HomeMy WebLinkAboutCDP 2022-0008; MARTIN RESIDENCE LOT 5 BUENA VISTA CIRCLE; FINAL SOILS REPORT; 2026-05-04AS-GRADED GEOTECHNICAL REPORT MARTIN RESIDENCE LOT 5 BUENA VISTA CIRCLE CARLSBAD, CALIFORNIA PREPARED FOR JOHN MARTIN 3301 LINCOLN STREET CARLSBAD, CALIFORNIA 92008 PREPARED BY CHRISTIAN WHEELER ENGINEERING 3980 HOME AVENUE SAN DIEGO, CALIFORNIA 92105 Geotechnical & Geological Consulting ✦ Materials Inspection & Testing ✦ Building Envelope Consulting ✦ Laboratory Services www.christianwheeler.com ✦ info@christianwheeler.com ✦ (619) 550-1700 3980 Home Avenue, San Diego, California 92105 Geotechnical & Geological Consulting ✦ Materials Inspection & Testing ✦ Building Envelope Consulting ✦ Laboratory Services www.christianwheeler.com ✦ info@christianwheeler.com ✦ (619) 550-1700 3980 Home Avenue, San Diego, California 92105 CHRJSTIAN WHEELER. ENGINEER.ING May 4, 2026 John Martin CWE 2210558.08 3301 Lincoln Street Carlsbad, California 92008 Subject: As-Graded Geotechnical Report Martin Residence, Lot 5 Buena Vista Circle, Carlsbad, California Reference: Christian Wheeler Engineering, Report 2210558.01, Report of Preliminary Geotechnical Investigation, dated December 8, 2021 Dear Mr. Martin: In accordance with your request and our proposal dated August 15, 2024, we have prepared this report to summarize our services during the earthwork operations at the subject site. This report presents the as-graded geotechnical conditions of the site, our observations, the results of our laboratory testing, and the results of relative compaction tests performed in the fills and backfills that were placed during the grading operation at the project site. The observation and testing services addressed by this report were coordinated by Coastline Construction and were provided between August 28 and October 29, 2024. In order to assist in our understanding of the designed configuration of the project, our firm was provided with an undated grading plan (Drawing No. 544-4A) for the site prepared by PLSA Engineering. Plate No. 1 of this report is a reproduction of the plan, modified to show the approximate locations of our field tests and the relevant limits of the earthwork operation. INTRODUCTION AND PROJECT DESCRIPTION The subject site is an undeveloped residential lot, which is located adjacent to and north of Buena Vista Circle in in the City of Carlsbad, California. Prior to the grading addressed in this report, the southeast portion of the site was characterized by a relatively level building pad with an elevation of approximately 43 feet. A natural bluff descends from the northwest side of the level pad area of the site to the northwest perimeter of Geotechnical & Geological Consulting ✦ Materials Inspection & Testing ✦ Building Envelope Consulting ✦ Laboratory Services www.christianwheeler.com ✦ info@christianwheeler.com ✦ (619) 550-1700 3980 Home Avenue, San Diego, California 92105 Geotechnical & Geological Consulting ✦ Materials Inspection & Testing ✦ Building Envelope Consulting ✦ Laboratory Services www.christianwheeler.com ✦ info@christianwheeler.com ✦ (619) 550-1700 3980 Home Avenue, San Diego, California 92105 CHRJSTIAN WHEELER. ENGINEER.ING CWE 2210558.08 May 4, 2026 Page 2 the. Overall, the bluff displays a general inclination of about 3:1 (horizontal to vertical). The bottom of the bluff along the northwest portion of the site is at an approximate elevation of 6 to 8 feet (PLSA). A one- to two-story single-family residence with an attached garage and ADU has been constructed at the subject site. The lot also supports a swimming pool and spa, site retaining walls, and other normally associated appurtenances. The residence and ADU are of conventional, wood frame construction with an on- grade concrete floor slab. The improvements are supported by conventional shallow, conventional foundations. Grading to accommodate the proposed improvements consisted of cuts and fills of less than 4 feet from existing site grades and creating the excavation for the swimming pool. SCOPE OF SERVICE The following services were provided by Christian Wheeler Engineering during the course of the earthwork operations. Participated in a pre-grading meeting to address the geotechnical aspects of the work and to coordinate our testing and observation services. Provided continuous or periodic observation of the earthwork operations, as determined by the rate of progress of the earthwork. Provided field recommendations for elements of the earthwork not specifically addressed by the referenced geotechnical report, as needed. Recorded the approximate elevations and limits of significant geotechnical elements. Performed in-place density tests in the fills and backfills placed. Determined the laboratory maximum density and optimum moisture content of soils encountered in the earthwork. Prepared this report, which presents a summary of our observations and results of our relative compaction tests. SITE PREPARATION AND GRADING The earthwork addressed by this report was performed by Fortified Foundations. The site preparation consisted of over excavating the surficial soils (topsoils and upper most portion of the olds paralic deposits) to the contact with competent old paralic deposits. The competent old paralic deposits were encountered approximately 12 inches below the existing grades. Removals were preformed to a depth of approximately 2 feet below the proposed pad grade in the area to support the proposed residence. CWE 2210558.08 May 4, 2026 Page 3 The approximate limits of removal are shown on the attached Plate No. 1. The soils exposed at the bottom of the excavation were scarified 12 inches, moisture-conditioned, and compacted to at least 90 percent relative compaction in areas to support settlement sensitive improvements such as exterior flatwork and to at least 95 percent relative compaction in the area to support the proposed residence. Fill materials consisting of the on-site and imported silty sands were typically placed by the excavator and skip loader in relatively thin, uniform lifts. Moisture-conditioning was applied as needed and compactive efforts were then performed by means of a sheepsfoot roller to attain at least 90 percent relative compaction in areas to support settlement sensitive improvements such as exterior flatwork and to at least 95 percent relative compaction in the area to support the proposed residence. RETAINING WALL BACKFILL OPERATION The rear yard retaining wall backfills addressed by this report was performed by Fortified Foundations. The retaining walls were backfilled using native sandy soils. The backfills were placed in thin horizontal lifts by means of skid steer and were moisture-conditioning to near optimum conditions as needed. The soils were compacted in place by means of a rammer compactor to at least 90 percent of maximum dry density. LABORATORY AND FIELD TESTING The maximum dry density and optimum moisture content of the soils predominantly encountered in the earthwork were determined in our laboratory in accordance with ASTM D1557, “Test Method for Laboratory Compaction Characteristics of Soil Using Modified Effort.” The tests were conducted in accordance with the methodology prescribed for the grain-size distribution of the soils tested. The results of these tests are presented in Appendix A on Table I. Field tests to measure the in-place density and moisture content of the fills and backfills were conducted in accordance with ASTM D6938, “Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods.” The locations of the field tests were selected by our technician in areas discerned to exhibit compaction that was generally representative of that attained in the fills and backfills. The results of the field tests are presented in Appendix A on Table II through III. CONCLUSIONS It is the opinion of Christian Wheeler Engineering that the earthwork addressed by this report has been performed in general accordance with the recommendations presented in the referenced geotechnical report, the grading requirements of the City of Carlsbad. This opinion is based upon our observations of the earthwork operations, the results of the density tests taken in the field, and the maximum density tests performed in our laboratory. It is our further opinion that the site is suitable for the proposed construction. CWE 2210558.08 May 4, 2026 Page 4 Our recommendations for the minimum design of foundations for the proposed structures, originally presented in the referenced geotechnical report, are in our opinion, still suitable based on the as-graded conditions. AS-BUILT GEOLOGY The geologic units encountered during the earthwork operations were generally consistent with those anticipated in our referenced report of geotechnical investigation. No unforeseen, adverse geologic conditions or features were noted by our field personnel during the earthwork operation addressed herein. The earthwork operations addressed by this report have, in our opinion, satisfactorily mitigated the potentially adverse conditions described in the referenced report. LIMITATIONS The descriptions, conclusions and opinions presented in this report pertain only to the work performed on the subject site during the period from August 28, 2024 to December 23, 2024. As limited by the scope of the services that we agreed to perform, the conclusions and opinions presented herein are based upon our observations of the work and the results of our laboratory and field tests. Our services were performed in accordance with the currently accepted standard of practice in the region in which the earthwork was performed, and in such a manner as to provide a reasonable measure of the compliance of the described work with applicable codes and specifications. With the submittal of this report, no warranty, express or implied, is given or intended with respect to the services performed by our firm, and our performance of those services should not be construed to relieve the grading contractor of his responsibility to perform his work to the standards required by the applicable building codes and project specifications. Christian Wheeler Engineering sincerely appreciates the opportunity to provide professional services on this project. If you should have any questions after reviewing this report, please do not hesitate to contact our firm. Respectfully submitted, CHRISTIAN WHEELER ENGINEERING ___________________________________ ___________________________________ Daniel B. Adler, RCE #36037 David R. Russell, CEG #2215 DRR:dba ec: jdmartin999@gmail.com; derrick@coastlinesd.com; bknapp@plsaengineering.com SW X X XXXXXXXXXXXXXXXX XXXXXX XXXXX XXXXX XXXX OE OE OE OE X X X X X X X X X X X X X X X X X X X X X X X X X X X X X S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE /// /// /// /// /// /// /// SDSDSDSDSDSDSDSDSD SDSDSDSDSDSD S S /// /// /// /// /// /// W W W 48"TD 40"TD 18"TD 18"TD 18"TD 18"TD 12"TD16"TD RF = 5 6 . 2 RF = 5 7 . 1 RF = 53.2 RF = 53.9 VEGE VEGE CO N C 44 44 44 44 44 44 44 43 43 43 43 43 43 43 43 43 42 42 42 42 42 41 41 41 40 40 40 39 39 39 38 38 38 37 37 37 36 36 36 35 35 35 34 34 34 33 33 33 32 32 32 31 31 31 30 30 30 29 29 29 28 28 28 27 27 27 26 26 26 25 25 25 24 24 24 23 23 23 22 22 22 21 21 21 20 20 20 19 19 19 18 18 18 17 17 17 16 16 16 15 15 15 14 14 14 13 13 13 12 12 12 11 11 11 10 10 10 10 9 9 9 9 9 8 8 8 8 8 8 8 8 8 8 7 AS P H 42.4 42.5 43.3 43.6 43.9 42.5 42.3 42.5 42.5 42.6 42.8 42.8 42.8 43.3 43.2 43.2 43.3 43.6 43.6 43.6 43.7 43.7 43.5 43.7 44.3 43.9 42.742.4 43.4 43.8 43.9 44.3 42.9 EOP= 4 3 . 6 7 EOP=4 3 . 7 3 EOP=4 3 . 5 8 EOP=43 . 4 1 EOP=43 . 2 1 EOP= 4 3 . 8 4 EOP= 4 3 . 7 0 EOP=4 3 . 6 2 EOP=4 3 . 4 7 EOP=4 3 . 3 0 EOP=43 . 1 0 X X X X X X X SD SD SD SD SD SD SD SD SD SD RESIDENCE FF = 45.97 PAD = 45.3 ADU FF = 45.97 PAD = 45.3 POOL 45.2 FS GARAGE GFF = 45.3 BU E N A V I S T A CIR C L E PE R D W G 5 4 4 - 4 N 5 6 ° 0 2 ' 2 0 " E 1 1 4 . 8 2 ' N 64°00'37" W 276.98' N 64°01'09" W 266.00' LOT 4 BUENA VISTA GARDENS MAP 2492 LOT 6 BUENA VISTA GARDENS MAP 2492 APN: 155-221-06-00 APN: 155-221-04-00 BU E N A V I S T A L A G O O N RO W RO W ROW LOT 5 BUENA VISTA GARDENS MAP 2492 A A C B GF = 4 5 . 3 2%MIN. 5% MIN. (~0 . 8 % ) 2%MI N . 2% MIN. FS = 46.6 2% MIN. BBQ SPA BMP 1 FG = 43.5 AREA = 900 SF E E (42.6 FG)(43.1 FG) (43.7 FG)(44.3 FG) (43.8 FS) 44.8 FS 44.8 FS (43.7 FS) EXISTING FENCE TO BE REMOVED EXISTING TREES TO REMAIN EXISTING TREES TO REMAIN EXISTING SLOPE TO BE PROTECTED IN PLACE EXISTING FENCE TO REMAIN EXISTING PCC SIDEWALK TO BE REMOVED 45.71 TW 45.3 TW@FG (43.2 BW) 42.36 TF 49.06 TW 45.8 TW@FG (43.7 BW) 43.03 TF EXISTING GUY WIRE TO REMAIN EXISTING POWER POLE TO REMAIN EXISTING STRUCTURE TO REMAINEXISTING STRUCTURE TO REMAIN EXISTING STRUCTURE TO REMAIN EXISTING TREE TO REMAIN 45.3 FG 45.3 FG 45.3 FG 45.8 FS 43.5 FG EXISTING SLOPE TO BE PROTECTED IN PLACE EXISTING WATER METER AND SERVICE TO BE PROTECTED IN PLACE EXISTING PLANTER WALL TO REMAIN EXISTING OVERHEAD UTILITIES TO REMAIN LIMITS OF WETLAND DELINEATION PER BIOLOGIST 100 FT WETLAND BUFFER SETBACK PER BIOLOGIST NO GRADING PROPOSED WITHING 100 FT SEBACK 100 FT WETLAND BUFFER SETBACK PER BIOLOGIST 45.5 TW 43.5 TW @ FG (41.5 BW) 40.14 TF 45.0 TG 43.9 IE 45.1 FG 45.5 TW 43.5 TW @ FG (42.2 BW @ FG) 40.14 TF 45.5 TW 43.5 TW @FG (42.7 BW) 40.14 TF 45.5 TW 43.5 TW@FG (42.2 BW) 40.14 TF 45.55 TW 45.3 TW@FG (43.3 BW) 42.2 TF 43.7 TW 43.6 TW@FG (43.6 BW) 43.03 TF 45.8 FS 45.8 FS/HP 45.3 FS EXISTING FENCE TO REMAIN EXISTING OVERHEAD UTILITY TO REMAIN 45.8 FS 45.5 FS 44.9 TG 43.9 IE 47.05 TW 46.8 TW@FG (42.8 BW) 41.69 TF 45.5 TW 43.5 TW @ FG (42.1 BW @ FG) 40.14 TF 45.71 TW 45.3 TW@FG (42.8 BW) 41.69 TF PROPOSED POOL WALL; DESIGN BY OTHERS 45.8 FS 45.8 FS 45.2 FS 45.55 TW 45.3 TW @FG (43.8 BW) 42.87 TF 44.8 TG 44.3 IE 45.0 HP 46.4 TG 43.8 IE 45.55 TW 45.5 TW@FG 43.5 BW 41.53 TF 44.21 TW 43.5 TW@FG 43.4 BW 41.53 TF 45.55 TW 45.3 TW@ FG 44.5 BW 43.54 TF 46.22 TW 45.7 TW@FS 43.0 BW 41.53 TF 45.55 TW 45.2 TW@FG (44.3 BW) 43.54 TF 45.55 TW 45.3 TW@FG 44.5 BW 43.54 TF PROPOSED PUBLIC ACCESS EASEMENT PURSUANT TO LCP POLICY 7-6 44.5 TG 43.7 IE 44.7 FG 44.9 TG 43.9 IE 44.5 TG 41.25 IE 47.05 TW 46.7 TW@FG (42.6 BW) 41.69 TF 46.84 TW 46.8 TW@FS 43.5 BW@FG 40.14 TF 45.1 FG 45.5 TW 43.5 TW@FG (42.7 BW) 40.14 TF 45.6 TG 44.5 IE 45.6 TG 44.3 IE 43.7 IE 43.8 IE 43.8 IE 43.6 IE (43.6 RIM) (37.2 IE) 41.25 IE 42.2 IE ANY COMBINED WALL AND FENCE HEIGHT NOT TO EXCEED 6-FT WITHIN SYSB ANY COMBINED WALL AND FENCE HEIGHT NOT TO EXCEED 6-FT WITHIN SYSB ANY COMBINED WALL AND FENCE HEIGHT NOT TO EXCEED 3.5-FT WITHIN FYSB 45.8 FS 45.5 TW 44.9 TW@FG 43.5 BW@FG 40.14 TF 45.5 TW 43.5 TW@FG (42.6 BW) 40.14 TF 41.25 IE 42.2 IE 43.4 TG 42.7 IE 43.4 TG 42.6 IE 45.6 TG 44.7 IE 13.5% 4.0% GR A D E B R E A K Δ = 1 0 . 1 6 ° L = 1 0 9 . 9 2 ' R = 6 2 0 . 0 0 ' 11.0% 1 1 43.70 FS 43.85 FS 2% MIN. COLUMN PER STRUCTURAL DESIGN (TYP.) LA 45 4.0% 5%MIN. 3 33 3 3 3 3 3 3 TOP OF SLOPE 46.6 TOE OF SLOPE 45.3 14 14 15 2 2 2 2 25.0' PROP O S E D O P E N S P A C E E A S E M E N T 22 . 0 ' 7. 7 ' 8. 2 ' 10 . 0 ' S Y S B 10 . 0 ' S Y S B 15 C B D D 45.8 FS 45.8 FS 2% MIN . 2%MIN. 7 7 7 7 30. 0 ' 8.8' 11.8' 10 9 45.8 FS BUILDING OVERHANG (TYP.) 45.1 FG 4 43.6 FS 4 STEPS 11 8 45.5 TW 43.5 TW @ FG (42.2 BW @ FG) 40.14 TF 45.4 FS 45.4 FS 3 STEPS 46.22 TW 45.8 TW@FG 45.3 BW 44.21 TF 45.55 TW 45.3 TW@FG 42.5 BW 41.53 TF 2 45.55 TW 45.3 TW@FG 43.5 BW 42.87 TF 46.22 TW 45.7 TW@ FS 45.3 BW 44.21 TF END CONSTRUCTION OF SDRSD C-3 RETAINING WALL 15 2 47.51 TW 46.7 TW@FG (42.6 BW) 40.14 TF END CONSTRUCTION OF SDRSD C-3 RETAINING WALL 45.55 TW 44.7 TW@FG (42.6 BW) 41.53 TF 12 2 45.5 TW 43.5 TW @ FG (41.5 BW) 40.14 TF 15 45.0 HP 44.8 TG 44.0 IE3 44.9 HP 45.4 TG 44.2 IE3 45.2 TG 44.2 IE3 45.3 TG 44.3 IE 3 45.2 TG 44.1 IE 3 45.6 TG 44.6 IE3 3 STEPS 7 2%MIN. 45.8 FS 45.55 TW 45.3 TW@FG 43.5 BW 42.4 TF 45.1 TG 42.4 IE3 42.3 IE 45.6 TG 43.0 IE3 BUILDING OVERHANG (TYP.) LA 16 5 5 16 5 545.5 TW 45.2 TW@FG 43.5 BW@FG 40.14 TF STEP 45.4 FS 45.1 FG 6 43.9' 20.0' 17 17 17 17 43.85 TG 43.1 IE 43.70 TG 42.8 IE 45.55 TW 45.3 TW@FG 42.5 BW 41.53 TF 2% 18 43.6 FS 43.6 FS 45.55 TW 43.5 TW@FG 42.5 BW 41.73 TF 45.55 TW 45.3 TW@FG 44.5 BW 43.54 TF45.3 TW 44.3 BW 45.7 TW 40.0 BW 45.3 TW 44.3 BW 45.3 TW 44.3 BW 45.2 TG 44.4 IE 3 45.4 FS PLANTER 45.3 FS 46.1 FS 45.6 FS STEP 45.3 FG 45.9 TG 44.1 IE3 45.8 FS FS = 46.1 6 5%MIN. 5 5 16 5 45.55 TW 43.3 TW@FG 43.0 BW 41.73 TF 19 42.3 IE 45.55 TW 45.3 TW@FG 42.5 BW 41.73 TF 45.1 TG 42.7 IE 3 16 45.2 TG 42.6 IE 45.1 TG 42.5 IE GRAPHIC SCALE: 1" = 10' 0 10'20'30' J:\ACTIVE JOBS\3628 MARTIN BUENA VISTA CIR-CARLSBAD\CIVIL\DRAWING\GRADING PLANS PLAN VIEW - PRECISE GRADING PLAN SCALE: 1" = 10' HORIZONTAL SITE NOTES 1. ALL UTILITIES SHOWN HEREON PER BEST AVAILABLE RECORD INFORMATION; WITH EXCEPTION OF SEWER UTILITIES. CONTRACTOR TO FIELD VERIFY SEWER UTILITIES. 2. ALL EXISTING ONSITE STRUCTURES TO BE DEMOLISHED UNLESS OTHERWISE NOTED. 3. ALL EXISTING ONSITE TREES TO BE REMOVED UNLESS OTHERWISE NOTED. 4. ALL ONSITE WATER, SEWER, AND STORM DRAIN FACILITIES TO BE PRIVATELY MAINTAINED. 5. HARDSCAPE SHALL DRAIN AWAY FROM PROPOSED STRUCTURES AT MINIMUM OF 2.0% FOR 10 FEET, AND LANDSCAPE FOR A MINIMUM OF 5.0% IN ACCORDANCE WITH THE 2016 CALIFORNIA BUILDING CODE SECTION 1804.4. ANY DEVIATION SHALL REQUIRE RECOMMENDATION FROM PROJECT GEOTECHNICAL ENGINEER. CONSTRUCTION NOTES EXISTING SURVEY MONUMENT SHALL BE PROTECTED IN PLACE. MONUMENT SHALL BE REPLACED BY A LICENSED LAND SURVERYOR WHO SHALL FILE A CORNER RECORD WITH THE COUNTY IF DISTURBED OR DESTROYED CONSTRUCT MASONRY RETAINING WALL PER SDRSD C-03 INSTALL 6" AREA DRAIN BY NDS OR APPROVED EQUAL CONSTRUCT 5" PCC DRIVEWAY; SUBGRADE AND COMPACTION PER GEOTECHNICAL RECOMMENDATIONS BASED ON TESTED R-VALUE INSTALL 6" PVC STORM DRAIN INSTALL 6" TRENCH DRAIN BY NDS OR APPROVED EQUAL INSTALL RIP RAP ENERGY DISSIPATER PER SDRSD D-40; ROCK CLASS = NO. 2 BACKING T=1.1 FT CONSTRUCT 36" X 36" BROOKS BOX; SEE DETAIL SHEET 5 FOR UNDERDRAIN AND ORIFICE PLATE CONNECTION TO BOX INSTALL FLOW SPREADER W/ FLOW CONTROL; 41.25 IE INSTALL FLOW SPEADER; 42.2 IE LOW-FLOW DISCHARGE AND ORIFICE PLATE CONNECTION TO BROOKS BOX; SEE DETAIL SHEET 5 CONSTRUCT MODIFIED PCC HEADWALL PER DETAIL SHEET 5 INSTALL 20-FT DIAMETER CANOPY TREE WELL PER DETAILS SHEET 5; ARBUTUS UNEDO TREE SPECIES INSTALL BMP SIGNAGE PER DETAIL SHEET 5; MINIMUM 18" X 12" SIGN CONSTRUCT STRUCTURALLY ENGINEERED RETAINING WALL PER DETAILS SHEET __ INSTALL 4" PVC STORM DRAIN CONSTRUCT 4" PCC WALK PER GEOTECH RECOMMENDATIONS CONSTRUCT CANTILEVERED WOOD DECK PER SEPARATE LANDSCAPE PLANS ARCHITECTURAL SITE WALL PER SEPARATE LANDSCAPE PLAN PA S C O , L A R E T , S U I T E R & A S S O C I A T E S 19 1 1 S A N D I E G O A V E N U E , S A N D I E G O , C A 9 2 1 1 0 PH : ( 8 5 8 ) 2 5 9 - 8 2 1 2 F A X : ( 8 5 8 ) 2 5 9 - 4 8 1 2 REVIEWED BY: DATEINSPECTOR DATE "AS BUILT" ENGINEERING DEPARTMENT RCE EXP. MARTIN RESIDENCE BUENA VISTA CIRCLE BAK CDP 2022-0008 8 GR 2023-0033 3628-02 544-4A 3 1 2 3 4 5 6 10 11 12 13 14 GRADING PLAN 15 7 8 9 16 17 18 19 4 5 6 2 7 8 3 1 43.0' 42.0' 43.0' Qaf Qop Qaf Qop Qaf Qop MARTIN RESIDENCELOT 5 BUENA VISTA CIRCLE, CARLSBAD, CALIFORNIA DATE: AUGUST 2019 BY: MAH PLATE NO.: 1 MAY 2025 AS-GRADED GEOTECHNICAL MAP REPORT NO.: 2210558.08 43.0' Qaf Qop RELATIVE COMPACTION TEST ARTIFICIAL FILL OVER OLD PARALIC DEPOSITS APPROXIMATE LIMITS OF REMOVALS/OVEREXCAVATION CWE LEGEND ELEVATIONS AT EXCAVATION BOTTOM # 19 10 22 21 20 14 12 23 16 18 24 9 15 17 11 13 RW 5 RW 7 RW 9 RW 8 RW 1 RW 14 RW 2 RW 13 RW 3 RW 6 RW 4 RW 12 RW 11 RW 10 26282527 RW 15 RW 16 29 33 32 31 30 0 0 0 0 0 0 0 0 0 ' / I \ ,--' \ \ I I I I I I I 0 0 0 0 0 0 0 0 0 0 I I / / ' )---~ ) I L----------- I ~--.. ) ( --"--a,-~/-. I .,.---------" ,,-/ ---.../ //_ -I I /_I -----..,_ I ~ / I I -.. _ .• ·: _;: · .. -_.-.•• '' :· _·:: :-_ ' /"". ~'/ .. --·-.· ... .. ' . ... . . . . . . . . "',;; • ,.-t---,-+---.,--- l No. 86542 xp. 03/31/2 • - II D I I I I I -----..________ w CHR.ISTIAN WHEELER. FNCINFFR.INC t-----+---+---------------,t------+---+-----+----1 ~ 11 CITY OF CARLSBAD I LJ t-----t--+----------------t-----+--+----t----1 GRADING PLANS FOR: APPROVED: JASON S. GELDERT ENGINEERING MANAGER RCE 63912 EXPIRES 9 30 24 DAlE DA 1E INITIAL ENGINEER OF WORK REVISION DESCRIPTION DA 1E INITIAL DAlE INITIAL OlHER APPROVAL CITY APf'ftOVAL DWN BY: __ _ CHKD BY: __ _ RVWD BY: PROJECT NO. I DRAWING NO. Appendix A Test Results CWE 2210558.08 May 4, 2026 Appendix A, Page A-1 TABLE I: SUMMARY OF OPTIMUM MOISTURE & MAXIMUM DENSITY TEST RESULTS (ASTM D1557) Soil Type Description Optimum Moisture (%) Maximum Dry Density (pcf) 1 Light Brown, Silty Sand (Geotechnical Investigation)8.2 132.0 2 Grayish-brown, Silty Sand (Import - 5606 Pala Road, Fallbrook )8.2 125.7 3 Light Brown to grayish-brown, Silty Sand (Mix of Sample 1 & 2)7.3 129.7 TABLE II: SUMMARY OF FIELD IN-PLACE DENSITY TEST RESULTS (ASTM D6938) - MASS GRADING Test No.Date Location Elev. (feet)Soil Type Field Moisture (%) Field Dry Density (pcf) Max. Density (pcf) Rel. Comp. (%) 1 9/4/2024 Residence Pad Area-South Side 44.0 3 9.8 124.8 129.7 96.2 2 9/4/2024 ADU Pad Area 44.0 3 8.2 125.2 129.7 96.5 3 9/4/2024 Garage Pad Area 44.0 3 8.5 124.3 129.7 95.8 4 9/4/2024 Residence Pad Area-North Side 44.0 3 10.1 124.6 129.7 96.1 5 9/5/2024 Residence Pad Area-North Side 45.0 3 9.8 125.6 129.7 96.8 6 9/5/2024 ADU Pad Area 45.0 3 8.5 124.7 129.7 96.1 7 9/5/2024 Garage Pad Area 45.0 3 8.2 124.2 129.7 95.8 8 9/5/2024 Residence Pad Area-South Side 45.0 3 9.3 124.5 129.7 96.0 9 9/6/2024 ADU Pad Area 44.5 3 9.1 125.2 129.7 96.5 10 9/6/2024 Residence Pad Area-North Side 44.5 3 10.2 124.6 129.7 96.1 11 9/6/2024 Garage Pad Area 44.5 3 11.1 124.1 129.7 95.7 12 9/6/2024 Residence Pad Area-South Side 44.5 3 9.5 124.9 129.7 96.3 13 9/9/2024 Residence Pad Area-North Side 45.0 2 8.2 120.5 125.7 95.9 14 9/9/2024 Garage Pad Area 45.0 2 10.1 120.3 125.7 95.7 15 9/9/2024 Residence Pad Area-West End 45.0 2 9.8 121.4 125.7 96.6 16 9/9/2024 ADU Pad Area 45.0 2 8.7 120.8 125.7 96.1 17 9/10/2024 ADU Pad Area 45.0 2 8.7 120.6 125.7 95.9 18 9/10/2024 ADU Pad Area 45.0 2 10.2 121.4 125.7 96.6 19 9/10/2024 Residence Pad Area-North Side 45.0 2 11.3 121.7 125.7 96.8 20 9/10/2024 Garage Pad Area 45.0 2 9.5 122.1 125.7 97.1 21 9/11/2024 Garage Pad Area (F.G.)45.3 2 10.1 121.5 125.7 96.7 22 9/11/2024 Residence Pad Area (F.G.)45.3 2 9.8 122.3 125.7 97.3 23 9/11/2024 Residence Pad Area (F.G.)45.3 2 10.7 121.8 125.7 96.9 24 9/11/2024 ADU Pad Area (F.G.)45.3 2 9.5 123.1 125.7 97.9 25 10/30/2024 Flatwork Area, North of House Pad 44.0 1 8.4 119.7 132.0 90.7 26 10/30/2024 Flatwork Area, North of House Pad 44.0 1 8.6 119.5 132.0 90.5 27 11/1/2024 Flatwork Area, North of House Pad 44.5 1 8.3 120.2 132.0 91.1 28 11/1/2024 Flatwork Area, North of House Pad 44.5 1 8.8 119.6 132.0 90.6 29 12/23/2024 Pool Bottom, South End 43.2 3 12.4 117.4 129.7 90.5 30 12/23/2024 Pool Bottom, South End 43.2 3 10.5 122.7 129.7 94.6 31 12/23/2024 Pool Bottom, South End 43.2 3 8.7 123.3 129.7 95.1 32 12/23/2024 Pool Bottom, South End 43.2 3 6.8 116.7 129.7 90.0 33 12/23/2024 Pool Bottom, South End 43.2 3 9.2 119.7 129.7 92.3 TABLE III: SUMMARY OF FIELD IN-PLACE DENSITY TEST RESULTS (ASTM D6938) - RETAINING WALL Test No.Date Location Elev. (feet)Soil Type Field Moisture (%) Field Dry Density (pcf) Max. Density (pcf) Rel. Comp. (%) RW1 10/22/2024 Rear Yard Biofiltration Eastern Wall 42.0 1 10.0 121.4 132.0 92.0 RW2 10/22/2024 Rear Yard Biofiltration Eastern Wall 42.0 1 12.6 114.4 132.0 86.7 RW3 10/22/2024 Rear Yard Biofiltration Eastern Wall 42.0 1 11.2 119.1 132.0 90.2 CWE 2210558.08 May 4, 2026 Appendix A, Page A-2 TABLE III: SUMMARY OF FIELD IN-PLACE DENSITY TEST RESULTS (ASTM D6938) - RETAINING WALL Test No.Date Location Elev. (feet)Soil Type Field Moisture (%) Field Dry Density (pcf) Max. Density (pcf) Rel. Comp. (%) RW4 10/22/2024 Rear Yard Biofiltration Eastern Wall 42.0 1 13.1 114.8 132.0 87.0 RW5 10/23/2024 Retest RW2 42.0 1 9.1 118.9 132.0 90.1 RW6 10/23/2024 Retest RW4 42.0 1 8.4 123.2 132.0 93.3 RW7 10/23/2024 Rear Yard Biofiltration Eastern Wall 42.5 1 10.4 119.1 132.0 90.2 RW8 10/23/2024 Rear Yard Biofiltration Eastern Wall 44.0 1 10.9 120.1 132.0 91.0 RW9 10/24/2024 Rear Yard Biofiltration Eastern Wall 44.5 1 9.9 121.7 132.0 92.2 RW10 10/24/2024 Rear Yard Biofiltration Eastern Wall 43.0 1 10.7 119.4 132.0 90.5 RW11 10/25/2024 Rear Yard Biofiltration Eastern Wall 45.0 1 8.9 119.2 132.0 90.3 RW12 10/25/2024 Rear Yard Biofiltration Eastern Wall 45.0 1 8.3 119.7 132.0 90.7 RW13 10/25/2024 Rear Yard Biofiltration Eastern Wall 43.0 1 8.4 118.9 132.0 90.1 RW14 10/28/2024 Rear Yard Biofiltration Eastern Wall 44.5 1 8.3 119.9 132.0 90.8 RW15 10/29/2024 North PL Retaining Wall - West End 45.0 1 8.5 119.1 132.0 90.2 RW16 10/29/2024 Rear Yard Biofiltration Eastern Wall 45.0 1 8.7 119.4 132.0 90.5