Loading...
HomeMy WebLinkAbout1009 HOME AVE; ; CBR2024-3384; PermitBuilding Permit Finaled Residential Permit Print Date: 06/04/2026 Job Address: 1009 HOME AVE, CARLSBAD, CA 92008-1831 Permit No: Status: {city of Carlsbad CBR2024-3384 Closed -Finaled Permit Type: BLDG-Residential Work Class: Second Dwelling Unit Parcel#: Valuation: Occupancy Group: 2031301300 $56,157.64 #of Dwelling Units: 1 Bedrooms: Bathrooms: Occupant Load: Code Edition: Sprinkled: Project Title: Track#: Lot#: Project#: Plan#: Construction Type: Orig. Plan Check#: Plan Check#: Applied: 12/31/2024 Issued: 05/07/2025 Fina led Close Out: 05/14/2025 Final Inspection: 05/14/2025 INSPECTOR: Kersch, Tim Description: DAILEY: CONVERTING AN EXISTING CARPORT INTO A JADU (308 S.F) // (REFERENCE CC2024-1025) (E-REVIEW) Applicant: PATRICK DAILEY 1011 HOME AVE CARLSBAD, CA 92008-1831 (760) 643-8623 FEE BUILDING PLAN CHECK Property Owner: PATRICK DAILEY 1011 HOME AVE CARLSBAD, CA 92008-1831 (760) 643-8623 BUILDING PLAN REVIEW-MINOR PROJECTS (LDE) BUILDING PLAN REVIEW -MINOR PROJECTS (PLN) CERTIFICATE OF OCCUPANCY SB1473 -GREEN BUILDING STATE STANDARDS FEE SFD & DUPLEXES SFD & DUPLEXES STRONG MOTION -RESIDENTIAL (SMIP) Total Fees: $3,983.40 Total Payments To Date: Contractor: $3,983.40 Balance Due: AMOUNT $893.10 $204.00 $107.00 $21.00 $3.00 $1374.00 $1374.00 $7.30 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired . Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 ti www.carlsbadca.gov (_ Cicyof Carlsbad RESIDENTIAL BUILDING PERMIT APPLICATION FOR CITY USE ONLY Plan Check No.: __ _ PC Deposit: __ _ B-1 Date: __ _ This form shall be completed to initiate a residential building permit application. The building permit application is not a building permit. No work shall start until a building permit is duly issued. Job Address: 1011 Home Ave ... Unit#: APN: 203-130-13-00 -----' Description of Work: Converting an existing carport into a JADU Project Valuation: $_1_0_0,_0_0 ___ Is there an active code enforcement violation on this site? ■ Y □ N Are Planning permits required?: □ Y ■ N Case File Nos.: ______________ _ Please indicate the type of application(s) requested and provide the applicable information: 0 New SF: Living SF, 308 . Deck SF, . Patio SF, 70 . Garage SF, ____ ....c Is this to create a new ADU/JADU? ■ Y □ N. New fireplace? □ Y ■ N. D Remodel: 265 SF of affected area. ------Is the area a conversion or change of use? ■YON. □ Pool/Spa: _N_/A _____ SF. Additional Gas or Electrical Features? _Yi_e_s __________ _ □ Solar: n/A KW, ____ Modules. Mounted: 0 Roof □ Ground. Tilt: □ Y □ N. RMA: □ Y □ N. Battery: □ Y □ N. Panel Upgrade: □ Y □ N. Electric Meter Number: ____________ _ □ Plumbing, Mechanical, Electrical: _N_e_w_B_a_t_h_&_K_i_tc_h_e_n ________________ _ □ Other: _________________________________ _ APPLICANT {PRIMARY CONTACT): Name: Permits in Motion Address: 4 715 60th Street City: San Diego State: CA Zip: 92115 Phone: (619) 994-5557 Email: permits@permitsinmotion.com DESIGN PROFESSIONAL: Name: D. Scott Hall Address: 16885 W. Bernardo Dr. #102 City: San Diego State: CA Zip: 92128 Phone: 619-200-1623 Email: dscotthall2@icloud.com State License: __________ _ PROPERTY OWNER: Name: Pat Dailey Address: 1011 Home Ave. City: Carlsbad State: CA Zip: 92008 Phone: 760-473-6833 7G O (o 'i ~ -86.;:i_ ~ Email: p.dailey@roadrunner.com CONTRACTOR: Name: Owner/Builder Address: ____________ _ City: ______ State: __ Zip: __ _ Phone: -------------Em a i I: _____________ _ CSLB License#: ______ Class: __ _ City Business License#: _______ _ Billing Party: □ Applicant ■ Property Owner □ Contractor □ Other: _____________ _ Page 1 of 4 rev 11/24 The construction, addition, or alteration of buildings is governed by the California Contractors License Law (commencing with Business Professions Code section 7000). The law has an exemption that allows a person who is not a California Licensed Contractor to construct a single-family residential structure and engage in home improvements and repairs, provided they meet certain requirements. (Form B-61 provides information about the requirements that apply to Owner-Builders makes you aware of your responsibilities and possible risk you may incur by having a permit issued to an Owner-Builder.) Permits for multi-family projects are only to be issued to California Licensed Contractors. Refer to Form B-16 for other frequently asked questions. APPLICANT (PROPERTY OWNER, CONTRACTOR, OR AGENT) CERTIFICATIONS: CHEC~X LJ . I/We certify that I/we a legal right, interest, or entitlement to the use of the property that is the ~ subject of this application. ~ I/We understand that State law mandates the Applicant to provide an estimated value of all work proposed (B-29 form). I/We hereby certify the construction valuation provided is accurate and includes all proposed work such as all structural work, finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevator, labor costs, and all permanent equipment and systems. If the valuation is underestimated, the permit may be denied, unless the Applicant can show detailed estimates to meet the approval of the Building Official. If the Applicant is not the Property Owner, both the Property Owner and Applicant (authorized Contractor or authorized Agent of the Property Owner/Contractor) must sign below. By signing this declaration, the Property Owner authorizes the Applicant listed in this application to act as the J Property Owner's Agent on all matters before the city pertaining to development on this property. ~ I/We understand that State law requires construction to be done by a Licensed Contractor and the c{ Property Owner may apply for an Owner-Builder permit under an exemption from the law. □ A. If the Contractor is the Applicant, the License Contractor Declaration on page 4 must be completed. □ B. If the Applicant is an Owner-Builder, an Owner-Builder affidavit is required and must be submitted (Form B-61). The city will not issue a building permit until this form has been submitted. The License Contractor Declaration on page 4 does not need to be submitted. I/We have read this application form in its entirety and reviewed the building permit application and the information I/we have provided is true and correct to the best of our knowledge. Grade lines as shown on drawings accompanying this application are assumed to be correct. This certifies that the description of the project and all the plans and supporting documentation; including the location and labeling of all existing and proposed buildings, structures, access roads, and utilities and easements; are accurate in all material respects as of the date when made. I/We understand that it is my responsibility to ensure that statements and representations are not misleading. I/We agree to promptly remove, correct, or add information as needed to correct any misleading or materially inaccurate information. I/We understand that any misstatement or omission of the requested information or of any information subsequently requested might be grounds for rejecting the application, denying the application, suspending or revoking a permit issued on the basis of these or subsequent representations, or for the seeking of such other and further relief as deemed appropriate by the City of Carlsbad. If a digital submittal is made or required, I/we certify that the submittal package includes digital files that follow the city's electronic submissions standards.) Failure to submit correctly formatted electronic files may result in the submittal being returned, which will delay intake and/or review. Page 2 of 4 rev 11/24 I/We certify that I am (we are) aware of all permit requirements and will not willfully deviate from the approved plan. I/We agree to comply with all applicable city and county ordinances and state laws relating to building construction. I/We assume full responsibility for the satisfactory completion of all .--,/' work authorized under the permit(s), including work performed prior to assuming control. L_j After construction begins, I/we understand that a height certification, pad certification, or boundary .--,/' certification may need to be submitted to the Building Inspector, when required. l:'.j I understand that a building permit application will expire If a permit has not been issued/obtained within one year from the application date (original filing date), unless an extension of time has been granted (Form B-25). With some limited exceptions, if a building permit application expires and there is interest in proceeding with the same project, a new application will be required and the project will be subject to new fees and regulations that are in effect at the time the new application is submitted. After submitting the application, the Billing Party designated as part of the application will be sent future city invoices for above referenced building permit(s). I understand that if a permit fee or development impact fee refund is issued, the check will be mailed to the financial responsible party (the actual person or company that paid the invoice). If the information on file for the financially responsible party is outdated or inaccurate, it must be corrected before the refund can be sent. Form .--./ B-49B may be completed to update the financially responsible party's contact information. l_j I/We agree to waive, release, and discharge the City of Carlsbad ("City") and its officers, elected or appointed officials, employees, volunteers and agents (the "Indemnified Parties") from all claims and demands, rights and causes of action of any kind with respect to the building permit application, the purpose of which is to challenge, attack set aside, void, modify, or annul the approval or denial of the application, or the processing thereof, except liability caused by the Indemnified Parties' sole negligence or willful misconduct, in which case the indemnity received by the city shall be reduced by the amount: (a) that the city's active negligence contributed to the liability on a comparative basis; or (b) such other amount as may be required by law. This obligation is effective without reference to the existence or applicability of any insurance coverages which may have been required by city or any additional insured endorsements which may extend to Indemnified Parties. Property Owner(s) and Applicant, on behalf of themselves and all parties claiming under or through them, waive all rights of subrogation and contribution against the Indemnified Parties while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed, regardless of any prior, concurrent or subsequent passive negligence by the Indemnified Parties. By signing below, I acknowledge that I have completely read, understand, and agree to the declarations above forth herein. (This section must be signed by both parties if not the same individual.) Date:~S_-_7_-_2--.§ __ _ Signat Date:_b_,..._t_.,....._;;2.-._b __ Signature of Applicant Page 3 of 4 rev 11/24 ( City of Carlsbad OWNER-BUILDER FORM B-61 This form shall be completed to initiate an Owner-Builder residential building permit application. It must be submitted concurrently with the B-1 Form. Assessor's Parcel Number: ----------------------------- Site Address: __ 1_D_c>____.1 _~µ_t)_lh __ e __ A __ v_'e ____________ _ Description of Work: Co V) vc,.,,,__V·i-, ...... '\.y OWNER-BUILDER CERTIFICATIONS: Owner-Builder Acknowledgment and Information Verification Form CHECK EACH BOX ~I understand a frequent practice of unlicensed persons is to have the Property Owner obtain an "Owner-Builder" building permit that erroneously implies that the Property Owner is providing his or her own labor and material personally. I, as an Owner-Builder, may be held liable and subject to serious financial risk for any injuries sustained by an unlicensed person and his or her employees while working on my property. My homeowner's insurance may not provide coverage for those injuries. I [3 am willfully acting as an Owner-Builder and am aware of the limits of my insurance coverage for injuries to workers on my property. I understand building permits are not required to be signed by a Property Owner unless the Property Owner is responsible for the construction and are not hiring a Licensed Contractor to assume this responsibility. I understand as an "Owner-Builder" I am the responsible party of record on the permit. I understand that I may protect myself from potential financial risk by hiring a Licensed Contractor and having the permit filed in his or her name instead of my own . I understand Contractors are required by law to be licensed and bonded in California and to list their license numbers on permits and contracts. I understand if I employ or otherwise engage any persons, other than California Licensed Contractors, and the total value of my construction is at least five hundred dollars ($500), including labor and materials, I may be considered an "employer" under State and Federal law. I understand if I am considered an "employer" under State and Federal law, I must register with the State and Federal government, withhold payroll taxes, provide workers' compensation disability insurance, and contribute to unemployment compensation for each "employee." I also understand my failure to abide by these laws may subject me to serious financial risk. I understand under California Contractors' State License Law, an Owner-Builder who builds single­ family residential structures cannot legally build them with the intent to offer them for sale, unless all work is performed by Licensed subcontractors and the number of structures does not exceed four within any calendar year, or all ofthe work is performed under contract with a licensed general Page 1 of 2 rev 11/24 ~building Contractor. L::J I understand as an Owner-Builder if I sell the property for which this permit is issued, I may be held liable for any financial or personal injuries sustained by any subsequent owner(s) that result from any latent construction defects in the workmanship or materials. IT I understand I may obtain more information regarding my obligations as an "employer" from the Internal Revenue Service, the United States Small Business Administration, the California Department of Benefit Payments, and the California Division of Industrial Accidents. I also understand I may contact the California Contractors' State License Board (CSLB) www.cslb.ca.gov for more information about Licensed Contractors. IT I am aware of and consent to an Owner-Builder building permit applied for in my name and understand that I am the party legally and financially responsible for proposed construction activity in accordance with the plans and specifications submitted herewith and for the purpose set forth. I agree that, as the party legally and financially responsible for this proposed construction activity, I will abide by all applicable laws and requirements that govern Owner-Builders as well as employers. Licensed Contractors are regulated by laws designed to protect the public. I understand if I contract with a person who does not have a license, the Construction Industry Licensing Board, the Department of Business and Professional Regulation and the Building Department may be unable to assist me with any financial loss that I sustain as a result of a complaint. I understand my only remedy against an unlicensed person may be in civil court. I also understand that, if an unlicensed person or employee of an individual or firm is injured while working on my property, I may be held liable for damages. If I obtain an Owner-Builder permit and wish to hire a Licensed Contractor, I will be responsible for verifying whether the Contractor is properly licensed and the status of the Contractor's workers' r-,/ compensation coverage. LJ' The city may withhold final approval, revoke the permit, or pursue any action or remedy for unlicensed activity against the Property Owner and any person performing work that requires licensure under the permit issued. Assembly Bill 2335 amended California Health and Safety Code Section 19825 and added new application requirements to enhance consumer awareness and protection. Did you know-unlicensed persons frequently have the property owner obtain an "Owner-Builder" building permit which erroneously implies that the Property Owner is providing his or her own labor and material personally? Moreover, your homeowner's insurance may not provide coverage for injuries sustained on your property by an unlicensed person and his/her employees. If you are considered an "employer" under State and Federal law, you must register with the State and Federal government, withhold payroll taxes, provide workers compensation and disability insurance, and contribute to unemployment compensation for each "employee." By signing below, I acknowledge that I have completely read, understand, and agree to the declarations above and accept all terms set forth herein and I affirm under perjury that I am exempt from the CSLB requirement. I also acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion ofthe i ements covered by this application/perm it, I cannot legally sell a structure that I have built as not been constructed in its entirety by Licensed Contractors. Date: ___ r:._7 _-_--~( _'_2_5' __ FOR CITY USE ONLY Receipt Acknowledgement: _____________ _ Date: _________ _ BUILDING STAFF Page2of2 rev 11/24 Building Permit Inspection History Finaled {city of Carlsbad PERMIT INSPECTION HISTORY for CBR2024-3384) Application Date: 12/31/2024 Owner: PATRICK DAILEY Permit Type: BLDG-Residential Work Class: Second Dwelling Unit Issue Date: 05/07/2025 Subdivision: VILLAGE HOMES UNIT# 1 Status: Closed -Finaled Expiration Date: 11/10/2025 IVR Number: 60926 Address: 1009 HOME AVE CARLSBAD, CA 92008-1831 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Primary Inspector Reinspection Inspection Status 5/14/2025 05/14/2025 BLDG-84 Rough Combo 284777-2025 Passed Tim Kersch Thursday, June 4, 2026 (14,24,34,44) Checklist Item BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting­ Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts­ Dampers Checklist Item BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final COMMENTS Met all minimum requirements for JADU. COMMENTS Passed Yes Yes Yes Yes Yes Passed Yes Yes Yes Yes Yes Complete Page 1 of 1 Transmittal Letter April 8, 2025 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. Carlsbad, CA 92008 Plan Review: Converting Existing Carport into a JADU Address: 1011 Home Ave, Carlsbad CA 1rlle N orth COMPiLIANCE SE RVIC 1 S THIRD REVIEW City Permit No: CBR2024-3384 True North No.: 25-018-002 Applicant Name: Terry Montello Applicant Email: permits@permitsinmotion.com True North Compliance Services, Inc. has completed the review of the following documents for the project referenced above on behalf of the City of Carlsbad. Our comments can be found on the attached list. 1. Drawings: Electronic copy dated February 18, 2025, by D. Scott Hall Designers. Attn: Permit Technician, the scope of work on the plans has been reviewed for coordination with the scope of work on the permit application. See below for information if the scope of work on plans differs from the permit application: Valuation: Scope of Work: Floor Area: See Notes Below Confirmed Confirmed Notes: The valuation was not specified in the permit application. Our comments follow on the attached list. Please call if you have any questions or if we can be of further assistance. Sincerely, True North Compliance Services Review By: Anne Hammad -Plan Review Engineer QA/QC Review By: Alaa Atassi -Plan Review Engineer True North Compliance Services, Inc. 8369 Vickers Street, Suite 207, San Diego, CA 92111 T / 562.733.8030 Converting Existing Carport into a JADU 1011 Home Ave April 8, 2025 Plan Review Comments [ELECTRONIC -RESUBMITTAL INSTRUCTIONS: City of Carlsbad-THIRD REVIEW City Permit No.: CBR2024-3384 True North No.: 25-018-002 Page2 Please do not resubmit plans until all departments have completed their reviews. For status, please contact building@carlsbadca.gov Please make all corrections, as requested in the correction list. Corrected sets can be submitted as follows: Email the revised plans and comment response letter(s) to building@carlsbadca.gov for continued review. Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific instructions for resubmittal review. The city will not route plans back to Dennis Grubb & Associates for continued Fire Prevention review. GENERAL INFORMATION: A. The following comments are referred to the 2022 California Building, Mechanical, Plumbing, Electrical Codes, California Green Building Standards Code, and Energy Code (i.e., 2021 IBC, UMC, UPC, and 2020 NEC, as amended by the State of California). B. There may be other comments generated by the Building Division and/or other City departments that will also require your attention and response. This attached list of comments, then, is only a portion of the plan review. Contact the City for other items. C. Respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which details, specification, or calculation shows the required information. Your complete and clear responses will expedite the re-check. D. Where applicable, be sure to include the architect and engineer's stamp and signature on all sheets of the drawings and on the coversheets of specifications and calculations per CBPC 5536.1 and CBPC 6735. This item will be verified prior to plan approval. E. If you have any questions regarding the comments below, please contact Anne Hammad via email anneh@tncservices.com or telephone (562) 733-8030. OCCUPANCY & BUILDING SUMMARY: Occupancy Groups: Occupant Load: Type of Construction: Sprinklers: Stories: Area of Work (sq. ft.): R-3 NIA V-B No 1 JADU -308 sq. ft. Remodel -265 sq. ft. Patio -70 sq. ft. Converting Existing Carport into a JADU 1011 Home Ave City of Carlsbad-THIRD REVIEW City Permit No.: CBR2024-3384 True North No.: 25-018-002 Page3 April 8, 2025 COMMENTS: PC2: Plans changes from JADU to ADU The following additional comments were generated based on the change. Please be advised, all unpermitted work is considered new and shall comply with the most recent code. Separation between dwelling units is required. The following comments apply per CRC R302.3: o Dwelling units in two-family dwellings shall be separated from each other by wall having not less than a I-hour fire-resistance rating when tested in accordance with ASTM E 119 or UL 263 or CBC 703.2.2. PC3: The common walls and floors are required to have a have an STC rating of 50 minimum per CBC 1206.2 and CBC 1206.3. Please show on the detail provided. o Revise the plan to show a I-hour fire-resistive assembly between the two units. Provide construction details with a basis of approval (i.e., UL design#, G.A.file #). PC3: The basis of approval for the 1-hr fire-rated wall provided is based on the 2012 /BC. Please update to the 2021 /BC, as the edition used is outdated. !STANCE FRA-101 (Load Bearing SEE .0TESl,2 721.1 (2) Revise sheet A5 to specify ADU, instead of JADU PC3: The change should extend throughout the plans. Sheet A4 still refers to it as a "JADU". Please revise. 1 . N -!eo. 1H ealer Ma uf: tH: a~ S .,..... ..... .••• ,. ... ~.,,..__,~ Moo l: H ·-1500-~HX-. 1 / ,· If you have any questions regarding the above comments, please contact Anne Hammad via email anneh@tncservices.com or telephone (562) 733-8030. [END] Transmittal Letter March 16, 2025 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. Carlsbad, CA 92008 Plan Review: Converting Existing Carport into a JADU Address: 1011 Home Ave, Carlsbad CA 1rlle N orth COMPiLIANCE SE RVIC 1 S SECOND REVIEW City Permit No: CBR2024-3384 True North No.: 25-018-002 Applicant Name: Terry Montello Applicant Email: permits@permitsinmotion.com True North Compliance Services, Inc. has completed the review of the following documents for the project referenced above on behalf of the City of Carlsbad. Our comments can be found on the attached list. 1. Drawings: Electronic copy dated February 18, 2025, by D. Scott Hall Designers. Attn: Permit Technician, the scope of work on the plans has been reviewed for coordination with the scope of work on the permit application. See below for information if the scope of work on plans differs from the permit application: Valuation: Scope of Work: Floor Area: See Notes Below Confirmed Confirmed Notes: The valuation was not specified in the permit application. Our comments follow on the attached list. Please call if you have any questions or if we can be of further assistance. Sincerely, True North Compliance Services Review By: Anne Hammad -Plan Review Engineer QA/QC Review By: Alaa Atassi -Plan Review Engineer True North Compliance Services, Inc. 8369 Vickers Street, Suite 207, San Diego, CA 92111 T / 562.733.8030 Converting Existing Carport into a JADU 1011 Home Ave March 16, 2025 City of Carlsbad-SECOND REVIEW City Permit No.: CBR2024-3384 True North No.: 25-018-002 Page2 Plan Review Comments [ELECTRONIC -RESUBMITTAL INSTRUCTIONS: Please do not resubmit plans until all departments have completed their reviews. For status, please contact building@carlsbadca.gov Please make all corrections, as requested in the correction list. Corrected sets can be submitted as follows: Email the revised plans and comment response letter(s) to building@carlsbadca.gov for continued review. Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific instructions for resubmittal review. The city will not route plans back to Dennis Grubb & Associates for continued Fire Prevention review. GENERAL INFORMATION: A. The following comments are referred to the 2022 California Building, Mechanical, Plumbing, Electrical Codes, California Green Building Standards Code, and Energy Code (i.e., 2021 IBC, UMC, UPC, and 2020 NEC, as amended by the State of California). B. There may be other comments generated by the Building Division and/or other City departments that will also require your attention and response. This attached list of comments, then, is only a portion of the plan review. Contact the City for other items. C. Respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which details, specification, or calculation shows the required information. Your complete and clear responses will expedite the re-check. D. Where applicable, be sure to include the architect and engineer's stamp and signature on all sheets of the drawings and on the coversheets of specifications and calculations per CBPC 5536.1 and CBPC 6735. This item will be verified prior to plan approval. E. If you have any questions regarding the comments below, please contact Anne Hammad via email anneh@tncservices.com or telephone (562) 733-8030. OCCUPANCY & BUILDING SUMMARY: Occupancy Groups: Occupant Load: Type of Construction: Sprinklers: Stories: Area of Work (sq. ft.): R-3 NIA V-B No 1 JADU -308 sq. ft. Remodel -265 sq. ft. Patio -70 sq. ft. Converting Existing Carport into a JADU 1011 Home Ave City of Carlsbad-SECOND REVIEW City Permit No.: CBR2024-3384 True North No.: 25-018-002 Page3 March 16, 2025 COMMENTS: PC2: Plans changes from JADU to ADU. The following additional comments were generated based on the change. Please be advised, all unpermitted work is considered new and shall comply with the most recent code. Separation between dwelling units is required. The following comments apply per CRC R302.3: o Dwelling units in two-family dwellings shall be separated from each other by wall having not less than a 1-hour fire-resistance rating when tested in accordance with ASTM E 119 or UL 263 or CBC 703.2.2. o Wall assemblies shall extend from the foundation to the underside of the roof sheathing. Please show compliance on section view. o Revise the plan to show a 1-hour fire-resistive assembly between the two units. Provide construction details with a basis of approval (i.e., UL design #, G.A. file #). Ceiling height shall be 7 ft minimum at all locations per CRC R304.2. Please revise and show compliance. Req ·red) ol ( E}2x6@24 RR/CJ .----R-15 lnsulahon@ tN)Veritetl Rarter Bays ___ _ R-15 lnsu ati!m@ {N):2X4@ 16 E){t. Wa,Us .ol __ t----,-,. Revise sheet A5 to specify ADU, instead of JADU. Energy forms shall be revised to specify ADU instead of JADU. Converting Existing Carport into a JADU 1011 Home Ave March 16, 2025 City of Carlsbad-SECOND REVIEW City Permit No.: CBR2024-3384 True North No.: 25-018-002 Page4 If you have any questions regarding the above comments, please contact Anne Hammad via email anneh@tncservices.com or telephone (562) 733-8030. [END] Transmittal Letter January 13, 2025 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. Carlsbad, CA 92008 Plan Review: Converting Existing Carport into a JADU Address: 1011 Home Ave, Carlsbad CA True orth ....... •~ COMPLIANCE SERVIC S FIRST REVIEW City Permit No: CBR2024-3384 True North No.: 25-018-002 Applicant Name: Terry Montello Applicant Email: permits@permitsinmotion.com True North Compliance Services, Inc. has completed the review of the following documents for the project referenced above on behalf of the City of Carlsbad. Our comments can be found on the attached list. 1. Drawings: Electronic copy dated December 26, 2024, by D. Scott Hall Designers. Attn: Permit Technician, the scope of work on the plans has been reviewed for coordination with the scope of work on the permit application. See below for information if the scope of work on plans differs from the permit application: Valuation: Scope of Work: Floor Area: See Notes Below Confirmed Confirmed Notes: The valuation was not specified in the permit application. Our comments follow on the attached list. Please call if you have any questions or if we can be of further assistance. Sincerely, True North Compliance Services Review By: Anne Hammad -Plan Review Engineer QA/QC Review By: Alaa Atassi -Plan Review Engineer True North Compliance Services, Inc. 8369 Vickers Street, Suite 207, San Diego, CA 92111 T / 562. 733.8030 Converting Existing Carport into a JADU 1011 Home Ave January 12, 2025 Plan Review Comments ELECTRONIC -RESUBMITTAL INSTRUCTIONS: City of Carlsbad-FIRST REVIEW City Permit No.: CBR2024-3384 True North No.: 25-018-002 Page2 Please do not resubmit plans until all departments have completed their reviews. For status, please contact building@carlsbadca.gov Please make all corrections, as requested in the correction list. Corrected sets can be submitted as follows : Email the revised plans and comment response letter(s) to building@carlsbadca.gov for continued review. Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific instructions for resubmittal review. The city will not route plans back to Dennis Grubb & Associates for continued Fire Prevention review. GENERAL INFORMATION: A. The following comments are referred to the 2022 California Building, Mechanical, Plumbing, Electrical Codes, California Green Building Standards Code, and Energy Code (i.e., 2021 IBC, UMC, UPC, and 2020 NEC, as amended by the State of California). B. There may be other comments generated by the Building Division and/or other City departments that will also require your attention and response. This attached list of comments, then, is only a portion of the plan review. Contact the City for other items. C. Respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which details, specification, or calculation shows the required information. Your complete and clear responses will expedite the re-check. D. Where applicable, be sure to include the architect and engineer's stamp and signature on all sheets of the drawings and on the coversheets of specifications and calculations per CBPC 5536.1 and CBPC 6735. This item will be verified prior to plan approval. E. If you have any questions regarding the comments below, please contact Alaa Atassi via email alaa@tncservices.com, or telephone (562) 733-8030. OCCUPANCY & BUILDING SUMMARY: Occupancy Groups: Occupant Load: Type of Construction: Sprinklers: Stories: Area of Work (sq. ft.): R-3 NIA V-B No 1 JADU -308 sq. ft. Remodel-265 sq. ft. Patio -70 sq. ft. ARCIDTECTURAL COMMENTS: Al. On sheet Al: Please add the proposed 70 SF patio to the scope of work statement. Converting Existing Carport into a JADU 1011 Home Ave January 12, 2025 A2. On sheet A2: City of Carlsbad-FIRST REVIEW City Permit No.: CBR2024-3384 True North No.: 25-018-002 Page3 a) For roof slopes from 2: 12 to 4: 12, double underlayment application is required per CRC R905.2.2. Please provide. b) Please revise all notes to reference the 2022 edition of the codes, where applicable. ECT. ff , PRIME~ ROOF cot.OR A3. On sheet A4: a) In the remodel area: i) Please specify the area of glazing for the proposed door (D04). Per CRC R303. l, habitable rooms shall have a minimum of 8% glazing of the total area of the room. Please show compliance. ii) With the removal of the window on the northern wall, please show how a minimum of 4% of the total room area for natural ventilation is maintained. Alternatively, update the plan to provide mechanical ventilation per the exceptions. CRC R303 .1 b) In the JADU: i) Revise window (W06) to be tempered glass as safety glazing shall be provided in glazing in enclosures for bathtub or shower. CRC R308.4.3. ii) The closet is marked as existing. Please clarify. m I PHX,WIFl (5200 BTU)I I ' ) :0-, ' .. . / r .., .' i,o .. / ' ' ' / ' ' ~ ' I ' / / iii) Revise the smoke alarm to be located at least 20 feet from a permanently installed cooking appliance. CRC R314.3.3. (1) Smoke alarms are permitted to be located at least 10 feet from a permanently installed cooking appliance if the smoke alarm is an ionization smoke alarm with alarm silencing switch, or photoelectric smoke alarm in accordance with CRC R314.3.3 (4) Exception. Converting Existing Carport into a JADU 1011 Home Ave January 12, 2025 A4. On sheet A5: ' .. ' • Risers I City of Carlsbad-FIRST REVIEW City Permit No.: CBR2024-3384 True North No.: 25-018-002 Page4 C ~ f',.. a) In sections Y5 and Y6, the roof appears flat, while in sections X2 and X3, it is sloped. Please ensure coordination between the sections. b) The roof of the JADU in the sections indicates new vented rafter bays, yet sheet A2 outlines the roof assembly as existing. Please clarify. i) In the case of a new assembly, show enclosed rafter space ventilation per CRC R806.1 . (E:}2x6@24 RR/CJ o/ 16 Ga, Galv. line Wire Staple to s· o.c. (7/8-legs) o/ (2) Layers of (N)C\ass "A• Butlt Up Roof ESR 1388 Non-Combustible Hardi-Board Siding ESR·2290 ol 2 La I'S or Grade ·o~ Bulldl Pa r c) Submit details for the exterior wall finishes. Details shall include the following: i) Flashing showing transition from the different exterior siding per CRC R703.1. ii) Water resistive barrier per CRC R703.2. iii) Clearance between the siding and the earth or paved surface per CRC R703. A5. On sheet Sl: a) Specify all wood framing members that rest on concrete exterior foundations to be 8 inches above the exposed ground per CRC R317 .1. Converting Existing Carport into a JADU 1011 Home Ave January 12, 2025 MECHANICAL COMMENTS: No comments. ELECTRICAL COMMENTS: City of Carlsbad-FIRST REVIEW City Permit No.: CBR2024-3384 True North No.: 25-018-002 Page5 El. Provide at least one wall switched-controlled lighting outlet in the family room and in the JADU per CEC 210.70(A) PLUMBING COMMENTS: P 1. At showers, address the following: a) Specify the shower door to be 22" minimum per CPC 408.5. b) Shower door shall open so as to maintain a 22" minimum unobstructed opening for egress per CPC 408.5. c) Controls for the showerhead shall be located on the sidewall of the shower compartment so that the showerhead does not discharge directly at the entrance to the compartment per CPC 408.9. GREEN BUILDING COMMENTS: G 1. Climate Action Plan requirements apply to all new structures, residential additions/remodels equal to or exceeding $60,000 in valuation, and commercial City of Carlsbad requires that all projects that qualify for CAP compliance will require a completed Climate Action Plan (CAP) Consistency Checklists (city forms B-50) to be completed by the APPLICANT. https://www.carlsbadca.gov/home/showpublisheddocument/6878/638225157825900000 a) For plans submitted to the City the following Climate Action Plan requirements apply, per Carlsbad ordinance: b) The applicant is to fill out the B-50 CAP Consistency Checklist. The scope of work and project valuation will determine which sections of the CAP are required. c) Plan examiners review the B-50 CAP Consistency Checklist for completion. For example: If new residential construction is the scope of work, CAP sections 2A, 3A, and 4A are required to be filled on the B-50 checklist. G2. CALGreen mandatory measures are required for residential projects that increases the conditioned space per CGBC 301.1.1. a) Incorporate mandatory measures specified in Chapter 4 of the 2022 CGBC onto the plan set or download the mandatory checklist from the following link: https://aiacalifomia.org/learn-grow­ practice/practices/ cal green-checklists/ ENERGY COMPLIANCE COMMENTS: Tl. Discrepancies were found between the energy report provided and the plans. Please provide a new energy report that matches the work proposed in the plans: a) The JADU slab is indicated as new in the energy report, while in the architectural and structural plans, it is marked as existing. Converting Existing Carport into a JADU 1011 Home Ave January 12, 2025 ~ N_ Slab JAOU JADU City of Carlsbad-FIRST REVIEW City Permit No.: CBR2024-3384 True North No.: 25-018-002 Page6 b) Please make adjustments for the status of the roof of the JADU based on your response to architectural comment A4/b as the report currently specifies it as new. c) Upon providing the updated report: i) List all HERS inspection features and special features required on the cover sheet. Please coordinate with the Energy Report. ii) If a radiant barrier is required, revise the roof plan to specify a radiant barrier to be installed. iii) Revise the R-value of the new elements of the JADU shown on sheet A5 based on the updated energy report. T2. The Title 24 Energy Features Summary on sheet Al does not seem to be applicable to this project. It is for a two-story main residence with an ADU. Please remove the summary from the plans. T3. On sheet A4: Address the following comments: a) Revise plan to show at least one luminaire in the bathrooms to be controlled by a vacancy sensor. CEnergyC 150.0(k)2(E) b) Revise plan to show interior lighting fixtures that are not controlled by occupancy or vacancy sensors to be equipped with dimming controls. CEnergyC 150.0 (K)(2)(F) STRUCTURAL COMMENTS: SL For the new patio: Revise the notes on sheets A4 and S3 to show a 10-mil polyethylene or approved vapor retarder with joints lapped not less than 6 inches between the concrete slab floor and the base course or subgrade. CRC R506.2.3 " • :Provkle Interior Mllsiure Oonll'ol elerne-.nts per CC.BS section 4.S0S , 4 • ltlick. eoocrela slab (25oO psi ilnrmurn) ~ • ~n bars@ 1,8," o.c. 1>ach wey al 1he middle of slab ,av •• 6 mil vapor ba derlain by @! laast 4 inc/>!)~ thick !;la-a,;, o( 1/2' ,;,r l~rg . . . . 2022 Cal Greeri Sectloo 4.505.2.1 C!IJ)illary Break •· Moisture oontwit of l>uifding materials lllied in ,,,all ar,d floor framing is lo S2. For the JADU slab: Per CRC R506.2.3 a vapor retarder is required. Be advised, alternate materials can be proposed to prevent the passage of water vapor. The following alternate products are approved for use on an existing slab that does not have a vapor retarder: a) ICC ESR#1413 -RedGard Waterproofing and Crack Prevention Membrane, C-Cure Pro-Red Waterproofing Membrane 963, CBP 232 Waterproofing and Anti-Fracture Membrane, and Jambo Waterproofing Membrane b) ICC ESR #2417 -LATICRETE Hydro Ban c) ICC ESR #2785 -Polycoat-Aquatight and Flexideck d) ICC ESR#3474-Mapelastic AquaDefense Waterproofing Membrane S3. On sheet Sl: a) The plans specify the use of shear walls, but structural calculations were not part of this submittal. Please provide a complete shear wall and lateral design, and check the height to width ratio for shear walls. Additional comments may apply upon submittal. Converting Existing Carport into a JADU 1011 Home Ave January 12, 2025 City of Carlsbad-FIRST REVIEW City Permit No.: CBR2024-3384 True North No.: 25-018-002 Page 7 b) The headers on the eastern wall are marked as existing on the roof plan. Please clarify. S4. On sheet S4: Please update the nailing schedule to 2304.10.2 NAlLING SCHEDULE: PER CBC TM3lE N 1 C RIPTION OF BUII.DJNG EL'EMENTS If you have any questions regarding the above comments, please contact Alaa Atassi via email alaa@tncservices.com, or telephone (562) 733-8030. [END] True North Compliance Services, Inc. I PLAN REVIEW APPROVAL I TtESEPI.ANSIOOCUt,£NTS~VEBEEN REVIEWED FDRCONPI..WICE l'ofTH THE APPUCABlECAUFORNIABI..I.ClNGSTANOAAOS COOESASAC>a'TEOBYTHESTATEOF CIJ.JFDRMAANDAMENJEDBYTHE JURlSaCTlON.PLAN~EWACCEPT.w:::EOF OOCUMEtlTSOOESNOTAlJlliallZE CONSTRLCTIONTOPROCEEDIN\Jl()I.AT](IIOF :::~~,~~~ THSSETOFTHEPLANSANlSPECFICAT](IIS MUSTBEKEPTONTHEJOOSITTATALLTIMES ANO IT IS LN.AWFLl TOMAl<ENNOiNIGES DRH.TERATIONS'MTHOUTPERMISSIONFROM TtEalY.OCCUPNICYOFSTRUCTURE(S)IS ~PERl,fTTEDLNll.FINALN'PRDVH.IS GAANTEOBYH.l.APF'U:.MILEDEPARThlENTS. Dailey ADU Conversion 1011 Home Avenue, Carlsbad, CA 92008 Structural Calculations -25027 Qualls Engineering Structural Engineering Services D. Scott Hall Designers 16885 West Bernardo Drive # 102 San Diego, CA 92127 Phone: 619 200-1623 Fax: 858 559-4662 Qualls Engineering Sheet: _1...,_/_6 __ Structural Engineering Services Project: Dailey ADU Conversion Job#: 25027 GOVERNING CODE: CONCRETE: REINFORCING STEEL: SAWN LUMBER: Engineer: _B_K _______ _ DESIGN BASIS 2022 CBC fc = 2,500 psi (MINIMUM) ASTM A615, Fy = 60 ksi Date: 2/6/25 DOUGLAS FIR LARCH, ALLOWABLE STRESS DESIGN PER 2022 CBC. PROJECT SCOPE Project consists of a proposed conversion of an approximate 310 square feet existing carport into an ADU located at 1011 Home Avenue, Carlsbad, CA, 92008. The proposed remodel is primarily constructed utilizing wood frame construction, the existing roof framing is 2x conventional stick framing, and the existing foundation design is typical slab on grade with turned down footings. There has not been a soils report provided for this project. Therefore, the foundation design will be based on minimum soils values per 2022 CBC chapter 18. Qualls Engineering Structural Engineering Service! Design Loads: Roof: Dead Load ( DL ) Roofing 1 /2" Plywood Wood Framing lnsulatior 1/2" Gyp. Bd. Mech./Elec. Misc. IDL= Live Load (LL) Project: Dailey ADU Conversion Engineer: -"B...;..K;...._ __________ _ 5.0 psf 1.3 psf 4.0 psf 0.5 psf 2.2 psf 0.5 psf 1.5 psf 15.0 psf LL =--~20 .... ~o psf (Reducible) DL + LL =I 35.0ipsf Walls: Stud Walls Exterior Stud Walls Interior Stud Walls Allowable Soils Bearing Pressure 15.0 7.0 psf psf ASBP = 1,500 psf @ 12 inches below lowest adjacent finished gradE Seismic: Site Class: D Sheet: 2 -----Job#: 25027 -----Date: Ss = 1.062 Fa= 1.200 Fv = - SMs= 1.274 SM1 = - Sos= 0.850 s, = 0.385 Occupancy Category Response Redundanc) Importance Mod. Factor Factor Factor, 10 R p II 1.00 6.5 1.3 Wind Load: (Simplified Envelope Procedure) Basic Wind Speed: 97 mph Exposure: C MWFRS P = 0.6*.A.*Kzi*Ps30 (LRFD): P = (ASD): p =I 16.7 psf 10.0!psf Components & Cladding P = 0.6*.A.*Kzi*Pnet30 (LRFD): P = (ASD): p =I 20.4 psf 12.3!psf >. = 1.21 Kz1 = 1.0 Ps30= 13.8 Pnet3o= 16.9 pCs Sosf(R/1) So1 = - ( LRFD ) ( ASD ) 0.110 I 0.121 Qualls Engineering Structural Engineering Services Project: Dailey ADU Conversion Sheet: 3 Job#: -2-50_2_7 __ Engineer: _B_K _________ _ Date: Lateral Analysis Tributary Area (ff) Level Component Weight (psf) Tributary I Tributary Weight IWeight Length (ft) Height (ft) (lbs) (lbs) Roof 15 1,531 22,965 Roof Exterior Wall 15 126 I 8.0 15,120 32,485 Interior Wall 7 70 I 8.0 3,920 Cs (ASD) W (lbs) V (lbs) V (psf) 0.121 32,485 3,943 2.6 Wind Check Ps 10.0 North-South East-West Level Height (ft) Diaphragm Vx (psf) Depth (ft) Level Height (ft) Diaphragm Vx (psf) Depth (ft) Roof Peak 11 --Roof Peak 11 -- Roof 8 36 1.9 Roof 8 I 63 1.1 Direction Governing Load North-South Seismic I 2.6 psf East-West Seismic I 2.6 psf Qualls Engineering Structural Engineering Services D...1_ Contro:U'ing llri&IIOD Load No rth-South Seismic Lev,e'I V:dps.f} Roof 2.6 N:orth-South Gml A B Project: Dailey ADU Conversion Engineer: BK --------- Lateral Design Tnb Area {rft V ,(tbst 157 404 309 796 Wa'[II Le.ngth (ft~ Effecti.ve Effective Sheet: 4 ---- Job#: 25027 Date: ---- Level Grid Watl1 Wall.2 Wa'IIIJ, lot11II Tota'I Mintmum. v ,{plif) VtP'iO S:WJy;pe ,jh:2:w ,jh:'2.'W adf,u s.t,oo 1, adj,ust,ed) Rioof A 1.5 "'-: 4 8 6.43 1.5 51 63 6E B 15.75 15.75 15.75 15.75 51 51 6E Overturning: North-So:uth L,.min •lm V 1fplf. Miot Riooflrib E.xtWal. !lntWall IMm 1l'ft-lbs) ,(ttt {ft) ,cm •lft-slbsJ Roof I A 21 .25 51 8,592 7 8 50,801 I B 15.75 51 6,3-66 7 8 27,907 '0.7E 0.78D-0 .. 7E North-South C,[1'bst li (:lbst HD Capacity ,Obs,) OCR Roof A 404 0 None 600 0.00 0 B 404 0 None 600 0.00 Qualls Engineering Structural Engineering Services Diir,ectron E.ast-West L,ev,e] Roof East-West Controll'ing Lo.ad Seism ic V.,,ifpsf} 2.6 Grid 1 2 Project: Dailey ADU Conversion Engineer: BK ---------- Lateral Design T11"b Area ,(ff} V ,{(bs► 157 404 309 796 Wa'[I L,ength (flt Eff,eciirv,e Eff:ediiv1e Sheet: s ---- Job#: 25027 Date: ---- Leve-;I GItd Wall1 WaU2 W,a'IIJ, Tota'II Iota] ,Minimum V ,jipllf} v ,[plfO SW l"~pe lh::Zw ,jh:lw adJus.ted) adjus,ted> 1 :i,::: 3.5 3.06 3.5 116 132 6E R!oof -- 2 7 7 7.00 7 1.14 114 6E Overturning: Ea-st-West L,. min ,(flt v ,fpJiO Mbt R!ooflrib ExtWaUI Int Wall IM181 fft-lbs) ,1m (ft) ,1m ,tft...,(bs~ 1 3.5 11 6 3,235 1 8 827 Roof 7 6,3166 8 3,3.08 ,2 114 1 <J.7E {).7BD-0.7E East-West C(lbs) l l lbs) HD Capacity (lbs) DCR I 1 924 740 HDU2 3,075 0.24 Roof I 2 909 540 None 600 0.90 Qualls Engineering Sheet: _6 __ _ Structural Engineering Services Project: Dailey ADU Conversion Job#: 25027 Date: Engineer: BK FOUNDATION DESIGN Allowable Soils Bearing Capacity 1,500 psf Foundation design b = 12 d = 12 ------ 12 12 2#4 inch wide x inch deep footing with top and bottom _:j 1:=::====== Allowable Max Line Load w max = b x ASBP Allowable Max Point Load = 1,500 plf P max = b x 2d x ASBP = 3,000 lbs Spread Footing Design Pmax = b2 x ASBP F2= 2 foot square footing with 3 # 4 each way@ btm Pmax = 6,000 lbs F2.5= 2.5 foot square footing with 3 # 4 each way@ btm Pmax = 9,375 lbs F3= 3 foot square footing with 4 # 4 each way@ btm Pmax = 13,500 lbs F3.5= 3.5 foot square footing with 4 # 5 each way@ btm Pmax = 18,375 lbs F4= 4 foot square footing with 5 # 5 each way@ btm Pmax = 24,000 lbs FS= 5 foot square footing with 6 # 5 each way@ btm Pmax = 37,500 lbs l_ City of Carlsbad DETERMINATION OF PROJECT'S SWPPP TIER LEVEL AND CONSTRUCTION THREAT LEVEL E-32 Development Services Land Development Engineering 1635 Faraday Avenue 442-339-2750 www.carlsbadca.gov I'm applying for: □ Grading Permit )( Building Permit □ Right-of-way permit □ Other Project Name: Dailey JADU Project ID: _____ DWG #/CB# ______ _ Address: 1011 Home Ave. Carlsbad.CA 92008 APN 203-130-13-00 Disturbed Area: 0.002 Ac ----- Section 1: Determination of Project's SWPPP Tier Level ,,. ck applicable criteria and circle the corresponding SWPPP Tier Level, then go to section 2) Exempt -No Threat Project Assessment Criteria My project is in a category of permit types exempt from City Construction SWPPP requirements. Provided no significant grading proposed, pursuant to Table1, section 3.2.2 of Storm Water Standards, the followinq permits are exempt from SWPPP requirements: ► Electrical ► Patio ► Mobile Home ► Plumbing ► Spa (Factory-Made) ► Fire Sprinkler ► Mechanical ► Re-Roofing ► Sign ► Roof-Mounted Solar Array Tier 3-Significant Threat Assessment Criteria -(See Construction General Permit (CGP) Section 1.B)* D My project includes construction or demolition activity that results in a land disturbance of equal to or greater than one acre including but not limited to clearing, grading, grubbing or excavation; or, D My project includes construction activity that results in land disturbance of less than one acre but the construction activity is part of a larger common plan of development or the sale of one or more acres of disturbed land surface or, D My Project is associated with construction activity related to residential, commercial, or industrial development on lands currently used for agriculture; or D My project is associated with construction activity associated with Linear Underground/overhead Projects (LUP) including but not limited to those activities necessary for installation of underground and overhead linear facilities (e.g. conduits, substructures, pipelines, towers, poles, cables, wire, towers, poles, cables, wires, connectors, switching, regulating and transforming equipment and associated ancillary facilities) and include but not limited to underground utility mark out, potholing, concrete and asphalt cutting and removal, trenching, excavation, boring and drilling, access road, tower footings/foundation, pavement repair or replacement, stockpile/borrow locations. □ Other per CGP Tier 2-Moderate Threat Assessment Criteria: My project does not meet any of the Significant Threat Assessment Criteria described above and meets one or more of the following criteria: D Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, D Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: • located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, • disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or • disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or • construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through Apr. 30). Tier 1-Low Threat Assessment Criteria }( My project does not meet any of the Significant or Moderate Threat criteria above, is not an exempt permit type per above and the project meets one or more of the following criteria: • results in some soil disturbance; and/or • includes outdoor construction activities (such as roof framing, saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling) SWPPP T'--' -· , Exempt Tier3 Tier2 Tier 1 * Items listed are excerpt from CGP. CGP governs criteria for triggers for Tier 3 SWPPP. Developer/owner shall confirm coverage under the current CGP and any amendments, revisions and reissuance thereof. E-32 Page 1 of 2 Rev. 04/22 SWPPP Section 2: Determination of Project's Construction Threat Level Tier (Check applicable criteria under the Tier Level as determined in section 1, circle Construction Level the corresponding Construction Threat Level, then complete the Threat Level signature block below) Exempt -Not Applicable -Exempt Tier 3 -High Construction Threat Assessment Criteria: My Project meets one or more of the following: □ Project site is 50 acres or more and grading will occur during the rainy season □ Project site is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA High □ Soil at site is moderately to highly erosive (defined as having a predominance of soils Tier3 with USDA-NRCS Erosion factors kf greater than or equal to 0.4) □ Site slope is 5 to 1 or steeper □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 -April 30). □ Owner/contractor received a Storm Water Notice of Violation within past two years Tier 3 -Medium Construction Threat Assessment Criteria Medium □ All projects not meeting Tier 3 High Construction Threat Assessment Criteria Tier 2 -High Construction Threat Assessment Criteria: My Project meets one or more of the following: □ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA □ Soil at site is moderately to highly erosive (defined as having a predominance of soils High with USDA-NRCS Erosion factors kt greater than or equal to 0.4) Tier2 □ Site slope is 5 to 1 or steeper □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1-Apr. 30). □ Owner/contractor received a Storm Water Notice of Violation within past two years □ Site results in 10,000 sq. ft. or more of soil disturbance Tier 2 -Medium Construction Threat Assessment Criteria Medium □ My project does not meet Tier 2 High Threat Assessment Criteria listed above Tier 1 -Medium Construction Threat Assessment Criteria: My Project meets one or more of the following: □ Owner/contractor received a Storm Water Notice of Violation within past two years Medium □ Site results in 500 sq. ft. or more of soil disturbance Tier 1 □ Construction will be initiated during the rainy season or will extend into the rainy season (Oct.1-April 30) Tier 1 -Low Construction Threat Assessment Criteria Low □ My project does not meet Tier 1 Medium Threat Assessment Criteria listed above I certify to the best of my knowledge that the above statements are true and correct. I will prepare and submit an appropriate tier level SWPPP as determined above prepared in accordance with the City SWPPP Manual. I understand and acknowledge that I must adhere to and comply with the storm water best management practices pursuant to Title 15 of the Ca~sbad Municipal Code and to City Standards at all times during construction activities for the permit type(s) checked above. The City Engineer/Building Official may authorize minor variances from the Construction Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher SWPPP Tier Level is warranted. Owner/Owner's Authorized Agent Name: Title: City Concurrence: Yes No (For City Use Only) Owner/Owner's Authorized Agent Signature: Date: By: Date: Project ID: E-32 Page 2 of 2 Rev. 04/22 C cityof Carlsbad STANDARD PROJECT REQUIREMENT CHECKLIST E-36 Project Information Project Name: A New JADU for Pat Dailey Plan ID: -Permit No. - DWG No. - Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov Baseline BMPs for Existing and Proposed Site Features Complete the Table 1 -Site Design Requirement to document existing and proposed site features and the BMPs to be implemented for them. All BMPs must be implemented where applicable and feasible. Applicability is generally assumed if a feature exists or is proposed. BMPs must be implemented for site design features where feasible. Leaving the box for a BMP unchecked means it will not be implemented (either partially or fully) either because it is inapplicable or infeasible. Explanations must be provided in the area below. The table provides specific instructions on when explanations are required. Table 1 -Site Design Requirement A. Existing Natural Site Features (see Fact Sheet BL-1) 1. Check the boxes below for each existing feature on 1. Select the BMPs to be implemented for each identified feature. Explain the site. why any BMP not selected is infeasible in the area below. SD-G SD-H Conserve natural Provide buffers around waterbodies features □ Natural waterbodies □ □ □ Natural storaqe reservoirs & drainaqe corridors □ -- .Kl Natural areas, soils, & veaetation (incl. trees) □ -- B. BMPs for Common Impervious Outdoor Site Features (see Fact Sheet BL-2) 1. Check the boxes below for each 2. Select the BMPs to be implemented for each proposed feature. If neither BMP SD-B nor proposed feature. SD-I is selected for a feature, explain why both BMPs are infeasible in the area below. SD-B SD-I Minimize size of Direct runoff to pervious Construct surfaces from impervious areas areas permeable materials □ Streets and roads □ □ □ Check this box to confirm Kl Sidewalks & walkways IX □ that all impervious areas on the site will be minimized Kl Parking areas & lots IX □ where feasible. ~ Driveways IZj. □ If this box is not checked, Kl Patios, decks, & courtyards IX □ identify the surfaces that cannot be minimized in area □ Hardcourt recreation areas □ □ below, and explain why it is □ Other: □ □ infeasible to do so. C. □ BMPs for Rooftop Areas: Check this box if rooftop areas are proposed and select at least one BMP (see Fact below. Sheet BL-3) If no BMPs are selected, explain why they are infeasible in the area below. 1X1 SD-B I D SD-C I OSD-E Direct runoff to pervious areas Install areen roofs Install rain barrels E-36 Page 1 of 3 Revised 10/21 D. □ BMPs for Landscaped Areas: Check this box if landscaping is proposed and select the BMP below (see Fact □ SD-K Sustainable Landscaping Sheet BL-4) If SD-K is not selected, explain why it is infeasible in the area below. Provide discussion/justification for site design BMPs that will not be implemented (either partially or fully): Baseline BMPs for Pollutant-generating Sources All development projects must complete Table 2 -Source Control Requirement to identify applicable requirements for documenting pollutant-generating sources/ features and source control BMPs. BMPs must be implemented for source control features where feasible. Leaving the box for a BMP unchecked means it will not be implemented (either partially or fully) either because it is inapplicable or infeasible. Explanations must be provided in the area below. The table provides specific instructions on when explanations are required. Table 2 -Source Control Requirement A. Management of Storm Water Discharges 1. Identify all proposed outdoor 2. Which BMPs will be used to prevent 3. Where will runoff from the work areas below materials from contacting rainfall or work area be routed? runoff? □ Check here if none are proposed (See Fact Sheet BL-5) (See Fact Sheet BL-6) Select all feasible BMPs for each work area Select one or more option for each work area SC-A SC-B SC-C SC-D SC-E Other Overhead Separation Wind Sanitary Containment covering flows from protection sewer system adjacent areas [XTrash & Refuse Storage ~ □ □ □ IX □ Kl Materials & Equipment Storage 129 □ □ □ l2i □ IX Loading & Unloading □ IX □ □ IX □ □ Fueling □ □ □ □ □ □ □ Maintenance & Repair □ □ □ □ □ □ □ Vehicle & Eauioment Cleanino □ □ □ □ □ □ □ Other: □ □ □ □ □ □ B. Management of Storm Water Discharges (see Fact Sheet BL-7) Select one option for each feature below: . Storm drain inlets and catch basins ... fgl are not proposed □ will be labeled with stenciling or signage to discouraqe dumpinq (SC-F) . Interior work surfaces, floor drains & ~ are not proposed □ will not discharge directly or indirectly to the MS4 sumps ... or receiving waters •X Drain lines (e.g. air conditioning, boiler, □ are not proposed ~ will not discharge directly or indirectly to the MS4 etc.) ... or receiving waters . Fire sprinkler test water ... ~ are not proposed □ will not discharge directly or indirectly to the MS4 or receivino waters Provide discussion/justification for source control BMPs that will not be implemented (either partially or fully): E-36 Page 2 of 3 Revised 10/21 Form Certification This E-36 Form is intended to comply with applicable requirements of the city's BMP Design Manual. I certify that it has been completed to the best of my ability and accurately reflects the project being proposed and the applicable BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the review of this form by City staff is confined to a review and does not relieve me as the person in charge of overseeing the selection and design of storm water BMPs for this project, of my responsibilities for project desi n. Preparer Signature: Date: 12/4/2024 Print re arer name: D. Scott Hall E-36 Page 3 of 3 Revised 10/21 C cityof Carlsbad PURPOSE CLIMATE ACTION PLAN CONSISTENCY CHECKLIST B-50 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www.carlsbadca.gov This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements apply to their project. This completed checklist (B-50) and summary (B-55) must be included with the building permit application. The Carlsbad Municipal Code (CMC) can be referenced during completion of this document. NOTE: The following type of permits are not required to fill out this form ❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool The B-50 checklist was originally developed several years ago to support implementation of the CAP. Recent updates to the California Building Standards Code have imposed newer performance standards on building permit applications. Therefore, the applicant is advised to review all applicable code sections and apply the maximum performance standard, which may exceed the CAP consistency checklist requirements Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy compliance, IECC/HERS Compliance Specialist, ICC GB Energy Code Specialist, RESNET HERS rater certified, certified ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen Inspector/Plans Examiner, or Green Building Residential Plan Examiner. If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, check N/A and provide an explanation or code section describing the exception. The project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and Green Code sections . ..i111 ........ ________________________________________________________________________________________________________________________________________________________ ;;;;;;;;;; Application Information Project Name/Building Permit No.: Dailey ADU BP No.: Date: Property Address/APN: 1011 Home Ave. Carlsbad, CA. 92008. APN 203-130-13-00 Applicant Name/Co.: Pat Dailey ApplicantAddress: 1011 Home Ave. Carlsbad, CA. 92008 Contact Phone: (760) 4 73-6833 Contact Email: p.dailey@roadrunner.com Contact information of person completing this checklist (if different than above): Name: D. Scott Hall Contact Phone: 619-200-1623 Company name/address: D. Scott Hall Designers Contact Email: dscotthall2@icloud.com B-50 Page 1 of 7 Revised 12/22 Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For alterations and additions to existing buildings, attach a Permit Valuation breakdown on a separate sheet. For purposes of determining valuation, the amount should be upon either the actual contract price for the work to be permitted or shall be determined with the use of the current "ICC Building Valuation Data" as published by the International Code Council, whichever is higher (refer to Section 18.04.035 of the CMC). Building Permit Valuation (BPV) $ breakdown _$_4_0_,0_0_0 _______ _ Construction Type Complete Section(s) Notes: i] Residential □ New construction 2A*, 3A*, 4A* *Includes detached, newly constructed ADU !!!!I Additions and alterations: !!!!I BPV < $60,000 N/A All residential additions and alterations □ BPV ~ $60,000 1A,4A 1-2 family dwellings and townhouses with attached garages □ Electrical service panel upgrade only only. *Multi-family dwellings only where interior finishes are □ BPV ~ $200,000 1A, 4A* removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed 28* *Multi-family dwellings only where ~$1,000,000 BPV AND BPV ~ $1,000,000 affecting ~75% existing floor area D Nonresidential and hotels/motels □ New construction 1 B, 28, 38, 48 and 5 □ Alterations: □ BPV ~ $200,000 or additions~ 18, 5 1,000 square feet □ BPV ~ $1 ,000,000 18, 28, 5 Building alterations of~ 75% existing gross floor area ~ 2,000 sq. ft. new roof addition 28,5 1 B also applies if BPV ~ $200,000 Instructions: 1. Choose first between residential or non-residential based on the type of project being submitted. 2. Next chose between new construction or addition/alteration for residential or non-residential. 3. The columns to the right of your selection will determine which sections of the CAP program are applicable to your project. 4. Appropriate details must be included on the plans for selections made. EXAMPLE: Scope of work includes a new, 2 story, single family residential structure. I The selections would be: Residential and New construction in the table above. For a 2-story structure, CAP sections 2A, 3A and 4A would be applicable. (Solar PV, water heating, EV charging) The * indicates that new detached ADU's are included. EXAMPLE: Scope of work includes a tenant improvement (i.e., alterations) valued at over one million dollars. The selections would be: Non-residential and Alteration BPV ~ $1,000,000. CAP sections 1 B, 28 and 5 would be applicable to this project. (Energy efficiency, Solar PVand Transportation Demand Management (TOM)*) It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. 3 CAP Ordinance Compllance Checklist Item Check the appropriate boxes, explain all not applicable and exception ~ems, and provide supporting calculations and documentation as necessary. 1. Energy Efficiency Please refer to Section 18.30.060 of the Carlsbad Municipal Code (CMC) and Section 150.2 of the CEC for more information. Appropriate details and notes must be placed on the plans according to selections chosen in the design. A. 0 Residential addition or alteration ii!: $60,000 building permit valuation. Details of selection chosen below must be placed on the plans referencing CMC 18.30.060. !!!I N/ A <$60, 000 □ Exception: Home energy score ~7 (attach certification) Year Built Single-family Requirements Multi-family Requirements □ Before 1978 Select one option: □ Duct sealing □ Attic insulation □Cool roof □ Attic insulation □ 1978 and later Select one option: □ Lighting package □ Water heating package □ Between1978-1991 Select one option: □ Duct sealing □ Attic insulation □ Cool roof □ 1992 and later Select one option: □ Lighting package □Water-heating package B. 0 New Nonresidential construction (including additions over 1,000sf), new hotel/motel construction AND alterations ~ $200,000 building permit valuation. See Section 18.21.050 of the CMC and CALGreen Appendix AS. At least one measure from each applicable building component required. □ N/A _______ _ AS.203.1.1 Choose one: □ Outdoor lighting □ Restaurant service water heating (Section 140.5 of the CEC) □ Warehouse dock seal doors □ Daylight design PAFs □ Exhaust air heat recovery □ N/A ---------- AS.203.1.2.1 Choose one: □ .95 Energy budget (Projects with indoor lighting OR mechanical} □ .90 Energy budget (Projects with indoor lighting AND mechanical) □ N/A ---------- AS.211.1 ** □ On-site renewable energy: □ N/A _______ _ AS.211.3** □ Green power: (If offered by local utility provider, 50% minimum renewable sources) □ N/A AS.212.1 □ Elevators and escalators:(Project with more than one elevator or two escalators) □ N/A AS.213.1 □ Steel framing: (Provide details on plans for options 1-4 chosen) □ N/A._ _______ _ * High-rise residential buildings are 4 or more stories. ** For alterations.:: $1,000,000BPV and affecting> 75%existing gross floor area, OR alterations that add 2,000 square feet of new roof addition: comply with Section 18.030.040 of the CMC (section 2B below) instead. 4 2. Photovoltaic Systems A. □ Residential new construction. Refer to Section 150.1(c)14 of the CEC for single-family requirements and Section 170.2(d) of the CEC for multi-family requirements. If project includes installation of an electric heat pump water heater pursuant to CAP section 3 below (residential water heating), increase system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional CFA orSARA #d.u. Calculated kWdc* Exception sheets if necessary) □ D □ □ Total System Size: kWdc kWdc = (CFAx.572) / 1,000 + (1 .15 x #d.u.) *Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type If proposed system size is less than calculated size, please explain. B. □ Nonresidential, hotel/motel and multifamily additions, alterations and repairs of these projects ~$1,000,000 BPV AND affecting ~75% existing floor area, OR addition that increases roof area by ~2,000 square feet. Please refer to Section 18.30.040 and 18.30.070 of the CMC when completing this section. Choose one of the following methods: (Gross floor area or Time-Dependent Valuation method) □ Gross Floor Area (GFA)Method GFA: Min.System Size: kWd □ If< 10,000s. f. Enter: 5 kWdc □ If.?: 10,000s.f. calculate: 15 kWdcx (GFA/10,000} ** **Round building size factor to nearest tenth, and round system size to nearest whole number. □ Time-Dependent Valuation Method C. 0 AnnualTDV Energyuse:*** ______ x .80= Min. system size: _____ kWdc *** Attach calculation documentation using modeling software approved by the California Energy Commission. * All newly constructed non residential, hotel/motel and highrise multifamily buildings that are required by CEC section 140.10(a)to have a PV system shall also have a battery storage system meeting CEC section 140.10(b). Non residential, hotel/motel and multifamily additions, alterations or repairs that trigger solar due to the Car1sbad Climate Action Plan will NOT require battery storage. Battery storage is required when triggered by CEC section 140.10(a) and/or 170.2(9). 5 3. Water Heating A. Residential. Refer to Section 18.30.050 of the CMC and Sections 150.1(c)8 or 170.2(d) of the CEC when completing this section. Provide complete details on the plans. Residential new construction and alterations: □ Required: 60% of energy needed for service water heating from on-site solar or recovered energy. For systems serving individual units, choose one system: □ Single 240-volt heat pump water heater AND compact hot water distribution AND Drain water heat recovery (low-rise residential only) □ Single 240-volt heat pump water heater AND PV system .3 kWdc larger than required. □ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher. □ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors □ Gas or propane system with a solar water hearing system and recirculation system. For systems serving multiple units, choose one system: □ Heat pump water heating system with recirculation loop tank and electric backup. □ Solar water heating system that is either: □ .20 solar savings fraction □ .15 solar savings fraction, plus drain water heat recover OR: □ System meets performance compliance requirements of section 150.1(d) or 170.2(d) and deriving at least 60% of energy from on-site solar or recovered energy. □ Exception: ____________________________________ _ B. Nonresidential and hotel/motel new construction. This section also applies to high-rise residential. Refer to Sections 18.030.020 and 18.040.030 of the CMC and Sections 140.5 and 170.2 of the CEC when completing this section. Provide complete details on the plans. 1. Non-residential: □ Required: Water heating system derives at least 40% of its energy from one of the following: □ Solar-thermal □ Photovoltaics □ Recovered energy □ Required: High-capacity service water heating system 2. Water heating system is (choose one): D Heat pump water heater □ Electric resistance water heater(s) □ Solar water heating system with .40 solar savings fraction 3. Hotel/motel: □ Required: High-capacity service water heating system (meeting Section 170.2(d) of the CEC) □ Required: Located in garage or conditioned space Exception: 6 4. Electric Vehicle Charging A D Residential -New construction and major alterations.* This section also applies to hotel/motel projects. Refer to Section 18.21.030 of the CMC and Section 4.106.4 of the GBSC when completing this section. Choose one: □ One and two-family residential dwelling alterations with attached private garage. (not required if a panel upgrade would be needed) □ New detached ADU. (no EV space required when no additional parking facilities are added) □ New one and two-family residential dwellings and townhouse with attached private garage. □ One EV Ready parking space required □ Exception: __________ _ □ New and major alterations to multi-family and hotel/motel projects: □ Exception: ________________ _ Total Parking Spaces Proposed EVSE Spaces EV Capable ( 10% of total) I EV Ready (25% ofTotal) I EV chan:iers (5% of Total) I I *Major alterations are: (1) for one and two-family dwellings and for town houses with an attached garage, alterations have a building permit valuation ~$60,000 or include an electrical service panel upgrade. (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation ~ $200,000, i nteriorfinishes a re removed and significant site work and upgrades to structural and mechanical, electrical, a nd/orp lumbing systems are proposed. B. D Non-Residential -New construction □ Exception : ____________ _ Please refer to Section 18.21 .040 of the CMC when completing this section Total Parking Spaces Proposed EV Capable I EVCS (Installed with EVSE) I EV Ready (optional) I EV Space (optional) I I I Calculation: Refer to the table below: Total Number of Parking Spaces provided Number of required EV Capable Spaces Number of required EVCS Qnstalled with EVSE) □ 0-9 1 1 □ 10-25 4 1 □ 26-50 8 2 □ 51-75 13 3 □ 76-100 17 5 □ 101-150 25 6 □ 151-200 35 9 □ 201 andover 20 percent of total 25 percent of Required EV Spaces Calculations: Total EV Capable spaces= .20 x Total parking spaces proposed (rounded upto nearest whole number) EVSE Installed= Total EVSE Spacesx .25(rounded upto nearest whole number) EVSE other may be "EV Ready" or "EV Space" 7 5. D Transportation Demand Management (TDM): Nonresidential ONLY An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT. City staff will use the table below based on your submitted plans to determine whether your permit requires a TOM plan. If TOM is applicable to your permit, staff will contactthe applicant to develop a site-specific TOM plan based on the permit details. Acknowledgment: Employee ADT Estimation for Various Commercial Uses Use Office (all)2 Restaurant Retaib Industrial Manufacturing Warehousing EmpADTfor first 1,000 s.f. 20 11 8 4 4 4 EmpADTI 1000 s.f.1 13 11 4.5 3.5 3 1 1 Unless otherwise noted, rates estimated from /TE Trip Generation Manual, 1(JlhEdition 2 For all office uses, use SANDAG rate of 20 ADT/1,000 sf to calculate employee ADT 3 Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Other commercial uses may be subject to special consideration sample calculat;ons; Office: 20,450 sf 1. 20,450 sf/ 1000 x 20 = 409 Employee ADT Retail: 9,334 sf 1. First 1,000 sf = 8 ADT 2. 9,334 sf -1,000 sf = 8,334 sf 3. (8,334 sf/ 1,000 x 4.5) + 8 = 46 Employee ADT I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should my permit require a TOM plan and understand that an approved TOM plan is a condition of permit issuance. Applicant Signature: __________ _ Name: ______________ _ Date: ______________ _ Phone No.: ____________ _ 8 C Cityof Carlsbad CLIMATE ACTION PLAN (CAP) COMPLIANCE CAP Building Plan Template B-55 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov The following summarizes project compliance with the applicable Climate Action Plan ordinances of the Carlsbad Municipal Code and California Green Building Standards Code (CALGreen), current version. The following certificate shall be included on the plans for all building permits that are required to comply with the CAP measures: 1. ENERGY EFFICIENCY APPLICABLE: □YES 111 NO Complies with CMC 18.30.060 or 18.21.050 0Yes ON/A Existing Structure, year built: ------< Prepared Energy Audit? Qes D No Energy Score: _____ _ Efficiency Measures included in scope: 2. PHOTOVOLTAIC SYSTEM APPLICABLE: DYES [i]No 3. 4. s. Complies with CMC section 18.30.040 and 2022 California Energy Code section 150.1(c)14 D Yes DIA Size of PV system (kWdc): Sizing PV by load calculations If by Load Calculations: 0Yes 0No Total calculated electrical load: 80%of load: Exception Requested Exception Approved B Yes 0No Yes ONo ALTERNATIVE WATER HEATING SYSTEM APPLICABLE: DYES ll]No Complies with CMC sections 18.30.020 18.20.030 and/or 18.30.050? Alternative Source: □ Electric □ Passive Solar Exception Requested Exception Approved ELECTRIC VEHICLE (EV) CHARGING APPLICABLE: OYes ON/A DYes □Yes DYES Complies with CMC section 18.21.030? Panel Upgrade? 0Yes ON/A D Yes 0No Required Provided Total EV Parking Spaces: No. of EV Capable Spaces: No. of EV Ready Spaces: No. of EV Installed Spaces: Hardship Requested Hardship Approved -----OVes □Yes TRAFFIC DEMAND MANAGEMENT APPLICABLE: Compliant? TDM Report on file with city? C cityof Carlsbad HOUSING DEVELOPMENT TRACKING ueve1opment :,erv,ces Planning Division 1635 Faraday Avenue (442) 339-2610 www.carlsbadca.gov P-20 The following information is required by to the State of California to track new housing development for all income levels. Please complete this form to the best of your knowledge and submit prior to building permit Plan Check #CBR2024-3384 issuance. Project Name: Dailey ADU Tract/Permit No.: Project Address: 1011 HomeAve. Carlsbad, CA. 92008 APN: 203-130-13-00 Structure Description: D Single-Family JK1 Single-Family + ADU D Two -Four Unit D 5 + Unit Structure D Accessory Dwelling Unit D Mobile Home (new spaces added) D Remodel/Reconstruction (new dwelling units added) D Commercial/Residential (mixed-use) Project's planned initial occupancy is for: * Rental occupant ~ Owner occupant furADU furSFD For single-family, do you intend to use this property as your personal residence? ~ Yes □ No If yes, please provide the estimated market value: _$_4_0_,_0_0_0 _____ _ Will an affordable housing deed restriction be recorded on the property? D Yes Which units in the project will be deed restricted? __ A_D_U _______________ _ Please indicate the number of units for each bedroom type that will be provided and a price range. Individual responses will not be shared with outside parties. Number of units for sale Number of units for rent 1 OWNER(S): Pat Dailey (Last, First, Middle Initial or Firm Name) ADDRESS: 1011 HomeAve. CITY, STATE, ZIP: Carlsbad, CA. 92008 TELEPHONE: 760-643-8623 SIGNATURE: r ..... Bedrooms per unit Studios 1 bd 2 bd 3bd 4+ bd Bedrooms per unit Studios 1 bd 2 bd 3bd 4+ bd DEVELOPER(S): ADDRESS: CITY, STATE, ZIP: TELEPHONE: $ $ $ $ $ $ $ $ $ $ Price range (low and high) Rent range (low and high) $900.00 -$1000.00 Pat Dailey (Last, First, Middle Initial or Firm Name) 1011 HomeAve. Carlsbad, CA. 92008 760-643-8623 DATE: 1-30-2025