Loading...
HomeMy WebLinkAboutEIR 83-05; ALANDA; EIR PART II - ENVIRONMENTAL IMPACT REPORT; 1983-10-03f f I ! \. . AL;ANDA·PRDJECT ! . ··-.. ' • --- iEIR:·s·3~5; : PART II' ' ________ ~ CITY OF ·cA~~~~_J\D\ ---------, ' . ' LAN~_ ~-~~ -~LANNI~ G Q_fFICE \ -_______ :._ ___ ,\· I ___ .-:.... __ J ;O~TOBER 3, 1983 I\ ---------------------------------- - ·-TAB-LE OF CONTENTS 1 --. ... -.. I ERRATA SHEET -- II RESPONSE TO COMMENTS: Ill COMMENTS'. IV REVIEWING AGENCIES-: V NOTICES --. - VI DRAFT EIR, ' I I .r.1 • ERRATA SHEET: ,, I' 1 / ERRATA SHEET ALANDA PROJECT Page 5, paragraph 3, lines 1 through 3 should read: The topography of the site is considered steep, since 32% of the project has a slope gradient of greater than 25%. Less than 10% of the site is flatter than 10%. Page 11, paragraph 2, lines 6 and 7 should read: Slopes on the site are relatively steep; 32% of the site has a s~ope gradient greater than 25%. Page 41, paragraph 3, lines 2 and 3 should read: More than 32% of the site has a slope gradient greater than 25%, and less than five acres is flatter than 10% slope. Page 41, Table 3-6, columns 1 through 3 should read: Slope Gradient Acreage Percent of the Site 0 -10% 4.6 9.7 10 -25% 27.1 57.7 > 25% 15.3 32.6 Page 44, paragraph 2, line 4 should be replaced by: Development below the 200-foot contour line would require measures to avoid impacts from saturated soils and poorly compacted colluvium/alluvium. These measures include removal and recompaction of poorly compacted soil and the construction of a subdrain system to reduce problems from saturated soil. Page 48, paragraph 2, lines 2 and 3 should read: It can be seen that less than 10% of the site has a gradient of less than 10%. More than 32% of the site has a gradient greater than 25%. Page 111, item 4 is deleted. Appendix 1, ICU calculations for El Camino Real/Marron Rd. and Elm Ave. at El Camino Real should be replaced with the attached sheets. P. M PEAK 1--K:>rn INTERSECTION CAPACITY UTILIZATION ANALYSIS INTERSECTION ru.1 AVE. AT EL CAMINO REAL [:,<.+ MOVE-LANES ':::APA-EXISTING PROJECT EXISTING EXIST. PROJ. MENT CITY PEAK HR. PEAK HR. PLUS PROJEO V/C V/C ( I VOLUME VOLUME PK.HR.VOL. RATIO RATIO I NL I /600 0 S-3 .53 .03 NT 2 3200 880 0 88C) .30 -ti NR --~s 0 65 - SL I /C.00 70 0 70 .04• ST 3 4Boo 8 7S-0 875 .20 SR --0 b 7 G7 - EL I /{,OO 0 r; 7 67 .04-"" ET I /600 0 4 4-.04- ER --0 53 53 - WL I 1000 70 0 70 ,04- wt I /bOO 0 4-4-. os-l WR --70 () 70 - YELLOW TIME ., 0 .;()4< EXISTING INTERSECTION CAPACITY UTILIZATION (l.(:.U.) - EXIST. PLUS PRO J. INTERSf::CTI0N CAPACiTY UTl'....IZATION ( 1.C.U' .53 I. C. U. rs SUt-1 CRITICAL MOVEMENTS, DENOTED SY ASTERISK c::) t\J=~J0RT:-iB0Ul\iD, S=S0IJTrlB0UND, E=i:AS TB0UND, '.-.'=:•JES TSOUND, T=THRCL.GH, R=RIGHT L=L::FT TOTAL V/C LEV. OF SERV. EXISTING PLUS PROJECT l...ND. 0. 70 B L.O.S. 8 0.71-0.80 C 0.81-0.90 D 0. 91-1. 00 E bVER 1.00 F t NASLAND ENGINEERING CIVIL ENGINEERING -SURVEY ING -LAND PLANNING 2020 OCEANSIDE· BLVD., OCEANSIDE, CA 92054 439 -3313 EL CAMINO REAL/ELM AVENUE (CONFLICTING MOVEMENTS) EXISTING PLUS PROJECT PEAK HOUR /0.23~ .03 • 0.20 NBLT O SB & SBRT EL CAMINO REAL SBLT NB & NBRT 0.04 0.30 ~ 0.34*/ • ~ .09" .04 _ 0.05 EBLT WBLT 0.04 WB & WBRT EL'i AVENUE EB & EBRT .04 ~ .08 / P.MPEAK ~ INTERSECTION CAPACITY -UTILIZATION ANALYSIS INTERSECTION MA.ARON RO. AT. EL CAMN:> REAL £"f +-- MOVE-LANES ":: A?A -EXISTING PROJECT EXISTING ::x1sr. IPROJ. MENT CITY PEAK HR. PEAK :,R. PLU~ PFlOJEd V/C V!C VOLUME VOLUME PK . .1-iR. VOL. RATIO RATIO NL 2 3200 /73 , 3 l8~ .Ob NT 3 4800 (:,6'} +2 711 _, 7« N~ --Bo 13 ~3 - s ._ 2 32.00 I 2 '7 0 12 9 .04-.. s r 3 4800 528 42 5"70 . I 3 SR --68 0 68 - EL I /600 /42 0 142 . Ot:} ET 2 3200 214 0 214' . 14-« ER --215 I 3 228 - WL I /600 /22 13 135 . 08-¾A. wr 2 3200 /3/ 0 131 -07 WR --102. 0 /02. - YELLOW TIME .t 0 .10._ E)l(JSflNG INTERSECT!ON CA?ACITY UT1L:ZAT10N c1.-: u.> - Ex ·s r p•_us p_;~Q J. INiE~5~CTJ0N CAPAC:TY UTl'_IZ..\T:ON ( IC_,_. ' .S3 l. C. U. rs SJ-1 S:R[TICAL -'-'.CV~ .... -::\iTS, ::;~.'iCi::iJ 3Y ~s-:::~r SK ~::) \i=' .OR r-,ac 1...11,0, S =Su1Ji...,BCL.i~D, ==.=..,,_S :30Lr-i0, • .. w='.-1~5 T3;")t;1',D, -:""=T-:Rc·_G!-i, ~=~r:;:-;r L=L::FT TOTAL V/C LEV-. OF SERY. EXISTING PLUS PROJ"E"CT t..ND. 0.70 B i.. . 0. S. 13 0.71-0.80 C 0.81-0.90 D 0.91-1.00 E ~VER 1.00 F ~ NASLAND ENGINEERING CIVIL ENCi NEERiNG -SURVEYING -LANO PLANNING 2020 OCEANSIDE" BLVD., OCEA"61DE, CA 92054 4 39 -JJ1J EL CAMINO REAL/MARRON ROAD (CONFLICTING MOVES) EXISTING EVENING PEAK HOUR /0.17~ 0.05 0.12 •' ~.0.16""" 0.09 . _ 0.01 NBLT SB & SBRT EBLT WB & WBRT EL CAMINO REAL -----------------MARRON ROAD SHLT ~"B & ~'BRT WBLT _ EB & EBRT 0.04 0.16 0.08 0.13 "'0.20*/ ~0.21*/ EXISTING PLUS PROJECT. PROJECT PLUS EVENING PEAK HOUR / 0.06 Q .13 ~"BLT SB & SBRT EL CAMINO REAL ----------------- SBLT NB & NBRT 0.04 0.17 "0.21•/ .09 g ,Q7 WB & WBRT EBLT WBLT MARRON ROAD EB & EBRT 0.08 .14 ~ .22 /" ---------------- II . RESPONSE TO COMMENTS1 -----------,1------------------------------------- PUBLIC COMMENTS AND RESPONSES FOR ALANDA ENVIRONMENTAL IMPACT REPORT . ' RESPONSE TO COMMENTS ALANDA The following persons or agencies submitted comments concerning the Draft EIR on the proposed project during the public review period: 1. Alanda, a General Partnership (project proponent) 2. Costa Real Municipal Water District 3. Robert C. Ladwig 4. Carlsbad Unified School District 5. San Diego County Parks and Recreation Department The comments are summarized below along with responses where necessary and appropriate. Copies of the comments are included following this summary. 1 .. 1. Response by Proponent, Alanda, a General Partnership, September 23, 1983. Subsequent to the preparation of the Draft EIR, additional studies were conducted and a Specific Plan developed. For the most part, the comments made by Alanda do not concern the adequacy of the EIR but are addressed to the additional studies and project modifications made after the Draft EIR was prepared. The major points are summarized below. For a detailed description of the new information, please see the comment from Alanda. It must be noted that the proposed Specific Plan is not evaluated in the Draft EIR. Rather the Draft EIR analyzes the environmental effects associated with the "worst case" -the maximum development permitted under the original General Plan Amendment. a. Comment: A contractual interest in the property known as "Dr. White's horse ranch" has been acquired, and this property is being added to the project. This wil~ mean that any street connection between the proposed project and Ridgecrest Drive can be abandoned. Response: This modification could eliminate adverse impacts to traffic circulation in Seacrest Estates and would remove potential impacts to visual quality, land use compatibility and growth­ inducement associated with the horse ranch. b. Comment: A soils study contracted by Alanda subsequent to the Draft EIR found that a large ancient landslide does not exist, but is in fact, a large mudflow condition that can be corrected by common grading techniques. Response: This additional information was assembled in response to an area of potential concern raised by the initial geology report. The additional geological information, attached to the Alanda comment, eliminates the potentially prohibitive impact of a landslide on the site. c. Comment: An archaeological consultant was retained to study the possibility of significant impact on the site. The site was found to be of archaeological importance and cooperative efforts must take place to insure the proper study of the property. 2 Response: The new archaeological information substantiates the find­ ing of significant cultural resources as determined by the Draft EIR. Mitigation measures must be developed to the statisfaction of the City, in accordance with State law. d. Comment: The General Plan Amendment requested has therefore been revised to allow for high density apartments North of medium density townhomes South of Elm with the balance of Elm Avenue, the project as previously planned for single-family lots. The effect of these changes reduces densities from 400 apartments and 100 single-family lots to 220 apartments, 65 townhomes and 66 single-family lots, or about 70% of the previously proposed density. Response: The revised project density would reduce the magnitude of impacts found by the Draft EIR. However, a detailed environmental analysis of the reduced density project has not been conducted and is not a part of this EIR. e. Comment: The reduced number of units proposed by the Specific Plan would be 19% of the 4,200 vehicle trips generated by the worst case project and used in the EIR. Response: The impacts associated with traffic would be magnitude by the reduced density project. However, significance would still be made for a short term impact Avenue, and the project would still contribute adversely traffic congestion in the project areas, particularly in of Plaza Camino Real. reduced in findings of to Chestnut to overall the vicinity f. Comment: The completion of Elm Avenue will serve to improve the traffic circulation system in the City as well as easing impacts from project traffic. Response: This is discussed on pages 31 and 34 in the Draft EIR. g. Comment: The mudflow on the property found by the additional geologic investigation would be resolved by remedial grading during construc­ tion of Elm Avenue and the apartments to the north. Response: No response required. 3 h. Comment: Other geologic concerns existing on the site are primarily in the vicinity of El Camino Real, including three potential small landslide areas, saturated soils, and loosely compacted soils and/or fill. These areas are primarily South of the Elm Avenue extension and occur below the 200 foot contour line where no development is to occur. Only the southern-most landslide area is contemplated for development under the Specific Plan, with two single-family lots. The small landslide areas will be corrected using grading measures regardless of their location and without consideration as to whether or not they are to be developed. Response: No response required. i. Comment: Ground water is located primarily in the drainage area near the eastern boundary. This area is slated for open space and, if disturbed at all, will be used only as open space and improved with drainage facilities. The area along El Camino Real and the drainage channel will not be developed other than that portion to be used as a slope bank, created with approved drainage capabilities. This will allow for retention of much of the vegetation and natural slope, thereby preserving the current visual status and maintenance of the drainage channel. The tributary drainage areas along the southern portion of the site will be handled by remedial grading with slope banks not to exceed a 2:1 ratio which will resolve the existing situation of a highly erosive soil in those locations. All manufac- tured slopes as well as natural slopes will be planted with erosion resistant ground cover and landscaping. Response: No response required. ' j. Comment: A review of the Specific Plan reveals that existing single-family residences to the west of the project will in no case be contiguous to multi-family residential development, and in very few cases will it be possible to see even the roof lines of those buildings. The elevation of the homes to be developed close to Ridgecrest Drive and the surrounding area are well below the grade of the existing homes. Proposed single family separated from existing residences by elevation 4 development would be differences (manufac- tured slopes). Proposed multi-family residences would be separated from proposed single-family development by Elm Avenue. Response: Elm Avenue is considered to an adequate buffer between proposed single-family housing. Elevation differences could provide an adequate buffer between existing and proposed development. Care should be given to use of appropriate landscaping materials to enhance the buffer qualities of the slopes. k. Comment: The project site is currently vacant and unless declared to be open space or park area, passive uses such as walking or hiking,' bird watching, etc. are not within the rights of those purported to be using the property. Rising Glen Road which exists on the site is currently a one lane, paved road but is not intended to be used as a connecting road between Ridgecrest Drive and El Camino Real. It functions in that regard only through a prescriptive easement for use by the Jandros. This road is not maintained, currently has potholes, is eroded and is an unsafe road to be used for access. Response: The property is not fenced or posted with no trespassing signs and access is readily available. The site provides habitat to birds which can be seen from surrounding development, and provides visual open space. For these reasons, the site is considered to serve as valuable passive open space. 1. Comment: With regard to Visual Impact, very little of the project South of Elm Avenue will be visible from El Camino Real. Most of what will be seen from El Camino Real will be landscaped hillside and open space. The townhomes south of Elm will be at least 100 feet above the El Camino Real elevation. A further review of the elevations on the western side will show that the existing home sites are at about 300 feet elevation and the elevation of the street proposed will be anywhere from 250 feet to 280 feet. Views from the homes on the western side will not be interrupted by buildings. Response: The Specific Plan has been designed in respond to the concerns raised in the Draft EIR, and such a way as to potential visual- impacts to existing residences to the west appear to be eliminated. 5 m. Comment: As many of the existing trees as possible will be left along El Camino Real as a visual and noise buffer. Even though El Camino Real has not yet been designated as a scenic route, the visual impact from El Camino Real has been given a great deal of weight in the design of the project. The existing slopes and all manufactured slopes on the eastern part of the property which can be seen from El Camino Real will be heavily landscaped leaving much of the existing vegetation. The contour and elevation of Elm Avenue the hillside will be followed through in grading. as it rises up The proposed grading on the south side of Elm for the single-family houses is not excessive for this type of development. The description in the EIR of the cut slopes and the manufactured slopes for the roadway is fairly accurate. However, due to the existing mudflow areas, maintenance of the present appearance will not be possible because of the necessity of removal of the mudflow debris. This will be necessary with or without this project upon the extension of Elm Avenue. Response: The project's appearance from El Camino Real would seem to consist of manufactured slopes (up to 100 feet high in the northern portion) and natural topography in open space areas. High manufac­ tured slopes could result in significant visual impacts and may not be in conformance with the El Camino Real Corridor Study guidelines included in the Draft EIR on page 51. n. Comment: The site is referred to as having a rural appearance. However, in reviewing an aerial photo of the area it is evident that with development to the east across El Camino Real, development to the north along the freeway and future development to the south on the Sheffler property, this project is actually an urban infill site and not a rural area. Response: The site has a rural appearance since it is an expanse of undeveloped land, vegetated with grassland and shrubs, and used by an apiary and a horse ranch. As stated in the Draft EIR, the site is surrounded by developed land or land for which projects have been approved but not constructed. The parcel is one of the last remaining vacant sites between SR 78 and Chestnut Avenue. 6 o. Comment: The Specific Plan calls for set-backs on the southern side of El Camino Real well in excess of that which is required for mitigation of the noise from El Camino Real, with the exception of the extreme southerly portion, where the eucalyptus trees will act as a buffer. Only on the north side of the extension of Elm Avenue in the very northernmost corner of the site are any structures located within 120 feet of the center lane of El Camino Real. The elevation of the pads at that location are well above the street grade of El Camino Real and through common State approved noise abatement safeguards such as landscaping, insulation, special windows, etc., this effect can be minimized to acceptable interior noise levels. Response: In accordance with State law, the developer will show that interior noise levels in residential buildings will be at 45dBA or less, to the satisfaction of the City. p. Comment: The existing situation of the mudflow area and the colluvium concentration in the tributary channels is contributing to the siltation of Buena Vista Creek. The site, as it exists, is erosive in the tributary area to the drainage channels and across the northern corner of the property. This is due to currently existing mudflow characteristics and the corresponding soil types. The proven method of resolving erosion of this type of soil is to regrade and plant, which is proposed by this project. As previously Camino Real, which will stated there are areas, especially along El be left undisturbed and therefore would not contribute to erosion during the construction period. The logical timing for development of a project of this nature calls for grading to take place during the summer months so that landscaping can mature prior to the rainy season. The importance of correct timing of the development of this site is recognized and the methods of controlling erosion during the earth work phase are taken into account. However, this site is erosive as it currently exists and development and proper landscaping as planned will mitigate an undesirable situation. Response: The Specific Plan has been designed to minimize erosion and drainage impacts. However, it is almost impossible to completely 7 eliminate erosion and sedimentation during construction and potential for significant impact still remains. q. Comment: The existing drainage channel is not totally natural since the development of El Camino Real and the drainage pipes underneath El Camino Real channel water onto the site from the eastern side of El Camino Real. In the proposed development plan much of the drainage channel is left undisturbed. That which is disturbed will be improved with drain pi_pes to handle the flow of the water. Response: No response required. r. Comment: Market studies undertaken by Alanda show that the market value of the proposed single-family residences will be in the range of $135,000.00-$165,000.00 The townhome unit will range from $69,000- $85,000 and the apartment rental rates will be from $330.00-$535.00 per month. As a condition for the application for this Specific Plan and the associated General Plan Amendment the requirement that the multi-family dwellings be a low-to-moderate income apartment project was placed on this project. The apartment portion of this project will contain 220 units, renting for the following rates: 1 BR #330.00/month 2 BR, 1 BA 464.00/month 2 BR, 2 BA 534.00/month These are well within the requirements for moderate income families as listed in Table 2-3 in the Draft EIR. Response: No response required. s. Comment: The maintenance of 10.6 acres of this project as open space will afford a natural environment for the birds and animals that inhabit this site. Response: This will mitigate the adverse but not significant biologi­ cal impact determined by the Draft EIR. t. Comment: Subsequent to receipt of the Draft EIR, WESTEC SERVICES, an archaeological and biological consulting firm in San Diego, was 8 retained to prepare an analysis of the significance of the archaeolog­ ical resources on this site. Their report shows the site to be of archaeological significance. Alanda agrees to follow recommended and approved mitigation measures in this regard. Response: No response required. u. Comment: As a condition of development in the City of Carlsbad, fees will be paid to compensate for the additional burden on the public services. Response: No response required. v. Comment: Measures will be taken in the development of the project to efficiently use all sources of energy. Response: No response required. w. Comment: The Environmental Impact Report states that the location of this project is favorable in minimizing the negative effects upon air quality because of its close pro~imity to all services, thereby reducing the average trip length. It also states that the project will create a significant impact upon air quality as regulated and defined by the State. Controlling air pollution is a regional problem, not just a problem associated with the development of one site. Therefore, this project will have a minimal over-all effect on the air quality of the City of Carlsbad. Response: No response required. 2. Costa Real Municipal Water District, September 14, 1983. a. Comment: Under the terms and conditions of the water service agreement of May 25, 1983, between the Water District and the City of Carlsbad, local retail water service will be provided by the City of Carlsbad and the Water District will be responsible for the transmis­ sion facilities and all of the capital facilities that will provide service to the entire 20,000-acre District area. The Board of Directors has determined that nine capital projects are needed in order to provide the necessary level of water service District-wide. 9 Additionally, the Water ties charge which will District has established a new major facili­ provide some of the financing for the construction of the major facilities and all of the proposed develop­ ment will be obligated to participate in this new financing program. The Water District is currently making a complete reevaluation of all established master plans for public water service for the entire District area and the proposed development will be responsible for the construction of all necessary public water system facilities that are identified in the current plans as well as any modifications at such time this reevaluation program is completed and formally adopted by the Board of Directors. Response: Thank you for the additional information. The developer will participate in the new financing program to the satisfaction of the City of Carlsbad and the Costa Real Municipal Water District. 3. Robert C. Ladwig, September 6, 1983. a. Comment: The northern part of the site appears to be suited for development with apartment buildings. Elm Avenue should be, used as a buyffer zone to separate proposed high density residences from single family, lower density residences which are currently designated by the existing General Plan. Response: The revised project proposes to use Elm Avenue to separate higher density apartment uses from lower density single family residences. The original GPA and zone change have been revised to permit apartment units north of Elm, medium density townhomes south of Elm, with the remainder of the southern part of the site to be used for single family lots. b. Comment: Additional geologic work needs to be done to determine the presence of a large scale landslide which would preclude development on the site. Response: The additional geologic work has been done and found that the landslide condition is, in fact, a mudslide which can be corrected with standard grading techniques. 10 c. Comment: The Draft EIR recommends that no development be located below the 200-foot contour. The proposed Specific Plan does locate apartment development on the north part of the site below the 200-foot contour. Response: Additional geologic work and further analysis has been done which determine that construction below the 200-foot contour. is acceptable provided that appropriate grading and construction measures be used to mitigate potential impacts from saturated soils and poorly compacted colluvium/alluvium. d. Comment: There is one large slope that is on the east end of "B" Street which is a cul-de-sac off of "A" Street. This slope goes down to El Camino Real and is well in excess of 100 feet in height. Response: The proposed Specific Plan was prepared after the Draft EIR and was not intended to be evaluated by the EIR. A manufactured slope in excess of 100 feet could have significant impacts to visual quality along El Camino Real, particularly in light of the El Camino Corridor Study, described in the Draft EIR on page 51. The potential impact could be partially mitigated by appropriate landscaping with trees and native or naturalized shrubs and ground covers. It should be noted that at this time the Specific Plan has not been finalized and the 100-foot slope may not be included in the development plan. e. Comment: The Draft EIR, page 44, suggested a number of items that could be looked at to reduce the impacts of grading on this steep site. The last sentence on that page suggests that "because of the steepness of the site, reduction to insignificance is not possible with development of any kind." Additional soils investigation should be performed prior to approval of development for the site. Response: Additional soils analysis based on field investigation will be performed by the developer to the satisfaction of the City prior to approval of the Final Map. f. Comment: The Draft EIR makes a finding of an adverse but not significant impact to the residential streets through Seacrest Estates due to traffic from the proposed project using the proposed connection 11 between Rising Glen and Ridgecrest. The adjacent residents feel that there will be a considerable increase in traffic through the neighbor­ hood and that Rising Glen should not connect through to Ridgecrest. Response: The Specific Plan does not propose a connection between the project and Ridgecrest Drive. 4. Carlsbad Unified School District, August 22, 1983. a. Comment: On page 9, paragraph 2, under Public Services, the report states, "Schools in the project vicinity are operating under capacity at this time. However, substantial development in the District might result in overcrowded conditions, and the project would add incremen­ tally to that situation. The payment of fees to the School District would mitigate this impact to insignificance." We are not in agreement with this statement. While the payment of fees will help mitigate the impact, it will by no means reduce the impact to insignificance. The Governing Board is very concerned about the District's ability to furnish adequate facilities for students in light of development currently taking place or in the planning stages. Some schools are currently at capacity, and others are within a few students of reaching capacity. Depending on the location of the development and the schools it will impact, the District may wish to meet with the developer to discuss the donation of land in lieu of fees or the application of fees twoard the purchase of land for a school site before we can advise the City that we can provide school facilities. Response: Thank you for the additional information. will meet with the District to determine mitigation satisfaction of the District. The developer fees to the 5. San Diego County Parks and Recreation Department, August 22, 1983. a. Comment: The proposed project will have no effect on County Parks and Recreation activities. Response: No response required. 12 -------------------------------------------------------------- RESPONSE BY PROPONENT, ALANDA, A GENERAL PARTNERSHIP, TO THE ENVIRONMENTAL IMPACT REPORT DATED AUGUST 15, 1983 BY NASLAND ENGINEERING. September 23, 1983 TABLE OF CONTENTS INTRODUCTION PROJECT DESCRIPTION SUMMARY TRAFFIC CIRCULATION GEOLOGY LAND USE COMPATIBILITY VISUAL QUALITY NOISE HYDROLOGY AND DRAINAGE SOCIOECONOMIC ISSUES BIOLOGICAL RESOURCES ARCHAEOLOGICAL RESOURCES PUBLIC SERVICES ENERGY AIR QUALITY i l 3 4 s s 6 6 7 8 8 8 8 9 September 23, 1983 INTRODUCTION The attached document is submitted to the City of Carlsbad on behalf of ALANDA in response to the Environmental Impact Report of August 15, 1983 by Nasland Engineering regarding Assessor's Parcel Nos. 167-060-10 and 167-060-13. Throughout the project planning, special attention has been given to the physical characteristics of the site, i.e. topography, geology, biology, as well as the desire of the community, visual quality and traffic patterns. The resulting Specific Plan represents a culmination of the ideas, concerns and information brought to light during the project planning evolution. ALANDA, A General Partnership By i September 23, 1983 RESPONSE ~1 PROPONENT, ALANDA, ~ GENERAL PARTNERSHIP, !Q THE ENVIRONMENTAL IMPACT REPORT DATED AUGUST 15L !983 ~1 ~~2~~~Q ENGINEERING. UPDATE Since the initial filing of the request for the General Plan Amendment and zoning Change and the subsequent Environmental Impact Report, the following events have occurred: 1-A contractual interest in the property known as "Dr. White's horse ranch" has been acquired, and this property is being added to the project. This will mean that any street connection between the proposed project and Ridgecrest Drive can be abandoned. 2. A soils study contracted by ALANDA subsequent to the draft EIR found that a large ancient landslide does not exist, but is in fact, a large mudflow condition that can be corrected by common grading techniques. 3. An archaeological consultant was retained to study the possibility of significant impact on the site. The site was found to be of archaeological importance and cooperative efforts must take place to insure the proper study of the property. 4. The concern of some citizens in the area was expressed regarding low-to-moderate income apartments South of Elm Avenue. The use of Elm Avenue as a density boundary was encouraged. The General Plan Amendment requested has therefore been revised to allow for high density apartments North of Elm Avenue, medium density townhomes South of Elm with the balance of the project as previously planned for single family lots. The effect of these changes reduces densities from 400 apartments and 100 single family lots to 220 apartments, 65 townhomes and 66 single family lots, or about 70% of the previously proposed density. PROJECT DESCRIPTION SUMMARY: 1. Gross site area 49.75+ acres. 2. Net site area (excluding public streets) 43.8+ acres. 3. Total number of lots is 70. -1- A. Lots 1 through 66 (single family) Existing zone: R-A, 10,000 Proposed zone: R-1 Existing land use: RLM Proposed land use: RLM Area: 15.7 acres B. Lot 67 (townhomes) Existing zone: R-A, 10,000 Proposed zone: RD-M Existing land use: RLM Proposed land use: RM Area: 10.5 acres c. Lot 68 (apartments) Existing zone: R-A 10,000 Proposed zone: RD-M Existing land use: RM Proposed land use: RMH Area: 8.8 acres D. Lots 69 and 70 (open space) Area: 10.6 acres (These lots will be owned by the apartments and will be included in the total acreage upon which the multi-family density will be based.) 4. Townhomes There are 11 buildings with 5 or 6 1 or 2 bedrooms for a total of 65 units. LOT # OF UNITS lBDRM 2BDRM 67 65 22 43 5. Apartments There are 9 three-story buildings with 20 or 25 one or two bedroom each for a total of 220 units. LOT # OF UNITS 1 BDRM 2 BDRM 68 220 54 166 -2- 6. 7. Parking LOT GARAGES CURB TOTAL REQ. 67 108 48 156 92 68 139 189 328 317 TOTAL 247 237 484 409 Landscape Concept Planting: The overall planting concept will emphasize a naturalistic character of indigenous, drought-tolerant plant material. Street trees will provide a pleasant canopy along roadways while parking areas will be screened from streets and buildings with ornamental shrubs and undulating ground forms. Irrigation: All planting areas will feature a fully automated irrigation system with low precipitation sprinkler heads and special water-saving techniques such as drip irrigation. Note: All planting areas will conform to City of Carlsbad, "Landscape Guideline Manual" dated May 1983. TRAFFIC CIRCULATION: The calculations for the traffic impact section of the Environmental Impact Report were based on 400 apartment units and 100 singe-family residences pursuant to the original General Plan Amendment application. As a result the total daily traffic generated was calculated at 4200 trips per day (EIR pg. 32). The revised Specific Plan requests approval of 220 apartments, 65 townhomes, and 66 single-family residences. Using the same generation rate, this would mean 2940 trips added by this pro­ ject, or 70% of the count used to determine significance. Under the existing General Plan designations, development of the property could generate 2140 trips per day (EIR pg. 32). There­ fore, 800 additional trips per day would be added as a result of this General Plan Amendment. This is 19% of the 4200 trip figure used to test significance. With regard to traffic flow, the completion of Elm Avenue will serve to re-direct traffic generated by this project thereby easing potentially significant impact to any one location. -3- GEOLOGY: Subsequent to the contracting of the draft EIR, ALANDA engaged GEOCON, INC., a geological consulting and engineering company, to determine whether or not an ancient landslide exists on the property. ( A copy of Geocon's report is attached hereto). Geocon found that the landslide is not present but is, in fact, a large mudflow area. Mitigation of the mudflow area is significantly less in nature and severity than that which would be required for a landslide. The only method of mitigating the mudflow is through remedial grading. The area covered by this mudflow includes almost 100% of the path Elm Avenue will take through the project. Therefore, the extension of Elm Avenue will require grading in order to resolve the mudflow and reduce it to a non-hazardous situation. The mudflow also exists in the areas in which apartment development is proposed and mitigation will occur through the necessary grading required for the padded site. Other geologic concerns existing on the site are primarily in the vicinity of El Camino Real, including three potential small landslide areas, saturated soils, and loosely compacted soils and/or fill. These areas are primarily South of the Elm Avenue extension and occur below the 200 foot contour line where no development is to occur. Only the southern-most landslide area is contemplated for development under the Specific Plan, with two single-family lots. The small landslide areas will be corrected using grading measures regardless of their location and without consideration as to whether or not they are to be developed. Ground water is located primarily in the drainage area near the eastern boundary. This area is slated for open space and, if disturbed at all, will be used only as open space and improved with drainage facilities. The area along El Camino Real and the drainage channel will not be developed other than that portion to be used as a slope bank, created with approved drainage capabilities. This will allow for retention of much of the vegetation and natural slope, thereby preserving -the current visual status and maintenance of the drainage channel. The tributary drainage areas along the southern portion of the site will be handled by remedial grading with slope banks not to exceed a 2:1 ratio which will resolve the existing situation of a highly erosive soil in those locations. All manufactured slopes as well as natural slopes will be planted with erosion resistant ground cover and landscaping. -4- LAND USE COMPATIBILITY: A review of the Specific Plan reveals that existing single-family residences to the west of the project will in no case be contiguous to multi-family residential development, and in very few cases will it be possible to see even the roof lines of those buildings. The elevation of the homes to be developed close to Ridgecrest Drive and the surrounding area are well below the grade of the existing homes. Through elevation planning, buffer areas exist to separate single-family development from multi-family development, thereby minimizing the effect of having two contiguous zones. The project site is currently vacant and unless declared to be open space or park area, passive uses such as walking or hiking, bird watching, etc. are not within the rights of those purported to be using the property. Rising Glen Road which exists on the site is currently a one lane, paved road but is not intended to be used as a connecting road between Ridgecrest Drive and El Camino Real. it fuctions in that regard only through a prescriptive easement for use by the Jandres. This road is not maintained, currently has potholes, is eroded and is an unsafe road to be used for access. VISUAL QUALITY: With regard to Visual Impact, very little of the project South of Elm Avenue will be visible from El Camino Real. Most of what will be seen from El Camino Real will be landscaped hillside and open space. The townhomes south of Elm will be at least 100 feet above the El Camino Real elevation. A further review of the elevations on the western side will show that the existing home sites are at about 300 feet elevation and the elevation of the street proposed will be anywhere from 250 feet to 280 feet. Views from the homes on the western side will not be interrupted by buildings. As many of the existing trees as possible will be left along· El Camino Real as a visual and noise buffer. Even though El Camino Real has not yet been designated as a scenic route, the visual impact from El Camino Real has been given a great deal of weight in the design of the project. The existing slopes and all manufactured slopes on the eastern part of the property which can be seen from El Camino Real will be heavily landscaped leaving -5- much of the existing vegetation. The contour and elevation of Elm Avenue as it rises up the hillside will be followed through in grading. The proposed grading on the south side of Elm for the single-family houses is not excessive for this type of development. The description in the EIR of the cut slopes and the manufactured slopes for the roadway is fairly accurate. However, due to the existing mudflow areas, maintenance of the present appearance will not be possible because of the necessity of removal of the mudflow debris. This will be necessary with or without this project upon the extension of Elm Avenue. The site is referred to as having a rural appearance. However, in reviewing an aerial photo of the area it is evident that with development to the east across El Camino Real, development to the north along the freeway and future development to the south on the Sheffler property, this project is actually an urban infill site and not a rural area. NOISE: The Specific Plan calls for set-backs on the southern side of El Camino Real well in excess of that which is required for mitigation of the noise from El Camino Real, with the exception of the extreme southerly portion, where the eucalyptus trees will act as a buffer. Only on the north side of the extension of Elm Avenue in the very northernmost corner of the site are any structures located within 120 fee~ of the center lane of El Camino Real. The elevation of the pads at that location are well above the street grade of El Camino Real and through common State approved noise abatement safeguards such as landscaping, insula­ tion, special windows, etc., this effect can be minimized to acceptable interior noise levels. HYDROLOGY AND DRAINAGE: The existing situation of the mudflow area and the colluvium concentration in the tributary channels is contributing to the siltation of Buena Vista Creek. The site, as it exists, is erosive in the tributary area to the drainage channels and across the northern corner of the property. This is due to currently existing mudflow characteristics and the corresponding soil types. The proven method of resolving -6- erosion of this type of soil is to regrade and plant, which is proposed by this project. As previously stated there are areas, especially along El Camino Real, which will be left undisturbed and therefore would not contribute to erosion during the construct-ion period. The logical timing for development of a project of this nature calls for grading to take place during the summer months so that landscaping can mature prior to the rainy season. The existing drainage channel is not totally natural since the development of El Camino Real and the drainage pipes underneath El Camino Real channel water onto the site from the eastern side of El Camino Real. In the proposed development plan much of the drainage channel is left undisturbed. That which is disturbed will be improved with drain pipes to handle the flow of the water. The importance of correct timing of the development of this site is recognized and the methods of controlling erosion during the earth work phase are taken into account. However, this site is erosive as it currently exists and development and proper landscaping as planned will mitigate an undesirable situation. SOCIOECONOMIC ISSUES: Market studies undertaken by ALANDA show that the market value of the proposed single-family residences will be in the range of $135,000.00-$165,000.00. The townhome unit will range from $69,000-$85,000 and the apartment rental rates will be from $330-00 -$535.00 per month. As a condition for the application for this Specific Plan and the associated General Plan Amendment the requirement that the multi-family dwellings be a low-to­ moderate income apartment project was placed on this project. EIR TABLE 2-2 FAIR MARKET RENTAL RATES FOR SAN DIEGO COUNTY ADDENDUM: The_ Rising Glen apartment portion of will contain 220 units as per the Specific Plan These units will consist of the following: this project application. 1-54 one bedrooms at 24.7% of the project with a rental rate of approximately $330.00 per month. 2. 76 two bedroom units, (2 bedroom 1 bath) with a rental rate of approximately $464.00 per month. 3. 90 two bedroom units (2 bedroom 2 bath) with a rental rate of approximately $534.00 per month. -7- These rents are approximate only and are based on fair market figures for the project, not necessarily the low-to-moderate income figures. However, relating to EIR Table 2-3 page 23, without federal subsidy, it is stated that low income renters can pay up to 30% of their income for rent. Using a one bedroom unit renting at $330.00 per month this would mean that a family of two earning $13,200.00 or more could well afford to live in this unit. This is approximately $3,700.00 annual income less than shown on the chart on Table 2-3. Again assuming 30% of the income used for housing for the largest unit, $534.00 per month for the two bedroom 2 bath, a family of 4 of moderate income supposedly can pay up to 35% of their income. Using only 30% of their income, for rent, the gross annual income required would be $21,360.00, which is approximately $10,000.00 a year less than the moderate income for that size family. Therefore, the pro­ posed project is within the low-to-moderate price range for apartments. BIOLOGICAL RESOURCES: The maintenance of 10.6 acres of this project as open will afford a natural environment for the birds and animals inhabit this site. ARCHAEOLOGICAL RESOURCES: space that Subsequent to receipt of the Draft EIR, WESTEC SERVICES, an archaeological and biological consulting firm in San Diego, was retained to prepare an analysis of the significance of the archaeological resources on this site. Their report which is attached to this response, shows the site to be of archaeological significance. ALANDA agrees to follow recommended and approved mitigation measures in this regard. PUBLIC SERVICES: As a condition of development in the City of Carlsbad, fees will be paid to compensate for the additional burden on the public services. ENERGY: Measures will be taken in the development of the project to efficiently use all sources of energy. -8- AIR QUALITY: The Environmental Impact Report states that the location of this project is favorable in minimizing the negative effects upon air quality because of its close proximity to all services, thereby reducing the average trip length. It also states that the project will create a significant impact upon air quality as regulated and defined by the State. Controlling air pollution is a regional problem, not just a problem associated with the development of one site. Therefore, this project will have a minimal over-all effect on the air quality of the City of Carlsbad. -9- I I I I I I I I I I I LIMITED GEOLOGIC INVESTIGATION FOR AI.ANDA PROPERTY CARLSBAD, CALIFORNIA For LAND SPECIALISTS, INCORPORATED San Diego, California By GEOCON, INCORPORATED San Diego, California August, 1983 GEOCON I N C O R p O R A T E D ENGINEERS AND GEOLOGISTS • CONSULTANTS IN THE APPLIED EARTH SCIENCES File No. D-2981-M02 August 11, 1983 Land Specialists, Incorporated 3878 Old Town Avenue, Suite 202 San Diego, California 92110 Subject: ALANDA PROPERTY CARLSBAD, CALIFORNIA LIMITED GEOLOGIC INVESTIGATION Gentlemen: In accordance with your request, we have performed a limited geologic investigation within the northern half of the subject property. The purpose of our investigation was to determine if a previously reported large-scale landslide exists on the site. If this slide was confirmed, we were to evaluate its potential impact on the proposed development. Our investigation consisted of geologic mapping and the drilling of two large-diameter exploratory borings at the approximate locations shown on Figure 1, Geologic Map (pocket). The depths of the borings vary from 60 to 95 feet below existing ground level. No laboratory testing was performed as part of this investigation. The subject site is underlain by the Eocene-aged Santiago Formation, late Quaternary landslide and mudflow debris, colluvium, alluvium, topsoils, and fill soils. With the exception of the topsoils and fill soils, each of ·these units is discussed below. ■ 9530 DOWDY DRIVE • SAN DIEGO, CALIFORNIA 92126 • PHONE (714) 695-2880 f ., ,, I I I I I I I I I I I I I I I I I File No. D-2981-H02 August 11, 1983 The Santiago Formation consists of interbedded sandstones, siltstones, and subordinate claystone. Slope stabilization measures are often required for the clay-rich portions of this sequence such as encount.ered in the borings at approximately 18o+ feet in elevation. This clay bed may be exposed on the 80-foot-high cut slope proposed along the future Elm Avenue. The majority of the landslides encountered at the site belong to a particular type commonly defined as mudflows. These features are relatively shallow, without a distinct and continuous slip_ plane and are typically confined within ravines or canyon bottoms. The landslide debris consists of highly disturbed clayey sands, clay, cobble and large angular sandstone or siltstone fragments removed from the underlying Santiago Formation. Stabilization of mudflows usually requires less extensive methods than the large-scale rotational landslides. The colluvial deposits consist of very loose, unconsolidated silty sands. The depth of these soils may exceed 15. feet and remedial grading will be required if settlement sensitive improvements are proposed for the areas of their occurrence. Typically, the colluvial deposits are well developed within the depressed areas at the upper portions of the property. These depressed areas essentially represent zones where the mudflows were originated. Alluvial soils composed of loose clayey sands occur along the property's eastern limit. Grading within these soils could be seriously hampered due -2- GEOCON INCORPORATED I I I I I I I I I I I I I I I I I File No. D-2981-M02 August 11, 1983 to their saturated condition, therefore, removal and recompaction of these deposits should be scheduled for the end of summer· when the water table should _be the lowest. The geologic structure at the site•is that of a homocline dipping gently to the west or northwest. Relatively heavy seepage was encountered in Boring No. 2 within the Santiago Formation sandstones. It is our opinion that the primary sources of groundwater at the site is landscape irrigation within the neighboring subdivision. In conclusion, it is our opinion that the property is not underlain by the suspected large-scale rotational or translational landslide shown on our previous report of geologic reconnaissance for this property dated July 13, 1983. Several ancient mudflows were discovered within the property limtis as a result; of this study, however, it ·is our opinion that this adverse condition can be mitigated with common'grading procedures. On the attached Geologic Map, Figure 1, we have only shown the approximate extent of the most significant mudflow encountered within-the north half of the property. We suspect that two smaller mudflows as well as several additional small landslides are are present within the property's southern portion. These suspected features are not shown on Figure I. -3- GEOCON INCORPORATED ,-· ,, I .. I I I I I I I I I I I I I I I I File No. D-2981-M02 August 11, 1983 We anticipate that stabilization measures may be required for some sections of the proposed cut slopes where weak clay beds will be encountered • . Significant removal and recompaction will be required in the areas where loose colluvial deposits and mudflow debris are present if settlement sensitive improvements are proposed for the subject areas. In order to provide specific recommendations with regard to landslide mitigation, slope stability, foundations, drainage provision, etc., it is our opinion that further investigative work will be required when the grading plans are more fully developed. If you have any questions regarding this report or if we may be of further service, please do not hesitate to contact the undersigned. Very truly yours, ~RPORATED Michael W. Hart CEG 706 AEF:MWH:lm (2) addressee {4) HCH and Associates Attn: Mr. Tony Ambrose -4- ~~(A. Andrei E. Farcas RG 3738 GEOCON INCORPORATED I I ! I I I I I I I I I I I I I I I I I I I File No. D-2981-NOl August 11, 1983 DEP1'H SAMl't..E LOG tJ i,,...,,.,,,.., IN NUMBER i,J.oalTION ,_,_ FEET OF Ill_.,,, SAMPLE IN-PLACE DESCfltPrlON l>RY IIOISTIJffE DENSITY CONTENT A~.f " tlry Ill BORING 1 o"'-_ _.__--1,_---11----------------------tr---t-----t l)11 . - . ► 8· - . . ► 14. 18 ► 20 . ► 26 • • . 28 • . 30 l% . ...... '. .. .. . . . TOPSOIL Soft, moist, dark brown, Silty CLAY SANTIAGO FORMATION Dense, humid, grayish-tan, medium­ grained, weakly cemented SANDSTONE . _ becomes coarse, well graded, weakly • ·._·. / cemented SANDSTONE wiht SILTSTONE . . I rip-up clasts . ' / .. l •. . . I .. . . I ·.·. Ir-stiff. humid, light garyish-brown, • • .. '. I I Silty CLAYSTONE bed, attitude . : 1 .. 1 .. ·. / 1 approximately horizontal J.: :~ ::· -----u I .• . f . . ·, ·. I ._r-., I . ', ur-grades into whitish-gray, weakly -~I 1: ;,> I .. • . .,, I cemented, well graded SANDSTONE ·.'. ·!'. v.,,.. I ... .... . . . . ... .. . , . .. ....... I I I I I I I I . . . • . u' ""·.a----- humid, light gray, Figure A-1, Log of Test Boring 1 Continued next page GEOCON INCORPORATED ~ \ ..: ... fl\,;,.,;_"-~~-• .,,..._p,,,,.,..,.,_~.,,., .... -, ... _,,.,."'. ~·~---....... ---· ·-. .. q .,. ii I I I I I I I I I I I I I I I I I -File No. D-2981-M02 August 11, 1983 IID"T1f SAM/It£ LOG II ,..,_,,,,,_ DESCRll'TION IN NUMBER i,JDCATION ,,__ /lEET OF 8,-.llr 30 . . 32- - • 34- - 36- . - • 38· - - . 40. . • 42- . . 44- - 46- - 48· . so - 52- . 54· - "56- 58 i- 60 SAMPLE . . . ~ 7~·-· / Lr ----·\ If I / \__ BORING 1 CONTINUED Stiff, moist, fractured, dark gray CLAYSTONE with shiny parting surfaces grades into very stiff, moist, purplish-gray massive SILTSTONE L _______________ _ Very dense, humid, massive tanish-light gray, very fine Silty SANDSTONE :ff/: ~\/(~ ·:+f( ·:\{( r-grades into very stiff, massive, • • -1 humid, light grayish-brown SILTSTONE, :.i_:i:1:·.. J bedding attitude horizontal ; • : . : • • I .::. ·.: :: ' ·111 · r r-dense, humid, light gray SANDSTONE :_: ;: ,_ __ J/ interbed .. ,; I ._: : ·."· :-I ••• ·-.r--....._ 1 :-:-:··.·. > ·.?_:-:_-.\_.............. jVery dense, humid, massive,· weakly ::_\-j:I:: I cemented, light grayish-tan, fine, ;--:-.: ·.' Silty SANDSTONE, be_dding attitude :t lli Nl0°W/6°W • .. : ::=:-;: / 1-becomes coarse :.Ill< '· ), \{: • //r-stratigraphic disconformity .. ·.· ,· ,, ~ii{_; I {Ir-very stiff, humid, purplish-brown- :·f'j::(:" 1/1 gray, fractured SILTSTONE/CLAYSTONE, ·.::: :-.:~ 1,/ slightly sheared in limited discon-::IJ I·:, i, tinuous areas, orientation of shearing :,1·:1·:1·:·:.._ __ .JI random : •. : ·. . II 1l1T' ~;;:-J/ {very stiff, hard,. h~d, massive,• light I j ~ ,,,,,',,,'> J gray SILTSTONE 117 - DRY DENSITY MOIST/JR£ CONTENT " dry wl Figure A-2, Log of Test Boring 1 Continued Continued next page GEOCON INCORPORATED . i \ . .l l l l i i ' ·, ! I I. I I I I I I I I I I • • File No. D-2981-M02 August 11, 1983 DEPTH SAlil/JILE LOG a "-ndrol,Otl IN llll/MBElt ILOCilrlON ,_,_ FEET OF Blows/W SAMPLE • 60 . . 62- DESCRIPTION BORING 1 CONTINUED ~~~------------------------------ 64. - 66- -- • 68- -- 70· . -72 - . . . 74. 76 - . 78 • 80 82 -. • 88 -- 90 • - . 92 . . -94 . .. '• ... .... ·. ·: . :: .... -··· :-: :: ·. ;: .... : . ·. I ,• •: o I I I •: ~. •, .... . . .. ···: .. .. . . . • • • • 1• ...... 0 I• .. Very dense, gray, massive, very fine, Sandy SILTSTONE r ~~~r-•,_ _________________________ _ r------ Very hard, massive, well cemented SILTSTONE grades into very stiff, massive, light grayish-brown SILTSTONE stiff, humid, purplish-gray, fractured CLAYSTONE interbed with shiny parting surfaces and numerous black manganese stains Very dense, humid, grayish-tan, very fine Silty SANDSTONE Break in log very har~, very slow drilling BORING TERMINATED AT 95.0 FEET Figure A-3, Log of Test Boring 1 Continued IN-PLACE DRY li/Ol$71.1RE DENSITY CONTENT A~., " .,, rtf GEOCON INCORPORATED I I I I I I I I I i I .I File No. D-2981-M02 August 11, 1983 0EPrH SAMl'tE LOG II ~-DESCRll'TION IN NUMBER IPOIT"ION ,.__ RET OF 6'-f/1'1 • 0 ► lo 2- ~ . ~ 4 . ► . ~ 6- . 8 - ~ . ► 10 • . ► 12. . • 14 lo . 1o 16 • . ►18 ► . 20. . 22 -. •24 • -. ·26 • lo . 28 ► . 30 .sMIPLE BORING 2 SL0PEWASH grades into moist to wet, orange-red, medium-grained, Silty cohesionless SAND /? < LANDSLIDE (MUDFLOW) DEBRiS ••• • •1 Medium dense, wet to saturated, ·._: :;.;,,_ disturbed, weakly cemented to :;-. • cohesionless, Clayey, medium-grained < ·._--> SAND :·:.;%: r-becomes very coarse, moist, grayish- ~%_'.:--, I tan, Silty S~D with rare Silty /Clayey : .' :-~;. / zones, rare pebl:iles . •. /. :·. I ·/_.. . Li 1;.,.·-:•.---~ lr-{•·:J~_t fSoft to loose, moist, light brown-tan, ~1: J: . •, • ·. P:-I Silty SAND and gray, slightly sheared bl•lr: CLAY :.ry:( I ,Very fine bedded, loose to medium dense, :_\ ·_: ! f fine, light gray SAND, typical flow -:LJl: j / pattern with attitude of bedding v._:·:( .. :~.,··.; / contorted, 1 high 1 1y irregd~lar with . 1 numerous cay enses, 1ps approximate ·Y ~/ _.. 10° to 15° toward North ~- IN-PLACE DRY MOISTURE DENSITY (XN1ENT A~.f % dry .r .figure A-4, Log of Test Boring 2 Continued next page GEOCON INCORPORATED ~ ' ! I I I I I I I I File No. D-2981-M02 August 11, 1983 DEPTH SAMPLE LDG II ~- IN NIJMBER UXATION Rlai- lEET OF Bl~ SAMPLE l/£SCRIPTION DRY MOISTV/fE DENSITY aJN1ENT A~.I % MJ' Ill BORING 2 CONTINUED .. 30 -1---b_,,'l'":....~ .... I-_-_-__ ,._ _____ ..;;;:::.:;.::::.;.;:;;....:;...;;;;.:.:.:.:=~:;._----:----t-----r-----t ~~: -~ Highly disturbed· CLAY/SAND mixture• 32- .. 36· .. 38 .. . ., 40. .. 42- .. 44 . ., 46 • . "'48 .. . "'50. .. . .. 52. .. . .. 54 .. 56. .. . ., 58 .. . 60 •• y'""'-6 •rf!;,,.•·o: with numerous pebbles and cobbles x:.;f?.o. .-·--···).I\. L r;;O.-. '-. ---------------..,.. .;;:p. ' h h d -:Y.~~: , S ear zone, ighly sheared, disturbe , i(·i~ .> n light gray-tan, Clayey SAND and light :·::~~~~ // • I gray CLAY with numerous cobbles and ·;· ~":,;; ~-I pebbles within the sheared mass~ ~'""?":·' __ ;:-nl General attitude N65° / 45°NE :·:~:'?.!-ti :H··( 11 .•', .·• .• II :•l•J1:: \I :-fl:j:: l1--- .:j:F1:: I .. ..• . I ,,1·.1:1·.· _ I large SILTSTONE fragments exceeding 1' in diameter in a coarse Clayey Sandy matrix • •• • •• L-shear zone agproximately 1" thick, .·. :·: attitude N75 E/4°s \· <·:; \ SANTIAGO FORMATION .. •• ... :: \ Very dense, moist, whitish-gray, .......,.·-·~··.·~·---.--. Silty SANDSTONE }ft 1L :::.1~\ \ Very dense, saturated, coarse, weakly :c:.':: •:----~ cemented, whitish-gray SANDSTONE, ·: ::~.?." I\ general slight seepage L~.,. . . I : • • .•· I •◄ .... •·.·. IL_ ___________________ _ ~~-I Very dense, saturated, weakly to medium : ."'"'· ·.: \ cemented, very coarse SANDSTONE with ·.: . •• ---~I rare pebbles, general moderate seepage, ----,\\ flow increasing with depth, no caving hL_ II II 'I· h· II II II stratigraphic disconformity, light grayish-brown, fractured SILTSTONE/ CLAYSTONE~ slightly sheared in limited discontinuous areas; heavy seepage along the contact \L--very dense~ wet, light gray-tan, weakly \ cemented, medium-grained SANDSTONE,cavirg Figure' A-5, Log of Test Boring 2, Continued Continued next page GEOCON INCORPORATED 1 ,. I I I I I I I I I File No. D-2981-MOZ August 11, 1983 /IE1'TH SAMPLE U,G a ,.,,.,_,,,,,_ IN NUMBER IUJCATION Rni- l'EET OF Blow¢/ SAMPLE 60 l ~ . I I I I .. . L_ -. --,. . .. '.· .. - -. . .. .. .. . .. . . .. - - .. .. . - .. - . . . OESClf!,-TION BORING 2 CONTINUED light gray, very stiff SILTSTONE BORING TERMINATED AT 60.0 FEET Figure A-6, Log of Test Boring 2 Continued IN~LACE DltY IIOISTUltE DENSITY CfN1'ENT" A~., " ,,,,. _, -----, -· . --· GEOCON INCORPORATED ' . ' ;,.. • "I SIZE REDUCTION -PREPARED BY -LAND SPECIALISTS. INC. FROM DRAWINGS NOS ... 0.826A & D·2981-M01 BY .GEOCON INC. . .. ,,,, WESTEC Services, Inc. 3211 Fifth Avenue. San Diego, CA 92103-5765 (619) 294-9770 Mr. Stan Landess 3878 Old Town Avenue, Suite 202 San Diego, CA 92119 83-19-E September 1, 1983 Re: Preliminary Draft Report, Archaeological Testing at W-143/146, Carlsbad, Cali­ fornia Dear Mr. Landess: Please consider this a letter report concerning sites W-143/146, located in Carls­ bad, California. INTRODUCTION WESTEC Services, Inc. completed an archaeological testing program at W-143/ 146, Carlsbad, California. Field work was undertaken during the period August 22-25, 1983. A total of 14 person days were expended in this effort. All phases of investiga­ tion were supervised by Dennis K. Quillen, with assistance provided by Terri Jacques, Brian Hunter, Susan Arter, and Steven Van Wormer. W-143/146 is located within the proposed Rising Glen project which is bordered on the east by El Camino, Real, and on the west by Ridgecrest Drive approximately 1/2--mile south of Buena Vista Creek. The subject property was surveyed previously by Polan (1983). Originallv recorded by Rogers (1929) as two sites, W-143 and W-146 were combined as they merge east of the horse ranch which protrudes into the property off Ridgecrest Drive. An additional site, designated by Polan (1983) as Alanda l, is located just west of El Camino Real in the northeast corner of the project property. As a --means of better assessing the significance of W-143/146, a testing program, as recom- -mended by Polan (1983:26), was undertaken by WESTEC Services, Inc. The result of this field work is summarized below .. An examination of the project property revealed at least three areas of sub­ stantial archaeological midden deposits, one to the north and one to the south of the horse ranch, and the remaining corresponding to Polan's Alanda 1 site. These shell midden deposits are very extensive, covering nearly one-third of the project on the western and southern one-third of the property. Surface indications suggest deepest deposits were in the southern end of the property. Here, the soil is a rich dark brown to J:>lack shell midden containing shell, ash, ·charcoal and artifacts. The midden contained in the northwestern portion of the property is very similar, although containing fewer artifacts. Alanda 1 was relocated, and consisted primarily of shellfi,sh distributed lightly over the surface of a small knoll overlooking El Camino Real A series of postholes were excavated to better define these deposits. Two sep­ arate posthole series werf;! excavated; the first consisted of 12 points excavated in the northern half of the property beginning at the west-central edge of the property and San Diego, CA • Ventura. CA • Sacramento, CA • Brawley, CA. • Phoenix. AZ. • Philadelphia. PA • Washington, D.C . I :1 i i I I I i I '• Mr. Stan Landess September 1, 1983 Page 2 extending northeast across W-146 and A·~nda 1. Subsurface deposits at least 50 cm deep were encountered in the first 4 postholes extending from the western site bound­ ary. A shallow deposit at Alanda 1 was revealed, but may have been due to ·downslope movement of materials. An additional seven postholes were excavated in the midden deposit south of the horse ranch. Here the .. midden exceeded 80 cm in depth, with some postholes terminated because the deposit was too deep to continue excavation. The postholes excavated at W-143/146 clearly revealed a shell midden deposit containing shellfish, artifacts, and pottery, with a depth of at least 50 cm north of the horse ranch, and as much as a meter or more south of the horse ranch. A recently eroded gully bisects the southern deposit and the sides of this gully reveal a continuous midden deposit consisting of shellfish and artifacts, and possible fire hearths, at least a meter deep, extends across the entire property. Following excavation of the postholes, three 1 x 1 meter test units were exca­ vated. Unit 1 was placed in the northwestern deposit, nearly due north of the inter­ section of Ridgecrest Drive and Rising Glen Drive. A deposit 50 cm in depth was revealed. Consisting primarily of shellfish remains, approximately 7484.4 grams U6.5 lbs) in all. This midden deposit was found to be disturbed in the top 30 cm due to recent brush clearing by tractor. Rodent dens were noted in all levels. The artifactual remains recovered from Unit 1 are provided in Table 1. Pot- Level sherd 0-10 • 1 10-20 3 20-30 6 30-40 40-50 - ------ Flake 1 5 20 9 1 Table 1 ARTIFACTS BY LEVEL Unit 1, .W-143/146 Artifact Tool Ground­ stone His­ toric Comment 4 1 quartz flake; historic glass 1 teshua, 19 pressure flakes 1 quartz 2 quartz, historic glass NOTE:The last level, 40-50, was dug through a rodent bole. I .i J .. Mr. Stan Landess September 1, 1983 Page 3 Unit 2 was placed in the southeastern portion of the site just south of the gully which bisects the midden deposit, and approximately 75 meters west of El Camino ReaL Recent brush clearing by tractor has disturbed the first 30 cm of midden, with the remainder of the unit considerably disturbed by rodents. A ~ontinuous midden deposit at least 80 cm in depth was revealed. Excavation was continued to 90 cm in Unit 2, but it became clear that shellfish remains recovered were transported to this depth by rodents. A sizeable rodent den containing shellfish remains and fresh grass was encoun­ tered at 70 cm and continued below to 90 cm. Shellfish remains predominated, with approximately 14,968 grams (33 lbs) recovered. The majority of shell recovered here were Donax, followed in frequency by Chione and Pectin. Rodent, snake, and fish bone, flaked artifacts and pottery were also recovered. A complete listing of the artifacts recovered from l?'nit 2 is provided in Table 2. Table 2 ARTIFACTS BY LEVEL Unit 2, W-143/146 Artifact Pot-Ground-His- Level sherd Flake Tool stone toric Misc. Comment -- 0-10 4 1 Strip of tin can or pipe 10-20 2 38 2 2 1 Olivela Mano fragment, strips of shell tin can or pipe bead 20-30 1 21 1 Iron fragment --same as above 30-40 1 16 1 3 40-50 1 15 1 Iron fragment 50-60 3 13 1 Iron fragment 60-70 3 18 2 1 Olivela. Mano fragments, all shell pressure flakes bead 70-80 21 Small pressure flakes 80-90 18 1 Flake scraper Unit 3 was placed near the center of the midden deposit approximately 20 meters east of the western property boundary south of the horse ranch. This area had recently .. Mr. Stan Landess September 1, 1983 Page 4 ·,·;· been cleared of vegetation by a tractor,> and the top 30 cm of soil was disturbed. Midden on the surface at this location appeared the richest on the property, excavation of the unit confirmed this appearance. A' midden deposit 170 cm deep was exposed in Unit 3. A total of 73,029.5 grams (161 lbs) of shellfish was re4!overed from this one unit alone. Unlike Unit 2 where the major shellfish species was Donax; Chione and Pectin predominated in Unit 3. Although Donax was not absent, it appears to have been more frequent only in the upper levels of the unit. Rodent and fish bone were plentiful in all levels, as were flakes and fire-affected rock. Table 3 below lists the artifactual mate- rials recovered from Unit 3. , Pot- 'Level sherd -- 0-10 1 10-20 1 20-30 30-40 40-50 50-60 1 60-70 70-80 80-90 90- 100 100- 110 . 110- 120 120- 130 Flake 18 15 31 17 25 23 40 23 28 20 20 34 21 Table 3 ARTIFACTS BY LEVEL Unit 2, W-143/146 Artifact Ground-His- Tool stone toric Misc. 1 1 2 2 1 1 1 Comment 2 quartz 4 quartz, 1 chopper Bifacial rnano fragment 1 mano fragments, 2 cones (1 quartz, 1 basalt) 1 f elsite flake scraper 1 mano fragment Hammerstone ... Mr. Stan Landess September 1, 1983 Page 5 Table 3 ARTIFACTS BY LEVEL Unit 2, W-143/146 (Continued) Artifact Ground- Level Pot­ sherd Flake Tool stone His­ toric Misc. 130- 140 140- 150 150- 160 160- 170 26 17 13 18 1 SUMMARY AND SIGNIFICANCE EVALUATION Comment 3 patinated felsite; 2 local chert 4 patinated felsite; 1 clear quartz 1 local chert core/ hammer; 3 patinated felsite Nineteen postholes and three 1 x 1 meter test units excavated at site W-143/146 revealed a significant intact midden deposit containing shellfish, mammal, reptile and fish bone, and stone artifacts, ranging in depth from 50 cm north of the horse ranch, and 170 cm south of the horse ranch. This site was originally recorded by Rogers (1929) as two distinct sites, W-143 and W-146. An in-field examination by Polan (1983) revealed that these were separated only by the horse ranch, which juts into the west­ central portion of the property. At the time of recordation, Rogers noted "This is the greatest depth found on a Shoshonean site" for site W-146, and that W-143 was the "nucleus of a great Shoshonean occupation" (Rogers 1929). These late prehistoric deposits overlay older La Jollan material, indicating potential continuous occupation at W-143/146 for the past 7000 years. The sheer quantity and types of artifactual remains at this site tends to support this potential Continued study of W-143/146 could greatly enhance our understanding of the processes of cultural change and adaptation which took place over the past several thousand years along the northern San Diego County coast. Specific avenues of inquiry should focus upon analyzing the materials recovered from a representative sample of the site. At a minimum, special focus should be placed on seasonality studies of shellfish (isotopes), species identification of bone, particularly fish, pollen studies for reconstruction of past climates, and collection of materials for radiometric dating. Very few artifacts were recovered from the site, but this may be .. Mr. Stan Landess September 1, 1983 Page 6 due to sampling error; units placed where artifacts were not, and also from early col­ lector activities. Rogers {1929) noted that extensive collections had already been taken from each of these sites by local individuals. At least two hearth-like features were noted in the erosion exposed wall of the gully which bisects the deposit in the south end of the property. Efforts should be made to expose these. A human burial was appar­ e!'}tly removed from W-146 some time in the past. The skeleton of a 35-to 40-year old female, flexed on the right side and oriented east, at a depth of 3 feet, was discovered and turned over to the Museum of Man as a gift from H.E. Ellery. Unfortunately, no date, nor any address for the donor was found at Museum of Man. Currently, an effort to identify E.H. Ellery is being· undertaken, so the exact location where the remains were recovered can be identified. The potential for encountering additional remains is very good, and care and prudent observation should be exercised in excavation and construction activities on this project property. Clearly, the archaeological resources at W-143/146 are significant. The site con­ tains a relatively intact, very rich midden, possibly the richest remaining site in north­ ern San Diego County. This site may yield a vast quantity of material for studying prehistoric lifeways and culture change in (:;arlsbad, California. If you have any questions concerning this letter report, please do not hesitate to contact me. • Sincerely, Richard L. Carrico RLC:sal I J !/ I WOODSIDE/KUBOTA & ASSOCIATES, INC. ENGINEERS 2465 Pio Pico Drive• P.O. Box 1095 • Carlsbad, California 92008 • (714) 729-1194 September 14, 1983 Mr. Paul J. Klukas Land Use Planning Office City of Carlsbad 1200 Elm Avenue Carlsbad, CA 92008 Subject: EIR 83-5 --Alanda Costa Real Municipal Water District Dear Mr. Klukas: Thank you for this opportunity to comment upon the subject draft environmental impact report as it relates to the public water system facilities of the Costa Real Municipal Water District that will provide the wholesale water service to the project area. Under the terms and conditions of the water service agreement of May 25, 1983, between the Water District and the City of Carlsbad, local retail water service will be provided by the City of Carlsbad and -the Water District will be responsible for the transmission facilities and all of the capital facilities that will provide service to the entire 20,ooo~acre District area. We afe enclosing a copy of Table 4 -Costa Real Municipal Water District -Major.Facilities as set f o rt h i n th e II Fi n al Rep o rt Cos-ta Re al Mu n i c i a pl Wat e r Di st r i ct - Major Water Facilities Financing Plan and Rate Study 11 dated June, 1983, as prepared by Bartle Wells Associates. This Table 4 contains a total of nine capital projects which the Board of Directors of the Water District has determined are needed in order to provide the necessary level of water service District-wide. Additionally, the Water District has established a new major facilities charge which will provide some of the financin~ for the construction of the major facilities as set forth in Table 4 and all of the proposed development will be obligated to participate in this new financing program. The Water District is currently making a complete reevaluation of all established master plan~ for public water service for the entire District area and the proposed development will be responsible for the construction of all necessary public water system facilities that In Orange County, Santa Ana ENGINEERS Mr. Paul J. Klukas City of Carlsbad September 14, 1983 Page 2 are identified in the current plans as well as any modifications at such time this reevaluation program is completed and formally adopted by the Board of Directors. We trust this supplementary information with respect to public water service will be helpful in the evaluation of the full potential of the future water system needs to provide service to the proposed development as well as the entire District service area. In the event you have ~ny comments or questions, we would be pleased to respond. truly yours, L c--,-~-r-. K-~~~ict Engineer Realfa~nicipal Water District Enclosure cc: Costa Real Municipal Water District (w/o enc) Engineering Department, City of Carlsbad (w/enc) Mr. Roger Greer, Director of Utilities, City of Carlsbad (w/enc) JYK:paf CMWD 83-106 i . . ~\ ~ . • I '. l l TABLE 4 COSTA REAL MUNICIPAL WATER DISTRICT I MAJOR FACILITIES i· l Average Escalated Annual Cost Cost Bonded. t Project No. & Description • Year 1/1/83 (10%/year) Cost1 1. Hi Reservoir, La Costa 1982/83 $ 300 0002 $ $. --I ,f' 6. 0 MG storage 1983/84 2,500,000 2,750,000 348,300 2. Squires Dam I 1982/83 60 0002 I Cogeneration station 1983/84 . 340,000 374,000 47,400 · j ;,; 20,0002 3. TAP Extension 1982/83 1983/84 200,000 .220,000 27,900 4. Squires Dam II 3 1982/83 10,0002 I\! Terminal reservoir 1983/84 200,000 220 ,0002 • Emergency storage 1984/85 1,000,000 1,210,000 1985/86 1,000,000 1,330,000 \ 1986/87 1,000,000 • 1,460,000 528,300 1· 5. Santa Fe II 1983/84 30~000 33,0002 : ~· .. , 9. 0 MG storage and 1984/85 300,000 363,0002 Transmission Main 1985/86 2,000,000 2,662,000 1986/87 2,000,000 2,924,000. 727,000 6. Tap Re.servojr 1982/83 5,0002 6. 0 MG storage 1983/84 250,000 275,0002 1984/85 2,500,000 3,025,000 383,,100 7. La Costa Reservoir II. 1987/88 600,000 . 966,000 122,300 1. 5 MG storage 8. Evans Point Reservoir 1987/88 1,500,000 2,415,000 305,900 2. 5 MG storage 9. 'D' Reservoir 1986/87 -S 0004 I 7,300 8. O MG storage 1987/88 250,0004 403,000 $16,070,000 ' . I f I 1 -20 years at 10%, beginning in year following completion. • ,I I 2 -Funded from current· and prior revenues. '! I ' 3 -Minimum project may be substantially greater in master plan. 1' I· 4 -Preliminary costs only. . ,1 1, 9 Mr. Paul Klukas City of Carlsbad 1200-Elm Avenue Carlsbadi CA 92008· _· September 6, 19 8 3 RE: RISING GLEN PROJECT ON THE WEST SIDE OF EL CAMINO REAL AT ELM AVENUE Dear Paul: Thank you for loaning me your copy of the Environmental Impact Report and Tentative Map for this project. I live up on Donna Drive and was interested in the project, along with a number of other people. In reading through the report, and studying the map this past weekend, I have the following comments and concerns. Land Use I agree that apartments should be built on a portion of this site, but feel that apartment construction should be limited to the area northerly of Elm Avenue. That site is adjacent to a proposed. high density project, and would be compatible • with the surrounding development. The proposed apartment project south of Elm Avenue would be developed adjacent to the future single family residents of this subdivision and there is not an adequate buffer provided. I feel that Elm Avenue would provide an excellent.buffer, and the area to the south of Elm Avenue should be developed in single family lots. I agree that the zoning and ·1and use should be changed from what it is to accommodate the apartment construction northerly of Elm Avenue. I believe that the rest of the zoning and land use should stay as it currently exists on the Carlsbad Land Use and Zoning Maps. The Carlsbad Council and Planning Commission, along with the Staff have been concerned in the past to provide adequate buffers between the existing development and I feel the existing zoning and general plan designations provide that buffer for the existing people in that area. ;;, Mr. Pa•ul Klukas September 6, 1983 Page Two Grading and Geology In reviewing the Environmental .Impact Report and the enclosed soils investigation by Geocon, it is obvious that some more work needs to be done oh the entire site before a project is approved. In the EIR, on page 43 and 44 under the mitigation section; the environmental consultant recommends that prior to any land use changes, additional investigation should be conducted. Apparently this work is necessary to determine whether there is an ancient landslide on the site. The invest­ igation that was done by GEOCON did not dia .anv borinas and I would suggest that before any change or development is recommended for the site, that the existence (or non-existence) of any ancient landslide should be clearly identified. The environmental consultant also recommends that development be located above the 200 foot contour elevation, to avoid potential impacts from saturated soils and poorly compacted colluvium/alluvium in the lower elevations, particularly along the drainage next to El Camino ReaL I would like to point out, that at the time of the EIR, apparently there was no project planned to review and that now the entire apartment site northerly of Elm Avenue is below the 200 foot elevation. This could cause some problems and needs further investigation. There is' one large slope that is on the east end of "B" Street' which is a cul-de-sac off of "A" Street. This slope goes, down to El Camino Real and is well in excess of 100 feet in height. I think the owner should loot,: at a possibility of·shortening up the cul-de-sab to pull the slope back:away from El Camino Real in an effort to reduce the visual impact of the new slope in.that area. The environmental consultant, on page 44, the last paragraph, suggested a number of items that could be looked at to reduce the impacts of grading on this steep site. The last sentence on that page suggests that "because of the steepness of the site, reduction to insignificance is not possible with development of any kind." Because the environmental consultant has this deep concern fo_r development on this site, I thini it is important to follow his recommendations and provide the City with additional. soils investi­ gation based on field investigation prior to any consideration of development on this .site. • ,: .. Mr. Paul Klukas September 6, 1983 Page Three Traffic Some of the property owners-immediately adjacent to the project­ are concerned that with the connection of Rising Glen between_ Ridgecrest and "A" Street in the.project that there will be_a ·considerable increas~ in the traffic through the existing neigh­ borhood from the project. The traffic consultant thinks that . this will not _be a problem, but the adjacent residents -·feel that Rising Glen should be cut off as a connecting street to the proj­ ect. A similar situation.existed on the Sheffler project to-the south, in that Janis Drive originally was to connect through the project to Chestnut. The final project that the City did approve eliminated that connection, and Janis extends up into the project, only as a cul-de-sac. This is ·a similar situation and the Staff should possibly reconsider the Rising Glen street connection. I_would agree with the environmental consultant that there are some.concerns that need to be addressed b~fore any project should be ·approved on this site. I definitely feel that.the geologic problem needs to be further investigated, and also that the apartments be kept northerly of _Elm Avenu~. and that the area southerly of Elm Avenue b·e developed as a s·ingle family subdivision with 10~000 square foot lots, consistent with the existing General Plan and Zoning. Thank you again for loaning me the environmental report and the tentative map, and if you .have any questions or comments about my letter, please give me a call. Sincerely, Robert C. Ladwig 3289 Donna Drive, Carlsbad RCL:rc cc: Mr. Jim Gaiser, 3340 Ridgecrest, Carlsbad, CA Mr. Nick Banche, 3464 Ridgecrest, Carlsbd, CA Mr. Gus Nesseth, 3324 Seacrest, Carlsbad CA 801 Pine Avenue, Carlsbad, California 92008 729-9291 "Excellence In Education" BOARD OF TRUSTEES THOMAS L. CURTIN, M.D. President W. ALLAN KELLY Vice President J. EDWARD SWITZER, JR. Clerk JOHN J. MAMAUX Member JULIANNE L. NYGAARD Member DISTRICT ADMINISTRATION PHILIP GRIGNON, Ed.D. District Superintendent SUSAN H. LARGEN Instructional Services DAVID WM. BATES, SR. Employee Relations JAMES M. STARK Comptroller RICHARD A. SHALER Information Systems K.C. DUNLAP Facilities/Services August 22, 1983 Paul J. Klukas City of Carlsbad Land Use Planning Office 1200 Elm Avenue Carlsbad, CA 92008-1989 Dear Mr. Klukas, Thank you for the opportunity to review the Environmental Impact Report for the General Plan Amendment and zone change to increase residential densities on a 47 acre parcel on the northwest and southwest corners of El Camino Real and future Elm Avenue. We have reviewed the EIR 83-5-ALANDA and offer the following comments pursuant to your request: On page 9, paragraph 2, under Public Services, the report states,' 11Schools in the project vicinity are operating under capacity at this time. However, substantial development in the District might result in overcrowded conditions, and the project would add incrementally to that situation. The pay­ ment of fees to the School District would mitigate this impact to insignficance.11 We are not in agreement with this statemment. While the pay­ ment of fees will help mitigate the impact, it will by no means reduce the impact to insigificance. The Governing Board is very concerned about the District's ability to furnish adequate facilities for students in light of development currently taking place or in the planning stages. Some schools are currently at capacity, and others are within a few students of reaching capacity. Depending on the location of the development and the schools it will impact, the District may wish to meet with the developer to discuss the donation of land in lieu of fees or the applica­ tion of fees toward the purchase of land for a school site before we can advise the City that we can provide school facilities. 7 C Paul J. Klukas August 22, 1983 Page two Once again, thank you for the opportunity to review the EIR-5-ALANDA. If you have any questions regarding my comments, please contact me at (619) 438-6626. Sincerely, L2 ~ /~tark Comptroller mp l DEVELOPMENTAL SERVICES LAND USE PLANNING OFFICE 0 0 1200 ELM AVENUE CARLSBAD, CALIFORNIA 92008-1989 (619) 438-5591 ~ttp of ~arltibab August 9, 1983 Jim Tennant, Park Dev. Dir. ~--X/2 ~~ -0~ft,~ .~ County Parks and Recreation Dept. 5555 Overland Avenue ~;~ e,ii San Diego, CA 92123 SUBJECT: EIR 83-5 -ALANDA Enclosed for your review is a copy of the draft Environmental Impact Report for the General Plan Amendment and Zone Change to increase residential densities on a 47 acre parcel on the north­ west and south-west corners of El.Camipo Real and future Elm • Avenue. Pursuant to Section 15084 of the State Environm~ntal Impact Report Guidelines, we are r·equesting comments from responsible and other agencies. • Please address your comments,.at .mY. attention, to the Land Use Planning Office, City of Carlsbad, 1200 Elm Avenue, Carlsbad, CA 92008. If no comments are received by September 26, 1983, it will be assumed that your agency concurs with the analysis and mitigation measures described in the draft. Should you have any questions, please feel free to call me at ( 619) 438-5591. We will look f.orward to receiving your comments. CITY OF CARLSBAD ~ PAUL J. KLUKAS Land Use Planning Office PJK:bw SPEED LETTER In the interest of speed and I economy, we're replying to your letter with • marginal notes. • If you need more information, j please don't hesitate to call I or write. Thank you very much for your August 22, 1983 City of Carlsbad, Attn: Paul J. Klukas Land Use Planning Office Subject: EIR 83-5 ~ Alanda A review of your above named project will have no impact on County Parks and Recreation . :Kent actiA<' . µ ROBERT ~R~~r, San Diego Cotinty .Parks and Recreation Department RRC:\7t IV · REVU:WIN_G AGENCI_ES_1 ---- vA%tD tA)~ , C,06(7/()\ N kfljf ..... I [ lbD1J p~i ~6~ th I 1 ~llft C ~-D ~ tB.. ct1-1ot ... Calif. Native Plant Society San Diego Chapter Calif. Native Plan Society P. o. Box 985 Plant Society National City, CA 92054 Parks & Recreation Dept. District 6 Headquarters 1350 Front Street, Rm. 6054 San Diego, CA 92101 San Diego Gas & Electric Co. P. O. Box 1831 San Diego, CA 92112 Attn: Mike Evans County of San Diego Environmental Division 5201 Ruffin Road San Diego, CA 92123 State Dept. of Fish & Gaine State Building 1350 Front Street, Rm. 6054 _san_Dieao_._CA, 92101 S'~ DteGD Wrt.S1 ialit ~l vei A"'v l~wnivts SluN ord. y fol'f ffM,aS~WtJ ~oue'~ [ ~']"\~. 1,7,,-0 ' S-Q.C)\-. ~2..1 v6 kr Dist. Carlsbad, CA 92008 LIST OF REVIEWING AGENCIES Archaelogical Fellowship San Diego State University San Diego, CA 92115 SANDAG Attn: Intergov. Relations 1200 3rd Ave., Suite 524 San Diego, CA 92101 Dr. John S. Bradshaw Environmental Studies Lab. University of San Diego Alcala Park, San Diego, CA 92110 Jim Tennant, Park Dev. Dir. County Parks & Rec. Dept. 5555 Overland Ave. San Diego, CA 92123 Anne Geraghty Air Resources Board 110 2 Q Street Sacrainento, CA 95814 Esther Maser, Env. Prograin Coord. Superintendent Carlsbad Unified Sch. Dist. 801 Pine Avenue Carlsbad, CA 92008 s. D. County Sanitation Attn: Environmental Coord. 5555 Overland San Diego, CA 92123 Costa Real Water District c/o Jack Kubota & Assoc. P. O. Box 1095 Carlsbad, CA 92008 s. D. Co. Arch. Society c/o Carol Walker 237 Fowles Street Oceanside, CA 92054 Nick del Ciop:EX) Ofc.of Hist. Preservation 1220 K St.Mall, 3rd Floor Sacrainento, CA 95814 Dept. of Conservation Jim Cheshire 1416 Ninth St., Rm. 1326-2 Dept. of Trans:EX)rtation Sacrainento, CA 95814 2829 Juan Street Fred A. worthley Jr. Reg. Manager Department of Fish & Gaine 245 West Broadway Long Beach, CA 90802 San Diego, CA 92138 -. V NOTICES . I VI DRAFT EIR :. I • I i _,,