Loading...
HomeMy WebLinkAbout1229 GOLD FLOWER RD; ; CBR2025-1935; PermitBuilding Permit Finaled Residential Permit Print Date: 05/12/2026 Job Address: 1229 GOLD FLOWER RD, CARLSBAD, CA 92011 Permit Type: BLDG-Residential Work Class: Parcel#: 2145603500 Track#: Valuation: $69,632.64 Lot#: Occupancy Group: Project#: #of Dwelling Units: Plan#: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check#: Plan Check#: Occupant Load: Code Edition: Sprinkled: Project Title: Description: HOLIAN: (308 SF) INFILL ADDITION AT 2ND FLOOR Applicant: LOGAN ANDERSON 1106 2ND ST, # 561 ENCINITAS, CA 92024-5096 (619) 807-0640 FEE BUILDING PLAN CHECK Property Owner: HOLIAN FAMILY TRUST HOLIAN 1229 GOLD FLOWER RD CARLSBAD, CA 92011-3422 BUILDING PLAN REVIEW -MINOR PROJECTS (PLN) SB1473 -GREEN BUILDING STATE STANDARDS FEE SFD & DUPLEXES STRONG MOTION -RESIDENTIAL (SMIP) Addition Total Fees: $2,422.15 Total Payments To Date: $2,422.15 Permit No: Status: {city of Carlsbad CBR2025-1935 Closed -Finaled Applied: 08/06/2025 Issued: 10/03/2025 Finaled Close Out: 02/25/2026 Final Inspection: 02/25/2026 INSPECTOR: de Roggenbuke, Dirk Cornair, Brad Mcclane, Duncan Contractor: MODEL HOME INC1070 COMMERCE ST, # STE F SAN MARCOS, CA 92078-2626 (760) 682-5027 Balance Due: AMOUNT $893.10 $110.00 $3.00 $1407.00 $9.05 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and fi le the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov ( City of Carlsbad RESIDENTIAL BUILDING PERMIT APPLICATION FOR CITY USE l°~L Y PC Noetf:Jf/%.-l7J>j PC Deposit:~ J D Valuation: tj ~ VJ£ e B-1 Date: J 7 This form shall be completed to initiate a residential building permit application. Job Address: 1229 Gold Flower Rd Unit#: APN: 214-560-35-00 ---- Description of work: Infill addition at 2nd floor to an existing two-story single-family residence Project Valuation:$ 51 ,026.36 Is there an active code enforcement violation on this site? 0 Y 5[] N Are Planning permits required?: 0 Y 00 N Case File Nos.: ______________ _ Is there a manufactured home or mobile home at the job site?: 0 Y ral N (Refer to Form B-53) Please indicate the type of application(s) requested and provide the applicable information: Iii New SF: Living SF, 308 . Deck SF, . Patio SF, . Garage SF, ____ __,_ Is this to create a new ADU/JADU? □ Y [XI N. New fireplace? DY lxl N. D Remodel: ______ SF of affected area. Is the area a conversion or change of use? D Y □ N. D Pool/Spa: ______ SF. Additional Gas or Electrical Features? ____________ _ D Solar: ____ KW, _____ Modules. Mounted: □ Roof D Ground. Tilt: D Y □ N. RMA: □ Y □ N. Battery: □ Y D N. Panel Upgrade: □ Y □ N. Electric Meter Number: ____________ _ D Plumbing, Mechanical, Electrical: ________________________ _ D Other: __________________________________ _ APPLICANT (PRIMARY CONTACT): Name: Logan Anderson Address: 1106 2nd St, STE 103, PMB 561 City: Encinitas State: CA Zip: 92024 Phone: 619-807-0640 Email: logan@marcelalogan.com DESIGN PROFESSIONAL: Name: Logan Anderson Address: 1106 2nd St, STE 103, PMB 561 City: Encinitas State: CA Zip: 92024 Phone: 619-807-0640 Email: logan@marcelalogan.com State License: C-34208 ------------ PROPERTY OWNER: Name: Erin & Dan Holian Address: 1229 Gold Flower Rd City: Carlsbad State: CA Zip: 92011 Phone: 513-518-6132 Email: erinzholian@gmail.com CONTRACTOR: Name: Dustin Roller Address: 701 CRESTVIEW CT City: SAN MARCOS State:~ Zip: 92078 Phone: 760-682-5027 Email:INFO@MODELHOMEINC.COM CSLB License#: ...;;.9_27_8;;_2-'6 ____ Class: GENERAL B City Business License#: _______ _ Billing Party: D Applicant !XI Property Owner □ Contractor □ Other: _____________ _ Page 1 of 4 rev 8/25 The construction, addition, or alteration of buildings is governed by the California Contractors License Law (commencing with Business Professions Code section 7000). The law has an exemption that allows a person who is not a California Licensed Contractor to construct a single-family residential structure and engage in home improvements and repairs, provided they meet certain requirements. (Form 8-61 provides information about the requirements that apply to Owner-Builders makes you aware of your responsibilities and possible risk you may incur by having a permit issued to an Owner-Builder.) Permits for multi-family projects are only to be issued to California Licensed Contractors. Refer to Form 8-16 for other frequently asked questions. SECTION 1: APPLICANT (PROPERTY OWNER, CONTRACTOR, OR AGENT) CERTIFICATIONS CHECK EACH BOX Ix] I/We certify that I/we have a legal right, interest, or entitlement to the use of the property that is the subject of this application. Only the Property Owner or Owner's Agent may make or file the residential building permit application. By signing this form, I/we warrant under penalty of perjury that I/we am (are) lawful Agent(s) of the Property Owner(s). If a component of the project (in whole or in part) is proposed in the common area or exterior of a condominium building or planned development, I received permission from the Homeowners Association prior to filing the application. I/We understand that State law mandates the Applicant to provide an estimated value of all work proposed (Form 8-29). I/We hereby certify the construction valuation provided is accurate and includes all proposed work such as all structural work, finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevator, labor costs, and all permanent equipment and systems. If the valuation is underestimated, the permit may be denied, unless the Applicant can show detailed estimates to meet the approval of the Building Official. I/We understand that State law requires construction to be done by a Licensed Contractor and the Property Owner may apply for an Owner-Builder permit under an exemption from the law. IX] A. If the Contractor is the Applicant, the License Contractor Declaration in Section 2 must be completed. D B. If the Applicant is an Owner-Builder, an Owner-Builder affidavit is required and must be submitted (Form 8-61 ). The License Contractor Declaration in Section 2 does not need to be submitted. IX! I/We have read this application form in its entirety and reviewed the building permit application and the information I/we have provided is true and correct to the best of our knowledge. This certifies that ownership, the description of the project, and the location and labeling of all easements, grading, utilities, paving, and layout of a building site are accurate in all material respects as of the date when made. I/We understand that it is my responsibility to ensure that statements and representations are not misleading. I/We agree to promptly remove, correct, or add information as needed to correct any misleading or materially inaccurate information. I/We understand that any misstatement or omission of the requested information or of any information subsequently requested might be grounds for rejecting the application, denying the application, suspending or revoking a permit issued on the basis of these or subsequent representations, or for the seeking of such other and further relief as deemed appropriate by the City of Carlsbad. Page 2 of 4 rev 8/25 If a digital submittal is made or required, I/we certify that the submittal package includes digital fil es t hat follow the cit y's electronic submissions standards.) Failure to submit correctly formatted electronic files may result in the submittal being returned, which will delay intake and/or review. I/We certify t hat I am (we are) aware of all permit requirements and will not willfully deviate from the approved plan. I/We agree to comply with all applicable city and county ordinances and state laws relating to building construction. I/We assume full responsibility for the satisfactory completion of all work authorized under the permit(s), including work performed prior to assuming control. ~ After construction begins, I/we understand that a height certification, pad certification, or boundary certification may need to be submitted to the Building Inspector, when required. IX] I/We understand that a building permit application will expire If a permit has not been issued/obtained within one year from the application date (original filing date), unless an extension of time has been granted (Form B-25). With some limited exceptions, if a building permit application expires and there is interest in proceeding with the same project, a new application will be required and the project will be subject to new fees and regulations that are in effect at t he time the new application is submitted. After submitting the application, the Billing Party designated as part of the application will be sent future city invoices for above referenced building permit(s). I understand that if a permit fee or development impact fee refund is issued, the check will be mailed to the financial responsible party (the actual person or company that paid the invoice). If the information on file for the financially responsible party is outdated or inaccurate, it must be corrected before the refund can be sent . Form B-49B may be completed to update the financially responsible party's contact information. I/We agree to waive, release, and discharge t he City of Carlsbad ("City") and its officers, elected or appointed officials, employees, volunteers and agents (the "Indemnified Parties") from all claims and demands, rights and causes of action of any kind with respect to the building permit application, the purpose of which is to challenge, attack set aside, void, modify, or annul the approval or denial of the application, or the processing thereof, except liability caused by the Indemnified Parties' sole negligence or willful misconduct, in which case the indemnity received by the city shall be reduced by the amount: (a) that the city's active negligence contributed to the liability on a comparative basis; or (b) such other amount as may be required by law. This obligation is effective without reference to the existence or applicability of any insurance coverages which may have been required by city or any additional insured endorsements which may extend to Indemnified Parties. Property Owner(s) and Applicant, on behalf of themselves and all parties claiming under or through them, waive all rights of subrogation and contribution against the Indemnified Parties while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed, regardless of any prior, concurrent or subsequent passive negligence by the Indemnified Parties. By signing below, I/we acknowledge t hat I/we have completely read, understand, and agree to the declarat ions above and ccept all rth herein. Date:. ___ 1_0_1_11_2_0_2_5 __ _ Page 3 of 4 rev 8/25 ' ' SECTION 2: CONTRACTOR CERTIFICATIONS CHEO< EACH BOX [Kl I hereby affirm under penalty of perjury that I am a licensed under provisions of Chapter 9 (commencing with section 7000) of Division 3 of the Business and Professions Code, and the license is in full force and effect. □ WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS {$100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. Place a check mark next to the declaration regarding the workers' compensation coverage that applies. Check only one (A), (B), or (C): D A. I have and will maintain a certificate of consent to self-insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. □ B. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: IKl C. I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forth with comply with those provisions. D I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Civil Code section 3097). If not using a construction lending agency write N/A: Lender: .;...Nc.:../A..;__ ________________ _ 0 I understand that I will need a current Carlsbad business license to obtain the building permit. By signing below, I acknowledge that I have completely read, understand, and agree to the declarations above and accept all terms set forth herein . .:;z;~ Date: 101112s Signature of Contractor FOR CITY USE ONLY Receipt Acknowledgement: ____________ _ Date:. _________ _ BUILDING STAFF Page 4 of4 rev 8/25 ( City of Carlsbad OWNERS AUTHORIZED AGENT FORM B-62 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www .carlsbadca.gov OWNER'S AUTHORIZED AGENT FORM Only a property owner, contractor or their authorized agent may submit plans and applications for building permits. To authorize a third-party agent to sign for a building permit, the owner's third party agent must bring this signed form, which identifies the agent and the owner who s/he Is representing, and for what jobs s/he may obtain permits. The form must be completed in its entirety to be accepted by the City for each separate permit application. Note: The following Owner's Authorized Agent form is required to be completed by the property owner only when designating an agent to apply for a construction permit on his/her behalf. AUTHORIZATION OF AGENT TO ACT ON PROPERTY OWNER'S BEHALF Excluding the Property Owner Acknowledgement, the execution of which I understand ls my personal responsibility, I hereby authorize the following person{s) to-act as my agent(s) to apply for, sign, and file the documents necessary to obtain an Owner-Builder Permit for my project. 1nnh addition at 2nd floor to an existing two-story slngle-family residence Scope of Construction Project (or Description of Work): __________________ _ 1229 Gold Flower Rd Project Location or Address: __________________________ _ . d Logan & Marcela Anderson 619-807-0640 Name of Authorize Agent: ________________ Tel No. ________ _ Address of Authorized Agent: 1106 Second St, STE 103, PMB 561 Encinitas, CA 92024 I declare under penalty of perjury that I am the property owner for the address listed above and I personally filled out the above information and certify Its accuracy. P<opo,ty OWne,'s Slanatu,e, ~ lli (A GL-b.. Date, <? k IJ..e:, l PERMIT INSPECTION HISTORY for CBR2025-1935 Permit Type: BLDG-Residential Application Date: 08/06/2025 Owner: TRUST HOLIAN FAMILY TRUST HOLIAN Work Class: Addition Issue Date: 10/03/2025 Subdivision: CARLSBAD TCT#91-12 UNIT#02 Status: Closed -Finaled Expiration Date: 06/29/2026 Address: 1229 GOLD FLOWER RD IVR Number: 65191 CARLSBAD, CA 92011 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Date Start Date Status 12/29/2025 12/29/2025 BLDG-14 304563-2025 Passed Dirk de Roggenbuke Frame/Steel/Bolting/Weldi ng (Decks) Checklist Item BLDG-Building Deficiency COMMENTS Partial pass for exterior wall only will need a frame inspection for interior loft fill. Install encounter flash windows as per plan and recall for an exterior wall inspection. 11 /19/25 frame inspection only L TP fours at post to bottom plate and that header. Recall for plumbing electrical and mechanical inspection. 12/29/25 new beam at kitchen framing ok 12/31/2025 12/31/2025 BLDG-17 Interior Lath/Drywall 3047 41-2025 Passed Dirk de Roggenbuke Checklist Item COMMENTS BLDG-Building Deficiency Not ready 12/31/25 pantry, dining area Checklist Item COMMENTS BLDG-Building Deficiency 12/31/25 pantry, dining area 2/25/2026 02/25/2026 BLDG-Final Inspection 309256-2026 Passed Tuesday, May 12, 2026 Checklist Item BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final COMMENTS Duncan McClane Re inspection Passed Yes Passed Yes Passed Yes Passed Yes Yes Yes Yes Yes Inspection Complete Complete Complete Page 4 of 4 PERMIT INSPECTION HISTORY for CBR2025-1935 Permit Type: BLDG-Residential Application Date: 08/06/2025 Work Class: Addition Issue Date: Status: Closed -Finaled Expiration Date: IVR Number: Scheduled Actual Inspection Type Inspection No. Date Start Date 11/24/2025 11/24/2025 BLDG-13 Shear Panels/HD301820-2025 (ok to wrap) Checklist Item BLDG-Building Deficiency Checklist Item BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting­ Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts­ Dampers COMMENTS COMMENTS 12/16/2025 12/16/2025 BLDG-11 303619-2025 Tuesday, May 12, 2026 Foundation/Ftg/Piers (Rebar) Checklist Item BLDG-Building Deficiency Checklist Item BLDG-Building Deficiency COMMENTS COMMENTS 10/03/2025 06/29/2026 65191 Inspection Status Passed Passed Owner: TRUST HOLIAN FAMILY TRUST HOLIAN Subdivision: CARLSBAD TCT#91-12 UNIT#02 Address: 1229 GOLD FLOWER RD CARLSBAD, CA 92011 Primary Inspector Relnspection Inspection Brad Cornair Complete Passed Yes Passed Yes Yes Yes Yes Yes Brad Cornair Complete Passed Yes Passed Yes Page 3 of 4 I ' PERMIT INSPECTION HISTORY for CBR2025-1935 Permit Type: BLDG-Residential Application Date: 08/06/2025 Owner: TRUST HOLIAN FAMILY TRUST HOLIAN Work Class: Addition Issue Date: 10/03/2025 Subdivision: CARLSBAD TCT#91-12 UNIT#02 Status: Closed -Finaled Expiration Date: 06/29/2026 Address: 1229 GOLD FLOWER RD IVR Number: 65191 CARLSBAD, CA 92011 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status 11/19/2025 11/19/2025 BLDG-14 301432-2025 Failed Brad Cornair Relnspection Incomplete Frame/Steel/Bolting/lNeldi ng (Decks) Checklist Item BLDG-Building Deficiency Checklist Item BLDG-Building Deficiency COMMENTS Partial pass for exterior wall only will need a frame inspection for interior loft fill. Install encounter flash windows as per plan and recall for an exterior wall inspection. 11/19/25 frame inspection only L TP fours at post to bottom plate and that header. Recall for plumbing electrical and mechanical inspection. COMMENTS Not ready frame and meps inspection not completed Passed No Passed No 11/20/2025 11/20/2025 BLDG-84 Rough Combo 301565-2025 Partial Pass Brad Cornair Reinspection Incomplete (14,24,34,44) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-14 Frame-Steel-Bolting-Need fire blocking at exterior wall need to verify new duct No Welding (Decks) added to system meets minimum requirements. Verify AFCI and interconnected smoke detectors at final. BLDG-34 Rough Electrical Yes BLDG-44 Rough-Ducts-No Dampers 11/24/2025 11/24/2025 BLDG-13 Shear Panels/HD301820-2025 (ok to wrap) Passed Brad Cornalr Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes Tuesday,May12,2026 Complete Page 2 of 4 Building Permit Inspection History Finaled {city of Carlsbad PERMIT INSPECTION HISTORY for CBR2025-1935 Permit Type: BLDG-Residential Application Date: 08/06/2025 Owner: TRUST HOLIAN FAMILY TRUST HOLIAN Work Class: Addition Issue Date: 10/03/2025 Subdivision: CARLSBAD TCT#91 -12 UNIT#02 Status: Closed -Finaled Expiration Date: 06/29/2026 IVR Number: 65191 Address: 1229 GOLD FLOWER RD CARLSBAD, CA 92011 Scheduled Date 10/17/2025 Actual Inspection Type Start Date 10/17/2025 BLDG-11 Foundation/Ftg/Piers (Rebar) Checklist Item Inspection No. 298536-2025 COMMENTS BLDG-Building Deficiency Inspection Status Passed Primary Inspector Brad Cornair 10/31/2025 10/31/2025 BLDG-13 Shear Panels/HD299855-2025 (ok to wrap) Failed Brad Cornair Checklist Item BLDG-Building Deficiency Checklist Item BLDG-Building Deficiency COMMENTS Partial pass for exterior wall only will need a frame inspection for interior loft fill. Install encounter flash windows as per plan and recall for an exterior wall inspection. COMMENTS Install windows and counter flash recall exterior wall inspection 11/10/2025 11/10/2025 BLDG-13 Shear Panels/HD300718-2025 Partial Pass Dirk de Roggenbuke (ok to wrap) Checklist Item BLDG-Building Deficiency Checklist Item BLDG-Building Deficiency COMMENTS COMMENTS Install windows and counter flash recall exterior wall inspection 11/10/25 bottom windows, and slider install installed with flashing, two top windows not installed 11/19/2025 11/19/2025 BLDG-14 301432-2025 Failed Brad Cornair Frame/Steel/BoltingfWeldi ng (Decks) Checklist Item COMMENTS BLDG-Building Deficiency Not ready Tuesday, May 12, 2026 Reinspection Inspection Complete Passed Yes Reinspection Incomplete Passed Yes Passed No Reinspection Incomplete Passed No Passed No Reinspection Incomplete Passed No Page 1 of 4 lrue North COMPLI A NC E SERVICE S September 25, 2025 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. City of Carlsbad -FINAL REVIEW City Pennit No: CBR2025-l 935 True North No.: 25-018-788 Carlsbad, CA 92008 Plan Review: Infill Addition to Second Floor Address: 1229 Gold Flower Rd Applicant Name: Logan Anderson Applicant Email: logan@marcelalogan.com OCCUPANCY AND BUILDING SUMMARY: Occupancy Groups: R-3 Occupant Load: N/ A Type of Construction: V-B Sprinklers: No Stories: 2 Area of Work (sq. ft.): 308 sq. ft. The plans have been reviewed for coordination with the permit application. Valuation: Confirmed Scope of Work: Confirmed Floor Area: Confirmed Attn: Building & Safety Department, True North Compliance Services, Inc. has completed the final review of the following documents for the project referenced above on behalf of the City of Carlsbad: I. 2. 3. Drawings: One (l) copy dated September 16, 2025, by Logan Thane Anderson. Structural Calculations: One (1) copy dated July 25, 2025, by Christopher M. Cobb. Other Documents: One ( l) copy dated August 5, 2025, by City of Carlsbad. The 2022 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2021 IBC, UMC, UPC, and 2020 NEC, as amended by the State of California), 2022 California Green Building Standards Code, 2022 California Existing Building Code, and 2022 California Energy Code, as applicable, were used as the basis of our review. Please note that our review has been completed and we have no further comments. We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any questions or ifwe can be of further assistance. Sincerely, True North Compliance Services Review By: Emily Wilson -Plan Review Engineer Quality Review By: Areli Sanchez -Plan Review Supervisor True North Compliance Services, Inc. 8369 Vickers Street, Suite 207, San Diego, CA 92111 T / 562.733.8030 True North COMPLIANCE SERVICES August 18, 2025 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. City of Carlsbad-FIRST REVIEW City Permit No: CBR2025-l 935 True North No.: 25-018-788 Carlsbad, CA 92008 Plan Review: Infill Addition to Second Floor Address: 1229 Gold Flower Rd, Carlsbad CA Applicant ame: LOGAN ANDERSON Applicant Email: logan@marcelalogan.com True North Compliance Services, Inc. has completed the review of the following documents for the project referenced above on behalf of the City of Carlsbad. Our comments can be found on the attached list. 1. Drawings: Electronic copy dated August 4, 2025, by Marcela & Logan, Architects INC. 2. Structural Calculations: Electronic copy dated July 25, 2025, by Chrism Cobb. 3. CAP: Electronic copy dated August 5, 2025, by Logan Anderson. Attn: Permit Technician, the scope of work on the plans has been reviewed for coordination with the scope of work on the permit application. See below for information if the scope of work on plans differs from the permit application: Valuation: Scope of Work: Floor Area: Confirmed See Notes Below Confirmed Notes: The plans indicate replacement of first floor doors and windows which was not included in the permit application. Our comments follow on the attached list. Please call if you have any questions or if we can be of further assistance. Sincerely, True North Compliance Services Review By: Emily Wilson -Plan Review Engineer Quality Review By: Areli Sanchez -Plan Review Supervisor Plan Review Comments True North Compliance Services, Inc. 8369 Vickers Street, Suite 207, San Diego, CA 92111 T / 562. 733.8030 Infill Addition to Second Floor 1229 Gold Flower Rd August 18, 2025 ARD COPY -RESUBMITT AL INSTRUCTIONS: City of Carlsbad-FIRST REVIEW City Permit No.: CBR2025-1935 True North No.: 25-018-788 Page2 Please do not resubmit plans until aIJ departments have completed their reviews. For status, please contact building@carlsbadca.i::ov Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential proj ects). Corrected sets can be submitted as follows: • Deliver THREE corrected sets of plans and TWO corrected calculations/reports directly to the City of Carlsbad Building Division, 1635 Faraday Ave., Carlsbad, CA 92008, ( 442) 339-2719. The city will route the plans to True North, Planning and Land Development Engineering Departments (if applicable) for continued review. o Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific instructions for resubmittal review. The city will not route plans back to Dennis Grubb & Associates for continued Fire Prevention review. GENERAL INFORMATION: A. The following comments are referred to the 2022 California Building, Mechanical, Plumbing, Electrical Codes, California Green Building Standards Code, and Energy Code (i.e., 2021 IBC, UMC, UPC, and 2020 NEC, as amended by the State of California). B. There may be other comments generated by the Building Division and/or other City departments that will also require your attention and response. This attached list of comments, then, is only a portion of the plan review. Contact the City for other items. C. Respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which details, specification, or calculation shows the required information. Your complete and clear responses will expedite the re-check. D. Where applicable, be sure to include the architect and engineer's stamp and signature on all sheets of the drawings and on the coversheets of specifications and calculations per CBPC 5536. l and CBPC 6735. This item will be verified prior to plan approval. E. If you have any questions regarding the comments below, please contact Emily Wilson via email emilyw@tncservices.com or telephone (562) 733-8030. OCCUPANCY & BUILDING SUMMARY: Occupancy Groups: Occupant Load: Type of Construction: Sprinklers: Stories: Area of Work (sq. ft.): R-3 NIA V-B No two (308 second floor addition) sq. ft. InftlJ Addition to Second Floor 1229 Gold Flower Rd August 18, 2025 ARCIDTECTURAL COMME TS: City of Carlsbad-FIRST REVIEW City Permit No.: CBR2025-1935 True North No.: 25-018-788 Page3 Al. Sheet AOOO. Project Description. Please update to include the work proposed at the fust floor (the replacement of doors and windows). ' ., ... I I ' ' ■ 1STFLOORO£MO~~ C) +;~· --I . ~=4 .................. -···••···--j A2. Sheet A 101. First Floor Plan. Safety glazing is required where the glazing is within 24 inches of either side per CRC R308.4.2. Please revise window (01) to be tempered, if applicable. If not applicable, please provide dimensions to confirm exemption. ---+-- A3. Sheet A 101. First Floor Plan. Provide a 3 ft minimum landing at the exterior side of exterior doors per CRC R3 l l.3. Landing elevation shall not be more than 7.75" lower than the top of the threshold. The slope of the landing shall not exceed 2%. (E)FAIII.Y r-r r I I u ..... A4. Sheet Al 02. Second Floor Plan. Window (03) is provided as the emergency escape and rescue opening in the bedroom. Please specify the window opening to have the bottom of the clear opening to be 44 inches maximum, measured from the floor. CRC R310.2. l=--i-~I I •='-'--+----' Infill Addition to Second Floor 1229 Gold Flower Rd City of Carlsbad-FIRST REVIEW City Permit No.: CBR2025-1935 True North No.: 25-0 18-788 Page 4 August 18, 2025 ENERGY COMPLIANCE COMMENTS: Tl. T2. Revise plan to show interior lighting fixtures that are not controlled by occupancy or vacancy sensors to be equipped with dimming controls. CEnergyC 150.0 (K)(2)(F) 9 "" Sheet AIOI & Al 02. Specify all new and altered windows to have a maximum U-factor of0.30 and max. SHGC of0.23. Per the Title-24 Certificate of Compliance Form. STRUCTURAL COMMENTS: General: S 1. The following shall be addressed instead of providing Geotech report. Plans: a) Depth of foundation below natural grade shall not be less than 24 inches for foundation. b) Foundation construction shall be reinforced with at least four #5 reinforcing bars. Two bars shall be placed within four (4) inches of the bottom of a cleaned foundation footing and two bars shall be within four ( 4) inches of the top of the foundation. c) Isolated footings shall be tied with a grade beam. d) Design shall be based on CBC Table 1806.2 Material Class 5 and using a maximum 1,500 psf bearing capacity and 100 psf passive resistance. When exposed to sulfates, structural concrete should be based on a soluble sulfate exposure severity classification of"Severe" in accordance with ACI-318, Table 4.3 .1, and consist of 4500 psi, water/cement ratio of 0.45, and Type V cement for all concrete in contact with soil. Please update concrete notes on Sheet S-1.0 to comply. e) Doweling of the new foundation and slabs into existing foundation and slabs to resist the movements of expansive soil is required. Dowels shall be a minimum of six (6) inches into the existing concrete and a minimum of24 inches into the new concrete with number three (3) bars at 18 inches on center, each way. Please revise detail l/S3.0 to comply. S2. Sheet S-1.0. Please update the structural design criteria to reference 2022 CBC. OIIC S3. Sheet S-3.0. Detail l. Please provide a minimum 3" concrete cover for reinforcement. Infill Addition to Second Floor 1229 Gold Flower Rd August 18, 2025 (N)FTG PfR PIAN Structural Calculations: .. (N)f()OTit.G TO fl} tNltRSICTING nc. ... LU ~ City of Carlsbad-FIRST REVIEW City Perm.it No.: CBR2025-1935 True North No.: 25-018-788 Page 5 S4. Please update the code references to reference ASCE 7-16 & IBC 2021. I Code References If you have any questions regarding the above comments, please contact Emily Wilson via email emilyw@tncservices.com. or telephone (562) 733-8030. [END] rxl MORGAN bM:I STRUCTURAL www.morganstructural.com chris@morganstructural.com (919) 914-2043 jeff@morganstructural.com (760) 690-7454 Date: 7/25/2025 Engineer: Chris Cobb, SE Job#: 25.127 STRUCTURAL CALCULATIONS FOR THE HOLIAN INFILL 1229 GOLD FLOWER ROAD CARLSBAD, CA 92 011 01.() ON LOO MN o- (0~ I.() a:, s::t' ..-- N Lt) M en ~ I Lt) N 0 N ~ en (.) rx7 MORGAN bM:I STRUCTURAL www.morganstructural.com chris@morganstructural.com (919) 914-2043 jeff@morganstructural.com (760) 690-7454 TABLE OF CONTENTS GRAVITY DESIGN Roof, Floor & Wall Weights ....................................................................................... l Roof Key Plan ........................................................................................................... 3 Roof Framing ........................................................................................................... 4 Level 2 Floor Key Plan .............................................................................................. 7 Floor Framing ........................................................................................................... 8 LATERAL DESIGN ASCE Hazard Analysis ............................................................................................ l 7 Base Shear Analysis ................................................................................................ l 8 Shear Wall Analysis ................................................................................................ 24 FOUNDATION DESIGN Key Plan ................................................................................................................. 26 Foundation Design ................................................................................................. 27 REFERENCES Available As-Builts .................................................................................................. 30 project: Hogen Garage ~ MORGAN location: Carlsbad STRUCTURAL REFERENCE 2022 California BuildinQ Code Typical Roof Loads: Asphalt Shingle Roof 5/8" Sheathing Framing Insulation 5/8" Gyp Board Ceiling Misc Typical Floor Loads: Flooring 3/4" Sheathing Framing Insulation 5/8" Gyp Board Ceiling Misc Typical Deck Loads: Elastomeric Waterproofing 3/4" Sheathing Framing 7/8" Plaster Ceiling Misc ding Weights & Base Shear-Holian, Floor and Wall Weights 1 by: sheet no: CMC date: job no: 07/25/25 24.127 6.0 psf 1.9 psf 4.0 psf 1.0 psf 2.8 psf 4.3 est 20.0 psf DL: 20.0 psf RLL: 20.0 psf 7.0 psf 2.5 psf 4.0 psf 1.0 psf 3.0 psf 2.5 est 20.0 psf DL: 20.0 psf LL: 40.0 psf 0.5 psf 2.3 psf 4.0 psf 12.0 psf 2.2 est 21.0 psf DL:, 21.0 psf LL: 60.0 psf fXl MORGAN ~ STRUCTURAL jeff@morganstructural.com (760) 690-7454 HOLIDAN INFILL 1229 GOLD FLOWER ROAD CARLSBAD, CA 92011 2 DATE: 7/25/25 PROJECT #: 25.127 chris@morganstructural.com (919) 914-2023 2 Project Title: Engineer: Project ID: Project Descr: I Wood Beam UC#: KW-06016107, Bulld:20.25.06.16 DESCRIPTION: 8-5.1 I Code References Governing Code : IBC 2021 Referenced Design Standard(s): NOS 2018 Morgan Structural Engineering Load Combination Set : ASCE 7-22 / IBC 2024 (L<=100psf) Material Properties Analysis Method : Allowable Stress Design load Combination ASCE 7-22 / IBC 2024 (l <=100psf) Wood Species Wood Grade Douglas Fir-larch No.1 & Better Fb + Fb - Fe -Prll Fe -Perp Fv Ft Beam Bracing Beam is Fully Braced against lateral-torsional buckling 0 0 5 Lr 0.4 Span= 6.50 ft 1,200.0 psi 1,200.0 psi 1,550.0 psi 625.0psi 180.0 psi 800.0 psi Project File: 25.127 Holian.ec6 (c) ENERCALC, LLC 1982-2025 E : Modulus of Elasticity Ebend-xx 1,800.0ksi Eminbend -xx 660.0ksi Density 31.210pcf 2 Applied Loads Service loads entered. load Factors will be applied for calculations. Beam self weight NOT internally calculated and added Uniform Load : D = 0.0250, Lr= 0.020 ksf, Tributary Width= 20.0 ft DESIGN SUMMARY Design OK Maximum Bending Stress Ratio = 0.737: 1 Maximum Shear Stress Ratio = 0.383 : 1 Section used for this span 6x8 Section used for this span 6x8 fb: Actual = 1,106.18psi fv: Actual = 86.18 psi F'b = 1,500.00 psi F'v = 225.00 psi load Combination l oad Combination +D+Lr +D+Lr location of maximum on span = 3.250ft l ocation of maximum on span = 5.883 ft Span # where maximum occurs = Span# 1 Span # where maximum occurs = Span# 1 l Maximum Deflection Max Downward Transient Deflection 0.046 in Ratio= 1679 >=360 Span: 1 : Lr Only Max Upward Transient Deflection 0 in Ratio = 0 <360 n/a Max Downward Total Deflection 0.104 in Ratio= 746 >=240 Span: 1 : +D+Lr Max Upward Total Deflection 0 in Ratio= 0 <240 n/a Maximum Forces & Stresses for Load Combinations Load Combination IIJ!ax S!ress Ra!10s Moment l7alues Sfiear l7alues Segment length Span# M V CD CM cl Clx CE Cfu C i Cr M fb F'b V fv F'v DOnly 0.0 0.00 0.0 0.0 Length = 6.50 ft 0.569 0.296 0.90 1.00 1.00 1.00 1.000 1.00 1.00 1.00 2.64 614.5 1,080.0 1.32 47.9 162.0 +D+Lr 1.00 1.00 1.00 1.000 1.00 1.00 1.00 0.0 0.00 0.0 0.0 Length = 6.50 ft 0.737 0.383 1.25 1.00 1.00 1.00 1.000 1.00 1.00 1.00 4.75 1,106.2 1,500.0 2.37 86.2 225.0 +D+0.750Lr 1.00 1.00 1.00 1.000 1.00 1.00 1.00 0.0 0.00 0.0 0.0 Length = 6.50 ft 0.656 0.340 1.25 1.00 1.00 1.00 1.000 1.00 1.00 1.00 4.23 983.3 1,500.0 2.11 76.6 225.0 +0.60D 1.00 1.00 1.00 1.000 1.00 1.00 1.00 0.0 0.00 0.0 0.0 Length = 6.50 ft 0.192 0.100 1.60 1.00 1.00 1.00 1.000 1.00 1.00 1.00 1.58 368.7 1,920.0 0.79 28.7 288.0 3 3 !Wood Beam UC#: KW-06016107, Bulld:20.25.06.16 DESCRIPTION: B-5.1 Overall Maximum Deflections Span Load ComblnaUon 1 +D+Lr Vertical Reactions Load Combination Max Upward from all load Cond,tlons Max Upward from load Combinations Max Upward from Load Cases DOnly +D+Lr +D+0.750Lr +0.60D Lr Only Project Title: 4 Engineer: Project ID: Project Descr: Project File: 25.127 Holian.ec6 Morgan Structural Engineering (c) ENERCALC, LLC 1982-2025 Max. Location Load Combination Max. location ·-· Deft in Span •+· Dell in Span 0.1045 3.274 0.0000 0.000 Support notation : Far left is # 1 Values in KIPS Support 1 Support 2 2.925 2.925 2.925 2.925 1.625 1.625 1.625 1.625 2.925 2.925 2.600 2.600 0.975 0.975 1.300 1.300 4 Project Title: Engineer: Project ID: Project Descr: Wood Beam UC#: KW-06016107, Build:20.25.06.16 Morgan Structural Engineering DESCRIPTION: B-5.2 I Code References Governing Code : IBC 2021 Referenced Design Standard(s) : NDS 2018 Load Combination Set: ASCE 7-22 / IBC 2024 (L<=100psf) Material Properties Analysis Method : Allowable Stress Design Load Combination ASCE 7-22 / IBC 2024 (L<=100psf) Wood Species Wood Grade Douglas Fir-Larch No.1 & Better Fb + Fb - Fe -Prll Fe -Perp Fv Ft Beam Bracing Beam is Fully Braced against lateral-torsional buckling 0(2) Lr(2) D 0.05 Lr 0.04 Span • 6.50 ft 1,200.0psi 1,200.0 psi 1,550.0 psi 625.0psi 180.0 psi 800.0 psi Project File: 25.127 Hollan.ec6 (c) ENERCALC, LLC 1982-2025 E : Modulus of Elasticity Ebend-xx 1,800.0ksi Eminbend -xx 660.0ksi Density 31.210pcf 2 Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight NOT internally calculated and added Uniform Load : D = 0.0250, Lr= 0.020 ksf, Tributary Width= 2.0 ft Point Load : D = 2.0, Lr = 2.0 k @ 2.0 ft DESIGN SUMMARY Maximum Bending Stress Ratio = 0.919 1 Maximum Shear Stress Ratio Section used for this span 6x8 Section used for this span fb: Actual = 1,378.93psi fv: Actual F'b = 1,500.00psi F'v Load Combination Load Combination •D•Lr Location of maximum on span = 2.016ft Location of maximum on span Span # where maximum occurs = Span# 1 Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection 0.051 in Ratio= 1521 >=360 Span: 1 : Lr Only Max Upward Transient Deflection O in Ratio= 0 <360 n/a Max Downward Total Deflection 0.104 in Ratio= 752 >=240 Span: 1 : +D•Lr Max Upward Total Deflection O in Ratio= 0 <240 n/a Maximum Forces & Stresses for Load Combinations Load Combination l'iilax Slress Ral1os l'iilomenl IJalues Segment Length Span# M V CD CM Ct Clx CE Cfu Ci Cr M fb DOnly Length = 6.50 ft 0.643 0.340 0.90 1.00 1.00 1.00 1.000 1.00 1.00 1.00 2.99 694.7 •D•Lr 1.00 1.00 1.00 1.000 1.00 1.00 1.00 Length = 6.50 ft 0.919 0.486 1.25 1.00 1.00 1.00 1.000 1.00 1.00 1.00 5.93 1,378.9 •D+0.750Lr 1.00 1.00 1.00 1.000 1.00 1.00 1.00 Length m 6.50 ft 0.805 0.426 1.25 1.00 1.00 1.00 1.000 1.00 1.00 1.00 5.19 1,207.9 +0.60D 1.00 1.00 1.00 1.000 1.00 1.00 1.00 5 Design OK = 0.486 : 1 6x8 = 109.32 psi = 225.00 psi •D•Lr = 0.000 ft = Span# 1 --- Sfiear IJalues F'b V fv F'v 0.0 0.00 0.0 0.0 1,080.0 1.52 55.1 162.0 0.0 0.00 0.0 0.0 1,500.0 3.01 109.3 225.0 0.0 0.00 0.0 0.0 1,500.0 2.63 95.8 225.0 0.0 0.00 0.0 0.0 5 I Wood Beam UC#: KW-06016107, Bulld:20.25.06.16 DESCRIPTION: B-5.2 Project Title: Engineer: Project ID: Project Descr: Morgan Structural Engineering Maximum Forces & Stresses for Load Combinations Load Combination Segment Length Span # Length= 6.50 ft 1 0.217 0.115 1.60 1.00 1.00 1.00 1.000 1.00 1.00 1.00 Overall Maximum Deflections Span Load Combination Max. Location Load Combination •.• Deft in Span 1 +D+Lr 0.1037 2.965 M 1.79 Vertical Reactions Support notation : Far left is #1 Load Combination Max Upward from all Load Cond,llons Max Upward from Load Combinations Max Upward from Load Cases DOnly +D+Lr +D+0.750Lr +0.600 Lr Only Support 1 Support 2 3.062 1.523 3.062 1.523 1.547 0.778 1.547 0.778 3.062 1.523 2.683 1.337 0.928 0.467 1.515 0.745 6 6 Project File: 25.127 Holian.ec6 (c) ENERCALC, LLC 1982-2025 fb F'b V 416.8 1,920.0 0.91 33.1 288.0 Max. Location ·+· Defl in Span 0.0000 0.000 Values in KIPS rx1 MORGAN ~ STRUCTURAL jeff@morganstructural.com (760) 690-7454 ffiP xruv..- (0 t• ltlVIStDOPNG t HOLIDAN INFILL 1229 GOLD FLOWER ROAD CARLSBAD, CA 92011 . ·, . ~" ® 7 DATE: 7/25/25 PROJECT#: 25.127 chris@morganstructural.com (919) 914-2023 ffi ~. .---..u-•-• I I I I I 7 r Project Title: Engineer: Project ID: Project Descr: Wood Beam LIC#: KW-06016107, Build:20.25.06.16 DESCRIPTION: 8-1 Morgan Structural Engineering J Code References Governing Code : IBC 2021 Referenced Design Standard(s): NDS 2018 Load Combination Set: ASCE 7-22 / IBC 2024 (L<=100psf) Material Properties Analysis Method : Allowable Stress Design Load Combination ASCE 7-22 / IBC 2024 (L<=100psf) Wood Species Wood Grade Beam Bracing Boise Cascade Versa Lam 3100 Beam is Fully Braced against lateral-torsional buckling Fb + Fb - Fe -Prll Fe -Perp Fv Ft 3,100.0psi 3,100.0 psi 3,000.0psi 750.0 psi 285.0psi 2,100.0 psi Project File: 25.127 Holian.ec6 {c) ENERCALC, LLC 1982-2025 E : Modulus of Elasticity Ebend-xx 2,000.0ksi Em in bend -xx 1,036.83 ksi Density 41 .760pcf 2 3 Span = 19.0 ft Span = 2.0 ft Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight NOT internally calculated and added Load for Span Number 1 Uniform Load : D = 0.020, L = 0.040 ksf, Tributary Width = 6.0 ft Load for Span Number 2 Uniform Load : D = 0.020, L = 0.040 ksf, Tributary Width = 6.0 ft Point Load : D = 0.420, L = 0.860 k @ 2.0 ft DESIGN SUMMARY Maximum Bending Stress Ratio = 0.461: 1 Maximum Shear Stress Ratio Section used for this span 5.25x11.875 Section used for this span fb: Actual = 1,431.09psi fv: Actual F'b = 3,103.61 psi F'v Load Combination Load Combination +O+L Location of maximum on span ::; 19.000ft Location of maximum on span Span # where maximum occurs ::; Span# 1 Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection 0.227 in Ratio= 1002>=360 Span: 1 : L Only Max Upward Transient Deflection -0.003 in Ratio= 8124 >=360 Span: 2 : L Only Max Downward Total Deflection 0.341 in Ratio= 668 >=240 Span: 1 : +D+L Max Upward Total Deflection -0.004 in Ratio= 5416>=240 Span: 2 : +D+L Maximum Forces & Stresses for Load Combinations Load Combination Max Slress Ra!1os Momeni !Jalues Segment Length Span# M V CD CM cl CLx CE Cfu Ci Cr M fb DOnly Length = 19.0 ft 1 0.171 0.230 0.90 1.00 1.00 1.00 1.001 1.00 1.00 1.00 4.90 477.0 Length = 2.0 ft 2 0.171 0.230 0.90 1.00 1.00 1.00 1.001 1.00 1.00 1.00 4.90 477.0 +D+L 1.00 1.00 1.00 1.001 1.00 1.00 1.00 Length = 19.0 ft 1 0.461 0.622 1.00 1.00 1.00 1.00 1.001 1.00 1.00 1.00 14.71 1,431.1 8 = = = ::; ::; F'b 0.0 2,793.2 2,793.2 0.0 3,103.6 0.622 : 1 5.25x11.875 177.17 psi 285.00 psi +D+L 19.000 ft Span# 1 Sliear 'values V fv F'v 0.00 0.0 0.0 2.45 59.1 256.5 2.45 59.1 256.5 0.00 0.0 0.0 7.36 177.2 285.0 8 I Wood Beam UC#: KW-06016107, Bulld:20.25.06.16 DESCRIPTION: B-1 Project Title: Engineer: Project ID: Project Descr: Morgan Structural Engineering Maximum Forces & Stresses for Load Combinations Load Combination Segment Length Length = 2.0 ft +D+0.750L Length= 19.0 ft Length = 2.0 ft +0.600 Length= 19.0 ft Length = 2.0 ft 1 2 1 2 V CD CM 0.622 1.00 1.00 1.00 0.307 0.414 1.25 1.00 0.307 0.414 1.25 1.00 1.00 0.058 0.078 1.60 1.00 0.058 0.078 1.60 1.00 Overall Maximum Deflections Span 1 +D+L 2 Load CombinaUon Ct Clx 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Max. "." Defl 0.3412 0.0000 cf Cfu c i Cr 1.001 1.00 1.00 1.00 1.001 1.00 1.00 1.00 1.001 1.00 1.00 1.00 1.001 1.00 1.00 1.00 1.001 1.00 1.00 1.00 1.001 1.00 1.00 1.00 1.001 1.00 1.00 1.00 Location Load Combination in Span 8.279 8.279 +D+L 14.71 12.26 12.26 2.94 2.94 Vertical Reactions Support notation : Far left is # 1 Load Combination Max Upward from all Load Conditions Max Upward from Load Combinations Max Upward from Load Cases Max Downward from all Load Conditions (Resisting Uplift) Max Downward from Load Combinations (Resisting Uplift) Max Downward from Load Cases (Resisting Uplift) DOnly +D+L +D+0.750L +0.600 LOnly Support 1 Support 2 Support 3 2.646 11.912 2.646 11.912 1.764 7.941 0.882 2.646 2.205 0.529 1.764 3.971 11.912 9.927 2.382 7.941 -5.717 -5. 717 -3.805 -1.912 -5.717 -4.766 -1.147 -3.805 9 9 Project File: 25.127 Hollan.ec6 (c) ENEACALC, LLC 1982-2025 F'b V fv F'v 1,431.1 3,103.6 7.36 177.2 285.0 0.0 0.00 0.0 0.0 1,192.6 3,879.5 6.14 147.6 356.3 1,192.6 3,879.5 6.14 147.6 356.3 0.0 0.00 0.0 0.0 286.2 4,965.8 1.47 35.4 456.0 286.2 4,965.8 1.47 35.4 456.0 Max. Location "+" Defl in Span 0.0000 0.000 -0.0044 0.849 Values in KIPS Project Title: Engineer: Project ID: Project Descr: Wood Beam UC#: KW-06016107, Build:20.25.06.16 DESCRIPTION: B-2 Morgan Structural Engineering I Code References Governing Code : IBC 2021 Referenced Design Standard(s): NOS 2018 Load Combination Set: ASCE 7-22 / IBC 2024 (L<=100psf) Material Properties Project File: 25.127 Holian.ec6 (c) ENERCALC, LLC 1982-2025 Analysis Method : Allowable Stress Design Load Combination ASCE 7-22 / IBC 2024 (L<=100psf) Fb + Fb - 3,100.0 psi 3,100.0psi 3,000.0psi E : Modulus of Elasticity Ebend-xx 2,000.0ksi Fe -Prll Fe -Perp Fv Eminbend -xx 1,036.83 ksi Wood Species Wood Grade Beam Bracing Boise Cascade Versa Lam 3100 Fl Beam is Fully Braced against lateral-torsional buckling D 02 0115 l032 750.0psi 285.0psi 2,100.0 psi Density ---··----_-·----. . --- --. -.. -----~ --~ 41 .760pcf . • • -. Span• 11.330 ft Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight NOT internally calculated and added Uniform Load : D = 0.020, L = 0.040 ksf, Tributary Width = 8.0 ft, (Fir) Uniform Load : D = 0.20 , Tributary Width = 1.0 ft, (Wall) Uniform Load : D = 0.020, L = 0.060 ksf, Tributary Width = 3.0 ft, (Fir) DESIGN SUMMARY Maximum Bending Stress Ratio Section used for this span fb: Actual = F'b = Load Combination 0.691 1 3.5x11.875 2,151.74psi 3,103.46 psi Maximum Shear Stress Ratio Section used for this span fv: Actual F'v Load Combination Location of maximum on span = Span # where maximum occurs = +D+L 5.665ft Span# 1 Location of maximum on span Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection 0.191 in 0 in 0.351 in O in Ratio= 713>=360 Ratio= 0<360 Ratio= 387>=240 Ratio= 0<240 Maximum Forces & Stresses for Load Combinations Load Combination IIJlax Slress Ralios Segment Length Span# M V CD CM Ct CLx CE Cfu DOnly Length = 11.330 ft 1 0.352 0.278 0.90 1.00 1.00 1.00 1.001 1.00 +D+L 1.00 1.00 1.00 1.001 1.00 Length = 11.330 ft 0.693 0.549 1.00 1.00 1.00 1.00 1.001 1.00 +D+0.750L 1.00 1.00 1.00 1.001 1.00 Length = 11.330 ft 0.479 0.379 1.25 1.00 1.00 1.00 1.001 1.00 10 Span: 1 : L Only nla Span: 1 : +D+L n/a IIJlomenl 'i7alues C i Cr M fb 1.00 1.00 6.74 982.3 1.00 1.00 1.00 1.00 14.76 2,151.7 1.00 1.00 1.00 1.00 12.76 1,859.4 = = F'b 0.0 2,793.1 0.0 3,103.5 0.0 3,879.3 0.549: 1 3.5x11.875 156.45 psi 285.00 psi +D+L 10.379 ft Span# 1 Sfiear 'i7alues V fv F'v 0.00 0.0 0.0 1.98 71.4 256.5 0.00 0.0 0.0 4.34 156.5 285.0 0.00 0.0 0.0 3.75 135.2 356.3 10 !Wood Beam LIC#: KW-06016107, Bulld:20.25.06.16 DESCRIPTION: B-2 Project Title: Engineer: Project ID: Project Descr: Morgan Structural Engineering Maximum Forces & Stresses for Load Combinations Load Combination Segment Length V +0.600 Length = 11.330 ft 0.119 0.094 Overall Maximum Deflections Span Load Combination 1 +O+L Vertical Reactions Load Combination Max Upward from all Load Cond1t10ns Max Upward from Load Combinations Max Upward from Load Cases OOnly +O+L +0+0.750L +0.60D LOnly CD 1.60 CM Ct CLx cf Cfu ci Cr 1.00 1.00 1.00 1.001 1.00 1.00 1.00 1.00 1.00 1.00 1.001 1.00 1.00 1.00 4.04 Max. Location Load Combination ·-• Oefl In Span 0.3508 5. 706 Support notation : Far left is #1 Support 1 Support 2 5.212 5.212 5.212 5.212 2.833 2.833 2.379 2.379 5.212 5.212 4.504 4.504 1.428 1.428 2.833 2.833 11 11 Project File: 25.127 Holian.ec6 (c) ENERCALC, LLC 1982-2025 F'b V fv F'v 0.0 589.4 4,965.5 0.00 0.0 0.0 1.19 42.9 456.0 Max. Location "+" Dell In Span 0.0000 0.000 Values in KIPS I Wood Beam LIC#: KW-06016107, Bulld:20.25.06.16 DESCRIPTION: B-3 J Code References Governing Code: IBC 2021 Referenced Design Standard(s): NOS 2018 Project Title: Engineer: Project ID: Project Descr: Morgan Structural Engineering Load Combination Set : ASCE 7-22 / IBC 2024 {L<=100psf) Material Properties Analysis Method : Allowable Stress Design Load Combination ASCE 7-22 / IBC 2024 (L<=100psf) Wood Species Wood Grade Douglas Fir-Larch No.1 Fb + Fb - Fe -Prll Fe -Perp Fv Ft Beam Bracing Beam is Fully Braced against lateral-torsional buckling D(0.3) (0.61) D(0.24 L(0.5) D 0.12 L 0.24 Span= 6.50 ft 1350 psi 1350 psi 925psi 625psi 170 psi 675 psi Project File: 25.127 Holian.ec6 (c) ENERCALC, LLC 1982-2025 E : Modulus of Elasticity Ebend-xx 1600ksi Eminbend -xx 580ksi Density 31.21 pcf 2 Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight NOT internally calculated and added Uniform Load : D = 0.020, L = 0.040 ksf, Tributary Width= 6.0 ft Point Load : D = 0.240, L = 0.50 k @ 3.0 ft Point Load: D = 0.30, L = 0.610 k@ 2.0 ft, (B-4) DESIGN SUMMARY Maximum Bending Stress Ratio Section used for this span fb: Actual F'b Load Combination = = 0.70Q 1 6x8 945.59psi 1,350.00psi Maximum Shear Stress Ratio Section used for this span fv: Actual F'v Load Combination Location of maximum on span = Span # where maximum occurs = +O+L 2.989ft Span# 1 Location of maximum on span Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection 0.063 in O in 0.094 in O in Ratio= 1234>=360 Ratio= 0 <360 Ratio= 827>=240 Ratio= 0 <240 Maximum Forces & Stresses for Load Combinations Load Combination lvlax S!ress Ralios Segment Length Span# M V CD CM Ct CLx CE Cfu 0 Only Length = 6.50 ft 1 0.257 0.155 0.90 1.00 1.00 1.00 1.000 1.00 +D+L 1.00 1.00 1.00 1.000 1.00 Length = 6.50 ft 0.700 0.423 1.00 1.00 1.00 1.00 1.000 1.00 +0+0.750L 1.00 1.00 1.00 1.000 1.00 Length = 6.50 ft 0.466 0.282 1.25 1.00 1.00 1.00 1.000 1.00 12 Span: 1 : L Only n/a Span: 1 : +O+L n/a l'ii'lomen! IJalues C Cr M fb 1.00 1.00 1.34 311.9 1.00 1.00 1.00 1.00 4.06 945.6 1.00 1.00 1.00 1.00 3.38 787.2 = F'b 0.0 1,215.0 0.0 1,350.0 0.0 1,687.5 0.423 : 1 6x8 71.87 psi 170.00 psi +O+L 0.000 ft Span# 1 j Shear IJalues V Iv F'v 0.00 0.0 0.0 0.65 23.7 153.0 0.00 0.0 0.0 1.98 71.9 170.0 0.00 0.0 0.0 1.65 59.8 212.5 12 Wood Beam UC#: KW-06016107, Build:20.25.06.16 DESCRIPTION: B-3 Project Title: Engineer: Project ID: Project Descr: Morgan Structural Engineering Maximum Forces & Stresses for Load Combinations Load Combination Segment Length V +0.600 Length = 6.50 ft 0.087 0.052 Overall Maximum Deflections Span Load Combination 1 +D+L Vertical Reactions Load Combination Max Upward from all Load Conditions Max Upward from Load Combinations Max Upward from Load Cases DOnly +D+L +D+0.750L +0.600 LOnly CD 1.60 CM 1.00 1.00 Ct Clx 1.00 1.00 1.00 1.00 Max. "-" Defl 0.0943 CE Cfu ci Cr 1.000 1.00 1.00 1.00 1.000 1.00 1.00 1.00 0.80 Location Load Combination in Span 3.155 Support notation : Far left is #1 Support 1 Support 2 2.198 1.792 2.198 1.792 1.472 1.198 0.727 0.593 2.198 1.792 1.831 1.492 0.436 0.356 1.472 1.198 13 13 Project File: 25.127 Holian.ec6 (c) ENERCALC, LLC 1982-2025 F'b V fv F'v 0.0 187.1 2,160.0 0.00 0.0 0.0 0.39 14.2 272.0 Max. Location "+" Dell In Span 0.0000 0.000 Values in KIPS Project Title: Engineer: Project ID: Project Descr: I Wood Beam UC#: KW-06016107, Bulld:20.25.06.16 DESCRIPTION: B-4 I Code References Governing Code : IBC 2021 Referenced Design Standard(s): NOS 2018 Morgan Structural Engineering Load Combination Set : ASCE 7-22 / IBC 2024 (L<=100psf) Material Properties Analysis Method : Allowable Stress Design Load Combination ASCE 7-22 / IBC 2024 (L<=100psf) Wood Species Wood Grade Boise Cascade Versa Lam 3100 Fb + Fb • Fe -Prll Fe -Perp Fv Ft Beam Bracing Beam is Fully Braced against lateral-torsional buckling 0(0.24 L(0.5) D 0.04 L 0.08 Span • 12.0 ft 3,100.0 psi 3,100.0 psi 3,000.0psi 750.0psi 285.0psi 2,100.0psi Project File: 25.127 Holian.ec6 (c) ENEACALC, LLC 1982-2025 E : Modulus of Elasticity Ebend-xx 2,000.0ksi Eminbend -xx 1,036.83 ksi Density 41.760pcf 2 Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight NOT internally calculated and added Uniform Load : D = 0.020, L = 0.040 ksf, Tributary Width = 2.0 ft Point Load : D = 0.240, L = 0.50 k @ 3.0 ft DESIGN SUMMARY Maximum Bending Stress Ratio Section used for this span fb: Actual F'b Load Combination = 0.16Q 1 3.5x11.875 497.41 psi 3,103.46psi Maximum Shear Stress Ratio Section used for this span fv: Actual F'v Load Combination Location of maximum on span = Span # where maximum occurs = +D+L 4.467ft Span# 1 Location of maximum on span Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection 0.061 in Ratio= O in Ratio= 0.090 in Ratio= O in Ratio = 2379 >=360 Span: 1 : L Only 0 <360 n/a 1593 >=240 Span: 1 : +D+L 0 <240 n/a Maximum Forces & Stresses for Load Combinations Load Combination Segment Length Span # D Only Length = 12.0 ft +D+L Length = 12.0 ft +D+0.750L Length = 12.0 ft 1 +0.600 0.059 0.160 0.107 V CD CM 0.054 0.90 1.00 1.00 0.147 1.00 1.00 1.00 0.098 1.25 1.00 1.00 Ct CLx CE Cfu C i Cr 1.00 1.00 1.001 1.00 1.00 1.00 1.00 1.00 1.001 1.00 1.00 1.00 1.00 1.00 1.001 1.00 1.00 1.00 1.00 1.00 1.001 1.00 1.00 1.00 1.00 1.00 1.001 1.00 1.00 1.00 1.00 1.00 1.001 1.00 1.00 1.00 14 1.12 164.0 3.41 497.4 2.84 414.1 = = F'b 0.0 2,793.1 0.0 3,103.5 0.0 3,879.3 0.0 Design OK 0.147 :1 3.5x11.875 41.82 psi 285.00 psi +D+L 0.000 ft Span# 1 V fv F'v 0.00 0.0 0.0 0.38 13.8 256.5 0.00 0.0 0.0 1.16 41 .8 285.0 0.00 0.0 0.0 0.96 34.8 356.3 0.00 0.0 0.0 14 I Wood Beam UC#: KW-06016107, Bulld:20.25.06.16 DESCRIPTION: B-4 Project Title: Engineer: Project ID: Project Descr: Morgan Structural Engineering Maximum Forces & Stresses for Load Combinations Load Combination Segment Length Span # M V CD CM C1 CLx CE Cfu Ci Cr Length = 12.0 ft 1 0.020 0.018 1.60 1.00 1.00 1.00 1.001 1.00 1.00 1.00 Overall Maximum Deflections Span Load Combination Max. Location Load Combination ·-• Deft In Span 1 +D+L 0.0903 5.781 0.67 Vertical Reactions Support notation : Far left is #1 Load Combination Max Upward from all Load Cond,bons Max Upward from Load Combinations Max Upward from Load Cases D Only +D+L +D+0.750L +0.60D LOnly Support 1 Support 2 1.275 0.905 1.275 0.905 0.855 0.605 0.420 0.300 1.275 0.905 1.061 0.754 0.252 0.180 0.855 0.605 15 15 Project File: 25.127 Holian.ec6 (c) ENERCALC, LLC 1982-2025 F'b V fv F'v 98.4 4,965.5 0.23 8.3 456.0 Max. Location "+" Defl in Span 0.0000 0.000 Values in KIPS ~ Boise Cascade' II§§ ~ l""OIHIL t0M:)O()IIIIIJOUCf1 -== Single 11-7/8" BCI® 5000-1.7 DF J01 (Joist) BC CALC® Member Report Build 8931 Dry I 1 span I No cant. I 16" OCS I Repetitive I Glued & nailed Job name: File name: Address: Description: City, State, Zip: Specifier: Customer: Designer: Chris Cobb Code reports: ESR-1336 Company: B1 12-00-00 Total Horizontal Product Length= 12-00-00 Reaction Summary {Down/ Uplift) (lbs) Bearing Live Dead Snow Wind 81,3-1/2" 320/0 144/0 8 2, 3-1/2" 320 / 0 144 / 0 Load Summary Tag Descrletlon Load T~ee Ref. Start End 1 Standard Load Unf. Area (lb/ft2) L 00-00-00 12-00-00 Controls Summary Pos. Moment End Reaction End Shear Total Load Deflection Live Load Deflection Max Defl. Span/ Depth Bearing Supports 81 Wall/Plate 82 Wall/Plate Value 1288 ft-lbs 4641bs 441 lbs U999 (0 .111") U999 (0.076") 0.111" 11.7 Dim. (LxW) 3-1/2" X 2" 3-1/2" X 2" BC FloorValue® Summary % Allowable 40.9% 32.6% 27.2% n\a n\a n\a Value 464 lbs 4641bs %Allow Sueeort n\a n\a Duration 100% 100% 100% nla nla n\a %Allow Member 32.6% 32.6% BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Premium Controlling Location: 06-00-00 Notes Design meets Code minimum (U240) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. Design meets arbitrary (1 ") Maximum Total load deflection criteria. Live Dead Loe. 100% 90% Top 40 18 Case Location 1 06-00-00 00-00-00 00-03-08 1 06-00-00 2 06-00-00 1 06-00-00 Material Unspecified Unspecified Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. BC CALC® analysis is based on IBC 2021. Calculations assume member is fully braced. Page 1 of 1 16 1 PASSED9 July 24, 2025 20: 10:4 7 82 Roof Live Snow Wind Roof ocs Live 115% 160% 125% 16" Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code-accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. ASCE. Mtillr.AN soom ~ CM. ENGINHIIS Address : 1229 Gold Flower Rd Carlsbad, California 9201 1 ~ " u ... , .. ~ ;, .... ~ .... 1\1,oRJ i1 _; " r •• i L 1> .\ '}9i._ i , ;. ... ASCE Hazards Report j.' ~; Standard: ASCE/SEI 7-16 Risk Category: 11 Soil Class: D -Default (see Section 11 .4.3) " ~ f -!, r°'"ll'~ '( \ '¾"' ~ ~ :,q,1"' I luu ln, ... 1(1 . \ -.• ~ ... 'f,.Ql1:,ihl . ., Latitude: 33.110549 Longitude: -117.301493 Elevation : 0 ft (NAVD 88) ,1,..,.., ti J,1•·1,1 .. V11t.1 I "'' f,,l'W,'r11 ,., ' It ... , \ . Q>. " ,: . . 0 [gcoo11do ., !: -~ '"' ',, EktM•..., .,. ~ .5 ,, ✓ --: 4'1 I ,Ill''"'"' p.6 I ~ .,, " ~ , : < -·1 ,~ .. ,. ~ . ~ . •" : ' '· ., l ~ 3. " .>.,, ,J ~ " >: • • .. . I ~ ' ..,., ~ 1 .... , .. ' ... C L ; , ;1 !:, \ ' ~· ,, ,,. , yA;c 'I,__, -1 1,111.1 n1&.11 "'1i,1 "I ; \ I Wind Results: Wind Speed 10-year MRI 25-year MRI 50-year MRI 100-year MRI Data Source: Date Accessed: ~ 96 Vmph 66 Vmph 72 Vmph 77 Vmph 82 Vmph ASCE/SEI 7-16, Fig. 26.5-18 and Figs. CC.2-1-CC.2-4, and Section 26.5.2 Fri Jul 25 2025 Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear interpolation between contours. Wind speeds are interpolated in accordance with the 7-16 Standard. Wind speeds correspond to approximately a 7% probability of exceedance in 50 years (annual exceedance probability= 0.00143, MRI = 700 years). Site is not in a hurricane-prone region as defined in ASCE/SEI 7-16 Section 26.2. https://ascehazardtool.org/ Page 1 of 3 17 Fri Jul 25 2025 17 ASCE. AAIJIICAN SOCIEIYOF CM.ENGINIBIS Seismic Site Soil Class: D -Default (see Section 11.4.3) Results: Ss 1.06 So1 : NIA S1 0.383 TL : 8 Fa 1.2 PGA : 0.467 Fv N/A PGA M : 0.561 SMs 1.273 F PGA 1.2 SM1 N/A 18 : 1 Sos 0.848 Cv : 1.312 Ground motion hazard analysis may be required. See ASCE/SEI 7-16 Section 11.4.8. Data Accessed: Fri Jul 25 2025 Date Source: https://ascehazardtool.ornt usGs Seismic Design Maps Page 2 of 3 18 Fri Jul 25 2025 ASCE. M4l!llCAN SOCIEIY~ CM. ENGINEEllS The ASCE Hazard Tool is provided for your convenience, for informational purposes only, and is provided "as is" and without warranties of any kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or has been extrapolated from maps incorporated in the ASCE standard. While ASCE has made every effort to use data obtained from reliable sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation, relationship, or sponsorship of such third-party content by or from ASCE. ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the contents of this Tool or the ASCE standard. In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors, employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data provided by the ASCE Hazard Tool. https://ascehazardtool.org/ Page 3 of 3 19 Fri Jul 25 2025 19 rX7 MORGAN bl"bl STRUCTURAL Job: Hogen Garage SEISMIC DESIGN BASE SHEAR (STATIC) Risk Category: II 10 = 1.00 R = 6.5 Cd = 4 (IBC Table 1604.5) (ASCE Table 11.5-1) (ASCE Table 12.2-1) (ASCE Table 12.2-1) SEISMIC GROUND MOTION VALUES Site Classification = D Short Period Ss = 1.060 Fa = 1.200 SMs = 1.272 Sos = 0.848 (IBC Table 1613.5.3(1)) (IBC Eq. 16-37) (IBC Eq. 16-39) APPROXIMATE FUNDAMENTAL PERIOD Building Type: All Other Structural Systems Maximum Height = 35.0 ft Ta = 0.29 sec To= 0.12 sec Ts = 0.62 sec (ASCE Eq. 12.8-7) SEISMIC DESIGN CATEGORY SOC= D (ASCE 11.6) ASD Lateral Force Analysis 2022 CBC 00 = 2.5 Reduced by 1/2 for flexible diaphragms per ASCE Table 12.2-1 footnote g Long Period S 1 = 0.418 Fv = 1.882 S M1 = 0.787 So1 = 0.524 (IBC Table 1613.5.3(2)) (IBC Eq. 16-38) (IBC Eq. 16-40) TL = 8 sec (ASCE Figure 22-16) SEISMIC BASE SHEAR Cs= 0.1305 Cs MAX= 0.2804 Cs MIN= 0.0100 Cs= 0.1305 Govs (ASCE Eq. 12.8-2) (ASCE Eq. 12.8-3 & Eq. 12.8-4) (ASCE Eq. 12.8-5 & Eq. 12.8-6) 20 • 20 21 ~ MORGAN ~ STRUCTURAL Job: Hogen Garage ASD Lateral Force Analysis 2022 CBC Cs : 0.130 I k = 1.00 (ASCE Eg. 12.8-12) VERTICAL SEISMIC FORCE DISTRIBUTION (ASCE 12.8.3) Level Height DL Add'I Masf Floor Area Weight whk Cv Story Shear % Total (ft) (osf) (kios) (sq.ft.) (kips) (k-ft) (12.8-12) (kips) (osf) R 20.0 34.9 0.0 2000 70 1396 0.582 13 6.5 58.2% 2 10.0 49.7 1.0 2000 100 1004 0.418 9 4.6 41 .8% I Totals: 170 2400 1.0 I 22 I IBase Shear DIAPHKAuM !... "••: (ASCE 12.10) NORTH-SOUTH DIRECTION EAST-WEST DIRECTION Level DL PL (12.10-1) Max Min Gov PL (12.10-1) Max Min Gov (psf) (psf) (psf) (osf) (psf) (psf) (psf) (psf) (psf) (psf) (psf) R 34.9 0.0 6.5 11.8 5.9 6.5 0.0 6.5 11 .8 5.9 6.5 2 49.7 0.0 6.5 16.9 8.4 8.4 0.0 6.5 16.9 8.4 8.4 0.0 0.0 0.0 0.0 21 rx, MORGAN l:M:I STRUCTURAL Job: Hogen Garage ASD Lateral Force Analysis 2022 CBC /BC 1609.6 ALTERNATIVE ALL-HEIGHTS METHOD DESIGN WIND PRESSURE -MAIN WIND FORCE RESISTING SYSTEM Exposure Category= C (IBC 1609.4.2) Roof Pitch = t####/. ----------~ngle = 18 .4 ° Eave Height= 20.0 ft Maximum Height = 26.0 ft Mean Roof Height = 23.0 ft Main Wind Force: Vu1t = 96 mph (Figure 1609A) Vasd = 74 mph Kzt = 1.00 (ASCE 7 26.8) lw = 1.00 (ASCE 7 Table 1.5-2) N-S Dimension 50.0 ft E-W Dimension 40.0 ft Enclosure: Enclosed Low Rise? YES a = 9.5 (ASCE 7 Table 26.9.1) Zg = 900 (ASCE 7 Table 26.9.1) WIND DISTRIBUTION ON NORTH-SOUTH ROOF Level Windward Roof Leeward Roof Parapet z Kz Cnet Pnet Height Cnet Pnet Height Cnet Pnet Cnet Pnet Height Frotal (ft) (27.3-1) (psf) (ft) (psf) (ft) (psf) (psf) (ft) (plf) R 23.0 0.93 -0.72 -15.72 6.0 -0.66 -14.46 6.0 1.28 28 -0.85 -18.6 0.0 96.0 WIND DISTRIBUTION ON NORTH-SOUTH WALLS Level Windward Walls Leeward Walls Total Wind z Kz Cnet Pnet Height F Cnet Pnet Height F Walls 0.6x Total ft 27.3-1 psf ft If sf ft R 20.0 0.9 0.43 9.15 5.0 45.8 -0.51 -10.9 5.0 2 10.0 0.85 0.43 8.62 10.0 86.2 -0.51 -10.2 10.0 188.3 22 22 23 WIND DISTRIBUTION ON EAST-WEST ROOF Level Kz I Windward Roof Leeward Roof Parapet z Cnet Pnet Height Cnet Pnet Height C net Pnet C net Pnet Height Frotal (ft) (27.3-1 (osf) (ft) (psf) (ft) (psf) (psf) (ft) (olf) R 23.0 0.93 -0.72 -1 5.7 6.0 -0.66 -14.5 6.0 1.28 28.1 -0.85 -18.6 0.0 96.0 WIND DISTRIBUTION ON EAST-WEST WALLS Level Windward Walls Leeward Walls Total Wind z Kz C net Pnet Height F Cnet Pnet Height F Roof Walls 0.6x Total ft 27.3-1 sf ft If sf ft If If If R 20.0 0.9 0.43 9.15 5.0 45.8 -0.51 -10.9 5.0 96.0 100.0 117.6 2 10.0 0.98 0.43 9.97 10.0 99.7 -0.51 -11.8 10.0 0.0 217.9 130.8 23 00 MORGAN bMd STRUCTURAL DATE: 7/25/25 PROJECT: HOLIAN JOB #: 25.127 ADDED SQUARE FOOTAGE IS ABOUT 24'X11' = 264SF HOUSE OVERALL IS ROUGHLY: 40'*50' AT ROOF = 2000SF 30'*50' AT LEVEL 2 = 1500SF TOT AL IS 3500SF NET ADD IS LESS THAN 10%. 264/3500 = 7.5% AND IS ARGUABLY ACCCEPTABLY INSPECTION AND EXISITNG BUILDING CODE LIMITS WILL DO CURSORARY LATERAL ANALYSIS TO CHECK SPECIFIC SHEAR WALLS IMPACTED • 24 PAGE rX1 MORGAN ~ STRUCTURAL Job: Hogen Garage Building Force~ Simple Level Seis. Wind sf If R 4.5 52.8 2 3.3 86.4 Totals: 7.8 139.2 TYPE 6 4 3 2 44 33 7 ASD Lateral Force Analysis 2022 CBC Materials Sides EQ /Wind* 1/2" ST 1 10d @6" 1 340 I 476 plf 1/2" ST 1 10d @ 4" 1 510 /714 plf 1/2" ST 1 10d @3" 1 665 / 931 plf 1/2" ST 1 10d @2" 1 870 / 1218 plf 1/2" ST 1 10d@ 4" 2 1020 / 1428 plf 1/2" ST 1 10d ca>3" 2 1330 / 1862 plf ##### ##### Total Force= Trib Shear+ Add'I Shear Total Shear = Total Force / Wall Length *Per NOS, shearwa/1 capacities have been increased b 40% when walls are overned b wind /oadin . Wall Wall Wall %of Seismic Wind Shear Add'I Wall Gov. Wall ID Len Ht. Line Trib Area Trib Seis Wind Seis Wind H/L Force Shear Gov ft ft Load tt2 ft lbs lbs lbs lbs Ratio lbs If Case T e Roof (L3) NS SW 1 12.33 9.00 60% 300 8.0 1356 422 0 0 3/4:1 814 66 Seis 6 SW 2 9.33 9.00 40% 300 8.0 1356 422 0 0 1:1 542 58 Seis 6 SW3 16.00 9.00 100% 800 20.0 3616 1056 0 0 4/7:1 3616 226 Seis 6 EW SW 11 10.00 9.00 50% 0 13.0 0 686 0 0 8/9:1 343 34 Wind 6 SW 12 8.00 9.00 50% 0 13.0 0 686 0 0 1 1 /8: 1 343 43 Wind 6 SW 13 7.50 9.00 60% 563 13.0 2543 686 0 0 1 1 /5: 1 1526 203 Seis 6 SW 14 5.50 9.00 40% 563 13.0 2543 686 0 0 1 2/3:1 1017 185 Seis 6 Level2 NS SW 1 12.33 9.00 60% 300 8.0 1356 422 1356 422 3/4:1 1627 132 Seis 6 SW2 9.33 9.00 40% 300 8.0 1356 422 1356 422 1:1 1085 116 Seis 6 SW3 16.00 9.00 100% 800 20.0 3616 1056 3616 1056 4/7:1 7233 452 Seis 4 EW SW 11 12.00 9.00 50% 563 13.0 2543 686 0 686 3/4:1 1271 106 Seis 6 SW 12 X 9.00 50% 563 13.0 2543 686 0 686 SW 13 5.33 9.00 62% 563 13.0 2543 686 2543 686 1 2/3:1 3130 587 Seis 3 SW 14 3.33 9.00 38% 563 13.0 2543 686 2543 686 2 5/7:1 1956 587 Seis 2 25 25 fX1 MORGAN bM::J STRUCTURAL jeff@morganstructural.com (760) 690-7454 lllr== I I I I I HOLIDAN INFILL DATE: 7/25/25 PROJECT#: 25.127 • 26 1229 GOLD FLOWER ROAD CARLSBAD, CA 92011 chris@morganstructural.com (919) 914-2023 D _____ ..[g1.___________ D r------------------7 I I I I I I I I I r-, I I I • I I I L_J I I I I I I I L-----= I ~--I / r----r-----, I c / !~-----------~ 26 --------, I I I I I I I I I I r.'7 L.::J Project Title: Engineer: Project ID: Project Descr: General Footing Project File: 25.127 Holian.ec6 UC# : KW-06016107, Build:20.25.06.16 DESCRIPTION: F-1 ECCENTRIC Morgan Structural Engineering (c) ENERCALC, LLC 1982-2025 Code References Calculations per ACI 318-19, IBC 2021 Load Combinations Used: ASCE 7-22 / IBC 2024 (L<=100psf) General Information Material Properties fc : Concrete 28 day strength fy : Rebar Yield Ee : Concrete Elastic Modulus Concrete Density <p Values Flexure Shear Analysis Settings Min Steel % Bending Reinf. Min Allow % Temp Reinf. Min. Overturning Safety Factor Min. Sliding Safety Factor Add Ftg Wt for Soil Pressure Use ftg wt for stability, moments & shears Add Pedestal Wt for Soil Pressure Use Pedestal wt for stability, mom & shear Dimensions Width parallel to X-X Axis Length parallel to Z-Z Axis Footing Thickness Load location offset from footing center ... ex : Prll to X-X Axis Pedestal dimensions ... px : parallel to X-X Axis pz : parallel to Z-Z Axis Height 2.50 ksi 60.0 ksi 3,122.0 ksi 145.0 pcf 0.90 0.750 = 0.00180 1.0 : 1 1.0 : 1 Yes Yes 4.0 ft 3.0 ft 16.0 in 12 in in in in in No No X Bandwidth Distribution Check (ACI 15.4.4.2) Direction Requiring Closer SeparationBars along Z-Z Axis # Bars required within zone # Bars required on each side of zone Bottom Reinforcing Bars parallel to X-X Axis (resisting Z Flexure) Number of Bars = Reinforcing Bar Size Bars parallel to Z-Z Axis (resisting X Flexure) Number of Bars = 85.7 % 14.3 % 5 # 5 5 # 5 h Soil Design Values Allowable Soil Bearing = 1.50 ksf Soil Density 110.0 pcf Increase Bearing By Footing Weight No Soil Passive Resistance (for Sliding) = 250.0 pcf Soil/Concrete Friction Coeff. = 0.30 Increases based on footing Depth Footing base depth below soil surface = ft Allow press. increase per foot of depth = ksf when footing base is below ft Increases based on footing plan dimension Allowable pressure increase per foot of depth ksf when max. length or width is greater than = ft z X "' II j~ z Q) 0) 4'-0" 'O UJ 5-# 5 Bars :r .... Reinforcing Bar Size = Rebar Centerline to Edge of Concrete ... X-X ~ct!on Looking lo +Z .... 2-Z Section Looking to +X at Bottom of footing = 3.0 in 27 27 Project Title: Engineer: Project ID: Project Descr: General Footing Project File: 25.127 Holian.ec6 UC#: KW-06016107, Build:20.25.06.16 DESCRIPTION: F-1 ECCENTRIC Morgan Structural Engineering (c) ENERCALC, LLC 1982-2025 Applied Loads P : Column Load OB : Overburden M-xx M-zz V-x V-z DESIGN SUMMARY D Lr 3.0 L s w 3.0 E H k ksf k-ft k-ft k k -•Mii•iai•U----------------------------------------~ Min. Ratio PASS 0.9587 PASS n/a PASS n/a PASS n/a PASS n/a PASS n/a PASS 0.02743 PASS 0.02744 PASS 0.669 PASS 0.0360 PASS 0.0360 PASS 0.892 PASS 0.0 PASS 0.0 PASS 0.000 PASS 0.0 PASS 0.0 PASS 0.000 PASS n/a PASS 0.04190 PASS 0.04639 PASS 0.04639 PASS 0.07454 Detailed Results Soil Bearing Rotation Axis & Load Combination ... X-X, D Only X-X, +D+L X-X, +D+0.750L X-X, +0.60D 2-Z, D Only 2-2, +D+L 2-Z, +D+0.750L 2-Z, +0.600 Overturning Stablllty Rotation Axis & Load Combination ... Footing Has NO Overturning Sliding Stablllty Force Appllcatlon Axis Load Combination ... Footing Has NO Sliding Item Applied Soil Bearing 1.438 ksf Overturning -X-X 0.0 k-ft Overturning -2-2 0.0 k-ft Sliding -X-X 0.0 k Sliding -Z-2 0.0 k Uplift 0.0 k 2 Flexure (+X) Bot Tens 0. 7904 k-ft/ft 2 Flexure (-X) Bot Tens 0. 7905 k-ft/ft Min Steel X Flexure Bottom 0.346 in2/ft X Flexure (+2) Bot Tens 0. 7875 k-ft/ft X Flexure ( -2) Bot Tens 0.7875 k-fVft Min Steel Z Flexure Bottom 0.346 in2/ft Z Flexure (+X) Top Tens 0 k-ft/ft 2 Flexure (-X) Top Tens 0 k-ft/ft Min Steel X Flexure Top 0.000 in2/ft X Flexure (+2) Top Tens 0 k-ft/ft X Flexure (-Z) Top Tens 0 k-ft/ft Min Steel Z Flexure Top 0.000 in2/ft 1-way Shear (+X) o.o psi 1-way Shear (-X) 1.874 psi 1-way Shear (+Z) 1.885 psi 1-way Shear (-2) 1.885 psi 2-way Punching 11.181 psi Capacity 1.50 ksf 0.0 k-ft 0.0 k-ft 0.0 k 0.0 k 0.0 k 28.812 k-ft/ft 28.812 k-ft/ft 0.517 in2/ft 21.874 k-ft/ft 21 .874 k-ft/ft 0.388 in2/ft 0.0 k-ft/ft 0.0 k-ft/ft 0.000 in2/ft 0.0 k-ft/ft 0.0 k-ft/ft 0.000 in2/ft 44.718 psi 44.718 psi 40.629 psi 40.629 psi 150.0 psi Governing Load Combination +D+L about 2-2 axis No Overturning No Overturning No Sliding No Sliding No Uplift +1.20D+1.60L +1.20D+1.60L n/a +1.20D+1.60L +1.20D+ 1.60L n/a n/a n/a n/a +1 .20D+1.60L +1 .20D+ 1.60L +1.20D+1.60L +1 .20D+1.60L Xecc Zecc Actual Soil Bearing Stress@ Location Actual / Allow Gross Allowable (in) Bottom, -2 Top,+2 Left, -X Right, +X Ratio 1.50 n/a 0.0 0.4433 0.4433 n/a n/a 0.296 1.50 n/a 0.0 0.6933 0.6933 n/a n/a 0.462 1.50 n/a 0.0 0.6308 0.6308 n/a n/a 0.421 1.50 n/a 0.0 0.2660 0.2660 n/a nla 0.177 1.50 6.767 n/a n/a n/a 0.07208 0.8146 0.543 1.50 8.654 n/a n/a n/a 0.0 1.438 0.959 1.50 8.322 n/a nla n/a 0.0 1.281 0.854 1.50 6.767 n/a n/a n/a 0.04325 0.4888 0.326 Overturning Moment Resisting Moment Stability Ratio Status All units k Sliding Force Resisting Force Stability Ratio Status 28 General Footing LIC#: KW-06016107, Build:20.25.06.16 DESCRIPTION: F-1 ECCENTRIC Footing Tension on Bottom Flexure Axis & Load Combination X-X, +1.40D X-X, +1.40D X-X, +1.20D+1.60L X-X, +1.20D+1.60L X-X, +1.20D+0.50L X-X, +1.20D+0.50L X-X, +1.20D X-X, +1.20D X-X, +0.90D X-X, +0.90D Z-Z, +1.40D Z-Z, +1.40D Z-Z, +1.20D+1 .60L Z-Z, +1.20D+1.60L Z-Z, +1.20D+0.50L Z-Z, +1.20D+0.50L Z-Z, +1.200 Z-Z, +1.20D Z-Z, +0.900 z-z, +0.900 One Way Shear X Load Combination ... +1.400 +1.200+1.60L +1 .200+0.50L +1 .200 +0.900 One Way Shear Z Load Combination ... +1.40D +1.20D+1.60L +1.20D+0.50L +1.200 +0.90D Two-Way "Punching" Shear Load Combination ... +1.400 +1.20D+1.60L +1.200+0.50L +1.200 +0.900 Mu k-ft 0.3938 0.3938 0.7875 0.7875 0.4781 0.4781 0.3375 0.3375 0.2531 0.2531 0.3939 0.3937 0.7905 0.7904 0.4783 0.4781 0.3376 0.3375 0.2532 0.2531 Side +Z -Z +Z -Z +Z .z +Z -Z +Z -Z -X +X -X +X -X +X -X +X -X +X Project Title: Engineer: Project ID: 29 Project Descr: Project File: 25.127 Holian.ec6 Morgan Structural Engineering (c) ENERCALC, LLC 1982-2025 Tension As Req'd Gvrn. As Actual As Phi*Mn Status Surface inA2 jnA2 jnA2 k-ft Bottom 0.3456 ACI 7.6.1.1 0.3875 21 .874 OK Bottom 0.3456 ACI 7.6.1.1 0.3875 21 .874 OK Bottom 0.3456 ACI 7.6.1 .1 0.3875 21.874 OK Bottom 0.3456 ACI 7.6.1.1 0.3875 21 .874 OK Bottom 0.3456 ACI 7.6.1.1 0.3875 21.874 OK Bottom 0.3456 ACI 7.6.1.1 0.3875 21 .874 OK Bottom 0.3456 ACI 7.6.1.1 0.3875 21 .874 OK Bottom 0.3456 ACI 7.6.1 .1 0.3875 21.874 OK Bottom 0.3456 ACI 7.6.1.1 0.3875 21.874 OK Bottom 0.3456 ACI 7.6.1.1 0.3875 21.874 OK Bottom 0.3456 ACI 7.6.1.1 0.5167 28.812 OK Bottom 0.3456 ACI 7.6.1 .1 0.5167 28.812 OK Bottom 0.3456 ACI 7.6.1.1 0.5167 28.812 OK Bottom 0.3456 ACI 7.6.1.1 0.5167 28.812 OK Bottom 0.3456 ACI 7.6.1.1 0.5167 28.812 OK Bottom 0.3456 ACI 7.6.1 .1 0.5167 28.812 OK Bottom 0.3456 ACI 7.6.1.1 0.5167 28.812 OK Bottom 0.3456 ACI 7.6.1.1 0.5167 28.812 OK Bottom 0.3456 AC17.6.1.1 0.5167 28.812 OK Bottom 0.3456 ACI 7.6.1.1 0.5167 28.812 OK Vu @ -X Vu @ +X Vu:Max PhiVn Vu / Phl*Vn Status 0.95 psi 0.00 psi 0.95psi 44.72 psi 0.02 OK 1.87 psi 0.00 psi 1.87 psi 44.72psi 0.04 OK 1.15 psi 0.00 psi 1.15 psi 44.72 psi 0.03 OK 0.81 psi 0.00 psi 0.81 psi 44.72 psi 0.02 OK 0.61 psi 0.00 psi 0.61 psi 44.72 psi 0.01 OK Vu@•Z Vu @ +Z Vu:Max PhiVn Vu / Phi*Vn Status 0.94 psi 0.94 psi 0.94 psi 40.63 psi 0.02 OK 1.89 psi 1.89 psi 1.89 psi 40.63psi 0.05 OK 1.14 psi 1.14 psi 1.14 psi 40.63psi 0.03 OK 0.81 psi 0.81 psi 0.81 psi 40.63psi 0.02 OK 0.61 psi 0.61 psi 0.61 psi 40.63psi 0.01 OK All units k Vu Phi*Vn Vu / Phi*Vn Status 5.59 psi 150.00 psi 0.04 OK 11.18 psi 150.00 psi 0.07 OK 6.78 psi 150.00 psi 0.05 OK 4.79 psi 150.00 psi 0.03 OK 3.59 psi 150.00 psi 0.02 OK 29 J\~'-o I ( f ' I I "\1• f) # i-:;., ♦ ·~ ~ ,, ) r,• ,.. . 1 , _,1--e, > 1-:1,o (,P ,,;.. ♦ ♦ .,, I ' I " l"t' • t:> {,JI • ,,, ,. t • I ,, I I i\ I 4 ''" 10 ----< -,------ -·----- 10•-~· ~➔fr t --- GARAGE r:-:-- r I 1 ' \) I -------~I ----____ _J _J_ -I==-t-~ ~-~--I-=-· ; f \ \ ,I A\ ) I I ~ I r . i I • I BEDROOM 2 ~-<J'c::.i..~ I . I' I' ( I I I I I I __ I I TR~ 0 :2• !) I ig91Q1, ... ~ ······--- @-,~·~~~ .!?!.-.flfl0 UC~ o.c. i ~ ~r"L 0 ' I I I I I I I I f I I f f I • I I :j·l ~ I I I I I : I ~I I ~I ,:;, ~ -~§ ~ !,~/ 11. ~~ -7:~, __ ___.JJ ~ I -~') S>'EAA L~ I • 1800 I I I . " I f.• f ~-.· CO~T\NUE ROOf SHT C UNDER ~,._ fR°''C !'!P I -ro "~;p II r-t.' 0 I -'""7"xo'-- --~~ l -HUC46 L J~t< TRUSSES~ 4X6-£ ·JiM,:<f.ct;.,f,lr...fr.rt BR CAT W.W. ST6224 ~I ..;;-...;;.-i _ -.:: 4 ~ :1·· :~ ;1 • I l' •. IQ\~J.O. I ~-J•~'""i I I ~T_-- ~ -=t f ,! /:). tffi .., .. • 1,, ·, 1, !' fy !1 .1 < 1. I --,--- 1 I II t/ 1V, (3). fl 'l </?'!Id ~ ~) f I 7 L-------f- 2 ~{~:_J,-l- f'f,J 4 •, 1 /'I'll ~,,, /u •1{ ~-------~ Z. i '• ,, /f" IJ1> 1.u, 1.,,.,,.( r I I '( ' \ ; t :n,ij~AtN9, R~~N4• A~.~ -I I I @ - j ' ,. :"I "' 1; ., ..... . I 'I -...,; ' ' ., " '; .. ·~ ~ .. ~ " • •• ' ( "-', .. ,1 ·'' ". \' \I-. '<:\ ' \ (\ { .. \.\ .... "" ' ~ ' ~ Building Permit Finaled Revision Permit Print Date: 05/12/2026 Job Address: 1229 GOLD FLOWER RD, CARLSBAD, CA 92011 Permit No: Status: {city of Carlsbad PREV2025-0198 Closed -Finaled Permit Type: BLDG-Permit Revision 2145603500 $69,632.64 Work Class: Residential Permit Revision Parcel#: Valuation: Occupancy Group: #of Dwelling Units: Bedrooms: Bathrooms: Track#: Lot#: Project#: Plan#: Construction Type: Applied: 11/05/2025 Issued: 12/11/2025 Finaled Close Out: 02/25/2026 Final Inspection: Orig. Plan Check #: Plan Check#: ClHz;2,o-z, t;:i, IC\o,5 Occupant Load: Code Edition: Sprinkled: Project Title: Description: HOLIAN:CHANGES TO ORIGINAL PLANS. REMOVING A POST IN A BEDROOM Applicant: LOGAN ANDERSON 1106 2ND ST, # 561 ENCINITAS, CA 92024-5096 (619) 807-0640 FEE Property Owner: HOLIAN FAMILY TRUST HOLIAN 1229 GOLD FLOWER RD CARLSBAD, CA 92011-3422 BUILDING PLAN CHECK REVISION ADMIN FEE THIRD PARTY REVIEW -Consultant Cost (BLDG) Total Fees: $275.00 Total Payments To Date: $275.00 Building Division Contractor: MODEL HOME INC1070 COMMERCE ST, # STE F SAN MARCOS, CA 92078-2626 (760) 682-5027 Balance Due: AMOUNT $35.00 $240.00 $0.00 Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 ! 760-602-8560 f I www.ca rlsbadca.gov ( City of PLAN CHECK REVISION OR Deve/o{l_ment Services DEFERRED SUBMITTAL Building Division Carlsbad APPLICATION 1635 Faraday Avenue 442-339-2719 8-15 www.carlsbadca.gov Original Plan Check Number Cl?zrz. '1-o?-S ~ l ~ 3 S (byCitySta~. PP-ev 2{Y25 -01q Plan Rev1s1on Number Proj ect A ddress __._JZ-=--"2--____,Pf.___h~OL,.-"-""'D'---....... P""""~----'---=_.__--'-{2_;-t):;__ __________ _ General Scope of Revision/Deferred Submittal: _________________ _ CONTACT INFORMATION: Name DtJSTl tJ ~72- A ddress \ 0 7 D C~ Phone 7 b O b'o2 so~: 'N l ~ Email Address \ ~ :fQ @ s, \J~) f-t ~ City SA li ~Szip ~ wt,oVJ~ 1:toy'VJ,e:-1 Iv e,, , &o /v"\___ Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: j)ZP Plans p Calculations D Soils D Energy D Other 2. Describe revisions in detail 4. Does this revision, in any way, alter the exterior of the project? 5. Does this revision add ANY new floor area(s)? 6. Does this revision affect any fire related issues? 7. Is this a full set replacement (all sheets)? ---- 3. List page(s) where each revision is shown S -7._. 0 -z . \ 5-3. o □Yes .§!No Oves BNo O ves ~No O ves 1 ~No Date \ \ 1 l 'Z:5--'- sbad, CA 92008 f!r 760-602-27 19 _EM: 760-602-8558 Emal!: building@carlsbadca.gov www.carlsbadca.gov SUBMITTAL INSTRUCTIONS: Revisions are changes to Active/Issued building permits that are not finaled or expired. Submission must be completed in the same manner as the original review (hard copy or digital). HARD COPY Residential or Commercial New, Addition, Remodels, must follow hard-copy submittal process. If you originally applied for a permit via hard copy plans, revisions are applied via a hard copy process. Hard copy submittals are submitted in-person at the Building Counter at 1635 Faraday Ave, Carlsbad CA 92008. Hard Copy Submittal Requirements: • Completed and signed form 8-15. • A minimum of three (3) complete or partial plans is required. If the change effects any fire prevention related review items a fourth set is required. Note, if partial pages are submitted, at approval, the applicant will be responsible for slip-sheeting any new approved sheets into the city-held plan set at city offices. • If submitting revised reports/calculations, submit two (2) updated copies. If staff determine other reviewers to review the updated report/calculations, additional copies of reports/calculations may be required. • Form of payment for fees due or via online payment. Once city receives a complete application and submittal, city will process and route plans and update you, typically via email, with next steps such as fees due, plan check updates, resubmittals, approvals and/or instructions on updating city-held plan sets or other approval documents. DIGITAL If you originally applied for a permit via the on line portal, submissions for revisions are uploaded via the self-service portal. Digital Submittal Requirements: • Completed/signed form B-15. • Updated plan set (pdf). • Updates calculations or other supporting files, if applicable (pdf). Prior to uploading, be prepared with all submittal items listed above in pdf format. Once you are ready with pdf files, log into the portal. Go to your dashboard, find 'Active Permits' and the original permit. Open the original permit, go to the Attachments tab and upload all files. Remember as you add multiple files, to select the applicable file types for the different attachments. If you do not see the permit in the portal, please contact building, as you may need attached to the permit. Once all files are attached, click submit. City will review the new/uploaded files and update you via email and review/approval status and/or fees due. Once city receives a complete application, city will update you with next steps, including review updates, approval and updated plans. Depending on the scope of change, plan check may be required. If changes trigger additional plan review, additional plan review fees w ill be due per the City's current Master Fee Schedule. Substantial changes may trigger updates in development impact or permit fees. Outstanding fees are due prior to approval/issuance. If you have questions with navigating the portal (finding your permit, uploading files), please see the CSS Help Guide or contact us here. True North COMPLIANCE SERVICES December 8, 2025 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. City of Carlsbad -FINAL REVIEW City Pennit No: PREV2025-0198 True North No.: 25-018-1209 Carlsbad, CA 92008 Plan Review: Revision Infill Addition to Second Floor Address: 1229 Gold Flower Rd Applicant Name: Dustin Roller Applicant Email: info@modelhomeinc.com OCCUPANCY AND BUILDING SUMMARY: Occupancy Groups: R-3 Occupant Load: NI A Type of Construction: V-B Sprinklers: No Stories: 2 Area of Work (sq. ft.): 308 sq. ft. Valuation: Confirmed Scope of Work: Confirmed Floor Area: Confirmed Notes: NIA Attn: Building & Safety Department, True North Compliance Services, Inc. has completed the final review of the following documents for the project referenced above on behalf of the City of Carlsbad: I. Drawings: One (I) copy dated November l, 2025, by Chris M. Cobb. 2. Structural Calculations: One (1) copy dated November 23, 2025, by Morgan Structural. The 2022 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2021 IBC, UMC, UPC, and 2020 NEC, as amended by the State of California), 2022 California Green Building Standards Code, 2022 California Existing Building Code, and 2022 California Energy Code, as applicable, were used as the basis of our review. Please note that our review has been completed and we have no further comments, however, we bring the following to your attention: 1. This project is Hourly. Please charge the applicant the following hours of plan review. Review No. Hourly Rate Hours True North Compliance Services, Inc. 8369 Vickers Street, Suite 207, San Diego, CA 92111 T / 562.733.8030 Total 1st Review $120.00 1 $120.00 2nd Review $120.00 1 $120.00 Total $240.00 We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any questions or if we can be of further assistance. Sincerely, True North Compliance Services Review By: Emily Wilson -Plan Review Engineer Quality Review By: Areli Sanchez -Plan Review Supervisor True North COMPLIANCE SERVICeS November 18, 2025 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. City of Carlsbad-FIRST REVIEW City Permit No: PREV2025-0198 True North No.: 25-018-1209 Carlsbad, CA 92008 Plan Review: Revision Infill Addition to Second Floor Address: 1229 Gold Flower Rd, Carlsbad CA Applicant Name: DUSAN ROLLER Applicant Email: INFO@MODELHOMEINC.COM True North Compliance Services, Jnc. has completed the review of the fo llowing documents for the project referenced above on behalf of the City of Carlsbad. Our comments can be found on the attached list. I. Drawings: Electronic copy dated November 1, 2025, by Chris M. Cobb. 2. Structural Calculations: Electronic copy dated November 1, 2025, by Christopher M. Cobb .. Attn: Permit Technician, the scope of work on the plans has been reviewed for coordination with the scope of work on the permit application. See below for information if the scope of work on plans differs from the permit application: Valuation: Scope of Work: Floor Area: See Notes Below Confirmed Confirmed Notes: Valuation is not provided. This project is hourly. Please charge the applicant the following hours of plan review. Review# Hours Rate $120.00 Total Our comments follow on the attached list. Please call if you have any questions or if we can be of further assistance. Sincerely, True North Compliance Services Review By: Emily Wilson -Plan Review Engineer Quality Review By: Areli Sanchez -Plan Review Engineer True North Compliance Services, Inc. 8369 Vickers Street, Suite 207, San Diego, CA 92111 T / 562. 733.8030 Revision Infill Addition to Second Floor 1229 Gold Flower Rd November 18, 2025 Plan Review Comments ARD COPY -RESUBMITT AL INSTRUCTIONS: City of Carlsbad-FIRST REVIEW City Permit No.: PREV2025-0198 True North No.: 25-018-1209 Page2 Please do not resubmit plans until all departments have completed their reviews. For status, please contact building@carlsbadca.gov Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). Corrected sets can be submitted as follows: • Deliver THREE corrected sets of plans and TWO corrected calculations/reports directly to the City of Carlsbad Building Division, 1635 Faraday Ave., Carlsbad, CA 92008, (442) 339-2719. The city will route the plans to True North, Planning and Land Development Engineering Departments (if applicable) for continued review. o Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific instructions for resubmittal review. The city will not route plans back to Dennis Grubb & Associates for continued Fire Prevention review. GENERAL INFORMATION: A. The following comments are referred to the 2022 California Building, Mechanical, Plumbing, Electrical Codes, California Green Building Standards Code, and Energy Code (i.e., 2021 IBC, UMC, UPC, and 2020 NEC, as amended by the State of California). B. There may be other comments generated by the Building Division and/or other City departments that will also require your attention and response. This attached list of comments, then, is only a portion of the plan review. Contact the City for other items. C. Respond in writing to each comment by mar.king the attached comment list or creating a response letter. Indicate which details, specification, or calculation shows the required information. Your complete and clear responses will expedite the re-check. D. Where applicable, be sure to include the architect and engineer's stamp and signature on all sheets of the drawings and on the coversheets of specifications and calculations per CBPC 5536. l and CBPC 6735. This item will be verified prior to plan approval. E. If you have any questions regarding the comments below, please contact Emily Wilson via email emilyw@tncservices.com or telephone (562) 733-8030. OCCUPANCY & BUILDING SUMMARY: Occupancy Groups: Occupant Load: Type of Construction: Sprinklers: Stories: Area of Work (sq. ft.): R-3 NIA V-B No 2 308 sq. ft. Revision Infill Addition to Second Floor 1229 Gold Flower Rd November 18, 2025 STRUCTURAL COMMENTS: City of Carlsbad-FIRST REVIEW City Permit No.: PREV2025-0198 True North No.: 25-018-1209 Page3 SI. Provide structural calculations verifying the proposed footing size and reinforcement are adequate to support the applied loads (calcs for beam provided only). S2. Please update structural calculations to reference the ASCE 7-16 and IBC 202 1 instead of the ASCE 7-22 and TBC 2024 as they are not yet adopted. •---..,.,.,..,.,,auvu .:>et : l'\;:s\;t 1·22 / IBC 2024 Material Analysis Stress DH Load Com 2024 Fb • Fb· Wood Species Wood Grade Beam Bracing V Fe· Prl : Ca ~ Fc-Perp : Versa Lam 3100 Fv Ft : Beam Is Fully 8 against tateniH<>r$1onal bucking ASCE 7-1¥ IBC 2021 O(o.2•iL(D.,aJ If you have any questions regarding the above comments, please contact Emily Wilson via email emi lyw@tncservices.com or telephone (562) 733-8030. [END] rxl MORGAN bM:I STRUCTURAL Plan Revision Response Project Name: Project Address: City Permit No: True North No: Holian Remodel 1229 Gold Flower Road Carlsbad, CA PREV2025-0198 25-018-1209 Morgan Project No: Date: Comment Comment Morgan Structural Response No. 25.127 11/23/2025 S1 Verify proposed Calculation for footing added to calculations package. No change footing size and to plans required. reinforcement (only calcs for beam were provided). S2 Calculations should Revised calculations have been provided. These specific codes reference ASCE 7-16 have no impact on these designs. No changes to plans required. and IBC 2021. Reference Location Revised calculation package Revised calculation package This concludes our response to all city comments. If you have any further questions, please do not hesitate to call or email per our contact information below. Sincerely, Chris Cobb, S.E. Morgan Structural jeff@morganstructural.com I chris@morganstructural.com (760) 690-7454 I (919) 914-8883 rx1 MORGAN l:M::I STRUCTURAL www.morganstructural.com chris@morganstructural.com (919) 914-2043 jeff@morganstructural.com (760) 690-7454 Date: 11/23/2025 Engineer: Chris Cobb, SE Job#: 25.127 PLAN CHANGE 1 STRUCTURAL CALCULATIONS FOR THE HOLIAN INFILL 122 9 GOLD FLOWER ROAD CARLSBAD, CA 9 2011 OLD 0Q ON 0) I.DO C'0N -o-' c.o I.(') c;, LD~ ~ .,-.,-.,-Lt) N N 0 N Cu ~ 0.. Wood Beam UC#: KW-06016107, Build:20.25.10.02 DESCRIPTION: added beam I Code References Governing Code : IBC 2021 Referenced Design Standard(s): NOS 2018 Load Combination Set : ASCE 7-22 / IBC 2024 Material Properties Analysis Method : Allowable Stress Design Load Combination : ASCE 7-22 / IBC 2024 Wood Species Wood Grade Boise Cascade Versa Lam 3100 Project Title: Engineer: Project ID: Project Descr: Morgan Structural Engineering Fb + Fb - Fe -Prll Fe -Perp Fv Ft 3,100.0psi 3,100.0psi 3,000.0psi 750.0psi 285.0 psi 2,100.0psi Beam Bracing Beam is Fully Braced against lateral-torsional buckling ◊ D(0.24~L(0 48) Span• 19.50 ft Project File: 25.127 Holian.ec6 (c) ENERCALC, LLC 1982-2025 E : Modulus of Elasticity Ebend-xx 2,000.0ksi Eminbend -xx 1,036.83 ksi Density 41 .760pcf 2 Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight NOT internally calculated and added Uniform Load : D = 0.020, L = 0.040 ksf, Tributary Width= 12.0 ft DESIGN SUMMARY Maximum Bending Stress Ratio Section used for this span fb: Actual F'b Load Combination = = = 0.458 : 1 7x16 NDS2018 1,375.01 psi 3,002.48psi Maximum Shear Stress Ratio Section used for this span fv: Actual F'v Load Combination Location of maximum on span = Span # where maximum occurs = +D+L 9.750ft Span# 1 Location of maximum on span Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection 0.329 in 0 in 0.493 in 0 in Ratio= 711 >=360 Ratio= 0>=360 Ratio= 474>=240 Ratio= 0>=240 Maximum Forces & Stresses for Load Combinations Load Combination !'vlax Segment Length Span# M V CD CM Ct Clx CE Cfu DOnly Length= 19.50 ft 1 0.170 0.106 0.90 1.00 1.00 1.00 0.969 1.00 +D+L 1.00 1.00 1.00 0.969 1.00 Length= 19.50 ft 1 0.458 0.287 1.00 1.00 1.00 1.00 0.969 1.00 +D+0.750L 1.00 1.00 1.00 0.969 1.00 Length = 19.50 ft 1 0.305 0.191 1.25 1.00 1.00 1.00 0.969 1.00 +0.600 1.00 1.00 1.00 0.969 1.00 Span: 1 : L Only n/a Span: 1 : +D+L n/a c. I Cr M fb 1.00 1.00 11.41 458.3 1.00 1.00 1.00 1.00 34.22 1,375.0 1.00 1.00 1.00 1.00 28.52 1,145.8 1.00 1.00 = = = = F'b 0.0 2,702.2 0.0 3,002.5 0.0 3,753.1 0.0 Design OK 0.287 : 1 7x16 NDS2018 81 .67 psi 285.00 psi +D+L 18.219 ft Span # 1 fieai'Va ues V fv F'v 0.00 0.0 0.0 2.03 27.2 256.5 0.00 0.0 0.0 6.10 81 .7 285.0 0.00 0.0 0.0 5.08 68.1 356.3 0.00 0.0 0.0 Project Title: Engineer: Project ID: Project Descr: General Footing Project File: 25.127 Holian.ec6 UC#: KW-06016107, Build:20.25.11.05 DESCRIPTION: F-2.5 Morgan Structural Engineering (c) ENERCALC, LLC 1982-2025 Applied Loads P : Column Load OB : Overburden M-xx M-zz V-x V-z D Lr 2.340 L s w 4.680 E H k ksf k-ft k-ft k k _D_E_S_IG_N_S_U_M_M_'.A_R_Y _______________________________ ~--•i41i·i•i'l;-- Min. Ratio PASS 0.7808 PASS n/a PASS n/a PASS n/a PASS n/a PASS n/a PASS 0.040 PASS 0.040 PASS 0.784 PASS 0.040 PASS 0.040 PASS 0.784 PASS 0.0 PASS 0.0 PASS 0.000 PASS 0.0 PASS 0.0 PASS 0.000 PASS n/a PASS 0.0 PASS n/a PASS n/a PASS n/a Detailed Results Soil Bearing Rotation Axis & Load Combination ... X-X, 0 Only X-X, +O+L X-X, +O+0.750L X-X, +0.600 Z-Z, 0 Only Z-Z, +O+L Z-Z, +O+0.750L Z-Z, +0.600 Overturning Stability Rotation Axis & Load Combination ... Footing Has NO Overturning Sliding Stability Force Application Axis Load Combination ... Footing Has NO Sliding Footing Flexure Item Applied Soil Bearing 1.341 ksf Overturning -X-X 0.0 k-ft Overturning -Z-Z 0.0 k-ft Sliding -X-X 0.0 k Sliding -Z-Z 0.0 k Uplift 0.0 k Z Flexure (+X) Bot Tens 1.287 k-ft/ft Z Flexure (-X) Bot Tens 1.287 k-ft/ft Min Steel X Flexure Bottom 0.389 in2/ft X Flexure (+Z) Bot Tens 1.287 k-ft/ft X Flexure (-Z) Bot Tens 1.287 k-ft/ft Min Steel Z Flexure Bottom 0 .389 in2/ft Z Flexure (+X) Top Tens 0 k-ft/ft Z Flexure (-X) Top Tens 0 k-ft/ft Min Steel X Flexure Top 0.000 in2/ft X Flexure (+Z) Top Tens 0 k-11/ft X Flexure (-Z) Top Tens 0 k-ft/ft Min Steel Z Flexure Top 0.000 in2/ft 1-way Shear (+X) 0.0 psi 1-way Shear (-X) 0.0 psi 1-way Shear (+Z) 0.0 psi 1-way Shear (-Z) 0.0 psi 2-way Punching 8.580 psi Capacity 1.718 ksf 0.0 k-ft 0.0 k-ft 0.0 k 0.0 k 0.0 k 32.178 k-ft/ft 32.178 k-ft/ft 0.496 in2/ft 32.178 k-ft/ft 32.178 k-ft/ft 0.496 in2/ft 0.0 k-ft/ft 0.0 k-ft/ft Goveming Load Combination +O+L about Z-Z axis No Overturning No Overturning No Sliding No Sliding No Uplift +1200+ 1.60L +1.20O+1.60L n/a +1.20O+1.60L +1.20O+1.60L n/a 0.000 in2/ft n/a 0.0 k-ft/ft 0 .0 k-ft/ft 0.000 in2/ft 42.059 psi 0.0 psi 42.059 psi 42.059 psi 42.059 psi n/a n/a n/a n/a n/a +1.20O+1.60L Xecc Zecc Actual S011 Bearing Stress @ Location Actual / Allow Gross Allowable (in) Bottom, -Z Top,+Z Left, -X Right, +X Ratio 1.718 n/a 0.0 0.5919 0.5919 n/a n/a 0.345 1.718 n/a 0.0 1.341 1.341 n/a n/a 0.781 1.718 n/a 0.0 1.154 1.154 n/a n/a 0.672 1.718 n/a 0.0 0.3551 0.3551 n/a n/a 0.207 1.718 0.0 n/a n/a n/a 0.5919 0.5919 0.345 1.718 0.0 n/a n/a n/a 1.341 1.341 0.781 1.718 0.0 n/a n/a n/a 1.154 1.154 0.672 1.718 0.0 n/a n/a n/a 0.3551 0.3551 0.207 Overturning Moment Resisting Moment Stability Ratio Status All units k Sliding Force Resisting Force Stability Ratio Status Flexure Axis & Load Combination Mu Side Tension k-ft Surface As Req'd Gvm. As inA2 inA2 Actual As inA2 Phi*Mn k-ft Status X-X, +1.400 0.4095 +Z Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK General Footing UC#: KW-06016107, Build:20.25.11.05 DESCRIPTION: F-2.5 Footing Flexure Flexure Axis & Load Combination X-X, +1.40D X-X, +1.20D+1.60L X-X, +1.20D+1.60L X-X, +1.20D+0.S0L X-X, +1.20D+0.S0L X-X, +1.20D X-X, +1.20D X-X, +0.90D X-X, +0.90D 2-2, +1.40D 2-2, +1.40D 2-2, +1.20D+1 .60L 2-2, +1.20D+1 .60L 2-2, +1.20D+0.S0L 2-2, +1.20D+0.S0L 2-2, +1.20D 2-2, +1.20D 2-2, +0.90D 2-2, +0.90D One Way Shear X Load Combination ... +1.40D +1.20D+1.60L +1.20D+0.50L +1.20D +0.90D One Way Shear Z Load Combination ... +1.40D +1.20D+1.60L +1.20D+0.50L +1.20D +0.90D Two-Way "Punching" Shear Load Combination ... +1.40D +1.20D+1.60L +1.20D+0.50L +1.20D +0.90D Mu k-ft 0.4095 1.287 1.287 0.6435 0.6435 0.3510 0.3510 0.2633 0.2633 0.4095 0.4095 1.287 1.287 0.6435 0.6435 0.3510 0.3510 0.2633 0.2633 Side -2 +2 -2 +2 -2 +2 -2 +2 -2 -X +X -X +X -X +X -X +X -X +X Project Title: Engineer: Project ID: Project Descr: Project File: 25.127 Holian.ec6 Morgan Structural Engineering (c) ENEACALC, LLC 1982-2025 Tension As Req'd Gvm.As Actual As Phi*Mn Status Surface in"2 in"2 in"2 k-ft Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1 .1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1 .1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1 .1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Bottom 0.3888 ACI 7.6.1.1 0.4960 32.178 OK Vu@-X Vu @ +X Vu:Max PhiVn Vu / Phi*Vn Status 0.00 psi 0.00 psi 0.00 psi 42.06psi 0.00 OK 0.00 psi 0.00 psi 0.00 psi 42.06psi 0.00 OK 0.00 psi 0.00 psi 0.00 psi 42.06psi 0.00 OK 0.00 psi 0.00 psi 0.00 psi 42.06psi 0.00 OK 0.00 psi 0.00 psi 0.00psi 42.06psi 0.00 OK Vu@-Z Vu@+Z Vu:Max PhiVn Vu / Phi*Vn Status 0.00 psi 0.00 psi 0.00psi 42.06psi 0.00 OK 0.00 psi 0.00 psi 0.00 psi 42.06psi 0.00 OK 0.00 psi 0.00 psi 0.00 psi 42.06psi 0.00 OK 0.00 psi 0.00 psi 0.00psi 42.06psi 0.00 OK 0.00 psi 0.00 psi 0.00 psi 42.06psi 0.00 OK All units k Vu Phi*Vn Vu / Phi*Vn Status 2.73 psi 150.00 psi 0.02 OK 8.58 psi 150.00 psi 0.06 OK 4.29 psi 150.00 psi 0.03 OK 2.34 psi 150.00 psi 0.02 OK 1.76 psi 150.00 psi 0.01 OK I Wood Beam LIC#: KW-06016107, Build:20.25.10.02 DESCRIPTION: added beam Project Title: Engineer: Project ID: Project Descr: Morgan Structural Engineering Maximum Forces & Stresses for Load Combinations Load Combination Segment Length Span # M V CD CM C1 CLx CE Cfu C i Cr length= 19.50 ft 1 0.057 0.036 1.60 1.00 1.00 1.00 0.969 1.00 1.00 1.00 Overall Maximum Deflections Span load Combination Max. location load Combination ·-· Defl in Span 1 +D+l 0.4930 9.821 Project File: 25.127 Holian.ec6 J (c) ENERCALC, LlC 1982-2025 F'b 6.84 275.0 4,804.0 1.22 16.3 456.0 Max. location ·+· Defl in Span 0.0000 0.000 Vertical Reactions Support notation : Far left is #1 Values in KIPS Load Combination Max Upward from all Load Conditions Max Upward from load Combinations Max Upward from load Cases OOnl~ I +D+l +b+o. sot +0.600 l Only axial load to new footings is 7k use 2.5 ft squre footing, axial capacity = 9.4k use 4x8 post, capacity is at least 10k Support 1 Support 2 7.020 7.020 7.020 7.020 4.680 4.680 2 340 7.020 5.850 1.404 4.680 2 340 7.020 5.850 1.404 4.680 Post Allowable Compression Loads for Douglas-Fir-Larch Lumber Compression Parallel to Grain, Pc (100) I Framing Perp. to Grain, Nominal Top-Plate Height (It.) Size Grade Pc.i 8 9 10 11 2x4 #2 3.280 3.170 2,565 2,105 1,755 3x4 #2 5,470 5.285 4,275 3,510 2.930 #2 r 6,565 6,340 5,130 4,215 3,515 4-lnch 7.655 7.395 5.985 4,915 4.100 Wall (3)2x4 7,695 6,320 5,270 4x6 #2 9.360 7700 6.425 4x8 #2 15,860 12,270 10,105 8,440 4x10 ~2 20,235 19.080 15,555 12,835 10.730 12 1,485 2,475 2,970 3.465 4,455 5,430 7,140 9,085 General Footing UC#: KW-06016107, Build:20.25.11.05 DESCRIPTION: F-2.5 j Code References Governing Code : IBC 2021 Referenced Design Standard(s) : ACI 318-19 Project Title: Engineer: Project ID: Project Descr: Project File: 25.127 Holian.ec6 Morgan Structural Engineering (c) ENERCALC, LLC 1982-2025 Load Combinations Used : ASCE 7-22 / IBC 2024 (L<==100psf) General Information Material Properties fc : Concrete 28 day strength fy : Rebar Yield Ee : Concrete Elastic Modulus Concrete Density <p Values Flexure Shear Analysis Settings Min Steel % Bending Reinf. Min Allow % Temp Reinf. Min. Overturning Safety Factor Min. Sliding Safety Factor Add Ftg Wt for Soil Pressure Use ftg wt for stability, moments & shears Add Pedestal Wt for Soil Pressure Use Pedestal wt for stability, mom & shear Dimensions Width parallel to X-X Axis Length parallel to 2-2 Axis Footing Thickness Pedestal dimensions ... px : parallel to X-X Axis pz : parallel to 2-2 Axis Height Bandwidth Distribution Check (ACI 15.4.4.2) Direction Requiring Closer Separation # Bars required within zone # Bars required on each side of zone Bottom Reinforcing Bars parallel to X-X Axis (resisting 2 Flexure) Number of Bars = Reinforcing Bar Size = # Bars parallel to 2-2 Axis (resisting X Flexure) Number of Bars Reinforcing Bar Size = Rebar Centerline to Edge of Concrete ... at Bottom of footing = # 2.50 ksi 60.0 ksi 3,122.0 ksi 145.0 pcf 0.90 0.750 1.0 : 1 1.0 : 1 Yes Yes 2.50 ft 2.50 ft 18.0 in in in in nfa n/a nfa 4.0 5 4.0 5 (") No No Soil Design Values Allowable Soil Bearing Soil Density Increase Bearing By Footing Weight Soil Passive Resistance (for Sliding) Soil/Concrete Friction Coeff. Increases based on footing Depth Footing base depth below soil surface Allow press. increase per foot of depth when footing base is below Increases based on footing plan dimension Allowable pressure increase per foot of depth when max. length or width is greater than z X X Uj' "' (') II 2'-6" 1.50 ksf 110.0 pcf Yes 250.0 pcf 0.30 ft ksf ft ksf ft (D 4 -# 5 Bars 4 -# 5 Bars I ..- 3.0 in X-X Section Looking to +Z Z-Z Section Looking to +X