Loading...
HomeMy WebLinkAbout2026-06-16; Community Development Commission; Resolution 583Exhibit 9 RESOLUTION NO. 583 . A RESOLUTION OF THE COMMUNITY DEVELOPMENT COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, ADOPTING CHANGES TO THE MASTER FEE SCHEDULE WHEREAS, the Community Development Commission of the City of Carlsbad, California, has the authority to establish fees for housing services; and WHEREAS, from time to time the fees are reviewed and evaluated to maintain an adequate fee structure recovering costs for housing services; and WHEREAS, the Community Development Commission has determined the cost of providing housing services; and WHEREAS, the Community Development Commission finds it necessary to recover the costs for housing services; and WHEREAS, the Community Development Commission has held the necessary public hearing and allowed for public comment on the establishment of the fees. NOW, THEREFORE, BE IT RESOLVED by the Community Development Commission of the City of Carlsbad, California, as follows: 1.That the above recitations are true and correct. 2. That the proposed action is not a “project” as defined by California Environmental Quality Act, or CEQA, Section 21065 and CEQA Guidelines Section 15378(b)(4) and does not require environmental review under CEQA Guidelines Section 15060(c)(3) as it is a government fiscal activity and does not involve any commitment to any specific project which may result in a potentially significant physical impact on the environment. The activity or projects for which this budget is intended to fund may require preparation of an environmental document in accordance with CEQA and the CEQA Guidelines. 3.That the changes to the Master Fee Schedule as shown in Attachment A are adopted. 4. That this resolution shall become effective on Sept. 1, 2026; not sooner than 60 days after adoption in accordance with California Government Code Section 66017 for housing fees. June 16, 2026 Item #6 Page 300 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Community Development Commission, the City Council of the City of Carlsbad, the Board of Directors of the Carlsbad Municipal Water District, the Board of Directors of the Carlsbad Public Financing Authority, and the City Council as Successor Agency to the Carlsbad Redevelopment Agency held on the 16th day of June, 2026, by the following vote, to wit: AYES: Blackburn, Bhat-Patel, Acosta, Burkholder, Shin. NAYS: None. ABSTAIN: None. ABSENT: None. _____________________________________ KEITH BLACKBURN, Chairperson _____________________________________ GEOFF PATNOE, Secretary (SEAL) June 16, 2026 Item #6 Page 301 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Proposed Master Fee Schedule All Fees Within, except Trash Collection Rates and Park Land In- Lieu Fees, Effective Sept. 1, 2026 Trash Collection Rates and Park Land In-Lieu Fees Effective July 1, 2026 Attachment A June 16, 2026 Item #6 Page 302 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Proposed Master Fee Schedule FY 2026-27 Contents Section 1 – General City Service Fees, Deposits, Rates, Penalties and Fines Miscellaneous Fees and Returned Checks ....................................................................................... 4 Deposits and Securities .................................................................................................................... 5 Special Events and Safety Training Center ....................................................................................... 6 Ambulance, Street Light Energizing, and Affordable Housing Administration ................................ 7 City Clerk Fees .................................................................................................................................. 8 Library Fees ...................................................................................................................................... 9 Fire (Fire Extinguishing and Alarm Systems) .................................................................................. 10 Fire (Development Applications, Plan Review, and Inspection) .................................................... 11 Fire (Fire and Life Safety Inspections and Fire Code Permits) ....................................................... 13 Police Department Fees ................................................................................................................ 15 Administrative and Vehicle, Traffic, and Parking Penalties ...........................................................16 Trash Collection Rates ....................................................................................................................17 Utility Account and Service Fees ....................................................................................................25 Utility Meter Installation and Connection .....................................................................................27 Utility (San Diego County Water Authority) ..................................................................................29 Section 2 – Development Related Fees Planning Department Fees ............................................................................................................31 Engineering Department Fees .......................................................................................................36 Building (New Construction, Additions and Major Remodels) ......................................................44 Building (Minor/Miscellaneous Residential & Commercial Improvements) .................................52 Building (Plumbing, Mechanical, and Electrical) ............................................................................56 Building (Simple Single or Combination Permits List) ....................................................................58 Section 3 – Development Impact Fees Bridge and Thoroughfare District 2 Map .......................................................................................60 Local Facilities Management Zones Map .......................................................................................61 Park Land In-Lieu Fees, Park Districts Map ....................................................................................62 Planned Local Drainage Fee Areas and Map ..................................................................................63 Sewer Benefit Area and Connection Fees Map .............................................................................65 Affordable Housing, Agricultural and Habitat Mitigation, and Traffic ...........................................67 June 16, 2026 Item #6 Page 303 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Section 1 General City Service Fees, Deposits, Rates, Penalties and Fines June 16, 2026 Item #6 Page 304 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Miscellaneous Fees 1 Administrative Fee for 1915 Act Bond Call - 1% of principal being repaid (All Assessment Districts using 1915 Act Bonds)each [1] 2 Business License - additional CA fee each [3],[5] 3 Business License - master list of active business licenses each [2] 4 Business License - monthly list of new licenses each [2] 5 Cable Channel Administration Fee per hour [1] 6 Electric Vehicle Charging Fees Peak Pricing (4PM to 9PM)per kWh [1] Off-Peak Pricing (9PM to 12AM, 9AM to 4PM)per kWh [1] Super Off-Peak Pricing (12AM to 9AM)per kWh [1] 7 GIS - digital data delivery, production of new documents, reproduction of existing documents, and technical services per hour [1] 8 Hearing Disposition Services for Parking Citations - Personal Hearings each [1] 9 Hearing Disposition Services for Parking Citations - Written Review each [1] 10 City Publications each [1] 11 Community Facilities District Annexation - City Labor (Plus actual consultant costs)each [2] 713 Short-Term Vacation Rental Permit Application Fee [2]231$ 12 Sign Collection and Pickup Fee (plus $5 fee per sign)each [2] Credit Card Fee for Transient Occupancy Tax Payments [6] Returned Check Fee 13 First Returned Check each [4] 14 Each Additional Check each [4] basis. It will be based on the fully burdened hourly rate and the time hourly [2] [Notes] [1] Set per City policy [2] Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Set per CA Government Code 4467 [4] Set per CA Civil Code 1719 [5] Business license tax, set per Carlsbad Municipal Code 5.08.010, is separate from these fees. [6] Set by Resolution No. 2021-168, adopted by City Council on July 13, 2021. 4June 16, 2026 Item #6 Page 305 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Deposits and Securities Grading and Erosion Control 15 Grading Security (with approved plans)deposit [1],[2] 16 Grading Cash Deposit deposit [1],[2] Development/Subdivision Improvements 17 Faithful Performance Security deposit [1],[2] 18 Labor and Materials Security deposit [1],[2] 19 Monumentation Security deposit [1],[2] Right of Way Security deposit [1],[2] Right of Way Cash Deposit deposit [1],[2] [Notes] [1] Set per City policy [2]Per CA Government Code 53079, 1% shall be deducted from any interest due. The city may require a security be provided to ensure work related to a project is completed in accordance with the Carlsbad Municipal Code and development agreements executed with the city. This information is to help understand the standard structure of how these deposits and securities are calculated. The security amounts are calculated using final city-approved cost estimates, not initial or draft estimates during plan check. 5June 16, 2026 Item #6 Page 306 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Special Events Fees 20 Special Event Application - Minor - 2 or less intersections (fee + services rendered)each [1],[3]166$ 21 Special Event Application - Major - 3 or more intersections (fee + services rendered) each [1],[2]498$ 22 Special Event Application - Third party Vendor Fee per day [1],[2]112$ 23 Special Event City Services - Staff Time per hour [1] Actual Cost Safety Training Center Facility Fees 24 One Shooting Range full day [1]1,539$ 25 One Shooting Range 1/2 day [1]770$ 26 Two Shooting Ranges full day [1]1,728$ 27 Two Shooting Ranges 1/2 day [1]904$ 28 Classroom full day [1]705$ 29 Classroom 1/2 day [1]403$ 30 Confined Space Prop full day [1]752$ 31 Confined Space Prop 1/2 day [1]376$ 32 Grinder full day [1]539$ 33 Grinder 1/2 day [1]314$ 34 Grinder/Commercial Prop full day [1]808$ 35 Grinder/Commercial Prop 1/2 day [1]403$ 36 Grinder/Residential Prop full day [1]808$ 37 Grinder/Residential Prop 1/2 day [1]403$ 38 PriSim (Training Simulator)full day [1]566$ 39 PriSim (Training Simulator)1/2 day [1]283$ 42 Streetscape full day [1]190$ 43 Streetscape 1/2 day [1]139$ 44 Shooting Range - Hourly hourly [1]154$ [Notes] [1]Set per City policy [2] Carlsbad Municipal Code 8.17 defines and outlines Special Events which may require permitting. [3] Fee charged as determined by staff Full details on how to apply for a Special Event Application can be referenced in the Special Event Reference Handbook available on the City of Carlsbad website. The below fees are listed for reference only and may not be representative of the entirety of a Special Event Application cost. A valid, unexpired City of Carlsbad Business License is required for all special event applicants. Carlsbad Municipal Code Section 8.17.070 CMC requires an applicant to pay a non-refundable fee to allow third party vendors to participate under the applicant’s business License. 6June 16, 2026 Item #6 Page 307 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Ambulance Fees 45 Assessment/Non-Transport with medication given. No charge for assessment if no medication given and non-transport. per [1]493$ 46 Advanced Life Support 1 - plus Level I or Level II supplies and medications per [1]2,787$ 47 Advanced Life Support 2 - plus Level II supplies and medications per [1]2,787$ 48 Basic Life Support per [1]2,787$ 49 Mileage Charge mile [1]44$ 50 Oxygen Charge per [1]130$ Street Light Energizing Fees 51 40 watts each [2]102$ 52 45 watts each [2]111$ 53 70 watts each [2]157$ 54 85 watts each [2]186$ 55 100 watts each [2]214$ 56 120 watts each [2]251$ 57 150 watts each [2]306$ 58 200 watts each [2]400$ 59 250 watts each [2]493$ Affordable Housing Administrative Fees 51 Affordable Housing Agreement - Ownership (Fee per project)per project [1]748$ 52 Additional fee per unit per unit [1]278$ 53 Affordable Housing Agreement Ownership Unit - Real Estate Agent each [1] Actual Cost 54 Affordable Housing Agreement - Rental (Fee per project)per project [1]954$ 55 Affordable Rental Unit - Compliance and Annual Monitoring (per unit)per unit [1]157$ [Notes] [1] Set per City policy [2] Street Light Energizing Fees are the cost for energizing each street light for eighteen months, and include a $30.00 charge per light for connecting the light to an SDG&E service point. 7June 16, 2026 Item #6 Page 308 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit City Clerk Fees 60 Appeals to City Council each [2],[8] 61 Candidate Filing Fee each [3] 62 Notice of Intention to Circulate Initiative Petition each [4] Subpoena Fees 63 Deposition Subpoena per day [5] 64 Records Subpoena - research per hour [6] Copy Fees 65 Copies & Printing - Black & White each [1] 66 Copies & Printing - Color each [1] 67 CD Copy each [1] 68 DVD Copy each [1] 69 USB Drive Copy each [1] 70 FPPC Campaign Statements per page [7] 71 FPPC Conflict of Interest Statement per page [7] 72 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time per hour [2] [Notes] [1] Set per City policy [2]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Set per City of Carlsbad Municipal Code 1.12.010 [4] Set per CA Elections Code 9202 [5] Set per CA Government Code 68096.1(b) [6] Set per CA Evidence Code 1563(b)(1) [7] Set per CA Government Code 81008 [8] Additional department processing fees may apply. 8June 16, 2026 Item #6 Page 309 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Library Fees 73 Account Collection Fee per item [1]10.00$ 76 Card Replacement per card [2]2.00$ 77 Carlsbad History Collection Photo Fee per request [1] Actual Cost 78 Interlibrary Loan per request [2]6.00$ 79 Lost/Damaged Item - Processing fee per item [2]6.00$ 80 Lost/Damaged Item - beyond repair per item [1]List Price 81 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time per hour [2]12.00$ [Notes] [1] Set per City policy [2]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. 9June 16, 2026 Item #6 Page 310 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Fire Extinguishing and Alarm Systems New Sprinkler System 82 ESFR Fire Sprinkler System (Initial System)each [2] 1,300$ 83 Each Additional System each [2] 360$ 84 Per Additional Inspection hourly [2] 172$ 85 ESFR Fire Sprinkler System with In-Rack Sprinklers each [2] 1,506$ 86 Each Additional System each [2] 360$ 87 Per Additional Inspection hourly [2] 172$ 88 Fire Pump (First Pump)each [2] 1,197$ 89 Each Additional Pump each [2] 412$ 90 NFPA 13 System < 100 Heads each [2] 941$ 91 Per Additional Inspection hourly [2] 172$ 92 Per Additional Plan Type each [2] 205$ 93 NFPA 13 System > 100 Heads (Includes One Riser)each [2] 1,300$ 94 Each Additional Riser each [2] 360$ 95 Per Additional Inspection hourly [2] 172$ 96 Per Additional Plan Type each [2] 205$ 97 NFPA 13R System 3-16 units (Per Building)each [2] 1,300$ 98 Per Additional Inspection (Per Building)each [2] 205$ 99 Per Additional Plan Type each [2] 205$ 100 NFPA 13D Single Family System (Plan Review Per Initial or Single Plan Type)each [2]374$ 101 Per Additional Plan Type each [2] 189$ 102 NFPA 13D Single Family System (Inspection Per Building)each [2] 189$ 103 Underground Piping with up to 4 Hydrants/Risers each [2] 1,146$ Per Additional Inspection hourly [2]172$ 104 Underground Piping with 5 or more Hydrants/Risers each [2],[3] 1,558$ Per Additional Inspection hourly [2]172$ Tenant Improvement Sprinkler System 105 NFPA 13 or 13R System 6 Heads or Less each [2] 173$ 106 NFPA 13 or 13R System 7 - 100 heads each [2] 837$ 107 Per Additional Inspection hourly [2] 205$ 108 Per Additional Plan Type each [2] 189$ 109 NFPA 13 or 13R System > 100 Heads each [2] 991$ 110 Per Additional Inspection hourly [2] 205$ 111 Per Additional Plan Type each [2] 189$ Other Extinguishing Systems 112 Gas Systems (Med Gas, Industrial Gas, LPG)each [2] 631$ 113 Hood & Duct Extinguishing System each [2] 631$ 114 Each Additional System each [2] 309$ 115 Pre-Action System with Alarm each [2] 837$ 116 Refrigeration Systems < 500 lbs.each [2] 1,095$ 117 Refrigeration Systems > 500 lbs.each [2] 1,866$ 10June 16, 2026 Item #6 Page 311 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 118 Special Equipment (Ovens, Dust, Battery)each [2] 631$ 119 Special Extinguishing System each [2] 888$ 120 Spray Booths each [2] 631$ Additional Inspection for any Extinguishing System hourly [2]172$ Alarm Systems 121 New Alarm System each [2] 1,917$ 122 Per Additional Inspection hourly [2] 205$ 123 Per Additional Plan Type each [2] 205$ 124 Sprinkler Monitoring each [2] 580$ 125 Per Additional Inspection hourly [2] 189$ 126 Per Additional Plan Type each [2] 189$ 127 Tenant Improvement Fire Alarm System each [2] 941$ 128 Per Additional Inspection hourly [2] 189$ 129 Per Additional Plan Type each [2] 189$ Development Applications, Plan Review and Inspection Building Construction Plan (Architectural Review) 130 A-1 Occupancies - New each [2] 1,801$ 131 A-1 Occupancies - Tenant Improvements each [2] 1,376$ 132 A-2 & A-3 Occupancies - New each [2] 1,234$ 133 A-2 & A-3 Occupancies - Tenant Improvements each [2] 952$ 134 A-4 & A-5 Occupancies - New each [2] 1,801$ 135 A-4 & A-5 Occupancies - Tenant Improvements each [2] 1,376$ 136 E Occupancies - New each [2] 1,801$ 137 E Occupancies - Tenant Improvements each [2] 1,376$ 138 E Occupancies (Daycare Only) each [2] 720$ 139 F Occupancies - New each [2] 1,234$ 140 F Occupancies - Tenant Improvements each [2] 952$ 141 H Occupancies (Not Including Chem Class) - New each [2] 1,234$ 142 H Occupancies (Not Including Chem Class) - Tenant Improvements each [2]952$ 143 I Occupancies - New each [2] 1,234$ 144 I Occupancies - Tenant Improvements each [2] 952$ 145 L Occupancies - New each [2] 720$ 146 L Occupancies - Tenant Improvements each [2] 566$ 147 R-1 & R-2 Occupancies <50 Units New flat [2] 1,801$ 148 R-1 & R-2 Occupancies ≥50 Units New flat [2] 2,226$ 149 R-3 Townhomes New each [2] 1,234$ 150 R Occupancies All - Tenant Improvements each [2] 952$ 151 S Occupancies < 50,000 sq. ft. New flat [2] 720$ 152 S Occupancies < 50,000 sq. ft. - Tenant Improvements flat [2] 566$ 153 S Occupancies ≥ 50,000 sq. ft. New flat [2] 1,338$ 154 S Occupancies ≥ 50,000 sq. ft. - Tenant Improvements flat [2] 1,029$ 11June 16, 2026 Item #6 Page 312 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Plan Review and Inspection Hazardous Materials Storage 155 Chem Class <10 Chemicals flat [2] 734$ 156 Chem Class 10- 25 Chemicals flat [2] 1,146$ 157 Chem Class 26 - 100 Chemicals flat [2] 1,661$ 158 Chem Class >100 Chemicals flat [2] 2,175$ 159 Fire Department Access & Fire Lanes flat [2] 438$ Resubmittal Review flat [2]189$ 160 High Piled Storage flat [2] 1,146$ 161 High Rise Structure Greater Than 55 feet flat [2] 515$ 162 Per Additional Floor flat [2] 412$ Storage Tanks 163 Aboveground Storage Tanks (First Tank)each [2] 1,003$ 164 Underground Storage Tanks (First Tank)each [2] 909$ 165 Each Additional Tank each [2] 142$ Vegetation Fuel Modification 166 Custom Home flat [2] 674$ 167 Tract <75 Homes flat [2] 1,352$ 168 Tract ≥75 Homes flat [2] 1,970$ 169 Smoke Control - Rationale Analysis & Plan Review flat [2] 2,072$ Expedited Plan Review (pass through from consultant)flat [1] Actual Cost Other Fire Fees Aerial Fireworks Display 170 Major each [2]1,793$ 171 Minor each [2]1,037$ Plan Review 172 Processing Fee each [2]86$ 173 Per Hour - Overtime hourly [2]204$ 174 Per Hour - Regular Office Hours hourly [2]189$ Hourly Services for: Alternate Methods and Materials Review, Time and Materials Review, Project Meetings, etc. 175 First Hour each [2]241$ 176 Each Additional Hour hourly [2]205$ 177 Plan Resubmittal (3rd and Subsequent Submittal, Per Hour) hourly [2] 205$ 178 Failed Inspection (Per inspection)each [2]292$ Tent Permit (Not associated with special events) 179 Single Tent each [2]274$ 180 2-5 Tents flat [2]519$ 181 6 or More Tents flat [2]720$ After Hours Overtime inspection flat [2]308$ 182 Weed Abatement Administrative Fee each [2]377$ Defensible Space Inspection flat [2]236$ 183 Fire Nuisance Alarm - 1st Response in 12 Month Period each [1]-$ 184 Fire Nuisance Alarm - 2nd Response in 12 Month Period each [1]111$ 185 Fire Nuisance Alarm - 3rd Response in 12 Month Period each [1]221$ 186 Fire Nuisance Alarm - Each Additional Response Thereafter each [1] 433$ 187 Fire Nuisance Alarm - Each Billing each [1]14$ 12June 16, 2026 Item #6 Page 313 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 188 Special Events Application Processing flat [2],[6] 189$ 189 Special Events - Fire & Life Safety/Operations Support Prior To/During Event each [2],[6] Actual Cost Fire & Life Safety Inspections and Fire Code Permits Fire Inspections for the following Occupancies: 190 Care Facility for More than 6 Ambulatory & Non-Ambulatory Clients each [2],[4]204$ 191 Hospitals, Nursing Homes, Mental Hospitals, Detoxification and Surgery Centers each [2],[4]393$ 192 Commercial Care Facility (i.e. Child, Drug & Alcohol, Juvenile, Etc.)each [2],[4]204$ 193 Pre-Inspection Residential Care Facility (i.e. Single Family Residences)each [2],[4]204$ 194 High Rise Facility > 75 ft. (Per Floor of Building)each [2],[4] 204$ State Mandated School Inspection - Public or Private School 195 Pre-School each [2],[4] 471$ 196 Elementary/Middle School each [2],[4] 755$ 197 High School each [2],[4] 1,132$ Non-Compliance Fee each [2],[4]566$ State Mandated Hotel and Motel Inspection 198 1-5 Buildings Per Property flat [2],[4] 660$ 199 6-10 Buildings Per Property flat [2],[4] 1,133$ 200 11 or More Buildings Per Property flat [2],[4] 1,415$ Non-Compliance Fee each [2],[4]566$ State Mandated Apartment Inspection 201 3-10 Units Per Building flat [2],[4] 236$ 202 11-40 Units Per Building flat [2],[4] 283$ 203 Greater than 40 Units Per Building flat [2],[4] 377$ Non-Compliance Fee each [2],[4]472$ Fire Code Permits - Initial Permit 204 Tier 1 each [2],[5] 204$ 205 Tier 2 each [2],[5] 393$ 206 Tier 3 each [2],[5] 582$ Fire Code Permits - Annual Renewal Permit 207 Tier 1 each [2],[5] 110$ 208 Tier 2 each [2],[5] 204$ 209 Tier 3 each [2],[5] 299$ Assembly 210 < 300 people flat [2] 204$ 211 > 300 people flat [2]393$ All Other Occupancies Annual Inspections 212 Tier 1 - 5,000 sq. ft. or Less flat [2] 157$ 213 Tier 2 - 5,001 to 20,000 sq. ft.flat [2] 252$ 214 Tier 3 - 20,001 and Greater flat [2] 393$ 13 13June 16, 2026 Item #6 Page 314 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 215 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service rovided. per hour [2]205$ [Notes] [1] Set per City policy [2]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Additional Reinspection fees shall apply for phased inspection projects at the discretion of the Fire Marshall [4] [5] [6]Additional fees for Standby of fire personnel and equipment during event will apply. All annual inspection fees shall include time for the initial inspection and 1 reinspection. All subsequent reinspection shall be charged an additional rate per inspection. Tier 1 – Candles – Open Flame; Cryogens; Dry Cleaning; Liquefied Petroleum Gas (LPG); Motor Vehicle Fuel Dispensing; Industrial Ovens; Hot Works; Welding Tier 2 – Aerosol; Aviation Facility; Waste Handling; Carnival/Fair; Combustible Materials Storage; Compressed Gas; Dust Producing Operations; Flammable Liquids – Storage; Combustible Liquids – Storage; Flammable/Combustible Liquids – Tanks; Flammable/Combustible Liquids – AST/UST Removal; Fruit Ripening; Hazardous Materials; Magnesium Work; Repair Garage; Tire Storage; Explosives-Model Rockets Tier 3 – Aircraft Refueling; Explosives – Blasting & Fireworks; High Piled Combustible Storage (HPS); Lumber Yards & Woodworking Plants; Refrigeration Equipment; Spraying or Dipping Operations Package Permits – All permits associated in the following activities are included in the Tier priced above: Dry Cleaning; Motor Vehicle Fuel Dispensing; Repair Garage; Welding 14June 16, 2026 Item #6 Page 315 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Police Fees 216 Audio/Photos on USB each [2] $46 217 Burglary Alarm Registration Fee each [2] $31 Certificate of Registration - Application Fee each [1] $142 Certificate of Registration - Appeals Fee each [1] $706 218 False Alarm Response - Second Occurrence each [2] $41 219 False Alarm Response - Additional Occurrence each [2] $60 220 Excess False Alarm Panic Response each [3] $100 221 Excess False Alarm Panic Response - Robbery / Burglary each [3] $100 224 Entertainment License each [2] $324 225 Fingerprinting processing Fee each [2],[5] $29 Firearm Storage Fee each [1] $107 226 Fix-It Ticket - moving violation each [2],[6] $23 227 Fix-It Ticket - parking/registration violation each [2],[6] $15 228 Handicap Placard Violation Waiver Processing Fee each [2],[7] $31 229 Photograph Copy - Subpoena or Records requests that require retrieval in QueTel evidence ro ram.each [2] $24 Police Response for Loud Disturbances - Second Response and each Subse uent Res onse each [8] Actual Cost 230 Police/Fire - Emergency Response DUI Traffic Collision (max $12,000 er incident each [1] Actual Cost 231 Production of body worn camera videos. Staff time per hour of roduction and redaction of videos.each [1] Actual Cost 232 Report Copy Fee (Free to Victim)each [2] $24 Secondhand Dealer Licensing State Licensing Fee – set by California Department of Justice each [1] Actual Cost City Processing Fee – New Applications each [1] $167 City Processing Fee – Application Renewals each [1] $112 234 Storage/Impounded Vehicle Administrative Charge each [2] $167 Vehicle Repossesion Receipt each [9] $15 235 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service rovided. per hour [2] $92 [Notes] [1] Set per City policy [2]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Set per City of Carlsbad Municipal Code 8.50.080 [E] [4] Set per City of Carlsbad Municipal Code 5.16.070 [5] Plus actual cost from processing agency [6] Requires proof of correction [7] Waived with proof of correction 15June 16, 2026 Item #6 Page 316 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Administrative Citation Penalties 236 1st Violation of a City Ordinance each [2]100$ 237 2nd Violation of a City Ordinance each [2]200$ 238 3rd Violation of a City Ordinance each [2]500$ 239 Subsequent violation of same ordinance within one year each [2]500$ Vehicle, Traffic, and Parking Civil Penalties 240 CA Vehicle Code Parking Violation, if not specified by separate fee amount (rounded)each [3]48$ 241 CA VC 22500(i) Bus Zone each [3]263$ 242 CA VC 22500(l) Curb Cut/Disabled Access each [3]343$ 243 each [3]343$ 244 CA VC 22522 Sidewalk Access Ramp (3 ft. away)each [3]343$ 245 CA VC 22526 (a)(b) Block Intersection/Gridlock each [3]63$ 246 CA Vehicle Code Violation for Equipment, if not specified by separate fee amount (rounded)each [3]38$ 247 CA VC 4000(a) Expired Registration each [3]63$ 248 CA VC 26100C Tinted Covers on Headlights each [3]48$ 249 CA VC 28071 Passenger Car Bumpers Required each [3]88$ 250 established by the CA Vehicle Code Parking Violation or CA Vehicle each [1]50$ [Notes] [1] Set per City policy [2] Set per City of Carlsbad Resolution 2001-167 and limit set per CA Government Code Section 36900 [B] [3] Set per City Policy to the San Diego County Sheriff's Department Parking Fee Violation Table. 16June 16, 2026 Item #6 Page 317 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Trash Collection Rates (Stormwater fee included) Residential Services 251 3-Cart (64 or 96 gallon cart)[1]36.33$ 252 3-Cart Low Generator (35 gallon cart)[1]33.11$ 253 Back Yard Service Fee (added to curbside rate)[1]45.72$ 254 Additional Solid Waste Cart [1]3.96$ 255 Additional Recycled Materials Cart (4+)[1]3.96$ 256 Additional Organics Cart (4+)[1]3.96$ Extra Pick-up for Trash bags (Up to 6 bags per rate)[1]17.71$ Commercial Services Commercial Solid Waste - 64 or 96 Gallon Cart 257 One pick-up per week [1]36.24$ 258 Two pick-ups per week [1]72.48$ 259 Three pick-ups per week [1]108.72$ 260 Four pick-ups per week [1]140.39$ 261 Five pick-ups per week [1]172.20$ 262 Six pick-ups per week [1]203.97$ 263 Extra pick-up, 96 Gallon Cart (per occurance)[1]17.07$ Commercial 96 Gallon Cart - Recycling and Organics Included 264 One pick-up per week [1]75.99$ 265 Two pick-ups per week [1]134.33$ 266 Three pick-ups per week [1]192.60$ 267 Four pick-up per week [1]248.72$ 268 Five pick-ups per week [1]305.08$ 269 Six pick-ups per week [1]361.39$ 270 Multi-Family: Set of Solid Waste, Recycling, and Organics (per unit)[1]16.56$ Commercial Solid Waste Yard Bins 271 1-yard bin - one pick-up per week [1]95.48$ 272 1-yard bin - two pick-ups per week [1]162.18$ 273 1-yard bin - three pick-ups per week [1]229.13$ 274 1-yard bin - four pick-ups per week [1]295.87$ 275 1-yard bin - five pick-ups per week [1]362.93$ 276 1-yard bin - six pick-ups per week [1]429.91$ 277 1-yard bin - extra pick-up (per occurance)[1]45.93$ 278 2-yard bin - one pick-up per week [1]129.71$ 279 2-yard bin - two pick-ups per week [1]228.27$ 280 2-yard bin - three pick-ups per week [1]326.87$ 281 2-yard bin - four pick-ups per week [1]425.31$ 282 2-yard bin - five pick-ups per week [1]523.95$ 283 2-yard bin - six pick-ups per week [1]622.54$ 284 2-yard bin - extra pick-up (per occurance)[1]62.38$ 285 3-yard bin - one pick-up per week [1]176.19$ 286 3-yard bin - two pick-ups per week [1]321.27$ 17June 16, 2026 Item #6 Page 318 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 287 3-yard bin - three pick-ups per week [1]466.31$ 288 3-yard bin - four pick-ups per week [1]622.54$ 289 3-yard bin - five pick-ups per week [1]756.41$ 290 3-yard bin - six pick-ups per week [1]901.50$ 291 3-yard bin - extra pick-up (per occurance)[1]83.72$ 292 4-yard bin - one pick-up per week [1]234.98$ 293 4-yard bin - two pick-ups per week [1]438.80$ 294 4-yard bin - three pick-ups per week [1]642.70$ 295 4-yard bin - four pick-ups per week [1]846.53$ 296 4-yard bin - five pick-ups per week [1]1,050.36$ 297 4-yard bin - six pick-ups per week [1]1,254.22$ 298 4-yard bin - extra pick-up (per occurance)[1]100.16$ 299 5-yard bin - one pick-up per week [1]293.78$ 300 5-yard bin - two pick-ups per week [1]556.46$ 301 5-yard bin - three pick-ups per week [1]819.07$ 302 5-yard bin - four pick-ups per week [1]1,050.36$ 303 5-yard bin - five pick-ups per week [1]1,344.38$ 304 5-yard bin - six pick-ups per week [1]1,607.05$ 305 5-yard bin - extra pick-up (per occurance)[1]116.57$ 306 6-yard bin - one pick-up per week [1]321.27$ 307 6-yard bin - two pick-ups per week [1]622.54$ 308 6-yard bin - three pick-ups per week [1]901.50$ 309 6-yard bin - four pick-ups per week [1]1,254.22$ 310 6-yard bin - five pick-ups per week [1]1,607.05$ 311 6-yard bin - six pick-ups per week [1]2,059.12$ 312 6-yard bin - extra pick-up (per occurance)[1]145.72$ Commercial Split Bins (includes 2 locks )[1] 313 One pick-up per week [1]142.29$ 314 Two pick-ups per week [1]259.70$ 315 Three pick-ups per week [1]377.08$ 316 Four pick-ups per week [1]494.47$ 317 Five pick-ups per week [1]611.85$ 318 Six pick-ups per week [1]729.26$ Commercial Bin Compactor - Solid Waste 319 3-yard bin - one pick-up per week [1]246.99$ 320 3-yard bin - two pick-ups per week [1]462.52$ 321 3-yard bin - three pick-ups per week [1]678.06$ 322 3-yard bin - four pick-ups per week [1]893.57$ 323 3-yard bin - five pick-ups per week [1]1,109.10$ 324 3-yard bin - six picks-up per week [1]1,324.68$ 325 3-yard bin - extra pick-up (per occurance)[1]100.45$ 326 4-yard bin - one pick-up per week [1]407.88$ 327 4-yard bin - two pick-ups per week [1]781.48$ 328 4-yard bin - three pick-ups per week [1]1,155.66$ 329 4-yard bin - four pick-ups per week [1]1,529.75$ 18June 16, 2026 Item #6 Page 319 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 330 4-yard bin - five pick-ups per week [1]1,903.97$ 331 4-yard bin - six picks-up per week [1]2,278.26$ 332 4-yard bin - extra pick-up [1]165.88$ 333 6-yard bin - one pick-up per week [1]637.58$ 334 6-yard bin - two pick-ups per week [1]1,256.70$ 335 6-yard bin - three pick-ups per week [1]1,876.96$ 336 6-yard bin - four pick-ups per week [1]2,497.84$ 337 6-yard bin - five pick-ups per week [1]3,119.00$ 338 6-yard bin - six picks-up per week [1]3,740.30$ 339 6-yard bin - extra pick-up (per occurance)[1]259.27$ Commercial Recycling 340 32 gal cart - one pick-up per week [1]26.48$ 341 32 gal cart - two pick-ups per week [1]52.99$ 342 32 gal cart - three pick-ups per week [1]79.49$ 343 32 gal cart - four pick-ups per week [1]102.63$ 344 32 gal cart - five pick-ups per week [1]125.89$ 345 32 gal cart - six pick-ups per week [1]149.13$ 346 64 or 96 gal cart - one pick-up per week [1]28.99$ 347 64 or 96 gal cart - two pick-ups per week [1]57.98$ 348 64 or 96 gal cart - three pick-ups per week [1]86.96$ 349 64 or 96 gal cart - four pick-ups per week [1]112.31$ 350 64 or 96 gal cart - five pick-ups per week [1]137.76$ 351 64 or 96 gal cart - six pick-ups per week [1]163.17$ 352 64 or 96 gal cart - extra pick-up (per occurance)[1]13.66$ 353 1-yard bin - one pick-up per week [1]76.38$ 354 1-yard bin - two pick-ups per week [1]129.74$ 355 1-yard bin - three pick-ups per week [1]183.30$ 356 1-yard bin - four pick-ups per week [1]236.68$ 357 1-yard bin - five pick-ups per week [1]290.35$ 358 1-yard bin - six pick-ups per week [1]343.93$ 359 1-yard bin - extra pick-up (per occurance)[1]36.73$ 360 2-yard bin - one pick-up per week [1]103.77$ 361 2-yard bin - two pick-ups per week [1]182.60$ 362 2-yard bin - three pick-ups per week [1]261.49$ 363 2-yard bin - four pick-ups per week [1]340.24$ 364 2-yard bin - five pick-ups per week [1]419.16$ 365 2-yard bin - six pick-ups per week [1]498.04$ 366 2-yard bin - extra pick-up (per occurance)[1]49.90$ 367 3-yard bin - one pick-up per week [1]140.96$ 368 3-yard bin - two pick-ups per week [1]257.03$ 369 3-yard bin - three pick-ups per week [1]373.06$ 370 3-yard bin - four pick-ups per week [1]498.04$ 371 3-yard bin - five pick-ups per week [1]605.13$ 372 3-yard bin - six pick-ups per week [1]721.20$ 373 3-yard bin - seven pick-ups per week [1]840.39$ 19June 16, 2026 Item #6 Page 320 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 374 3-yard bin - extra pick-up (per occurance)[1]66.97$ 375 4-yard bin - one pick-up per week [1]187.96$ 376 4-yard bin - two pick-ups per week [1]351.03$ 377 4-yard bin - three pick-ups per week [1]514.16$ 378 4-yard bin - four pick-ups per week [1]677.21$ 379 4-yard bin - five pick-ups per week [1]840.29$ 380 4-yard bin - six pick-ups per week [1]1,003.37$ 381 4-yard bin - seven pick-ups per week [1]1,166.62$ 382 4-yard bin - extra pick-up (per occurance)[1]80.13$ 383 5-yard bin - one pick-up per week [1]235.02$ 384 5-yard bin - two pick-ups per week [1]445.16$ 385 5-yard bin - three pick-ups per week [1]655.26$ 386 5-yard bin - four pick-ups per week [1]840.29$ 387 5-yard bin - five pick-ups per week [1]1,075.50$ 388 5-yard bin - six pick-ups per week [1]1,285.65$ 389 5-yard bin - extra pick-up (per occurance)[1]93.26$ 390 6-yard bin - one pick-up per week [1]257.03$ 391 6-yard bin - two pick-ups per week [1]498.04$ 392 6-yard bin - three pick-ups per week [1]721.20$ 393 6-yard bin - four pick-ups per week [1]1,003.37$ 394 6-yard bin - five pick-ups per week [1]1,285.65$ 395 6-yard bin - six pick-ups per week [1]1,647.30$ 396 6-yard bin - extra pick-up (per occurance)[1]116.59$ Commercial Bin Compactor - Recycling 397 3-yard bin - one pick-up per week [1]197.60$ 398 3-yard bin - two pick-ups per week [1]370.03$ 399 3-yard bin - three pick-ups per week [1]542.44$ 400 3-yard bin - four pick-ups per week [1]714.85$ 401 3-yard bin - five pick-ups per week [1]887.28$ 402 3-yard bin - six picks-up per week [1]1,059.74$ 403 3-yard bin - extra pick-up (per occurance)[1]80.36$ 404 4-yard bin - one pick-up per week [1]326.30$ 405 4-yard bin - two pick-ups per week [1]625.19$ 406 4-yard bin - three pick-ups per week [1]924.52$ 407 4-yard bin - four pick-ups per week [1]1,223.79$ 408 4-yard bin - five pick-ups per week [1]1,523.18$ 409 4-yard bin - six picks-up per week [1]1,822.61$ 410 4-yard bin - extra pick-up (per occurance)[1]132.69$ 411 6-yard bin - one pick-up per week [1]510.07$ 412 6-yard bin - two pick-ups per week [1]1,005.37$ 413 6-yard bin - three pick-ups per week [1]1,501.55$ 414 6-yard bin - four pick-ups per week [1]1,998.27$ 415 6-yard bin - five pick-ups per week [1]2,495.21$ 416 6-yard bin - six picks-up per week [1]2,992.25$ 417 6-yard bin - extra pick-up (per occurance)[1]207.42$ 20June 16, 2026 Item #6 Page 321 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Commercial Organics Recycling 418 32 gal cart - one pick-up per week [1]26.48$ 419 32 gal cart - two pick-ups per week [1]52.99$ 420 32 gal cart - three pick-ups per week [1]79.49$ 421 32 gal cart - four pick-ups per week [1]102.63$ 422 32 gal cart - five pick-ups per week [1]125.89$ 423 32 gal cart - six pick-ups per week [1]149.13$ 424 64 or 96 gal cart - one pick-up per week [1]28.99$ 425 64 or 96 gal cart - two pick-ups per week [1]57.98$ 426 64 or 96 gal cart - three pick-ups per week [1]86.96$ 427 64 or 96 gal cart - four pick-ups per week [1]112.31$ 428 64 or 96 gal cart - five pick-ups per week [1]137.76$ 429 64 or 96 gal cart - six pick-ups per week [1]163.17$ 430 64 or 96 gal cart - extra pick-up (per occurance)[1]13.66$ 431 1-yard bin - one pick-up per week [1]76.38$ 432 1-yard bin - two pick-ups per week [1]129.74$ 433 1-yard bin - three pick-ups per week [1]183.30$ 434 1-yard bin - four pick-ups per week [1]236.68$ 435 1-yard bin - five pick-ups per week [1]290.35$ 436 1-yard bin - six pick-ups per week [1]343.93$ 437 1-yard bin - extra pick-up (per occurance)[1]36.73$ 438 1.5-yard bin - one pick-up per week [1]90.08$ 439 1.5-yard bin - two pick-ups per week [1]156.18$ 440 1.5-yard bin - three pick-ups per week [1]222.40$ 441 1.5-yard bin - four pick-ups per week [1]288.46$ 442 1.5-yard bin - five pick-ups per week [1]354.76$ 443 1.5-yard bin - six pick-ups per week [1]420.98$ 444 1.5-yard bin - extra pick-up (per occurance)[1]43.32$ 445 2-yard bin - one pick-up per week [1]103.77$ 446 2-yard bin - two pick-ups per week [1]182.60$ 447 2-yard bin - three pick-ups per week [1]261.49$ 448 2-yard bin - four pick-ups per week [1]340.24$ 449 2-yard bin - five pick-ups per week [1]419.16$ 450 2-yard bin - six pick-ups per week [1]498.04$ 451 2-yard bin - extra pick-up (per occurance)[1]49.90$ 452 3-yard bin - one pick-up per week [1]140.96$ 453 3-yard bin - two pick-ups per week [1]257.03$ 454 3-yard bin - three pick-ups per week [1]373.06$ 455 3-yard bin - four pick-ups per week [1]498.04$ 456 3-yard bin - five pick-ups per week [1]605.13$ 457 3-yard bin - six pick-ups per week [1]721.20$ 458 3-yard bin - extra pick-up (per occurance)[1]66.97$ 459 4-yard bin - one pick-up per week [1]187.96$ 460 4-yard bin - two pick-ups per week [1]351.03$ 21June 16, 2026 Item #6 Page 322 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 461 4-yard bin - three pick-ups per week [1]514.16$ 462 4-yard bin - four pick-ups per week [1]677.21$ 463 4-yard bin - five pick-ups per week [1]840.29$ 464 4-yard bin - six pick-ups per week [1]1,003.37$ 465 4-yard bin - extra pick-up (per occurance)[1]80.13$ Commercial Bin Compactor - Organics Recycling 466 3-yard bin - one pick-up per week [1]197.60$ 467 3-yard bin - two pick-ups per week [1]370.03$ 468 3-yard bin - three pick-ups per week [1]542.44$ 469 3-yard bin - four pick-ups per week [1]714.85$ 470 3-yard bin - five pick-ups per week [1]887.28$ 471 3-yard bin - six picks-up per week [1]1,059.74$ 472 3-yard bin - extra pick-up (per occurance)[1]80.36$ 473 4-yard bin - one pick-up per week [1]326.30$ 474 4-yard bin - two pick-ups per week [1]625.19$ 475 4-yard bin - three pick-ups per week [1]924.52$ 476 4-yard bin - four pick-ups per week [1]1,223.79$ 477 4-yard bin - five pick-ups per week [1]1,523.18$ 478 4-yard bin - six picks-up per week [1]1,822.61$ 479 4-yard bin - extra pick-up (per occurance)[1]132.69$ 480 6-yard bin - one pick-up per week [1]510.07$ 481 6-yard bin - two pick-ups per week [1]1,005.37$ 482 6-yard bin - three pick-ups per week [1]1,501.55$ 483 6-yard bin - four pick-ups per week [1]1,998.27$ 484 6-yard bin - five pick-ups per week [1]2,495.21$ 485 6-yard bin - six picks-up per week [1]2,992.25$ 486 6-yard bin - extra pick-up (per occurance)[1]207.42$ Special Haul Bin Rate 487 3-yard bin - one pick-up per week [1]215.40$ 488 3-yard bin - two pick-ups per week [1]336.63$ 489 3-yard bin - three pick-ups per week [1]457.86$ 490 3-yard bin - four pick-ups per week [1]579.09$ 491 3-yard bin - five pick-ups per week [1]700.34$ 492 3-yard bin - six pick-ups per week [1]821.57$ 493 3-yard bin - extra pick-up [1]70.33$ Construction and Demolition Recycling 494 Special Haul Bin (no Storm Water Fees) 1 week or less [1]152.12$ 495 2-yard temporary C&D Recycling Bin [1]177.37$ 496 3-yard temporary C&D Recycling Bin [1]180.27$ 497 4-yard temporary C&D Recycling Bin [1]195.92$ 498 6-yard temporary C&D Recycling Bin [1]202.40$ 22June 16, 2026 Item #6 Page 323 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Other Fees and Charges 499 Bin Exchange [1]98.45$ 500 Bin Lock Set Up Fee [1]61.52$ 501 Locking Fee [1]23.39$ 502 Overloaded Bins [1]84.76$ 503 [1]169.44$ 504 Bin Relocation (first 25 feet free)11.69$ 505 Special haul bin delivery [1]67.85$ 506 [1]531.13$ 507 [1]109.16$ 508 Copy Fee - The charge for copies requested by customers [1]2.32$ 509 Delivery of extra cart [1]19.01$ 510 [1]5.85$ Pull out rate for carts (For MFD / Commercial)[1]45.72$ Pull out rate for front load bins (more than 25 ft)[1]79.73$ 511 Bulky Item - Exceeding 5 per pick up - First item [1]69.11$ 512 Bulky Item - Exceeding 5 per pick up - each addl item [1]17.71$ 513 Per Bulky Item - first item [1]69.11$ 514 Per Bulky Item - each additional item [1]17.71$ 515 Bulky Item requiring 2 people to handle [1]99.25$ 516 Contamination Fee - to recover costs for separating solid waste placed in a recycling or green waste container or for arranging a special, unscheduled collection due to contamination. [1]88.12$ 517 Scout service per bin per service [1]79.73$ 518 Residential Return to Service Fee - The return to service fee for two or more calls in a one-month period by a residential customer [1]55.51$ 519 [1]33.30$ Roll off Service 520 Service Fee - Roll off service [1]361.59$ 521 Disposal Fee per Ton (pass through)[1]63.15$ 522 Recycling Processing Fee per Ton (pass through)[1]41.70$ 523 Organics Processing Fee per Ton (pass through)[1]90.57$ 524 C&D Processing Fee per Ton (pass through)[1]85.23$ 525 Contaminated Load (per occurrence)[1]361.59$ 526 Roll off - Demurrage Per Day Charge [1]7.70$ Single and Multi-Family Resident Bulky Item Pick-Ups - 5 items maximum per pick up Commercial Bulky Item Pick-Ups 23June 16, 2026 Item #6 Page 324 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 527 Delivery [1]93.05$ 528 Delivery Demo (includes signage) [1]98.38$ 529 Relocation Charge onsite [1]72.71$ 530 Relocation Charge offsite [1]103.71$ 531 Wash Out Receiver Boxes [1]83.17$ 532 Dead Run charge [1]124.67$ 533 Standby charge per minute, after 5 minutes [1]3.30$ [Notes] [1] Set per contract by Republic Services. These rates are effective July 1, 2026. 24June 16, 2026 Item #6 Page 325 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 534 Discontinuation of Service - Non-Payment (Shut-off)each [2]92$ 540 Service Reconnection for Non-Payment (Next Day) Business Hours (Next Scheduled Day Turn-On)each [2],[3]115$ 535 Service Reconnection (Non-Payment) - Same Day / Non-Business hours (After Hours Turn-On)each [2],[3]290$ 538 Door Hanger Notice for Nonpayment each [2]53$ 537 Electronic Notice (in lieu of door hanger)each [2]3$ 541 New Account Service Connection - (Same Day) Business Hours (Same Day Turn-On)each [2]194$ 539 New Account Set Up (Admin)each [2]48$ 536 Continuity of Service each [2]12$ Water Services Fees 542 Utility Standards and Specifications each [1],[2] Actual Cost 543 Potable Water Meter - Construction Meter Deposit deposit [1],[2]1,300$ 544 Potable Water Meter - Construction Meter Installation each [2]544$ 545 Potable Water Meter - Construction Meter Relocation each [2]272$ 546 Annual Potable Backflow Preventer Certification - 1st Notice [1],[2]3$ 547 Annual Potable Backflow Preventer Certification - 2nd Notice per month [1],[2]25$ 548 Annual Potable Backflow Preventer Certification - 3rd Notice per month [1],[2]59$ 549 Potable Water Shutdown (8 hours)each [1],[2]2,722$ Potable Water Shutdown (in excess of 8 hours) 0 - 2 hours each [1],[2]544$ Over 2 hours each [1],[2]1,633$ Recycled Water Fees 550 Cross-Connection Inspection - County Department of Environmental Health (CDEH) each [2] Actual Cost 551 Cross-Connection Reinspection each [2] Actual Cost 552 Recycled Water Meter - Construction Meter Deposit deposit [1],[2]1,300$ 553 Recycled Water Meter - Construction Meter Installation each [2]544$ 554 Recycled Water Meter - Construction Meter Relocation each [2]272$ 555 Recycled Water Shutdown (8 hours)each [2]2,722$ Recycled Water Shutdown (in excess of 8 hours) 0 - 2 hours each [1],[2]544$ Over 2 hours each [1],[2]1,633$ Wastewater Fees 556 Fats, Oils, and Grease (FOG) Fee [2]175$ 557 Temporary Discharge to Sewer (city processing fee, plus actual cost) per permit [6]545$ 25June 16, 2026 Item #6 Page 326 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Third Party Hydraulic Modelling Fees 558 Third Party Hydraulic Modeling - Consultant Cost (All Water Systems) per project [1],[4] Actual Cost Processing Fees - Wastewater 559 1-4 units residential and commercial < 9,400 s.f.per project [2],[5]816$ 560 All others per project [2],[5]1,089$ Processing Fees - Potable Water 561 System Pressure Check each [2]544$ 562 1-4 units residential and commercial < 9,400 s.f.per project [2],[5]816$ 563 All others per project [2],[5]1,089$ Processing Fees - Recycled Water 564 System Pressure Check each [2]544$ 565 1-4 units residential and commercial < 9,400 s.f.per project [2],[5]816$ 566 All others per project [2],[5]1,089$ Utilities Department Fees 567 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time per hour [2]279$ [Notes] [1] Set per City policy [2]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Set per CA Health and Safety Code 116914(a)(1) [4] Total fee will reflect actual consultant billings [5] Staff cost is in addition to actual consultant billings [6]city processing fee. [7] Additional Penalties may apply 26June 16, 2026 Item #6 Page 327 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Utility Meter Installation Fees Potable Water (meter size, inches) 568 5/8" Ultrasonic per [1]480$ 569 Fire Protection – 5/8" Ultrasonic per [1]480$ 570 3/4” Ultrasonic per [1]476$ 571 1” Ultrasonic per [1]608$ 572 1-1/2” Ultrasonic per [1]740$ 573 1-1/2” Turbo per [1]898$ 574 2” Ultrasonic per [1]1,051$ 575 2” Turbo per [1]1,106$ 576 3" Ultrasonic per [1] Actual Cost 577 4" Ultrasonic per [1] Actual Cost 578 6” Ultrasonic per [1] Actual Cost 579 8” Ultrasonic per [1] Actual Cost 580 10” Ultrasonic per [1] Actual Cost 581 12” Ultrasonic per [1] Actual Cost Recycled Water (meter size, inches) 582 5/8" Ultrasonic per [1]480$ 583 Fire Protection – 5/8" Ultrasonic per [1]480$ 584 3/4” Ultrasonic per [1]476$ 585 1” Ultrasonic per [1]608$ 586 1-1/2” Turbo per [1]898$ 587 2” Turbo per [1]1,106$ 588 3" Ultrasonic per [1] Actual Cost 589 4" Ultrasonic per [1] Actual Cost 590 6” Ultrasonic per [1] Actual Cost 591 8” Ultrasonic per [1] Actual Cost 592 10” Ultrasonic per [1] Actual Cost 593 12” Ultrasonic per [1] Actual Cost residential water meter is required to be 1” due to a fire sprinkler requirement, the Connection Fee, SDCWA System Capacity Charge and the Water Treatment Capacity Charge will be based on the size of the meter necessary to meet the water use requirements, not the actual meter size of 1”. These fees are in addition to the 27June 16, 2026 Item #6 Page 328 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Utility Potable and Recycled Water Connection Fees (meter size, inches) Ultrasonic 594 5/8” each [1]5,865$ 595 3/4”each [1]8,361$ 596 1”each [1]13,197$ 597 1-1/2”each [1]24,928$ 598 2”each [1]37,541$ 599 3”each [1]63,512$ 600 4”each [1]98,797$ 601 6”each [1]183,479$ 602 8”each [1]216,858$ Turbo (All Irrigation Meters) 603 1-1/2”each [1]29,265$ 604 2”each [1]46,923$ 605 3”each [1]98,797$ 606 4”each [1]282,277$ 607 6”each [1]564,541$ 608 8”each [1]790,630$ [Notes] [1] Set per City policy These fees are in addition to the Meter Installation Fees and SDCWA Fees. 28June 16, 2026 Item #6 Page 329 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit San Diego County Water Authority (SDCWA) Fees SDCWA System Capacity Charge (meter size, inches) 609 Fire Protection per [1] 610 5/8" Displacement per [1]6,501$ 611 3/4” Displacement per [1]6,501$ 612 1” Displacement per [1]10,402$ 613 1-1/2” Displacement per [1]19,503$ 614 1-1/2” Turbo per [1]19,503$ 615 2” Displacement per [1]33,805$ 616 2” Turbo per [1]33,805$ 617 3” per [1]62,410$ 618 4” per [1]106,616$ 619 6”per [1]195,030$ 620 8”per [1]338,052$ 621 10”per [1]507,078$ 622 12”per [1]858,132$ Water Treatment Capacity Charge (meter size, inches) 623 Fire Protection per [1] 624 5/8" Displacement per [1]182$ 625 3/4” Displacement per [1]182$ 626 1” Displacement per [1]291$ 627 1-1/2” Displacement per [1]546$ 628 1-1/2” Turbo per [1]546$ 629 2” Displacement per [1]946$ 630 2” Turbo per [1]946$ 631 3” per [1]1,747$ 632 4” per [1]2,985$ 633 6”per [1]5,460$ 634 8”per [1]9,464$ 635 10”per [1]14,196$ 636 12”per [1]24,024$ [Notes] [1] The following language is based on Carlsbad Municipal Water District Ordinance 45: Where a single family residential water meter is required to be 1” due to a fire sprinkler requirement, the Connection Fee, SDCWA System Capacity Charge and the Water Treatment Capacity Charge will be based on the size of the meter necessary to meet the water use requirements, not the actual meter size of 1”. These fees are set by San Diego County Water Authority, effective January 1, 2026, and are in addition to the Meter Installation Fees and Potable and Reclaimed Connection Fees. 29June 16, 2026 Item #6 Page 330 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Section 2 Development Related Service Fees June 16, 2026 Item #6 Page 331 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Planning Department Fees 638 Amendments and Revisions to Approved Projects flat [1] 50% of current a lication fee 639 Appeals to Planning Commision/City Council [2] 1,440$ Building Plan Review 640 Minor Projects, per permit each [3]122$ 641 Major Projects, per permit each [4]363$ 642 City Planner Determination each [1]1,305$ Coastal Development Permit (CDP) 643 2 - 4 unit or lot subdivision / multifamily project per permit [2]8,304$ 644 5 or more units or lot subdivision / multifamily project per permit [2]14,996$ 645 Emergency flat [2]3,035$ 646 Exemption flat [2]401$ 647 Minor Permit flat [2]3,974$ 648 Non-Residential flat [2]4,162$ 649 Single Family Home flat [2]5,639$ 650 Single Family Home w/bluff per permit [2]8,757$ Conditional Use Permit (CUP) 651 Within Biological Habitat Preserve flat [2]3,594$ 652 Minor flat [2]3,817$ 653 Regular flat [2]12,416$ 654 Daycare Permit (7 - 14 Children)flat [2]581$ Environmental Impact Assessment (EIA) 655 Initial Study - NEGATIVE DECLARATION flat [2]3,406$ 656 Initial Study - MITIGATED NEG DEC flat [2]8,066$ 657 Initial Study - checklist for streamlining or within the scope determinations 15152 - 15168 and 15183 flat [2]2,870$ 658 Initial Study - addendum for MNDs or NDs flat [2]3,714$ Environmental Impact Report (EIR) Addendum 659 First 20 hours of project planner base fee flat [2]5,393$ 660 >20 hours of project planner per hour [2]137$ Focused/Supplemental (requiring a public hearing) 661 First 120 hours of project planner and 20 hours of project en ineer base fee flat [2]22,081$ 662 >120 project planner hours and >20 project engineer hours per hour [2]315$ 31June 16, 2026 Item #6 Page 332 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit FULL EIR 663 First 180 hours of project planner and 40 hours of project en ineer base fee flat [2]34,053$ 664 >180 project planner hours and >40 project engineer hours per hour [2]315$ Fish & Game Fee 665 Environmental Impact Report (EIR)flat [5]4,278$ 666 Environmental Document pursuant to a Certified Regulatory Pro ram CRP flat [5]1,487$ 667 Negative Declaration (ND)/Mitigated Negative Declaration MND flat [5]3,094$ 668 Extensions to projects in process flat [1] 25% of current fee 669 General Plan Amendment Base Fee First 200 hours of project planner and 60 hours of project en ineer base fee flat [2]20,394$ >200 project planner hours and >60 project engineer hours per hour 374$ Habitat Management Plan (HMP) 670 Amendment to Plan Document - Major - first 60 hours of ro ect lanner base fee flat [2]10,160$ 671 >60 hours of project planner per hour [2]137$ 672 Amendment to Plan Document - Minor flat [2]5,667$ 673 Permit - Major -first 40 hours of project planner base fee flat [2]7,401$ 674 >40 hours or project planner per hour [2]137$ 675 Permit - Minor - first 20 hours of project planner base fee flat [2]1,523$ 676 >20 hours of project planner per hour [2]137$ 677 Permit - MINOR W/MINISTERIAL PERMIT flat [2]942$ 678 Hillside Development Permit - Major - first 40 hours of project lanner base fee flat [2]8,356$ 679 Hillside Development Permit - Minor - first 20 hours of project lanner base fee flat [2]2,808$ Historic Preservation Permit 680 Local Register Application each [2],[7]No Fee 681 Mills Act Application each [2],[7]No Fee 682 Concurrent Local Register and Mills Act Applications each [2],[7]No Fee 683 Third Party Technical Report Review - Contractor Cost each [2],[7]No Fee 684 Mills Act Inspections each [2],[7]No Fee Landscape Plan Check/Inspection Fees 687 City Processing Fee per project [2]490$ 688 Contractor Cost per project [1] Actual Cost 32June 16, 2026 Item #6 Page 333 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 689 Local Coastal Plan - Amendment Base Fee First 200 hours of project planner and 60 hours of project en ineer base fee flat [2]14,648$ >200 project planner hours and >60 project engineer hours per hour [2]374$ 691 Local Facilities Management Plan/Amendment Amendment to Plan Document - Major - first 60 hours of ro ect lanner base fee flat [1]10,432$ >60 hours of project planner per hour 137$ Master Plan 692 Master Plan - New 693 First 200 hours of project planner and 100 hours of project en ineer base fee flat [2]46,910$ 694 >200 project planner hours and >100 project engineer hours per hour [2]401$ Major Amendment 695 First 100 hours of project planner and 40 hours of project en ineer base fee flat [2]22,890$ 696 >100 project planner hours and >40 project engineer hours per hour [2]374$ Minor Amendment 697 First 30 hours of project planner and 7 hours of project en ineer base fee flat [2]4,763$ 698 >30 project planner hours and >7 project engineer hours per hour [2]374$ 699 Non-Conforming Construction Permit flat [2]1,306$ 700 Notice Fee (+ postage)flat [1] Actual Cost 701 Substantial Conformance Review [2]1,187$ 702 Planned Development (residential/non-residential) - 5 or more lots/units - Ma or Subdivision per project [2] 18,649$ 703 Planned Development (residential/non-residential) - 4 or fewer lots/units per project [2]9,593$ 704 Planning Commission Agenda and Minutes (+ postage)per page [1] Copy Charge 705 Planning Commission Determination-other flat [2]2,812$ 706 Postage (All)flat [1] Current Postage Rate x Number of labels 707 Precise Development Plan flat [2]18,535$ 708 Preliminary Plan Review - Major (Other)flat [2]1,380$ 709 Preliminary Plan Review - Minor (SFD)flat [2]471$ Preliminary Plan Review - SB330 flat [2]242$ 710 Re-Recording or Cancellation of an Instrument on Real Property cit rocessin fee, lus actual cost each [1]286$ 33June 16, 2026 Item #6 Page 334 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Reversion to Acreage (Consistent with city payroll records charged a ainst a $3,100 de osit 711 First 25 hours of project planner and 20 hours of project en ineer base fee flat [2]7,801$ 712 Satellite Antenna Permit flat [2]714$ Sign Program 714 Sign Permit (including non-commercial)flat [2]100$ 715 Sign Program flat [2]2,018$ 716 Modified Minor Sign Program flat [2]1,386$ 717 Modified Regular Sign Program flat [2]3,312$ Site Development Plan 719 Minor - Residential, less than or equal to 4 units/lots or as re uired er CMC/PLAN flat [2] 7,569$ 720 Major - 5 or more units/lots or as required per CMC/PLAN flat [2]23,164$ 721 Special Use Permit - Other flat [2]7,467$ Special Use Permit - Open Space Encroachment flat [2]1,057$ Special Use Permit - Floodplain flat [2]6,749$ Specific Plan Base Fee 723 First 200 hours of project planner and 60 hours of project en ineer base fee flat [2]44,642$ 724 >200 project planner hours and >60 project engineer hours per hour [2]374$ Amendment - Major 725 First 180 hours of project planner and 30 hours of project en ineer base fee flat [2]34,644$ 726 >180 project planner hours and >30 project engineer hours per hour [2]374$ Amendment - Minor 727 First 20 hours of project planner and 7 hours of project en ineer base fee flat [2]5,222$ 728 >20 project planner hours and >7 project engineer hours per hour [2]374$ 729 Street Name Change flat [2]2,589$ Tentative Maps 730 Tentative Parcel Map - Minor Subdivision - 0- 4 Lots/Units flat [2]9,652$ 731 Tentative Tract Map - 5 - 49 units/lots flat [2]15,230$ 732 Tentative Tract Map - 50 + units/lots flat [2]21,675$ 733 Tentative Tract Map Litigation Stay flat [1] 25% of current fee Third Party Review 734 Processing Fee per project [2]1,222$ 735 Consultant Cost per project [1] Actual Cost 736 Variance flat [2]5,980$ 34June 16, 2026 Item #6 Page 335 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 737 Variance - Minor flat [2] 2,144$ 742 Wireless Communication Third Party Review flat [1] Actual Cost Zone Change Base Fee First 200 hours of project planner and 60 hours of project en ineer base fee flat [2]15,161$ 743 >200 project planner hours and >60 project engineer hours per hour [2]374$ 744 Zone Code Compliance Letter flat [2]219$ 745 Research Fee per hour [2]202$ 746 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]202$ TOTAL [Notes] [1] Set per City policy [2]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Minor: residential new/remodel, commercial/ industrial tenant improvement [4] Major: Commercial/ industrial new [5] Set by Department of Fish and Wildlife. Fish & Game fees are additional to the EIA/EIR fees. Includes $50.00 County Clerk processing fee. Updated with new fees effective Jan. 1, 2026. [6] When multiple entitlement and/or permits occur within the same project that require combined legislative actions, a combination project discount applies. The highest fee will be charged at 100%, followed by a 50% discount on each concurrent entitlement and/or permit application [7]Historic Preservation Permit fees are temporarily waived, pursuant to Resolution No. 2025-122, adopted by City Council on June 10, 2025. 35June 16, 2026 Item #6 Page 336 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Appeal Fee each [2]2,061$ 747 Adjustment Plat per project [2]2,156$ Building Plan Review 748 Minor Projects, per permit each [3]393$ 749 Major Projects, per permit each [4]850$ Certificate 750 Certificate of Compliance each [2]2,036$ 751 Certificate of Compliance In Lieu of Parcel Map each [2]4,324$ 752 Certificate of Correction each [2]1,388$ Construction Change Review - Major 753 Base Fee per project [2]1,254$ 754 Plus fee per sheet per sheet [2]564$ Construction Change Review - Minor 755 Base Fee per project [2]792$ 756 Plus fee per sheet per sheet [2]456$ 757 deposit [13]2,039$ 758 Easement Document Processing and Recording per project [2]2,080$ 759 Encroachment Agreement Processing per project [2]972$ 760 deposit [1]Actual Cost Grading Plan Check Fees (cubic yard) 761 100 2,627$ 762 101 3,471$ 763 234$ 764 1,001 5,579$ 765 303$ 766 10,001 8,305$ 767 268$ 768 100,001 10,713$ 769 417$ 770 200,001 14,881$ 771 1,214$ 772 400,001 17,308$ 36June 16, 2026 Item #6 Page 337 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 773 844$ 774 1,000,001 base fee at 1,000,001 CY [2], [5], [6], [8]22,370$ 775 2,237$ Grading Permit Inspection Fees (cubic yard) 776 100 5,184$ 777 101 5,189$ 778 191$ 779 1,001 6,909$ 780 300$ 781 10,001 base fee at 10,001 CY [2], [5], [6], [8]9,607$ 782 439$ 783 100,001 13,559$ 784 215$ 785 200,001 15,711$ 786 294$ 787 400,001 21,593$ 788 2,126$ 789 1,000,001 34,348$ 790 3,435$ Improvement Plan Review Fee 791 $ 20,000 [2], [8]3,955$ 792 $ 20,001 [2], [8]5,196$ 793 [2], [8]657$ 794 $ 50,001 [2], [8]7,167$ 795 [2], [8]586$ 37June 16, 2026 Item #6 Page 338 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 796 $ 100,001 [2], [8]10,096$ 797 [2], [8]539$ 798 $ 250,001 [2], [8]18,183$ 799 [2], [8]278$ 800 $ 500,001 [2], [8]25,128$ 801 [2], [8]129$ 802 $ 1,000,001 [2], [8]31,554$ 803 [2], [8]316$ Improvement Inspection 804 $ 20,000 [2], [8]2,803$ 805 $ 20,001 [2], [8]3,866$ 806 [2], [8]652$ 807 $ 50,001 [2], [8]5,823$ 808 [2], [8]303$ 809 $ 100,001 [2], [8]7,339$ 810 [2], [8]237$ 811 $ 250,001 [2], [8]10,887$ 812 [2], [8]283$ 813 $ 500,001 [2], [8]17,964$ 814 [2], [8]135$ 815 $ 1,000,001 [2], [8]24,712$ 816 [2], [8]247$ $ 20,000 [2], [8]3,826$ $ 20,001 [2], [8]4,411$ [2], [8]524$ 38June 16, 2026 Item #6 Page 339 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit $ 50,001 [2], [8]5,982$ [2], [8]351$ $ 100,001 [2], [8]7,736$ [2], [8]253$ $ 250,001 [2], [8]11,529$ [2], [8]185$ $ 500,001 [2], [8]16,157$ [2], [8]80$ $ 1,000,001 [2], [8]20,168$ [2], [8]202$ $ 20,000 [2], [8]2,349$ $ 20,001 [2], [8]3,715$ [2], [8]387$ $ 50,001 [2], [8]4,876$ [2], [8]174$ $ 100,001 [2], [8]5,745$ [2], [8]190$ $ 250,001 [2], [8]8,590$ [2], [8]156$ $ 500,001 [2], [8]12,501$ [2], [8]51$ $ 1,000,001 [2], [8]15,040$ [2], [8]150$ 39June 16, 2026 Item #6 Page 340 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Mapping Fees Final Tract Map - Major Subdivision 817 Base Fee per map [2]12,023.00$ 818 Per acre fee (calculated with actual acreage)per acre [2]193.00$ 819 Parcel Map - Minor Subdivision per map [2]6,138.00$ 820 Neighborhood Improvement Agreements each [2]353.00$ 821 Oversize Load Permit - 1 trip per trip [7]16.00$ 822 Oversize Load Permit - Annual/Per Year per year [7]92.00$ 823 Quitclaim of Easement each [2]1,598.00$ 824 Reapportionment Fees for 1911 Act Assessment Districts each [1]Actual Cost Retaining Wall Plan Check Fees Retaining Wall Plan Check Valuation 825 $0 - $50,000 [2]642.00$ 826 $50,001 - $250,000 [2]2,254.00$ 827 $250,000+[2]3,726.00$ 828 Reversion to Acreage deposit [2]5,000.00$ Right-of-Way Permit Annual Permit Holder - Review and Processing each [2]219.00$ Annual Permit Holder - Field Inspection Inspections (within 5 days)per site [2]222.00$ Each additional inspection (over 5 days)inspection / [2]222.00$ per project [2], [9]276.00$ per project [2], [10]276.00$ 830 Minor - Construction Inspection Fee each [2], [12]920.00$ Processing and Review each [2], [12]552.00$ Revision after Approval each [2]276.00$ 829 Minor - Non-Construction Inspection Fee Traffic Control Only each [2]652.00$ Road Closure each [2]917.00$ Processing and Review Non Standard Traffic Control Plan each [2]532.00$ Standard Traffic Control Plan each [2]489.00$ Road Closure each [2]842.00$ Revision after Approval each [2]259.00$ 40June 16, 2026 Item #6 Page 341 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Utility Inspection Fee Access Facilities - No Ground Disturbance/Construction each [2], [14]610.00$ Miscellaneous Construction per project [2], [14]610.00$ New Facility Only (no trenching) (in ground/ above ground) each [2], [14]610.00$ Night & Weekend Work hourly [2], [14]723.00$ Overhead Lines, Add/Remove/Replace per project [2], [14]610.00$ Pole Placement/ Replacement each [2], [14]610.00$ each [2], [14]610.00$ Sewer Lateral each [2], [14]675.00$ Water Lateral each [2], [14]675.00$ 0 to 150 Linear Feet each [2], [11]1,598.00$ 151 to 1000 Linear Feet hourly [2], [11]178.00$ 1001 to 10,500 Linear Feet hourly [2], [11]178.00$ Processing and Review each [2]138.00$ Miscellaneous Construction each [2]276.00$ each [2]414.00$ Overhead Lines, Add/Remove/Replace each [2]138.00$ Pole License each [2]621.00$ Pole Placement/ Replacement each [2]207.00$ each [2]276.00$ Revision after Approval each [2]207.00$ Sewer Lateral each [2]602.00$ Water Lateral each [2]602.00$ 0 to 150 Linear Feet each [2]345.00$ 151 to 1000 Linear Feet each [2]828.00$ 1001 to 10,500 Linear Feet each [2]1,380.00$ Use - Initial Permit Inspection Curb and Sidewalk Café each [2]662.00$ Processing and Review Curb Café each [2]761.00$ Sidewalk Café each [2]715.00$ Outdoor Display each [2]305.00$ Use - Annual Renewal Curb Café each [2]276.00$ 41June 16, 2026 Item #6 Page 342 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Sidewalk Café each [2]276.00$ Outdoor Display each [2]276.00$ Village Area - Curb Café (max of two parking spaces)1,200.00$ 844 Secured Agreement Processing - Extension each [2]528.00$ 845 Secured Agreement Processing - Replacement, plus improvement plan revision fees if required each [2]920.00$ 846 records + overhead, consultant cost and recording fee. Also see deposit [1]Actual Cost 847 (Consistent with city payroll records + overhead, consultant cost and recording fee. Also see Streets and Highways Code Section 8760-deposit [1]Actual Cost Storm Water Pollution Prevention Plan (SWPPP) Fees Plan Review Fee 848 Tier 1 per site [2]92.00$ 849 Tier 2 per site [2]1,104.00$ 850 Tier 3- Base Fee per site [2]1,472.00$ 851 Tier 3 - per acre fee (calculated with actual acreage)per acre [2]184.00$ Inspection Fee 852 Tier 1 per site [2]3,951.00$ 853 Tier 2 per site [2]8,184.00$ 854 Tier 3- Base Fee per site [2]9,195.00$ 855 Tier 3 - per acre fee (calculated with actual acreage)per acre [2]2,073.00$ Storm Water Quality Management Plan (SWQMP) Fees 856 Plan Review - Base Fee each [2]1,574.00$ 857 Plan Review - per acre fee (calculated with actual acreage) per acre [2]132.00$ 858 Plan Review - Trash Capture Only each [2]1,748.00$ 859 Inspection Fee - Base Fee each [2]1,250.00$ 860 Inspection Fee - per acre fee (calculated with actual acreage) per acre [2]969.00$ 861 Street Vacation - Street/Public Service Easement Vacation - Regular each [2]5,361.00$ 862 Street Vacation - Street/Public Service Easement Vacation - Summary each [2]2,838.00$ Third Party Review 863 Processing Fee per project [2]403.00$ 864 Consultant Cost per project [1]Actual Cost 42June 16, 2026 Item #6 Page 343 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 865 basis. It will be based on the fully burdened hourly rate and the time per hour [2]229.00$ [Notes] [1] Set per City policy [2] Set per 2026 - Cost of Service Study and Fee Schedule Update [3] Minor: residential new/remodel, commercial/ industrial tenant improvement [4] Major: Commercial/ industrial new [5] Quantities are calculated by using the greater of cut/fill, plus remedial work. Plan checks extending more than 24 months may be assessed an additional fee of 25% of the current plan check fee. [6]Minor grading plan check fees are 50% of standard plan check fees. Qualifying for minor grading plan check is subject to City Engineer approval per CMC 15.16.062 [7] Maximum limit set by CA Vehicle Code 35795(b)(1) [8]prices. Water and sewer facilities owned by separate utility districts are not reviewed by the city and do not need to be included in project cost estimate. [9] Processing and traffic control review of City and CMWD projects. [10]Processing and traffic control review of previously approved private improvement plans (IMPs). [11]Includes all underground utilities, wet and dry utilities regardless of construction method, excluding stand alone sewer and water laterals, and may require securities. [12]Minor improvements, including but not limited to curb core, sidewalk, curb & gutter, driveway, minor street paving, and tree removal. [13]Stand alone developer improvement agreements that are not part of a larger grading or improvement plan. [14] Utility Inspection Fee refers to stand alone fees that are applied independently. 43June 16, 2026 Item #6 Page 344 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit [1], [3] Single Family Dwellings and Duplexes - (All newly constructed or added space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 966 1,000 [2]1,700$ 967 each add'l s.f. [2]0.35$ 968 2,500 [2]2,376$ 969 each add'l s.f. [2]0.35$ 970 4,000 [2]2,870$ 971 each add'l s.f. [2]0.33$ 972 6,000 [2]3,489$ 973 each add'l s.f. [2]0.33$ 974 8,000 [2]4,147$ 975 each add'l s.f. [2]0.58$ Commercial Residential and Multifamily Residential Uses - (All newly constructed or added space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee 956 500 [2]1,393$ 957 each add'l s.f. [2]0.76$ 958 5,000 [2]4,522$ 959 each add'l s.f. [2]0.63$ 960 10,000 base fee up to 10,000 s.f.[2]7,751$ 961 each add'l s.f. [2]0.06$ 962 50,000 base fee up to 50,000 s.f.[2]10,196$ 963 each add'l s.f. [2]0.17$ 44June 16, 2026 Item #6 Page 345 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 964 100,000 to 100,000 [2]18,598$ 965 each add'l s.f. [2]0.19$ Commercial Residential and Multifamily Residential Remodels - Structural - (Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 946 500 [2]1,147$ 947 each add'l s.f. [2]0.54$ 948 5,000 [2]3,669$ 949 each add'l s.f. [2]0.42$ 950 10,000 base fee up to 10,000 s.f.[2]5,723$ 951 each add'l s.f. [2]0.08$ 952 50,000 base fee up to 50,000 s.f.[2]8,908$ 953 each add'l s.f. [2]0.11$ 954 100,000 to 100,000 [2]14,212$ 955 each add'l s.f. [2]0.14$ Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 946 500 [2]1,037$ 947 each add'l s.f. [2]0.34$ 948 5,000 [2]2,523$ 949 each add'l s.f. [2]0.50$ 950 10,000 base fee up to 10,000 s.f.[2]5,002$ 45June 16, 2026 Item #6 Page 346 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 951 each add'l s.f. [2]0.06$ 952 50,000 base fee up to 50,000 s.f.[2]7,768$ 953 each add'l s.f. [2]0.10$ 954 100,000 to 100,000 [2]12,869$ 955 each add'l s.f. [2]0.13$ Shell Buildings for all Commercial/Industrial Uses - (The enclosure for all newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 916 500 [2]1,179$ 917 each add'l s.f. [2]0.42$ 918 5,000 [2]2,588$ 919 each add'l s.f. [2]0.32$ 920 10,000 base fee up to 10,000 s.f.[2]4,153$ 921 each add'l s.f. [2]0.03$ 922 50,000 base fee up to 50,000 s.f.[2]5,324$ 923 each add'l s.f. [2]0.01$ 924 100,000 to 100,000 [2]5,921$ 925 each add'l s.f. [2]0.07$ Commercial/Industrial Uses - Structural (All newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 866 500 [2]1,430$ 867 each add'l s.f. [2]0.45$ 46June 16, 2026 Item #6 Page 347 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 868 5,000 [2]3,292$ 869 each add'l s.f. [2]0.53$ 870 10,000 base fee up to 10,000 s.f.[2]5,945$ 871 each add'l s.f. [2]0.05$ 872 50,000 base fee up to 50,000 s.f.[2]8,021$ 873 each add'l s.f. [2]0.12$ 874 100,000 to 100,000 [2]14,075$ 875 each add'l s.f. [2]0.14$ Commercial/Industrial Tenant Improvement - Structural - (Structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 926 500 [2]1,033$ 927 each add'l s.f. [2]0.24$ 928 5,000 [2]2,248$ 929 each add'l s.f. [2]0.12$ 930 10,000 base fee up to 10,000 s.f.[2]2,805$ 931 each add'l s.f. [2]0.07$ 932 50,000 base fee up to 50,000 s.f.[2]5,422$ 933 each add'l s.f. [2]0.06$ 934 100,000 to 100,000 [2]8,132$ 935 each add'l s.f. [2]0.09$ 47June 16, 2026 Item #6 Page 348 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Commercial/Industrial Tenant Improvement - Non-structural - (Non- structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 936 500 [2]940$ 937 each add'l s.f. [2]0.24$ 938 5,000 [2]2,124$ 939 each add'l s.f. [2]0.06$ 940 10,000 base fee up to 10,000 s.f.[2]2,507$ 941 each add'l s.f. [2]0.05$ 942 50,000 base fee up to 50,000 s.f.[2]4,732$ 943 each add'l s.f. [2]0.04$ 944 100,000 to 100,000 [2]6,987$ 945 each add'l s.f. [2]0.07$ Low and Moderate Hazard Storage - space for storage occupancies classified as CBC Group S, private garages for commercial / industrial/multifamily uses, or other 886 500 [2]1,308$ 887 each add'l s.f. [2]0.47$ 888 5,000 [2]3,325$ 889 each add'l s.f. [2]0.25$ 890 10,000 base fee up to 10,000 s.f.[2]4,622$ 891 each add'l s.f. [2]0.03$ 892 50,000 base fee up to 50,000 s.f.[2]5,868$ 893 each add'l s.f. [2]0.01$ 48June 16, 2026 Item #6 Page 349 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 894 100,000 to 100,000 [2]6,394$ 895 each add'l s.f. [2]0.07$ Attached Accessory and Utility Uses - (All newly constructed, added or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule 896 200 [2]669$ 897 each add'l s.f. [2]1.70$ 898 400 [2]1,048$ 899 each add'l s.f. [2]0.49$ 900 600 [2]1,181$ 901 each add'l s.f. [2]0.41$ 902 1,000 [2]1,335$ 903 each add'l s.f. [2]0.20$ 904 3,000 [2]1,707$ 905 each add'l s.f. [2]0.65$ Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies/uses not specifically addressed elsewhere in this Fee 906 200 [2]669$ 907 each add'l s.f. [2]1.70$ 908 400 [2]1,048$ 909 each add'l s.f. [2]0.49$ 910 600 [2]1,181$ 911 each add'l s.f. [2]0.41$ 912 1,000 [2]1,335$ 913 each add'l s.f. [2]0.20$ 49June 16, 2026 Item #6 Page 350 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 914 3,000 [2]1,707$ 915 each add'l s.f. [2]0.65$ 976 1,000 [2]1,415$ 977 each add'l s.f. [2]0.23$ 978 2,500 [2]1,824$ 979 each add'l s.f. [2]0.18$ 980 4,000 [2]2,074$ 981 each add'l s.f. [2]0.24$ 982 6,000 [2]2,553$ 983 each add'l s.f. [2]0.24$ 984 8,000 [2]2,992$ 985 each add'l s.f. [2]0.43$ Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses flat [2]440$ Site Improvements private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway 996 500 [2]647$ 997 each add'l s.f. [2]0.08$ 998 5,000 [2]1,335$ 999 each add'l s.f. [2]0.04$ 1000 10,000 base fee up to 10,000 s.f.[2]1,653$ 1001 each add'l s.f. [2]0.01$ Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 50June 16, 2026 Item #6 Page 351 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 1002 50,000 base fee up to 50,000 s.f.[2]1,930$ 1003 each add'l s.f. [2]0.01$ 1004 100,000 to 100,000 [2]2,366$ 1005 each add'l s.f. [2]0.03$ [Notes] [1]Valuation based on current valuation multiplier published by the San Diego Chapter of the International Code Council. CBC 109.3 Building permit valuations. [2]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3]Plan check fee based on 65% of the current building permit fee and is due upon initial submittal 51June 16, 2026 Item #6 Page 352 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit [3] 1006 Above Ground Storage Tank per permit [2] Cell Site 1007 Radio over 30 ft. high each [2] 1008 Dish, 10 ft. dia. w/decoder each [2] 1009 Equipment Enclosure each [2] 1010 Awning or Canopy per permit [2] 1011 Bollards up to 4pcs per permit [2] 1012 Certificate of Occupancy per permit [2] Temporary Certificate of Occupancy per permit [2] Decks / Balcony 1013 Repair each [2] 1014 New/Replace each [2] Demolition of Building 1015 Commercial each [2] 1016 Residential each [2] EV Charging Stations Single-Family Residential per permit [2] Commercial / Multi-Family Residential 0-5 EV Charging Stations per permit [2] 6-10 EV Charging Stations per permit [2] Over 11 EV Charging stations per permit [2] 1017 Fence or Freestanding Wall up to 100'each [2] 1018 Fire Damage Repair - Residential - Minor per permit [2] 1019 Fireplace Repair/Replace per permit [2] Foundation Repair 1020 Commercial each [2] 1021 Residential each [2] 1022 Greenhouse per permit [2] Manufactured House / Building 1023 Commercial per permit [2] 1024 Residential per permit [2] 1025 published by California Division of Housing and Community per permit [2],[7] 1026 Partition/ Wall - Interior/Non-Structural <100'per permit [2] Patio 1027 Frame with Cover each [2] 1028 Frame with Cover & Walls each [2] 1029 Screen or Plastic Walls each [2] 1030 Plastering Outside per permit [2] 52June 16, 2026 Item #6 Page 353 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Remodel - Residential 1031 Kitchen/Bath each [2] 1032 Other - up to 500 sq. ft.each [2] 1033 Other - above 500 sq. ft.per 100 sq. ft. [2] Repairs - Miscellaneous 1034 Commercial each [2] 1035 Residential each [2] Retaining Wall 1036 Non-Engineered - City Standard per permit [2] Engineered per permit [2] Reroofing 1037 Commercial per permit [2] 1038 Residential per permit [2] Roof Structure Repair / Reinforcement 1039 Commercial each [2] 1040 Residential each [2] 1041 Saunas (Steam)per permit [2] Sign 1042 Wall - Illuminated per permit [2] 1043 Wall - Non-Illuminated per permit [2] 1044 Pole per permit [2] 1045 Monument per permit [2] Skylight 1046 Commercial each [2] 1047 Residential each [2] 1048 Solar - SolarApp+ Residential per permit [1] Add Residential Battery Back-up per permit [2] 1049 Solar - Residential (Up to 15 kW)per permit [2],[4] 1050 Per kW above 15kW per kW [2],[4] 1051 Add Residential Battery Back-up per permit [2],[4] 1052 Add Residential Panel Upgrade per permit [2],[4] 1053 Add Reverse Tilt System/ Ground Mount per permit [2],[4] 1054 Solar - Commercial (Up to 50 kW)per permit [2],[4] 1055 Per kW between 51kW - 250kW per kW [2],[4] Solar Commercial Systems (250kW)per permit [2],[4] 1056 Per kW above 250kW per kW [2],[4] 53June 16, 2026 Item #6 Page 354 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 1057 Spray Booth Install / Clean Room per permit [2] Stairs 1058 New/Replace First Story each [2] 1059 Additional Story each [2] 1060 Repair each [2] Siding 1061 Stucco each [2] 1062 Stone/Brick Veneer each [2] Storage Racks 1063 <8 ft, first 100 lf per permit [2] 1064 each add'l. 100 lf each [2] 1065 >8 ft, first 100 lf per permit [2] 1066 >8 ft, ea. Add'l 100 lf each [2] Swimming Pool 1067 Commercial per permit [2] 1068 Residential per permit [2] Storm Water Pollution Prevention Plan (SWPPP) Inspection Fee Demolitions, Remodels, and Alterations [2] New Construction [2] All Other Inspections [2] 1069 Temporary Seating or Bleachers Install per permit [2] 1070 Trash Enclosure Install per permit [2] Windows / Door 1071 Commercial each [2] 1072 Residential each [2] Waste Management Plan (C&D) fee per permit [2] Other Inspections (Per Hour) Admin Processing Fee ( revisions and resubmittals)per permit [2] 1073 per hour [2] 1074 Re-inspection fees per hour [2] 1075 per hour [2] 1076 flat [2] 54June 16, 2026 Item #6 Page 355 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Other Building Fees 1078 Appeal of Building Official Decision per permit [1] 1079 Building Permit Revision, Fee + Third Party Hourly Charge per hour [2] 1080 Building Plan Check Fee (8% discount on repetitive plan checks) each [2],[5] 1081 Green Building Standards Plan Check and Inspection each [2] 1082 Green Building State Standards Fee (SB1473)each [1] $1.00 per every $25,000 in building valuation or fraction thereof (minimum 1083 Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard Mapping Fee - Residential each [1] 1084 Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard Mapping Fee - Commercial each [1] 1085 Penalty for Commencing Work Before Permit Issuance each [6] 1086 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2] [Notes] [1] Set per City policy [2]Set per FY 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3]Valuation based on current valuation multiplier published by the San Diego Chapter of the International Code Council. CBC 109.3 Building permit valuations. [4] Limited to maximum amounts set by AB1414 [5]Plan check fee based on 65% of the current building permit fee and is due upon initial submittal [6] CMC 18.20.010 and CMC 18.04.010 [7]Limited to maximum amounts consistent with Sections 1017, 1020.1 and 1020.7 of Title 25 of the California Code of Regulations 55June 16, 2026 Item #6 Page 356 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit 1087 per permit [1] 1088 Water Heater Only per permit [1] Complex Mechanical Permits 1089 FAU less than 100,000 Btu/h per permit [1] 1090 FAU greater than 100,000 Btu/h per permit [1] 1091 Floor furnace (including vent)per permit [1] 1092 Suspended, wall, or floor-mounted heaters per permit [1] 1093 Appliance vents not included in an appliance permit per permit [1] 1094 Boiler up to 100,000 Btu/h per permit [1] 1095 Boiler 100,000 Btu/h to 500,000 Btu/h per permit [1] 1096 Compressor up to 3 HP per permit [1] 1097 Compressor up to 3 HP to 15 HP per permit [1] 1098 Other Complex Mechanical per permit [1] Complex Electrical Permits 1099 Commercial Appliance per permit [1] 1100 Power Apparatus per permit [1] 1101 Motor not over 1 HP each [1] 1102 Motor over 1 HP and not over 10 HP each [1] 1103 Motor over 10 HP and not over 50 HP each [1] 1104 Motor over 50 HP and not over 100 HP each [1] 1105 Motor over 100 HP each [1] 1106 Generator not over 1 KW each [1] 1107 Generator over 1 KW and not over 10 KW each [1] 1108 Generator over 10 KW and not over 50 KW each [1] 1109 Generator over 50 KW and not over 100 KW each [1] 1110 Generator over 100 KW each [1] 1111 Transformer not over 1 KVA each [1] 1112 Transformer over 1 KVA and not over 10 KVA each [1] 1113 Transformer over 10 KVA and not over 50 KVA each [1] 1114 Transformer over 50 KVA and not over 100 KVA each [1] 1115 Transformer over 100 KVA each [1] 1116 each [1] 1117 Services over 600 volts or over 1000 amperes in rating each [1] 1118 Other Complex Electrical each [1] Plumbing, Mechanical, and Electrical Permits - Not Associated with a Building Permit 56June 16, 2026 Item #6 Page 357 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Complex Plumbing Permits 1119 Fire Suppression System/Commercial Hood per permit [1] 1120 Onsite Sewer 6" & Over per permit [1] 1121 Onsite Water 6" & Over per permit [1] 1122 Onsite Storm Drain 6" & Over per permit [1] 1123 Utilities (private - main) city processing fee per permit [1] 1124 Utilities (private - main) plans examiner fee per permit [1] 1125 Other Complex Plumbing per permit [1] Affordable Housing Credit 1138 Cassia Heights (Southeast and Southwest quadrants)per unit [2] 1139 Tavarua Senior Affordable Apartments (Northwest quadrant) per unit [2] [Notes] [1]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [2] Set per City policy. 57June 16, 2026 Item #6 Page 358 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Simple Mechanical Items: Addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system. HVAC change out - existing dwelling Air-handling unit under 10,000 CFM Evaporative cooler Ventilation fan connected to a single duct Hood and duct system Duct systems Miscellaneous mechanical (wall furnace, condensing units, gas outlet/gas test, etc.) Other simple mechanical Simple Electrical Items: Receptacle, switch, and lighting outlets Lighting fixtures Pole or platform-mounted lighting fixtures Theatrical-type lighting fixtures or assemblies Appliances not exceeding one horsepower (HP), kilowatt (KW), or kilovolt-ampere (KVA), in rating Busways Trolley and plug-in-type busways - each 100 feet or fraction thereof Signs, outline lighting, or marquees supplied from one branch circuit Services of 600 volts or less and not over 200 amperes in rating Miscellaneous apparatus, conduits, and conductors Portable generators less than 10,000 W Temporary power panel/service Temporary power pole Other simple electrical Simple Plumbing Items: Plumbing fixtures Building sewer Rainwater systems Water heater Industrial waste pretreatment interceptor Water piping and/or water treating equipment Repair or alteration of drainage or vent piping Backflow devices Atmospheric-type vacuum breakers Gas test Gas outlets Residential remodel/repairs Other simple plumbing Simple Single or Combination Permits List 58June 16, 2026 Item #6 Page 359 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Section 3 Development Impact Fees June 16, 2026 Item #6 Page 360 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 60June 16, 2026 Item #6 Page 361 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 61June 16, 2026 Item #6 Page 362 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 62June 16, 2026 Item #6 Page 363 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 63June 16, 2026 Item #6 Page 364 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee Level/Deposit Planned Local Drainage Area Fees (PLDA) 1126 PLDA A, Low Runoff per acre 1127 PLDA B, Low Runoff per acre 1128 PLDA C, Low Runoff per acre 1129 PLDA D, Low Runoff per acre 1130 PLDA A, Medium Runoff per acre 1131 PLDA B, Medium Runoff per acre 1132 PLDA C, Medium Runoff per acre 1133 PLDA D, Medium Runoff per acre 1134 PLDA A, High Runoff per acre 1135 PLDA B, High Runoff per acre 1136 PLDA C, High Runoff per acre 1137 PLDA D, High Runoff per acre Low Runoff Potential Medium Runoff Potential High Runoff Potential CF ♦ GC ♦ L ♦ O ♦ OS ♦ P ♦ PI ♦ PI/O ♦ R ♦ R1.5 ♦ R4 ♦ R8 ♦ R15 ♦ R15/L ♦ R15/O ♦ R15/VC ♦ R23 ♦ R30 ♦ OK-TC ♦ VC ♦ VC/OS ♦ V ♦ PLDA FEE CATEGORYGeneral Plan Land Use Designation 64June 16, 2026 Item #6 Page 365 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 65June 16, 2026 Item #6 Page 366 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 66June 16, 2026 Item #6 Page 367 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4 Fee Name Fee Type No t e s Fee/Deposit Affordable Housing Impact Fee 1140 Affordable Housing Impact Fee per unit [1] 1141 per unit [2] 1142 Affordable Housing In-Lieu Fee (residential development projects proposing two to six units), per sq. ft. of net building area per unit per sq. ft. [2] Agricultural Mitigation Fees Agricultural Mitigation Fee [1]10,000$ Habitat Mitigation Fees, Per Acre 1143 Type D - Coastal Sage Scrub per acre [1] 1144 Type E - Non-Native Grassland per acre [1] 1145 Type F - Agricultural Land, Disturbed Land, Eucalyptus Woodland per acre [1] Public Facilities and Community Facilities District Fees 1146 Public Facilities Fee - inside CFD per project [1] 1147 Public Facilities Fee - outside CFD per project [1] 1148 Community Facilities District #1 Fees [1] Traffic Impact Fees 1149 Apartment (Inside of CFD 1)per ADT [1] 1150 Apartment (Outside of CFD 1)per ADT [1] 1151 Commercial/Industrial Cost Per Trip (Inside CFD)per ADT [1] 1152 Commercial/Industrial Cost Per Trip (Outside of CFD)per ADT [1] 1153 Condominium (Inside of CFD 1)per ADT [1] 1154 Condominium (Outside of CFD 1)per ADT [1] 1155 Single Family (Inside of CFD 1)per ADT [1] 1156 Single Family (Outside of CFD 1)per ADT [1] [Notes] [1] Set per City policy [2] Updated via City Council Resolution; effective April 1, 2022. 67June 16, 2026 Item #6 Page 368 of 618 Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4