfaces Directed to Dispersion Area per SD-B (Ci=0.90) sq-ft 12 Semi-Pervious Surfaces Serving as Dispersion Area per SD-B (Ci=0.30)sq-ft 13 Engineered Pervious Surfaces Serving as Dispersion Area per SD-B (Ci=0.10)sq-ft 14 Natural Type A Soil Serving as Dispersion Area per SD-B (Ci=0.10)sq-ft 15 Natural Type B Soil Serving as Dispersion Area per SD-B (Ci=0.14)sq-ft 16 Natural Type C Soil Serving as Dispersion Area per SD-B (Ci=0.23)sq-ft 17 Natural Type D Soil Serving as Dispersion Area per SD-B (Ci=0.30)sq-ft 18 Number of Tree Wells Proposed per SD-A # 19 Average Mature Tree Canopy Diameter ft 20 Number of Rain Barrels Proposed per SD-E # 21 Average Rain Barrel Size gal 22 Total Tributary Area 4,146 6,069 4,760 4,522 0 0 0 0 0 0 sq-ft 23 Initial Runoff Factor for Standard Drainage Areas 0.64 0.75 0.62 0.90 0.00 0.00 0.00 0.00 0.00 0.00 unitless 24 Initial Runoff Factor for Dispersed & Dispersion Areas 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 unitless 25 Initial Weighted Runoff Factor 0.64 0.75 0.62 0.90 0.00 0.00 0.00 0.00 0.00 0.00 unitless 26 Initial Design Capture Volume 128 220 143 197 0 0 0 0 0 0 cubic-feet 27 Total Impervious Area Dispersed to Pervious Surface 0 0 0 0 0 0 0 0 0 0 sq-ft 28 Total Pervious Dispersion Area 0 0 0 0 0 0 0 0 0 0 sq-ft 29 Ratio of Dispersed Impervious Area to Pervious Dispersion Area n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a ratio 30 Adjustment Factor for Dispersed & Dispersion Areas 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ratio 31 Runoff Factor After Dispersion Techniques 0.64 0.75 0.62 0.90 n/a n/a n/a n/a n/a n/a unitless 32 Design Capture Volume After Dispersion Techniques 128 220 143 197 0 0 0 0 0 0 cubic-feet 33 Total Tree Well Volume Reduction 0 0 0 0 0 0 0 0 0 0 cubic-feet 34 Total Rain Barrel Volume Reduction 0 0 0 0 0 0 0 0 0 0 cubic-feet 35 Final Adjusted Runoff Factor 0.64 0.75 0.62 0.90 0.00 0.00 0.00 0.00 0.00 0.00 unitless 36 Final Effective Tributary Area 2,653 4,552 2,951 4,070 0 0 0 0 0 0 sq-ft 37 Initial Design Capture Volume Retained by Site Design Elements 0 0 0 0 0 0 0 0 0 0 cubic-feet 38 Final Design Capture Volume Tributary to BMP 128 220 143 197 0 0 0 0 0 0 cubic-feet False False Automated Worksheet B.1: Calculation of Design Capture Volume (V2.0) Dispersion Area, Tree Well & Rain Barrel Inputs (Optional) Standard Drainage Basin Inputs Results Tree & Barrel Adjustments Initial Runoff Factor Calculation Dispersion Area Adjustments No Warning Messages Category #Description i ii iii iv v vi vii viii ix x Units 1 Drainage Basin ID or Name 1 2 3 4 ------unitless 2 85th Percentile Rainfall Depth 0.58 0.58 0.58 0.58 ------ inches 3 Predominant NRCS Soil Type Within BMP Location C C C C unitless 4 Is proposed BMP location Restricted or Unrestricted for Infiltration Activities? Restricted Restricted Restricted Unrestricted unitless 5 Nature of Restriction n/a n/a n/a n/a unitless 6 Do Minimum Retention Requirements Apply to this Project? Yes Yes Yes Yes yes/no 7 Are Habitable Structures Greater than 9 Stories Proposed? No No No No yes/no 8 Has Geotechnical Engineer Performed an Infiltration Analysis? Yes Yes 146 Yes yes/no 9 Design Infiltration Rate Recommended by Geotechnical Engineer 0.000 0.000 0.000 0.125 in/hr 10 Design Infiltration Rate Used To Determine Retention Requirements 0.000 0.000 0.000 0.125 ------ in/hr 11 Percent of Average Annual Runoff that Must be Retained within DMA 4.5% 4.5% 4.5% 25.9% ------ percentage 12 Fraction of DCV Requiring Retention 0.02 0.02 0.02 0.18 ------ ratio 13 Required Retention Volume 3 4 3 35 ------ cubic-feet False False Automated Worksheet B.2: Retention Requirements (V2.0) Advanced Analysis Basic Analysis Result No Warning Messages Category #Description i ii iii iv v vi vii viii ix x Units 1 Drainage Basin ID or Name 1 2 3 4 ------sq-ft 2 Design Infiltration Rate Recommended 0.000 0.000 0.000 0.125 ------in/hr 3 Design Capture Volume Tributary to BMP 128 220 143 197 ------cubic-feet 4 Is BMP Vegetated or Unvegetated?Vegetated Vegetated Vegetated Unvegetated unitless 5 Is BMP Impermeably Lined or Unlined?Lined Lined Lined Unlined unitless 6 Does BMP Have an Underdrain?Underdrain Underdrain Underdrain No Underdrain unitless 7 Does BMP Utilize Standard or Specialized Media?Standard Standard Standard Standard unitless 8 Provided Surface Area 211 248 146 sq-ft 9 Provided Surface Ponding Depth 21 24 9 inches 10 Provided Soil Media Thickness 24 24 24 inches 11 Provided Gravel Thickness (Total Thickness)9 9 8 inches 12 Underdrain Offset 3 3 3 inches 13 Diameter of Underdrain or Hydromod Orifice (Select Smallest)0.22 0.28 0.22 inches 14 Specialized Soil Media Filtration Rate in/hr 15 Specialized Soil Media Pore Space for Retention unitless 16 Specialized Soil Media Pore Space for Biofiltration unitless 17 Specialized Gravel Media Pore Space unitless 18 Volume Infiltrated Over 6 Hour Storm 0 0 0 0 0 0 0 0 0 0 cubic-feet 19 Ponding Pore Space Available for Retention 0.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 unitless 20 Soil Media Pore Space Available for Retention 0.05 0.05 0.05 0.40 0.05 0.05 0.05 0.05 0.05 0.05 unitless 21 Gravel Pore Space Available for Retention (Above Underdrain)0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40 0.40 unitless 22 Gravel Pore Space Available for Retention (Below Underdrain)0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 unitless 23 Effective Retention Depth 2.40 2.40 2.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 inches 24 Fraction of DCV Retained (Independent of Drawdown Time)0.33 0.23 0.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ratio 25 Calculated Retention Storage Drawdown Time 120 120 120 0 0 0 0 0 0 0 hours 26 Efficacy of Retention Processes 0.33 0.25 0.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ratio 27 Volume Retained by BMP (Considering Drawdown Time)43 54 32 0 0 0 0 0 0 0 cubic-feet 28 Design Capture Volume Remaining for Biofiltration 85 166 111 197 0 0 0 0 0 0 cubic-feet 29 Max Hydromod Flow Rate through Underdrain 0.0026 0.0044 0.0022 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 cfs 30 Max Soil Filtration Rate Allowed by Underdrain Orifice 0.53 0.77 0.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 in/hr 31 Soil Media Filtration Rate per Specifications 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 in/hr 32 Soil Media Filtration Rate to be used for Sizing 0.53 0.77 0.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 in/hr 33 Depth Biofiltered Over 6 Hour Storm 3.18 4.60 3.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 inches 34 Ponding Pore Space Available for Biofiltration 1.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 unitless 35 Soil Media Pore Space Available for Biofiltration 0.20 0.20 0.20 0.00 0.20 0.20 0.20 0.20 0.20 0.20 unitless 36 Gravel Pore Space Available for Biofiltration (Above Underdrain)0.40 0.40 0.40 0.00 0.40 0.40 0.40 0.40 0.40 0.40 unitless 37 Effective Depth of Biofiltration Storage 28.20 31.20 15.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 inches 38 Drawdown Time for Surface Ponding 40 31 14 0 0 0 0 0 0 0 hours 39 Drawdown Time for Effective Biofiltration Depth 53 41 24 0 0 0 0 0 0 0 hours 40 Total Depth Biofiltered 31.38 35.80 19.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 inches 41 Option 1 - Biofilter 1.50 DCV: Target Volume 128 249 167 296 0 0 0 0 0 0 cubic-feet 42 Option 1 - Provided Biofiltration Volume 128 249 167 0 0 0 0 0 0 0 cubic-feet 43 Option 2 - Store 0.75 DCV: Target Volume 64 124 84 148 0 0 0 0 0 0 cubic-feet 44 Option 2 - Provided Storage Volume 64 124 84 0 0 0 0 0 0 0 cubic-feet 45 Portion of Biofiltration Performance Standard Satisfied 1.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ratio 46 Do Site Design Elements and BMPs Satisfy Annual Retention Requirements?Yes Yes Yes No ------yes/no 47 Overall Portion of Performance Standard Satisfied (BMP Efficacy Factor)1.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ratio 48 Deficit of Effectively Treated Stormwater 0 0 0 -197 n/a n/a n/a n/a n/a n/a cubic-feet Biofiltration Calculations -This BMP does not fully satisfy the performance standards for pollutant control for the drainage area. False -Vegetated BMPs with surface ponding drawdown times over 24 hours must be certified by a landscape architect or agronomist. All BMPs must have a surface ponding drawdown time of 96 hours or less. False Result -Minimum annual retention criteria are not satisfied for each individual drainage area. Implement additional site design elements, increase structural BMP retention capacity, or demonstrate that such requirements are satisfied at the project-level. False Attention! Retention Calculations Automated Worksheet B.3: BMP Performance (V2.0) False False BMP Inputs Drywell Surface Area Calculations Each of the 4 foot diameter dry well provides 12.57 SF of infiltration area per foot of depth, plus 12.57 SF of infiltration area at the bottom. For a 22 foot deep dry well, infiltration occurs between 4 and 26 feet below grade. This provides 22 feet of infiltration depth in addition to the bottom area. Total infiltration area is calculated below. For Proposed Drywell: Pit diameter = 4 ft Pit depth = 22 ft Usable gravel depth = 22 ft Total infiltration area = depth of sidewalls * pit circumference + pit bottom area = 22 ft * 12.57 SF per foot of depth + 12.57 SF = 289.02 SF DCV Drawdown Calculations For Proposed Drywell: Total DCV for Drywell = 199 CF Drywell infiltration rate, K (per Geotech recommendation) = 0.125 in/hr Surface Area, ABMP = 289.02 sf * 2 Drywells = 578.04 sf Effective Depth, DAVG = DCV/ ABMP = 0.36 ft Drawdown Time, T = DAVG * 12 / K = 34.56 hours Diversion Flow Rate Calculation The diversion flow rate for the offline Pre-Treatment BMP has been sized to convey the maximum flow rate of runoff produced from a rainfall intensity of 0.20 inches per hour. The diversion flow rate for offline BMPs is calculated by: Q = CiA Where: Q = Diversion flow rate (cfs) C = Runoff factor, per table 3-1 of the SD County Hydrology Manual i = Rainfall intensity of 0.20 in/hr A = Tributary area (acres) which includes the total area draining to the BMP For BMP-4: Q = 0.90 * 0.20 * 0.105 ac = 0.02 CFS Treatment Capacity of CSD1515-3 = 0.50 CFS > 0.02 CFS Drywell Infiltration Storage Calculations Each of the 4 foot diameter Drywells has a 3’ diameter gravity-fed pit, lined with 4” thick concrete perforated casing, and is backfilled with gravel on the outside for a total diameter of 4 feet. Total volume of the Drywell is calculated below: For Proposed Drywells: Inside concrete pit diameter = 3 ft Full outer gravel pit diameter = 4 ft Inside concrete pit depth = 22 ft Full outer gravel pit depth = 22 ft Inside concrete pit volume, V = πr2h = π(1.5 ft)2(22 ft) = 155.51 cubic ft Inside concrete pit volume (including 4” wall thickness), V = πr2h = π(1.83 ft)2(20 ft) = 231.46 cubic ft Outer pit full volume, V = πr2h = π(2 ft)2(22 ft) = 276.46 cubic ft Volume of gravel = [Outer pit full volume - Inside concrete pit volume (including 4” wall thickness)] * 0.4 Void ratio = 18 cubic ft Total Storage = 155.51 cf + 18 cf = 173.51 CF 2 Drywells = 347.02 cf > 199 cf (required DCV) ATTACHMENT 2 BACKUP FOR PDP HYDROMODIFICATION CONTROL MEASURES [This is the cover sheet for Attachment 2.] Indicate which Items are Included behind this cover sheet: Attachment Sequence Contents Checklist Attachment 2a Hydromodification Management Exhibit (Required)  Included See Hydromodification Management Exhibit Checklist on the back of this Attachment cover sheet. Attachment 2b Management of Critical Coarse Sediment Yield Areas (WMAA Exhibit is required, additional analyses are optional) See Section 6.2 of the BMP Design Manual.  Exhibit showing project drainage boundaries marked on WMAA Critical Coarse Sediment Yield Area Map (Required) Optional analyses for Critical Coarse Sediment Yield Area Determination Appendix H.6.1 Verification of Geomorphic Landscape Units Onsite Appendix H.7 Downstream Systems Sensitivity to Coarse Sediment Attachment 2c Geomorphic Assessment of Receiving Channels (Optional) See Section 6.3.4 of the BMP Design Manual.  Not performed Included Attachment 2d Flow Control Facility Design and Structural BMP Drawdown Calculations (Required) See Chapter 6 and Appendix G of the BMP Design Manual  Included Use this checklist to ensure the required information has been included on the Hydromodification Management Exhibit: The Hydromodification Management Exhibit must identify:  Underlying hydrologic soil group  Approximate depth to groundwater  Existing natural hydrologic features (watercourses, seeps, springs, wetlands)  Critical coarse sediment yield areas to be protected (if present)  Existing topography  Existing and proposed site drainage network and connections to drainage offsite  Proposed grading  Proposed impervious features  Proposed design features and surface treatments used to minimize imperviousness  Point(s) of Compliance (POC) for Hydromodification Management  Existing and proposed drainage boundary and drainage area to each POC (when necessary, create separate exhibits for pre-development and post-project conditions)  Structural BMPs for hydromodification management (identify location, type of BMP, and size/detail) 314 Date Avenue Potential Critical Coarse Sediment Yield Areas Legend PCCSYA Project Site 1000 ft N ➤➤ N 3811 SWMM SCHEMATICS 9/8/2023 SWMM MODEL SCHEMATICS PRE-PROJECT MODEL POST-PROJECT MODEL SWMM PRE-DEV INPUT PARAMETERS FOR POC-1 DMA-1 0.46265 20,153 98.5 205 4.5 4172.0 20.7% 0.012 0.06 6.0 0.100 0.31 0.00925 24 *0% Imperv for SWMM purposes SWMM POST-DEV INPUT PARAMETERS FOR POC-1 DMA-1 0.09034 3,935 98 40 1% 2,553 64.9% 0.012 0.06 6.0 0.100 0.31 0.00181 DMA-2 0.13363 5,821 66 88 1% 4,708 80.9% 0.012 0.06 6.0 0.100 0.31 0.00267 DMA-3 0.10652 4,640 120 39 1% 2,777 59.8% 0.012 0.06 6.0 0.100 0.31 0.00213 DMA-4 0.10324 4,497 130 35 9% 4,497 100.0% 0.012 0.06 6.0 0.100 0.31 0.00206 BMP-1 0.00484 211 56 4 0% 0 0.0% 0.012 0.08 6.0 0.100 0.31 0.00010 BMP-2 0.00569 248 38 7 0% 0 0.0% 0.012 0.08 6.0 0.100 0.31 0.00011 BMP-3 0.00275 120 27 4 0% 0 0.0% 0.012 0.08 6.0 0.100 0.31 0.00006 DRYWELL 0.00057 25.0 7.0 4 0% 25 100.0% 0.012 0.08 6.0 0.100 0.31 0.00001 Self-Mit 0.01449 631.0 5.0 126 1% 0 0.0% 0.012 0.06 6.0 0.100 0.31 0.00029 De-Min 0.00057 25.0 4.0 6 1% 0 0.0% 0.012 0.06 6.0 0.100 0.31 0.00001 TOTAL 0.46265 20,153 0.00925 24 Conductivity Initial Deficit Total Inflow Separation Time % Slope, So Imp. Area (sf)% Imperv N-Imperv N-Perv Suction Head DMA Tributary Area, A (Ac) Tributary Area, A (sf) Overland Flow Length, L (ft) Overland Flow Width, W=A/LDMATributary Area, A (Ac) Tributary Area, A (sf) Overland Flow Length, L (ft) Overland Flow Width, W=A/L % Slope, So Imp. Area (sf)% Imperv N-Imperv Separation TimeN-Perv Suction Head Conductivity Initial Deficit Total Inflow [TITLE] ;;Project Title/Notes Timm Residence J-3811 Pre-Development Condition [OPTIONS] ;;Option Value FLOW_UNITS CFS INFILTRATION GREEN_AMPT FLOW_ROUTING KINWAVE LINK_OFFSETS DEPTH MIN_SLOPE 0 ALLOW_PONDING NO SKIP_STEADY_STATE NO START_DATE 08/28/1951 START_TIME 05:00:00 REPORT_START_DATE 08/28/1951 REPORT_START_TIME 05:00:00 END_DATE 05/23/2008 END_TIME 23:00:00 SWEEP_START 01/01 SWEEP_END 12/31 DRY_DAYS 0 REPORT_STEP 01:00:00 WET_STEP 00:15:00 DRY_STEP 04:00:00 ROUTING_STEP 0:01:00 RULE_STEP 00:00:00 INERTIAL_DAMPING PARTIAL NORMAL_FLOW_LIMITED BOTH FORCE_MAIN_EQUATION H-W VARIABLE_STEP 0.75 LENGTHENING_STEP 0 MIN_SURFAREA 12.566 MAX_TRIALS 8 HEAD_TOLERANCE 0.005 SYS_FLOW_TOL 5 LAT_FLOW_TOL 5 MINIMUM_STEP 0.5 THREADS 1 [EVAPORATION] ;;Data Source Parameters ;;-------------- ---------------- MONTHLY .06 .08 .11 .15 .17 .19 .19 .18 .15 .11 .08 .06 DRY_ONLY NO [RAINGAGES] ;;Name Format Interval SCF Source ;;-------------- --------- ------ ------ ---------- Oceanside INTENSITY 1:00 1.0 TIMESERIES Oceanside [SUBCATCHMENTS] ;;Name Rain Gage Outlet Area %Imperv Width %Slope CurbLen SnowPack ;;-------------- ---------------- ---------------- -------- -------- -------- -------- -------- ---------------- DMA-EX1 Oceanside POC-1 .46265 0 205 4.5 0 [SUBAREAS] ;;Subcatchment N-Imperv N-Perv S-Imperv S-Perv PctZero RouteTo PctRouted ;;-------------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- DMA-EX1 .012 .06 0.05 .1 25 OUTLET [INFILTRATION] ;;Subcatchment Param1 Param2 Param3 Param4 Param5 ;;-------------- ---------- ---------- ---------- ---------- ---------- DMA-EX1 6 0.1 .310 [LID_CONTROLS] ;;Name Type/Layer Parameters ;;-------------- ---------- ---------- BMP1 BC BMP1 SURFACE 06.0 0.0 0 0 5 BMP1 SOIL 18 0.4 0.2 0.1 5 5 1.5 BMP1 STORAGE 12 .67 0 0 NO BMP1 DRAIN .1164 0.5 0 6 0 0 BMP2 BC BMP2 SURFACE 6 0.0 0 0 5 BMP2 SOIL 18 0.4 0.2 0.1 5 5 1.5 BMP2 STORAGE 12 .67 0 0 NO BMP2 DRAIN 0 0.5 6 6 0 0 BMP3 BC BMP3 SURFACE 6 0.0 0 0 5 BMP3 SOIL 18 0.4 0.2 0.1 5 5 1.5 BMP3 STORAGE 12 .67 0 0 NO BMP3 DRAIN .1505 0.5 0 6 0 0 [LID_USAGE] ;;Subcatchment LID Process Number Area Width InitSat FromImp ToPerv RptFile DrainTo FromPerv ;;-------------- ---------------- ------- ---------- ---------- ---------- ---------- ---------- ------------------------ ------------ ---- ---------- [OUTFALLS] ;;Name Elevation Type Stage Data Gated Route To ;;-------------- ---------- ---------- ---------------- -------- ---------------- POC-1 0 FREE NO [TIMESERIES] ;;Name Date Time Value ;;-------------- ---------- ---------- ---------- Oceanside FILE "Rainfall\oceanside.dat" [REPORT] ;;Reporting Options SUBCATCHMENTS ALL NODES ALL LINKS ALL [TAGS] [MAP] DIMENSIONS -86.051 0.000 10000.000 10000.000 Units None [COORDINATES] ;;Node X-Coord Y-Coord ;;-------------- ------------------ ------------------ POC-1 607.015 5239.166 [VERTICES] ;;Link X-Coord Y-Coord ;;-------------- ------------------ ------------------ [Polygons] ;;Subcatchment X-Coord Y-Coord ;;-------------- ------------------ ------------------ DMA-EX1 128.683 6322.567 [SYMBOLS] ;;Gage X-Coord Y-Coord ;;-------------- ------------------ ------------------ Oceanside 435.306 6753.884 [LABELS] ;;X-Coord Y-Coord Label 77.263 6431.435 "EX-1" "" "Arial" 10 0 0 533.426 5191.128 "POC-1" "" "Arial" 10 0 0 337.187 6853.025 "Oceanside" "" "Arial" 10 0 0 EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.0) ------------------------------------------------------------ Timm Residence J-3811 Pre-Development Condition **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... NO Water Quality .......... NO Infiltration Method ...... GREEN_AMPT Starting Date ............ 08/28/1951 05:00:00 Ending Date .............. 05/23/2008 23:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 01:00:00 Wet Time Step ............ 00:15:00 Dry Time Step ............ 04:00:00 ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 26.028 675.090 Evaporation Loss ......... 0.255 6.627 Infiltration Loss ........ 23.826 617.985 Surface Runoff ........... 2.155 55.900 Final Storage ............ 0.000 0.000 Continuity Error (%) ..... -0.803 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 2.155 0.702 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 2.155 0.702 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.000 0.000 Continuity Error (%) ..... 0.000 *************************** Subcatchment Runoff Summary *************************** ------------------------------------------------------------------------------------------------------------------------------ Total Total Total Total Imperv Perv Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff Subcatchment in in in in in in in 10^6 gal CFS ------------------------------------------------------------------------------------------------------------------------------ DMA-EX1 675.09 0.00 6.63 617.99 0.00 55.90 55.90 0.70 0.51 0.083 Analysis begun on: Thu Dec 7 11:52:31 2023 Analysis ended on: Thu Dec 7 11:52:52 2023 Total elapsed time: 00:00:21 [TITLE] ;;Project Title/Notes Timm Residence J-3811 Post-Development Condition [OPTIONS] ;;Option Value FLOW_UNITS CFS INFILTRATION GREEN_AMPT FLOW_ROUTING KINWAVE LINK_OFFSETS DEPTH MIN_SLOPE 0 ALLOW_PONDING NO SKIP_STEADY_STATE NO START_DATE 08/28/1951 START_TIME 05:00:00 REPORT_START_DATE 08/28/1951 REPORT_START_TIME 05:00:00 END_DATE 05/23/2008 END_TIME 23:00:00 SWEEP_START 01/01 SWEEP_END 12/31 DRY_DAYS 0 REPORT_STEP 01:00:00 WET_STEP 00:15:00 DRY_STEP 04:00:00 ROUTING_STEP 0:01:00 RULE_STEP 00:00:00 INERTIAL_DAMPING PARTIAL NORMAL_FLOW_LIMITED BOTH FORCE_MAIN_EQUATION H-W VARIABLE_STEP 0.75 LENGTHENING_STEP 0 MIN_SURFAREA 12.566 MAX_TRIALS 8 HEAD_TOLERANCE 0.005 SYS_FLOW_TOL 5 LAT_FLOW_TOL 5 MINIMUM_STEP 0.5 THREADS 1 [EVAPORATION] ;;Data Source Parameters ;;-------------- ---------------- MONTHLY 0.06 0.08 .11 0.15 0.17 0.19 0.19 0.18 0.15 0.11 0.08 0.06 DRY_ONLY NO [RAINGAGES] ;;Name Format Interval SCF Source ;;-------------- --------- ------ ------ ---------- Oceanside INTENSITY 1:00 1.0 TIMESERIES Oceanside [SUBCATCHMENTS] ;;Name Rain Gage Outlet Area %Imperv Width %Slope CurbLen SnowPack ;;-------------- ---------------- ---------------- -------- -------- -------- -------- -------- ---------------- DMA-1 Oceanside BMP-1 .09034 64.9 40 1 0 BMP-1 Oceanside POC-1 .00484 0 4 0 0 Self-Mit Oceanside POC-1 .01449 0 126 1 0 DMA-2 Oceanside BMP-2 .13363 80.9 88 1 0 DMA-4 Oceanside DRYWELLS .10324 100 35 9 0 BMP-2 Oceanside POC-1 .00569 0 7 0 0 DMA-3 Oceanside BMP-3 .10652 59.8 39 1 0 BMP-3 Oceanside POC-1 .00275 0 4 0 0 De-Min Oceanside POC-1 .00057 0 6 1 0 [SUBAREAS] ;;Subcatchment N-Imperv N-Perv S-Imperv S-Perv PctZero RouteTo PctRouted ;;-------------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- DMA-1 0.012 .06 0.05 0.1 25 OUTLET BMP-1 0.012 .08 0.05 0.1 25 OUTLET Self-Mit 0.012 .06 0.05 0.1 25 OUTLET DMA-2 0.012 .06 0.05 0.1 25 OUTLET DMA-4 0.012 .06 0.05 0.1 25 OUTLET BMP-2 0.012 .08 0.05 0.1 25 OUTLET DMA-3 0.012 .06 0.05 0.1 25 OUTLET BMP-3 0.012 .08 0.05 0.1 25 OUTLET De-Min 0.012 .06 0.05 0.1 25 OUTLET [INFILTRATION] ;;Subcatchment Param1 Param2 Param3 Param4 Param5 ;;-------------- ---------- ---------- ---------- ---------- ---------- DMA-1 6 .1 .31 BMP-1 6 .1 .31 Self-Mit 6 .1 .31 DMA-2 6 .1 .31 DMA-4 6 .1 .31 BMP-2 6 .1 .31 DMA-3 6 .1 .31 BMP-3 6 .1 .31 De-Min 6 .1 .31 [LID_CONTROLS] ;;Name Type/Layer Parameters ;;-------------- ---------- ---------- BMP_1 BC BMP_1 SURFACE 24.73 0 0 0 5 BMP_1 SOIL 24 0.4 0.2 0.1 5 5 1.5 BMP_1 STORAGE 9 0.67 0 0 NO BMP_1 DRAIN .0749 0.5 0 6 0 0 BMP_2 BC BMP_2 SURFACE 24 0.0 0 0 5 BMP_2 SOIL 24 0.4 0.2 0.1 5 5 1.5 BMP_2 STORAGE 9 .67 0 0 NO BMP_2 DRAIN .1053 0.5 0 6 0 0 BMP_3 BC BMP_3 SURFACE 13.76 0.0 0 0 5 BMP_3 SOIL 24 0.4 0.2 0.1 5 5 1.5 BMP_3 STORAGE 8 0.67 0 0 NO BMP_3 DRAIN 0.1082 0.5 0 6 0 0 [LID_USAGE] ;;Subcatchment LID Process Number Area Width InitSat FromImp ToPerv RptFile DrainTo FromPerv ;;-------------- ---------------- ------- ---------- ---------- ---------- ---------- ---------- ------------------------ ------------ ---- ---------- BMP-1 BMP_1 1 210.83 0 0 100 0 * * 100 BMP-2 BMP_2 1 247.86 0 0 100 0 * * 100 BMP-3 BMP_3 1 119.79 0 0 100 0 * * 100 [OUTFALLS] ;;Name Elevation Type Stage Data Gated Route To ;;-------------- ---------- ---------- ---------------- -------- ---------------- POC-1 0 FREE NO INFILTRATION_LOSS 0 FREE NO [STORAGE] ;;Name Elev. MaxDepth InitDepth Shape Curve Type/Params SurDepth Fevap Psi Ksat IMD ;;-------------- -------- ---------- ----------- ---------- ---------------------------- --------- -------- -------- -------- STORAGE_PIPE 0 3 0 TABULAR STOR2(PIPESTORAGE) 0 0 DRYWELLS 0 24 0 TABULAR STOR3(DRYWELLS) 0 0 [OUTLETS] ;;Name From Node To Node Offset Type QTable/Qcoeff Qexpon Gated ;;-------------- ---------------- ---------------- ---------- --------------- ---------------- ---------- -------- R2 STORAGE_PIPE POC-1 0 TABULAR/DEPTH R2 NO R3 DRYWELLS STORAGE_PIPE 0 TABULAR/DEPTH R3 NO R4 DRYWELLS INFILTRATION_LOSS 0 TABULAR/DEPTH R4 NO [CURVES] ;;Name Type X-Value Y-Value ;;-------------- ---------- ---------- ---------- R4 Rating 0 0 R4 0.5 0 R4 1 0 R4 1.5 0 R4 2 0 R4 2.5 0 R4 3 0 R4 3.5 0.001 R4 4 0.001 R4 4.5 0.001 R4 5 0.001 R4 5.5 0.001 R4 6 0.001 R4 6.5 0.001 R4 7 0.001 R4 7.5 0.001 R4 8 0.001 R4 8.5 0.001 R4 9 0.001 R4 9.5 0.001 R4 10 0.001 R4 10.5 0.002 R4 11 0.002 R4 11.5 0.002 R4 12 0.002 R4 12.5 0.002 R4 13 0.002 R4 13.5 0.002 R4 14 0.002 R4 14.5 0.002 R4 15 0.002 R4 15.5 0.002 R4 16 0.002 R4 16.5 0.002 R4 17 0.002 R4 17.5 0.003 R4 18 0.003 R4 18.5 0.003 R4 19 0.003 R4 19.5 0.003 R4 20 0.003 R4 20.5 0.003 R4 21 0.003 R4 21.5 0.003 R4 22 0.003 R4 22.5 0.003 R4 23 0.003 R4 23.5 0.003 R4 24 0.003 ; R3 Rating 0 0 R3 0.5 0 R3 1 0 R3 1.5 0 R3 2 0 R3 2.5 0 R3 3 0 R3 3.5 0 R3 4 0 R3 4.5 0 R3 5 0 R3 5.5 0 R3 6 0 R3 6.5 0 R3 7 0 R3 7.5 0 R3 8 0 R3 8.5 0 R3 9 0 R3 9.5 0 R3 10 0 R3 10.5 0 R3 11 0 R3 11.5 0 R3 12 0 R3 12.5 0 R3 13 0 R3 13.5 0 R3 14 0 R3 14.5 0 R3 15 0 R3 15.5 0 R3 16 0 R3 16.5 0 R3 17 0 R3 17.5 0 R3 18 0 R3 18.5 0 R3 19 0 R3 19.5 0 R3 20 0 R3 20.5 0 R3 21 0 R3 21.5 0 R3 22 0 R3 22.5 1.182 R3 23 2.019 R3 23.5 2.473 R3 24 2.856 ; R2 Rating 0 0 R2 0.1 0.001 R2 0.2 0.002 R2 0.3 0.002 R2 0.4 0.003 R2 0.5 0.003 R2 0.6 0.003 R2 0.7 0.003 R2 0.8 0.004 R2 0.9 0.004 R2 1 0.004 R2 1.1 0.004 R2 1.2 0.005 R2 1.3 0.005 R2 1.4 0.005 R2 1.5 0.005 R2 1.6 0.005 R2 1.7 0.005 R2 1.8 0.006 R2 1.9 0.006 R2 2 0.006 R2 2.1 0.057 R2 2.2 0.147 R2 2.3 0.260 R2 2.4 0.388 R2 2.5 0.526 R2 2.6 0.669 R2 2.7 0.814 R2 2.8 0.958 R2 2.9 1.097 R2 3 1.228 R2 3.1 1.348 R2 3.2 1.453 R2 3.3 1.605 R2 3.4 1.826 R2 3.5 2.061 ; STOR2(PIPESTORAGE) Storage 0 0 STOR2(PIPESTORAGE) .1 31.3 STOR2(PIPESTORAGE) .2 56.4 STOR2(PIPESTORAGE) .3 72 STOR2(PIPESTORAGE) .4 83.9 STOR2(PIPESTORAGE) .5 93.6 STOR2(PIPESTORAGE) .6 101.9 STOR2(PIPESTORAGE) .7 108.8 STOR2(PIPESTORAGE) .8 114.9 STOR2(PIPESTORAGE) .9 120 STOR2(PIPESTORAGE) 1 124.5 STOR2(PIPESTORAGE) 1.1 128.3 STOR2(PIPESTORAGE) 1.2 131.5 STOR2(PIPESTORAGE) 1.3 134.1 STOR2(PIPESTORAGE) 1.4 136.3 STOR2(PIPESTORAGE) 1.5 137.9 STOR2(PIPESTORAGE) 1.6 139.1 STOR2(PIPESTORAGE) 1.7 140 STOR2(PIPESTORAGE) 1.8 138.8 STOR2(PIPESTORAGE) 1.9 139 STOR2(PIPESTORAGE) 2 137.9 STOR2(PIPESTORAGE) 2.1 136.3 STOR2(PIPESTORAGE) 2.2 134.2 STOR2(PIPESTORAGE) 2.3 131.4 STOR2(PIPESTORAGE) 2.4 128.3 STOR2(PIPESTORAGE) 2.5 124.5 STOR2(PIPESTORAGE) 2.6 120.1 STOR2(PIPESTORAGE) 2.7 114.8 STOR2(PIPESTORAGE) 2.8 108.9 STOR2(PIPESTORAGE) 2.9 101.8 STOR2(PIPESTORAGE) 3 93.7 STOR2(PIPESTORAGE) 3.1 83.9 STOR2(PIPESTORAGE) 3.2 72 STOR2(PIPESTORAGE) 3.3 56.4 STOR2(PIPESTORAGE) 3.4 31.3 STOR2(PIPESTORAGE) 3.5 0 ; STOR3(DRYWELLS) Storage 0 15.74 STOR3(DRYWELLS) 0.5 15.74 STOR3(DRYWELLS) 1 15.74 STOR3(DRYWELLS) 1.5 15.74 STOR3(DRYWELLS) 2 15.74 STOR3(DRYWELLS) 2.5 15.74 STOR3(DRYWELLS) 3 15.74 STOR3(DRYWELLS) 3.5 15.74 STOR3(DRYWELLS) 4 15.74 STOR3(DRYWELLS) 4.5 15.74 STOR3(DRYWELLS) 5 15.74 STOR3(DRYWELLS) 5.5 15.74 STOR3(DRYWELLS) 6 15.74 STOR3(DRYWELLS) 6.5 15.74 STOR3(DRYWELLS) 7 15.74 STOR3(DRYWELLS) 7.5 15.74 STOR3(DRYWELLS) 8 15.74 STOR3(DRYWELLS) 8.5 15.74 STOR3(DRYWELLS) 9 15.74 STOR3(DRYWELLS) 9.5 15.74 STOR3(DRYWELLS) 10 15.74 STOR3(DRYWELLS) 10.5 15.74 STOR3(DRYWELLS) 11 15.74 STOR3(DRYWELLS) 11.5 15.74 STOR3(DRYWELLS) 12 15.74 STOR3(DRYWELLS) 12.5 15.74 STOR3(DRYWELLS) 13 15.74 STOR3(DRYWELLS) 13.5 15.74 STOR3(DRYWELLS) 14 15.74 STOR3(DRYWELLS) 14.5 15.74 STOR3(DRYWELLS) 15 15.74 STOR3(DRYWELLS) 15.5 15.74 STOR3(DRYWELLS) 16 15.74 STOR3(DRYWELLS) 16.5 15.74 STOR3(DRYWELLS) 17 15.74 STOR3(DRYWELLS) 17.5 15.74 STOR3(DRYWELLS) 18 15.74 STOR3(DRYWELLS) 18.5 15.74 STOR3(DRYWELLS) 19 15.74 STOR3(DRYWELLS) 19.5 15.74 STOR3(DRYWELLS) 20 15.74 STOR3(DRYWELLS) 20.5 15.74 STOR3(DRYWELLS) 21 15.74 STOR3(DRYWELLS) 21.5 15.74 STOR3(DRYWELLS) 22 15.74 STOR3(DRYWELLS) 22.5 25.14 STOR3(DRYWELLS) 23 25.14 STOR3(DRYWELLS) 23.5 25.14 STOR3(DRYWELLS) 24 25.14 [TIMESERIES] ;;Name Date Time Value ;;-------------- ---------- ---------- ---------- Oceanside FILE "Rainfall\oceanside.dat" [REPORT] ;;Reporting Options SUBCATCHMENTS ALL NODES ALL LINKS ALL [TAGS] [MAP] DIMENSIONS 191.920 4920.830 1158.573 5718.627 Units None [COORDINATES] ;;Node X-Coord Y-Coord ;;-------------- ------------------ ------------------ POC-1 613.987 5157.890 INFILTRATION_LOSS 802.039 5158.460 STORAGE_PIPE 702.884 5175.555 DRYWELLS 763.859 5259.894 [VERTICES] ;;Link X-Coord Y-Coord ;;-------------- ------------------ ------------------ [Polygons] ;;Subcatchment X-Coord Y-Coord ;;-------------- ------------------ ------------------ DMA-1 564.189 5320.237 DMA-1 564.189 5320.237 BMP-1 574.667 5243.368 Self-Mit 521.209 5221.018 Self-Mit 521.209 5221.018 Self-Mit 524.302 5228.233 DMA-2 631.083 5327.599 DMA-2 631.083 5327.599 DMA-2 631.083 5329.631 DMA-4 765.569 5326.567 DMA-4 765.569 5326.567 BMP-2 632.222 5241.089 DMA-3 700.035 5324.857 DMA-3 700.035 5324.857 BMP-3 688.638 5235.390 De-Min 505.703 5182.565 [SYMBOLS] ;;Gage X-Coord Y-Coord ;;-------------- ------------------ ------------------ Oceanside 674.392 5364.747 EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.0) ------------------------------------------------------------ Timm Residence J-3811 Post-Development Condition **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... GREEN_AMPT Flow Routing Method ...... KINWAVE Starting Date ............ 08/28/1951 05:00:00 Ending Date .............. 05/23/2008 23:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 01:00:00 Wet Time Step ............ 00:15:00 Dry Time Step ............ 04:00:00 Routing Time Step ........ 60.00 sec ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Initial LID Storage ...... 0.003 0.069 Total Precipitation ...... 25.995 675.090 Evaporation Loss ......... 3.925 101.924 Infiltration Loss ........ 5.916 153.632 Surface Runoff ........... 5.849 151.906 LID Drainage ............. 10.649 276.553 Final Storage ............ 0.005 0.118 Continuity Error (%) ..... -1.329 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 16.498 5.376 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 16.904 5.508 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.001 0.000 Continuity Error (%) ..... -2.468 ******************************** Highest Flow Instability Indexes ******************************** All links are stable. ************************* Routing Time Step Summary ************************* Minimum Time Step : 60.00 sec Average Time Step : 60.00 sec Maximum Time Step : 60.00 sec % of Time in Steady State : 0.00 Average Iterations per Step : 1.00 % of Steps Not Converging : 0.00 *************************** Subcatchment Runoff Summary *************************** ------------------------------------------------------------------------------------------------------------------------------ Total Total Total Total Imperv Perv Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff Subcatchment in in in in in in in 10^6 gal CFS ------------------------------------------------------------------------------------------------------------------------------ DMA-1 675.09 0.00 67.63 216.57 379.17 20.00 399.16 0.98 0.11 0.591 BMP-1 675.09 7450.41 924.03 0.00 0.00 0.00 7200.87 0.95 0.11 0.886 Self-Mit 675.09 0.00 4.61 614.88 0.00 61.31 61.31 0.02 0.02 0.091 DMA-2 675.09 0.00 82.80 117.61 473.17 11.40 484.58 1.76 0.16 0.718 DMA-4 675.09 0.00 100.78 0.00 585.64 0.00 585.64 1.64 0.12 0.868 BMP-2 675.09 11380.17 974.71 0.00 0.00 0.00 11079.92 1.71 0.17 0.919 DMA-3 675.09 0.00 62.86 248.28 349.09 22.45 371.54 1.07 0.12 0.550 BMP-3 675.09 14391.43 994.21 0.00 0.00 0.00 14071.33 1.05 0.13 0.934 De-Min 675.09 0.00 4.60 614.75 0.00 61.61 61.61 0.00 0.00 0.091 *********************** LID Performance Summary *********************** -------------------------------------------------------------------------------------------------------------------- Total Evap Infil Surface Drain Initial Final Continuity Inflow Loss Loss Outflow Outflow Storage Storage Error Subcatchment LID Control in in in in in in in % -------------------------------------------------------------------------------------------------------------------- BMP-1 BMP_1 8125.50 924.07 0.00 84.00 7117.15 2.40 2.87 -0.00 BMP-2 BMP_2 12055.26 974.73 0.00 378.38 10701.78 2.40 3.10 -0.00 BMP-3 BMP_3 15066.52 994.25 0.00 2271.56 11800.28 2.40 3.21 -0.00 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- POC-1 OUTFALL 0.00 0.00 0.00 0 00:00 0.00 INFILTRATION_LOSS OUTFALL 0.00 0.00 0.00 0 00:00 0.00 STORAGE_PIPE STORAGE 0.01 2.29 2.29 18857 11:27 2.22 DRYWELLS STORAGE 3.44 22.17 22.17 12810 17:54 22.12 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- POC-1 OUTFALL 0.39 0.54 18857 11:57 3.73 4.11 0.000 INFILTRATION_LOSS OUTFALL 0.00 0.00 123 18:48 0 1.4 0.000 STORAGE_PIPE STORAGE 0.00 0.40 12810 17:54 0 0.377 0.073 DRYWELLS STORAGE 0.12 0.12 18857 11:16 1.64 1.64 -7.490 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** Storage Volume Summary ********************** -------------------------------------------------------------------------------------------------- Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------------------- STORAGE_PIPE 0.000 0 0 0 0.259 76 18857 11:27 0.25 DRYWELLS 0.054 14 0 0 0.353 89 12810 17:54 0.40 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- POC-1 5.87 0.01 0.54 4.111 INFILTRATION_LOSS 6.83 0.00 0.00 1.397 ----------------------------------------------------------- System 6.35 0.01 0.54 5.508 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- R2 DUMMY 0.25 18857 11:27 R3 DUMMY 0.40 12810 17:54 R4 DUMMY 0.00 123 18:48 ************************* Conduit Surcharge Summary ************************* No conduits were surcharged. Analysis begun on: Thu Dec 7 13:21:31 2023 Analysis ended on: Thu Dec 7 13:22:07 2023 Total elapsed time: 00:00:36 R2 Outlet Rating Curve HydroCAD output, SWMM Rating Curve Depth (ft) Area (ft2) 0 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.76 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.76 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.76 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.76 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.76 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.76 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 15.74 0.5 25.14 0.5 25.14 0.5 25.12 0.5 25.14 STOR3(DRYWELL) CURVE Depth (ft) Area (ft2) 0 0 0.1 31.3 0.2 56.4 0.3 72 0.4 83.9 0.5 93.6 0.6 101.9 0.7 108.8 0.8 114.9 0.9 120 1 124.5 1.1 128.3 1.2 131.5 1.3 134.1 1.4 136.3 1.5 137.9 1.6 139.1 1.7 140 1.8 139.8 1.9 139 2 137.9 2.1 136.3 2.2 134.2 2.3 131.4 2.4 128.3 2.5 124.5 2.6 120.1 2.7 114.8 2.8 108.9 2.9 101.8 3 93.7 3.1 83.9 3.2 72 3.3 56.4 3.4 31.3 3.5 0 STOR2(PIPESTORAGE) CURVE Elevation (feet) Discharge (cfs) Discarded (cfs) Primary (cfs) 10 0 0 0 10.5 0 0 0 11 0 0 0 11.5 0 0 0 12 0 0 0 12.5 0 0 0 13 0 0 0 13.5 0.001 0.001 0 14 0.001 0.001 0 14.5 0.001 0.001 0 15 0.001 0.001 0 15.5 0.001 0.001 0 16 0.001 0.001 0 16.5 0.001 0.001 0 17 0.001 0.001 0 17.5 0.001 0.001 0 18 0.001 0.001 0 18.5 0.001 0.001 0 19 0.001 0.001 0 19.5 0.001 0.001 0 20 0.001 0.001 0 20.5 0.002 0.002 0 21 0.002 0.002 0 21.5 0.002 0.002 0 22 0.002 0.002 0 22.5 0.002 0.002 0 23 0.002 0.002 0 23.5 0.002 0.002 0 24 0.002 0.002 0 24.5 0.002 0.002 0 25 0.002 0.002 0 25.5 0.002 0.002 0 26 0.002 0.002 0 26.5 0.002 0.002 0 27 0.002 0.002 0 27.5 0.003 0.003 0 28 0.003 0.003 0 28.5 0.003 0.003 0 29 0.003 0.003 0 29.5 0.003 0.003 0 30 0.003 0.003 0 30.5 0.003 0.003 0 31 0.003 0.003 0 31.5 0.003 0.003 0 32 0.003 0.003 0 32.5 1.185 0.003 1.182 33 2.022 0.003 2.019 33.5 2.476 0.003 2.473 34 2.859 0.003 2.856 R3 and R4 Rating Curve (Infiltration and Outlet Flow from Drywells via Hydrocad) Drawdown Calculation for BMP 1 Project Name Timm Residence Project No 3811 Surface Drawdown Time: 4.9 hr Surface Area 211 sq ft Underdrain Orifice Diameter: in 0.2188 in C:0.6 Surface Ponding (to invert of lowest surface discharge opening in outlet structure): 2.06 ft Amended Soil Depth: 2 ft Gravel Depth: 0.75 ft Orifice Q = 0.003 cfs Effective Depth 33.12 in Infiltration controlled by orifice 0.564 in/hr Infiltration controlled by media 5 in/hr Drawdown Calculation for BMP 2 Project Name Timm Residence Project No 3811 Surface Drawdown Time: 4.8 hr Surface Area 248 sq ft Underdrain Orifice Diameter: in 0.2813 in C:0.6 Surface Ponding (to invert of lowest surface discharge opening in outlet structure): 2 ft Amended Soil Depth: 2 ft Gravel Depth: 0.75 ft Orifice Q = 0.005 cfs Effective Depth 32.4 in Infiltration controlled by orifice 0.788 in/hr Infiltration controlled by media 5 in/hr Drawdown Calculation for BMP 3 Project Name Timm Residence Project No 3811 Surface Drawdown Time: 2.8 hr Surface Area 120 sq ft Underdrain Orifice Diameter: in 0.2188 in C:0.6 Surface Ponding (to invert of lowest surface discharge opening in outlet structure): 1.1467 ft Amended Soil Depth: 2 ft Gravel Depth: 0.67 ft Orifice Q = 0.002 cfs Effective Depth 21.7764 in Infiltration controlled by orifice 0.883 in/hr Infiltration controlled by media 5 in/hr Appendix G: Guidance for Continuous Simulation and Hydromodification Management Sizing Factors G-6 February 26, 2016 Figure G.1-2: California Irrigation Management Information System "Reference Evapotranspiration Zones" Appendix G: Guidance for Continuous Simulation and Hydromodification Management Sizing Factors G-7 February 26, 2016 Table G.1-1: Monthly Average Reference Evapotranspiration by ETo Zone (inches/month and inches/day) for use in SWMM Models for Hydromodification Management Studies in San Diego County CIMIS Zones 1, 4, 6, 9, and 16 (See CIMIS ETo Zone Map) January February March April May June July August Septembe r October Novembe r December Zone in/month in/month in/month in/month in/month in/month in/month in/month in/month in/month in/month in/month 1 0.93 1.4 2.48 3.3 4.03 4.5 4.65 4.03 3.3 2.48 1.2 0.62 4 1.86 2.24 3.41 4.5 5.27 5.7 5.89 5.58 4.5 3.41 2.4 1.86 6 1.86 2.24 3.41 4.8 5.58 6.3 6.51 6.2 4.8 3.72 2.4 1.86 9 2.17 2.8 4.03 5.1 5.89 6.6 7.44 6.82 5.7 4.03 2.7 1.86 16 1.55 2.52 4.03 5.7 7.75 8.7 9.3 8.37 6.3 4.34 2.4 1.55 January February March April May June July August Septembe r October Novembe r December Days 31 28 31 30 31 30 31 31 30 31 30 31 Zone in/day in/day in/day in/day in/day in/day in/day in/day in/day in/day in/day in/day 1 0.030 0.050 0.080 0.110 0.130 0.150 0.150 0.130 0.110 0.080 0.040 0.020 4 0.060 0.080 0.110 0.150 0.170 0.190 0.190 0.180 0.150 0.110 0.080 0.060 6 0.060 0.080 0.110 0.160 0.180 0.210 0.210 0.200 0.160 0.120 0.080 0.060 9 0.070 0.100 0.130 0.170 0.190 0.220 0.240 0.220 0.190 0.130 0.090 0.060 16 0.050 0.090 0.130 0.190 0.250 0.290 0.300 0.270 0.210 0.140 0.080 0.050 ATTACHMENT 3 Structural BMP Maintenance Information Use this checklist to ensure the required information has been included in the Structural BMP Maintenance Information Attachment: Preliminary Design/Planning/CEQA level submittal: Attachment 3 must identify:  Typical maintenance indicators and actions for proposed structural BMP(s) based on Section 7.7 of the BMP Design Manual Final Design level submittal: Attachment 3 must identify: Specific maintenance indicators and actions for proposed structural BMP(s). This shall be based on Section 7.7 of the BMP Design Manual and enhanced to reflect actual proposed components of the structural BMP(s) How to access the structural BMP(s) to inspect and perform maintenance Features that are provided to facilitate inspection (e.g., observation ports, cleanouts, silt posts, or other features that allow the inspector to view necessary components of the structural BMP and compare to maintenance thresholds) Manufacturer and part number for proprietary parts of structural BMP(s) when applicable Maintenance thresholds for BMPs subject to siltation or heavy trash(e.g., silt level posts or other markings shall be included in all BMP components that will trap and store sediment, trash, and/or debris, so that the inspector may determine how full the BMP is, and the maintenance personnel may determine where the bottom of the BMP is . If required, posts or other markings shall be indicated and described on structural BMP plans.) Recommended equipment to perform maintenance When applicable, necessary special training or certification requirements for inspection and maintenance personnel such as confined space entry or hazardous waste management ATTACHMENT 4 City standard Single Sheet BMP (SSBMP) Exhibit [Use the City’s standard Single Sheet BMP Plan.]