HomeMy WebLinkAbout2026-06-16; Community Development Commission; Resolution 583Exhibit 9
RESOLUTION NO. 583 .
A RESOLUTION OF THE COMMUNITY DEVELOPMENT COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, ADOPTING CHANGES TO THE MASTER FEE
SCHEDULE
WHEREAS, the Community Development Commission of the City of Carlsbad, California, has the
authority to establish fees for housing services; and
WHEREAS, from time to time the fees are reviewed and evaluated to maintain an adequate fee
structure recovering costs for housing services; and
WHEREAS, the Community Development Commission has determined the cost of providing
housing services; and
WHEREAS, the Community Development Commission finds it necessary to recover the costs for
housing services; and
WHEREAS, the Community Development Commission has held the necessary public hearing and
allowed for public comment on the establishment of the fees.
NOW, THEREFORE, BE IT RESOLVED by the Community Development Commission of the City of
Carlsbad, California, as follows:
1.That the above recitations are true and correct.
2. That the proposed action is not a “project” as defined by California Environmental
Quality Act, or CEQA, Section 21065 and CEQA Guidelines Section 15378(b)(4) and does
not require environmental review under CEQA Guidelines Section 15060(c)(3) as it is a
government fiscal activity and does not involve any commitment to any specific project
which may result in a potentially significant physical impact on the environment. The
activity or projects for which this budget is intended to fund may require preparation of
an environmental document in accordance with CEQA and the CEQA Guidelines.
3.That the changes to the Master Fee Schedule as shown in Attachment A are adopted.
4. That this resolution shall become effective on Sept. 1, 2026; not sooner than 60 days
after adoption in accordance with California Government Code Section 66017 for
housing fees.
June 16, 2026 Item #6 Page 300 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Community Development
Commission, the City Council of the City of Carlsbad, the Board of Directors of the Carlsbad Municipal
Water District, the Board of Directors of the Carlsbad Public Financing Authority, and the City
Council as Successor Agency to the Carlsbad Redevelopment Agency held on the 16th day of June,
2026, by the following vote, to wit:
AYES: Blackburn, Bhat-Patel, Acosta, Burkholder, Shin.
NAYS: None.
ABSTAIN: None.
ABSENT: None.
_____________________________________
KEITH BLACKBURN, Chairperson
_____________________________________
GEOFF PATNOE, Secretary
(SEAL)
June 16, 2026 Item #6 Page 301 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Proposed
Master Fee Schedule
All Fees Within, except Trash Collection Rates and Park Land In-
Lieu Fees, Effective Sept. 1, 2026
Trash Collection Rates and Park Land In-Lieu Fees
Effective July 1, 2026
Attachment A
June 16, 2026 Item #6 Page 302 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Proposed Master Fee Schedule FY 2026-27
Contents
Section 1 – General City Service Fees, Deposits, Rates, Penalties and Fines
Miscellaneous Fees and Returned Checks ....................................................................................... 4
Deposits and Securities .................................................................................................................... 5
Special Events and Safety Training Center ....................................................................................... 6
Ambulance, Street Light Energizing, and Affordable Housing Administration ................................ 7
City Clerk Fees .................................................................................................................................. 8
Library Fees ...................................................................................................................................... 9
Fire (Fire Extinguishing and Alarm Systems) .................................................................................. 10
Fire (Development Applications, Plan Review, and Inspection) .................................................... 11
Fire (Fire and Life Safety Inspections and Fire Code Permits) ....................................................... 13
Police Department Fees ................................................................................................................ 15
Administrative and Vehicle, Traffic, and Parking Penalties ...........................................................16
Trash Collection Rates ....................................................................................................................17
Utility Account and Service Fees ....................................................................................................25
Utility Meter Installation and Connection .....................................................................................27
Utility (San Diego County Water Authority) ..................................................................................29
Section 2 – Development Related Fees
Planning Department Fees ............................................................................................................31
Engineering Department Fees .......................................................................................................36
Building (New Construction, Additions and Major Remodels) ......................................................44
Building (Minor/Miscellaneous Residential & Commercial Improvements) .................................52
Building (Plumbing, Mechanical, and Electrical) ............................................................................56
Building (Simple Single or Combination Permits List) ....................................................................58
Section 3 – Development Impact Fees
Bridge and Thoroughfare District 2 Map .......................................................................................60
Local Facilities Management Zones Map .......................................................................................61
Park Land In-Lieu Fees, Park Districts Map ....................................................................................62
Planned Local Drainage Fee Areas and Map ..................................................................................63
Sewer Benefit Area and Connection Fees Map .............................................................................65
Affordable Housing, Agricultural and Habitat Mitigation, and Traffic ...........................................67
June 16, 2026 Item #6 Page 303 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Section 1
General City Service Fees,
Deposits, Rates, Penalties and
Fines
June 16, 2026 Item #6 Page 304 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Miscellaneous Fees
1 Administrative Fee for 1915 Act Bond Call - 1% of principal being
repaid (All Assessment Districts using 1915 Act Bonds)each [1]
2 Business License - additional CA fee each [3],[5]
3 Business License - master list of active business licenses each [2]
4 Business License - monthly list of new licenses each [2]
5 Cable Channel Administration Fee per hour [1]
6 Electric Vehicle Charging Fees
Peak Pricing (4PM to 9PM)per kWh [1]
Off-Peak Pricing (9PM to 12AM, 9AM to 4PM)per kWh [1]
Super Off-Peak Pricing (12AM to 9AM)per kWh [1]
7 GIS - digital data delivery, production of new documents,
reproduction of existing documents, and technical services per hour [1]
8 Hearing Disposition Services for Parking Citations - Personal Hearings each [1]
9 Hearing Disposition Services for Parking Citations - Written Review each [1]
10 City Publications each [1]
11 Community Facilities District Annexation - City Labor (Plus actual
consultant costs)each [2]
713 Short-Term Vacation Rental Permit Application Fee [2]231$
12 Sign Collection and Pickup Fee (plus $5 fee per sign)each [2]
Credit Card Fee for Transient Occupancy Tax Payments [6]
Returned Check Fee
13 First Returned Check each [4]
14 Each Additional Check each [4]
basis. It will be based on the fully burdened hourly rate and the time hourly [2]
[Notes]
[1] Set per City policy
[2] Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI.
[3] Set per CA Government Code 4467
[4] Set per CA Civil Code 1719
[5] Business license tax, set per Carlsbad Municipal Code 5.08.010, is separate from these fees.
[6] Set by Resolution No. 2021-168, adopted by City Council on July 13, 2021.
4June 16, 2026 Item #6 Page 305 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Deposits and Securities
Grading and Erosion Control
15 Grading Security (with approved plans)deposit [1],[2]
16 Grading Cash Deposit deposit [1],[2]
Development/Subdivision Improvements
17 Faithful Performance Security deposit [1],[2]
18 Labor and Materials Security deposit [1],[2]
19 Monumentation Security deposit [1],[2]
Right of Way Security deposit [1],[2]
Right of Way Cash Deposit deposit [1],[2]
[Notes]
[1] Set per City policy
[2]Per CA Government Code 53079, 1% shall be deducted from any interest due.
The city may require a security be provided to ensure work related to a project is completed in accordance with
the Carlsbad Municipal Code and development agreements executed with the city. This information is to help
understand the standard structure of how these deposits and securities are calculated. The security amounts are
calculated using final city-approved cost estimates, not initial or draft estimates during plan check.
5June 16, 2026 Item #6 Page 306 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Special Events Fees
20 Special Event Application - Minor - 2 or less intersections
(fee + services rendered)each [1],[3]166$
21 Special Event Application - Major - 3 or more intersections
(fee + services rendered) each [1],[2]498$
22 Special Event Application - Third party Vendor Fee per day [1],[2]112$
23 Special Event City Services - Staff Time per hour [1] Actual Cost
Safety Training Center Facility Fees
24 One Shooting Range full day [1]1,539$
25 One Shooting Range 1/2 day [1]770$
26 Two Shooting Ranges full day [1]1,728$
27 Two Shooting Ranges 1/2 day [1]904$
28 Classroom full day [1]705$
29 Classroom 1/2 day [1]403$
30 Confined Space Prop full day [1]752$
31 Confined Space Prop 1/2 day [1]376$
32 Grinder full day [1]539$
33 Grinder 1/2 day [1]314$
34 Grinder/Commercial Prop full day [1]808$
35 Grinder/Commercial Prop 1/2 day [1]403$
36 Grinder/Residential Prop full day [1]808$
37 Grinder/Residential Prop 1/2 day [1]403$
38 PriSim (Training Simulator)full day [1]566$
39 PriSim (Training Simulator)1/2 day [1]283$
42 Streetscape full day [1]190$
43 Streetscape 1/2 day [1]139$
44 Shooting Range - Hourly hourly [1]154$
[Notes]
[1]Set per City policy
[2] Carlsbad Municipal Code 8.17 defines and outlines Special Events which may require permitting.
[3] Fee charged as determined by staff
Full details on how to apply for a Special Event Application can be referenced in the Special Event Reference
Handbook available on the City of Carlsbad website. The below fees are listed for reference only and may not be
representative of the entirety of a Special Event Application cost. A valid, unexpired City of Carlsbad Business
License is required for all special event applicants. Carlsbad Municipal Code Section 8.17.070 CMC requires an
applicant to pay a non-refundable fee to allow third party vendors to participate under the applicant’s business
License.
6June 16, 2026 Item #6 Page 307 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Ambulance Fees
45 Assessment/Non-Transport with medication given. No charge for
assessment if no medication given and non-transport.
per [1]493$
46 Advanced Life Support 1 - plus Level I or Level II supplies and
medications per [1]2,787$
47 Advanced Life Support 2 - plus Level II supplies and medications per [1]2,787$
48 Basic Life Support per [1]2,787$
49 Mileage Charge mile [1]44$
50 Oxygen Charge per [1]130$
Street Light Energizing Fees
51 40 watts each [2]102$
52 45 watts each [2]111$
53 70 watts each [2]157$
54 85 watts each [2]186$
55 100 watts each [2]214$
56 120 watts each [2]251$
57 150 watts each [2]306$
58 200 watts each [2]400$
59 250 watts each [2]493$
Affordable Housing Administrative Fees
51 Affordable Housing Agreement - Ownership (Fee per project)per project [1]748$
52 Additional fee per unit per unit [1]278$
53 Affordable Housing Agreement Ownership Unit - Real Estate Agent each [1] Actual Cost
54 Affordable Housing Agreement - Rental (Fee per project)per project [1]954$
55 Affordable Rental Unit - Compliance and Annual Monitoring (per
unit)per unit [1]157$
[Notes]
[1] Set per City policy
[2]
Street Light Energizing Fees are the cost for energizing each street light for eighteen
months, and include a $30.00 charge per light for connecting the light to an SDG&E
service point.
7June 16, 2026 Item #6 Page 308 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
City Clerk Fees
60 Appeals to City Council each [2],[8]
61 Candidate Filing Fee each [3]
62 Notice of Intention to Circulate Initiative Petition each [4]
Subpoena Fees
63 Deposition Subpoena per day [5]
64 Records Subpoena - research per hour [6]
Copy Fees
65 Copies & Printing - Black & White each [1]
66 Copies & Printing - Color each [1]
67 CD Copy each [1]
68 DVD Copy each [1]
69 USB Drive Copy each [1]
70 FPPC Campaign Statements per page [7]
71 FPPC Conflict of Interest Statement per page [7]
72
Fees for services not listed will be determined on a case-by-case
basis. It will be based on the fully burdened hourly rate and the time per hour [2]
[Notes]
[1] Set per City policy
[2]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region
Urban CPI.
[3] Set per City of Carlsbad Municipal Code 1.12.010
[4] Set per CA Elections Code 9202
[5] Set per CA Government Code 68096.1(b)
[6] Set per CA Evidence Code 1563(b)(1)
[7] Set per CA Government Code 81008
[8] Additional department processing fees may apply.
8June 16, 2026 Item #6 Page 309 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Library Fees
73 Account Collection Fee per item [1]10.00$
76 Card Replacement per card [2]2.00$
77 Carlsbad History Collection Photo Fee per request [1] Actual Cost
78 Interlibrary Loan per request [2]6.00$
79 Lost/Damaged Item - Processing fee per item [2]6.00$
80 Lost/Damaged Item - beyond repair per item [1]List Price
81
Fees for services not listed will be determined on a case-by-case
basis. It will be based on the fully burdened hourly rate and the time per hour [2]12.00$
[Notes]
[1] Set per City policy
[2]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region
Urban CPI.
9June 16, 2026 Item #6 Page 310 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Fire Extinguishing and Alarm Systems
New Sprinkler System
82 ESFR Fire Sprinkler System (Initial System)each [2] 1,300$
83 Each Additional System each [2] 360$
84 Per Additional Inspection hourly [2] 172$
85 ESFR Fire Sprinkler System with In-Rack Sprinklers each [2] 1,506$
86 Each Additional System each [2] 360$
87 Per Additional Inspection hourly [2] 172$
88 Fire Pump (First Pump)each [2] 1,197$
89 Each Additional Pump each [2] 412$
90 NFPA 13 System < 100 Heads each [2] 941$
91 Per Additional Inspection hourly [2] 172$
92 Per Additional Plan Type each [2] 205$
93 NFPA 13 System > 100 Heads (Includes One Riser)each [2] 1,300$
94 Each Additional Riser each [2] 360$
95 Per Additional Inspection hourly [2] 172$
96 Per Additional Plan Type each [2] 205$
97 NFPA 13R System 3-16 units (Per Building)each [2] 1,300$
98 Per Additional Inspection (Per Building)each [2] 205$
99 Per Additional Plan Type each [2] 205$
100
NFPA 13D Single Family System (Plan Review Per Initial or
Single Plan Type)each [2]374$
101 Per Additional Plan Type each [2] 189$
102 NFPA 13D Single Family System (Inspection Per Building)each [2] 189$
103 Underground Piping with up to 4 Hydrants/Risers each [2] 1,146$
Per Additional Inspection hourly [2]172$
104 Underground Piping with 5 or more Hydrants/Risers each [2],[3] 1,558$
Per Additional Inspection hourly [2]172$
Tenant Improvement Sprinkler System
105 NFPA 13 or 13R System 6 Heads or Less each [2] 173$
106 NFPA 13 or 13R System 7 - 100 heads each [2] 837$
107 Per Additional Inspection hourly [2] 205$
108 Per Additional Plan Type each [2] 189$
109 NFPA 13 or 13R System > 100 Heads each [2] 991$
110 Per Additional Inspection hourly [2] 205$
111 Per Additional Plan Type each [2] 189$
Other Extinguishing Systems
112 Gas Systems (Med Gas, Industrial Gas, LPG)each [2] 631$
113 Hood & Duct Extinguishing System each [2] 631$
114 Each Additional System each [2] 309$
115 Pre-Action System with Alarm each [2] 837$
116 Refrigeration Systems < 500 lbs.each [2] 1,095$
117 Refrigeration Systems > 500 lbs.each [2] 1,866$
10June 16, 2026 Item #6 Page 311 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
118 Special Equipment (Ovens, Dust, Battery)each [2] 631$
119 Special Extinguishing System each [2] 888$
120 Spray Booths each [2] 631$
Additional Inspection for any Extinguishing System hourly [2]172$
Alarm Systems
121 New Alarm System each [2] 1,917$
122 Per Additional Inspection hourly [2] 205$
123 Per Additional Plan Type each [2] 205$
124 Sprinkler Monitoring each [2] 580$
125 Per Additional Inspection hourly [2] 189$
126 Per Additional Plan Type each [2] 189$
127 Tenant Improvement Fire Alarm System each [2] 941$
128 Per Additional Inspection hourly [2] 189$
129 Per Additional Plan Type each [2] 189$
Development Applications, Plan Review and Inspection
Building Construction Plan (Architectural Review)
130 A-1 Occupancies - New each [2] 1,801$
131 A-1 Occupancies - Tenant Improvements each [2] 1,376$
132 A-2 & A-3 Occupancies - New each [2] 1,234$
133 A-2 & A-3 Occupancies - Tenant Improvements each [2] 952$
134 A-4 & A-5 Occupancies - New each [2] 1,801$
135 A-4 & A-5 Occupancies - Tenant Improvements each [2] 1,376$
136 E Occupancies - New each [2] 1,801$
137 E Occupancies - Tenant Improvements each [2] 1,376$
138 E Occupancies (Daycare Only) each [2] 720$
139 F Occupancies - New each [2] 1,234$
140 F Occupancies - Tenant Improvements each [2] 952$
141 H Occupancies (Not Including Chem Class) - New each [2] 1,234$
142
H Occupancies (Not Including Chem Class) - Tenant
Improvements each [2]952$
143 I Occupancies - New each [2] 1,234$
144 I Occupancies - Tenant Improvements each [2] 952$
145 L Occupancies - New each [2] 720$
146 L Occupancies - Tenant Improvements each [2] 566$
147 R-1 & R-2 Occupancies <50 Units New flat [2] 1,801$
148 R-1 & R-2 Occupancies ≥50 Units New flat [2] 2,226$
149 R-3 Townhomes New each [2] 1,234$
150 R Occupancies All - Tenant Improvements each [2] 952$
151 S Occupancies < 50,000 sq. ft. New flat [2] 720$
152 S Occupancies < 50,000 sq. ft. - Tenant Improvements flat [2] 566$
153 S Occupancies ≥ 50,000 sq. ft. New flat [2] 1,338$
154 S Occupancies ≥ 50,000 sq. ft. - Tenant Improvements flat [2] 1,029$
11June 16, 2026 Item #6 Page 312 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Plan Review and Inspection
Hazardous Materials Storage
155 Chem Class <10 Chemicals flat [2] 734$
156 Chem Class 10- 25 Chemicals flat [2] 1,146$
157 Chem Class 26 - 100 Chemicals flat [2] 1,661$
158 Chem Class >100 Chemicals flat [2] 2,175$
159 Fire Department Access & Fire Lanes flat [2] 438$
Resubmittal Review flat [2]189$
160 High Piled Storage flat [2] 1,146$
161 High Rise Structure Greater Than 55 feet flat [2] 515$
162 Per Additional Floor flat [2] 412$
Storage Tanks
163 Aboveground Storage Tanks (First Tank)each [2] 1,003$
164 Underground Storage Tanks (First Tank)each [2] 909$
165 Each Additional Tank each [2] 142$
Vegetation Fuel Modification
166 Custom Home flat [2] 674$
167 Tract <75 Homes flat [2] 1,352$
168 Tract ≥75 Homes flat [2] 1,970$
169 Smoke Control - Rationale Analysis & Plan Review flat [2] 2,072$
Expedited Plan Review (pass through from consultant)flat [1] Actual Cost
Other Fire Fees
Aerial Fireworks Display
170 Major each [2]1,793$
171 Minor each [2]1,037$
Plan Review
172 Processing Fee each [2]86$
173 Per Hour - Overtime hourly [2]204$
174 Per Hour - Regular Office Hours hourly [2]189$
Hourly Services for: Alternate Methods and Materials Review,
Time and Materials Review, Project Meetings, etc.
175 First Hour each [2]241$
176 Each Additional Hour hourly [2]205$
177 Plan Resubmittal (3rd and Subsequent Submittal, Per Hour) hourly [2] 205$
178 Failed Inspection (Per inspection)each [2]292$
Tent Permit (Not associated with special events)
179 Single Tent each [2]274$
180 2-5 Tents flat [2]519$
181 6 or More Tents flat [2]720$
After Hours Overtime inspection flat [2]308$
182 Weed Abatement Administrative Fee each [2]377$
Defensible Space Inspection flat [2]236$
183 Fire Nuisance Alarm - 1st Response in 12 Month Period each [1]-$
184 Fire Nuisance Alarm - 2nd Response in 12 Month Period each [1]111$
185 Fire Nuisance Alarm - 3rd Response in 12 Month Period each [1]221$
186 Fire Nuisance Alarm - Each Additional Response Thereafter each [1] 433$
187 Fire Nuisance Alarm - Each Billing each [1]14$
12June 16, 2026 Item #6 Page 313 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
188 Special Events Application Processing flat [2],[6] 189$
189
Special Events - Fire & Life Safety/Operations Support Prior
To/During Event each [2],[6] Actual Cost
Fire & Life Safety Inspections and Fire Code Permits
Fire Inspections for the following Occupancies:
190
Care Facility for More than 6 Ambulatory & Non-Ambulatory
Clients each [2],[4]204$
191
Hospitals, Nursing Homes, Mental Hospitals, Detoxification and
Surgery Centers each [2],[4]393$
192
Commercial Care Facility (i.e. Child, Drug & Alcohol, Juvenile,
Etc.)each [2],[4]204$
193
Pre-Inspection Residential Care Facility (i.e. Single Family
Residences)each [2],[4]204$
194 High Rise Facility > 75 ft. (Per Floor of Building)each [2],[4] 204$
State Mandated School Inspection - Public or Private School
195 Pre-School each [2],[4] 471$
196 Elementary/Middle School each [2],[4] 755$
197 High School each [2],[4] 1,132$
Non-Compliance Fee each [2],[4]566$
State Mandated Hotel and Motel Inspection
198 1-5 Buildings Per Property flat [2],[4] 660$
199 6-10 Buildings Per Property flat [2],[4] 1,133$
200 11 or More Buildings Per Property flat [2],[4] 1,415$
Non-Compliance Fee each [2],[4]566$
State Mandated Apartment Inspection
201 3-10 Units Per Building flat [2],[4] 236$
202 11-40 Units Per Building flat [2],[4] 283$
203 Greater than 40 Units Per Building flat [2],[4] 377$
Non-Compliance Fee each [2],[4]472$
Fire Code Permits - Initial Permit
204 Tier 1 each [2],[5] 204$
205 Tier 2 each [2],[5] 393$
206 Tier 3 each [2],[5] 582$
Fire Code Permits - Annual Renewal Permit
207 Tier 1 each [2],[5] 110$
208 Tier 2 each [2],[5] 204$
209 Tier 3 each [2],[5] 299$
Assembly
210 < 300 people flat [2] 204$
211 > 300 people flat [2]393$
All Other Occupancies Annual Inspections
212 Tier 1 - 5,000 sq. ft. or Less flat [2] 157$
213 Tier 2 - 5,001 to 20,000 sq. ft.flat [2] 252$
214 Tier 3 - 20,001 and Greater flat [2] 393$
13
13June 16, 2026 Item #6 Page 314 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
215
Fees for services not listed will be determined on a case-by-case
basis. It will be based on the fully burdened hourly rate and the
time of service rovided.
per hour [2]205$
[Notes]
[1] Set per City policy
[2]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region
Urban CPI.
[3] Additional Reinspection fees shall apply for phased inspection projects at the discretion of the Fire Marshall
[4]
[5]
[6]Additional fees for Standby of fire personnel and equipment during event will apply.
All annual inspection fees shall include time for the initial inspection and 1 reinspection. All subsequent reinspection shall be charged an
additional rate per inspection.
Tier 1 – Candles – Open Flame; Cryogens; Dry Cleaning; Liquefied Petroleum Gas (LPG); Motor Vehicle Fuel Dispensing; Industrial Ovens; Hot
Works; Welding
Tier 2 – Aerosol; Aviation Facility; Waste Handling; Carnival/Fair; Combustible Materials Storage; Compressed Gas; Dust Producing
Operations; Flammable Liquids – Storage; Combustible Liquids – Storage; Flammable/Combustible Liquids – Tanks; Flammable/Combustible
Liquids – AST/UST Removal; Fruit Ripening; Hazardous Materials; Magnesium Work; Repair Garage; Tire Storage; Explosives-Model Rockets
Tier 3 – Aircraft Refueling; Explosives – Blasting & Fireworks; High Piled Combustible Storage (HPS); Lumber Yards & Woodworking Plants;
Refrigeration Equipment; Spraying or Dipping Operations
Package Permits – All permits associated in the following activities are included in the Tier priced above: Dry Cleaning; Motor Vehicle Fuel
Dispensing; Repair Garage; Welding
14June 16, 2026 Item #6 Page 315 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Police Fees
216 Audio/Photos on USB each [2] $46
217 Burglary Alarm Registration Fee each [2] $31
Certificate of Registration - Application Fee each [1] $142
Certificate of Registration - Appeals Fee each [1] $706
218 False Alarm Response - Second Occurrence each [2] $41
219 False Alarm Response - Additional Occurrence each [2] $60
220 Excess False Alarm Panic Response each [3] $100
221 Excess False Alarm Panic Response - Robbery / Burglary each [3] $100
224 Entertainment License each [2] $324
225 Fingerprinting processing Fee each [2],[5] $29
Firearm Storage Fee each [1] $107
226 Fix-It Ticket - moving violation each [2],[6] $23
227 Fix-It Ticket - parking/registration violation each [2],[6] $15
228 Handicap Placard Violation Waiver Processing Fee each [2],[7] $31
229 Photograph Copy - Subpoena or Records requests that require
retrieval in QueTel evidence ro ram.each [2] $24
Police Response for Loud Disturbances - Second Response and
each Subse uent Res onse each [8] Actual Cost
230 Police/Fire - Emergency Response DUI Traffic Collision (max
$12,000 er incident each [1] Actual Cost
231 Production of body worn camera videos. Staff time per hour of
roduction and redaction of videos.each [1] Actual Cost
232 Report Copy Fee (Free to Victim)each [2] $24
Secondhand Dealer Licensing
State Licensing Fee – set by California Department of Justice each [1] Actual Cost
City Processing Fee – New Applications each [1] $167
City Processing Fee – Application Renewals each [1] $112
234 Storage/Impounded Vehicle Administrative Charge each [2] $167
Vehicle Repossesion Receipt each [9] $15
235
Fees for services not listed will be determined on a case-by-case
basis. It will be based on the fully burdened hourly rate and the
time of service rovided.
per hour [2] $92
[Notes]
[1] Set per City policy
[2]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region
Urban CPI.
[3] Set per City of Carlsbad Municipal Code 8.50.080 [E]
[4] Set per City of Carlsbad Municipal Code 5.16.070
[5] Plus actual cost from processing agency
[6] Requires proof of correction
[7] Waived with proof of correction
15June 16, 2026 Item #6 Page 316 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Administrative Citation Penalties
236 1st Violation of a City Ordinance each [2]100$
237 2nd Violation of a City Ordinance each [2]200$
238 3rd Violation of a City Ordinance each [2]500$
239 Subsequent violation of same ordinance within one year each [2]500$
Vehicle, Traffic, and Parking Civil Penalties
240 CA Vehicle Code Parking Violation, if not specified by separate fee
amount (rounded)each [3]48$
241 CA VC 22500(i) Bus Zone each [3]263$
242 CA VC 22500(l) Curb Cut/Disabled Access each [3]343$
243 each [3]343$
244 CA VC 22522 Sidewalk Access Ramp (3 ft. away)each [3]343$
245 CA VC 22526 (a)(b) Block Intersection/Gridlock each [3]63$
246 CA Vehicle Code Violation for Equipment, if not specified by
separate fee amount (rounded)each [3]38$
247 CA VC 4000(a) Expired Registration each [3]63$
248 CA VC 26100C Tinted Covers on Headlights each [3]48$
249 CA VC 28071 Passenger Car Bumpers Required each [3]88$
250 established by the CA Vehicle Code Parking Violation or CA Vehicle each [1]50$
[Notes]
[1] Set per City policy
[2] Set per City of Carlsbad Resolution 2001-167 and limit set per CA Government Code Section 36900 [B]
[3] Set per City Policy to the San Diego County Sheriff's Department Parking Fee Violation Table.
16June 16, 2026 Item #6 Page 317 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Trash Collection Rates (Stormwater fee included)
Residential Services
251 3-Cart (64 or 96 gallon cart)[1]36.33$
252 3-Cart Low Generator (35 gallon cart)[1]33.11$
253 Back Yard Service Fee (added to curbside rate)[1]45.72$
254 Additional Solid Waste Cart [1]3.96$
255 Additional Recycled Materials Cart (4+)[1]3.96$
256 Additional Organics Cart (4+)[1]3.96$
Extra Pick-up for Trash bags (Up to 6 bags per rate)[1]17.71$
Commercial Services
Commercial Solid Waste - 64 or 96 Gallon Cart
257 One pick-up per week [1]36.24$
258 Two pick-ups per week [1]72.48$
259 Three pick-ups per week [1]108.72$
260 Four pick-ups per week [1]140.39$
261 Five pick-ups per week [1]172.20$
262 Six pick-ups per week [1]203.97$
263 Extra pick-up, 96 Gallon Cart (per occurance)[1]17.07$
Commercial 96 Gallon Cart - Recycling and Organics Included
264 One pick-up per week [1]75.99$
265 Two pick-ups per week [1]134.33$
266 Three pick-ups per week [1]192.60$
267 Four pick-up per week [1]248.72$
268 Five pick-ups per week [1]305.08$
269 Six pick-ups per week [1]361.39$
270 Multi-Family: Set of Solid Waste, Recycling, and Organics (per unit)[1]16.56$
Commercial Solid Waste Yard Bins
271 1-yard bin - one pick-up per week [1]95.48$
272 1-yard bin - two pick-ups per week [1]162.18$
273 1-yard bin - three pick-ups per week [1]229.13$
274 1-yard bin - four pick-ups per week [1]295.87$
275 1-yard bin - five pick-ups per week [1]362.93$
276 1-yard bin - six pick-ups per week [1]429.91$
277 1-yard bin - extra pick-up (per occurance)[1]45.93$
278 2-yard bin - one pick-up per week [1]129.71$
279 2-yard bin - two pick-ups per week [1]228.27$
280 2-yard bin - three pick-ups per week [1]326.87$
281 2-yard bin - four pick-ups per week [1]425.31$
282 2-yard bin - five pick-ups per week [1]523.95$
283 2-yard bin - six pick-ups per week [1]622.54$
284 2-yard bin - extra pick-up (per occurance)[1]62.38$
285 3-yard bin - one pick-up per week [1]176.19$
286 3-yard bin - two pick-ups per week [1]321.27$
17June 16, 2026 Item #6 Page 318 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
287 3-yard bin - three pick-ups per week [1]466.31$
288 3-yard bin - four pick-ups per week [1]622.54$
289 3-yard bin - five pick-ups per week [1]756.41$
290 3-yard bin - six pick-ups per week [1]901.50$
291 3-yard bin - extra pick-up (per occurance)[1]83.72$
292 4-yard bin - one pick-up per week [1]234.98$
293 4-yard bin - two pick-ups per week [1]438.80$
294 4-yard bin - three pick-ups per week [1]642.70$
295 4-yard bin - four pick-ups per week [1]846.53$
296 4-yard bin - five pick-ups per week [1]1,050.36$
297 4-yard bin - six pick-ups per week [1]1,254.22$
298 4-yard bin - extra pick-up (per occurance)[1]100.16$
299 5-yard bin - one pick-up per week [1]293.78$
300 5-yard bin - two pick-ups per week [1]556.46$
301 5-yard bin - three pick-ups per week [1]819.07$
302 5-yard bin - four pick-ups per week [1]1,050.36$
303 5-yard bin - five pick-ups per week [1]1,344.38$
304 5-yard bin - six pick-ups per week [1]1,607.05$
305 5-yard bin - extra pick-up (per occurance)[1]116.57$
306 6-yard bin - one pick-up per week [1]321.27$
307 6-yard bin - two pick-ups per week [1]622.54$
308 6-yard bin - three pick-ups per week [1]901.50$
309 6-yard bin - four pick-ups per week [1]1,254.22$
310 6-yard bin - five pick-ups per week [1]1,607.05$
311 6-yard bin - six pick-ups per week [1]2,059.12$
312 6-yard bin - extra pick-up (per occurance)[1]145.72$
Commercial Split Bins (includes 2 locks )[1]
313 One pick-up per week [1]142.29$
314 Two pick-ups per week [1]259.70$
315 Three pick-ups per week [1]377.08$
316 Four pick-ups per week [1]494.47$
317 Five pick-ups per week [1]611.85$
318 Six pick-ups per week [1]729.26$
Commercial Bin Compactor - Solid Waste
319 3-yard bin - one pick-up per week [1]246.99$
320 3-yard bin - two pick-ups per week [1]462.52$
321 3-yard bin - three pick-ups per week [1]678.06$
322 3-yard bin - four pick-ups per week [1]893.57$
323 3-yard bin - five pick-ups per week [1]1,109.10$
324 3-yard bin - six picks-up per week [1]1,324.68$
325 3-yard bin - extra pick-up (per occurance)[1]100.45$
326 4-yard bin - one pick-up per week [1]407.88$
327 4-yard bin - two pick-ups per week [1]781.48$
328 4-yard bin - three pick-ups per week [1]1,155.66$
329 4-yard bin - four pick-ups per week [1]1,529.75$
18June 16, 2026 Item #6 Page 319 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
330 4-yard bin - five pick-ups per week [1]1,903.97$
331 4-yard bin - six picks-up per week [1]2,278.26$
332 4-yard bin - extra pick-up [1]165.88$
333 6-yard bin - one pick-up per week [1]637.58$
334 6-yard bin - two pick-ups per week [1]1,256.70$
335 6-yard bin - three pick-ups per week [1]1,876.96$
336 6-yard bin - four pick-ups per week [1]2,497.84$
337 6-yard bin - five pick-ups per week [1]3,119.00$
338 6-yard bin - six picks-up per week [1]3,740.30$
339 6-yard bin - extra pick-up (per occurance)[1]259.27$
Commercial Recycling
340 32 gal cart - one pick-up per week [1]26.48$
341 32 gal cart - two pick-ups per week [1]52.99$
342 32 gal cart - three pick-ups per week [1]79.49$
343 32 gal cart - four pick-ups per week [1]102.63$
344 32 gal cart - five pick-ups per week [1]125.89$
345 32 gal cart - six pick-ups per week [1]149.13$
346 64 or 96 gal cart - one pick-up per week [1]28.99$
347 64 or 96 gal cart - two pick-ups per week [1]57.98$
348 64 or 96 gal cart - three pick-ups per week [1]86.96$
349 64 or 96 gal cart - four pick-ups per week [1]112.31$
350 64 or 96 gal cart - five pick-ups per week [1]137.76$
351 64 or 96 gal cart - six pick-ups per week [1]163.17$
352 64 or 96 gal cart - extra pick-up (per occurance)[1]13.66$
353 1-yard bin - one pick-up per week [1]76.38$
354 1-yard bin - two pick-ups per week [1]129.74$
355 1-yard bin - three pick-ups per week [1]183.30$
356 1-yard bin - four pick-ups per week [1]236.68$
357 1-yard bin - five pick-ups per week [1]290.35$
358 1-yard bin - six pick-ups per week [1]343.93$
359 1-yard bin - extra pick-up (per occurance)[1]36.73$
360 2-yard bin - one pick-up per week [1]103.77$
361 2-yard bin - two pick-ups per week [1]182.60$
362 2-yard bin - three pick-ups per week [1]261.49$
363 2-yard bin - four pick-ups per week [1]340.24$
364 2-yard bin - five pick-ups per week [1]419.16$
365 2-yard bin - six pick-ups per week [1]498.04$
366 2-yard bin - extra pick-up (per occurance)[1]49.90$
367 3-yard bin - one pick-up per week [1]140.96$
368 3-yard bin - two pick-ups per week [1]257.03$
369 3-yard bin - three pick-ups per week [1]373.06$
370 3-yard bin - four pick-ups per week [1]498.04$
371 3-yard bin - five pick-ups per week [1]605.13$
372 3-yard bin - six pick-ups per week [1]721.20$
373 3-yard bin - seven pick-ups per week [1]840.39$
19June 16, 2026 Item #6 Page 320 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
374 3-yard bin - extra pick-up (per occurance)[1]66.97$
375 4-yard bin - one pick-up per week [1]187.96$
376 4-yard bin - two pick-ups per week [1]351.03$
377 4-yard bin - three pick-ups per week [1]514.16$
378 4-yard bin - four pick-ups per week [1]677.21$
379 4-yard bin - five pick-ups per week [1]840.29$
380 4-yard bin - six pick-ups per week [1]1,003.37$
381 4-yard bin - seven pick-ups per week [1]1,166.62$
382 4-yard bin - extra pick-up (per occurance)[1]80.13$
383 5-yard bin - one pick-up per week [1]235.02$
384 5-yard bin - two pick-ups per week [1]445.16$
385 5-yard bin - three pick-ups per week [1]655.26$
386 5-yard bin - four pick-ups per week [1]840.29$
387 5-yard bin - five pick-ups per week [1]1,075.50$
388 5-yard bin - six pick-ups per week [1]1,285.65$
389 5-yard bin - extra pick-up (per occurance)[1]93.26$
390 6-yard bin - one pick-up per week [1]257.03$
391 6-yard bin - two pick-ups per week [1]498.04$
392 6-yard bin - three pick-ups per week [1]721.20$
393 6-yard bin - four pick-ups per week [1]1,003.37$
394 6-yard bin - five pick-ups per week [1]1,285.65$
395 6-yard bin - six pick-ups per week [1]1,647.30$
396 6-yard bin - extra pick-up (per occurance)[1]116.59$
Commercial Bin Compactor - Recycling
397 3-yard bin - one pick-up per week [1]197.60$
398 3-yard bin - two pick-ups per week [1]370.03$
399 3-yard bin - three pick-ups per week [1]542.44$
400 3-yard bin - four pick-ups per week [1]714.85$
401 3-yard bin - five pick-ups per week [1]887.28$
402 3-yard bin - six picks-up per week [1]1,059.74$
403 3-yard bin - extra pick-up (per occurance)[1]80.36$
404 4-yard bin - one pick-up per week [1]326.30$
405 4-yard bin - two pick-ups per week [1]625.19$
406 4-yard bin - three pick-ups per week [1]924.52$
407 4-yard bin - four pick-ups per week [1]1,223.79$
408 4-yard bin - five pick-ups per week [1]1,523.18$
409 4-yard bin - six picks-up per week [1]1,822.61$
410 4-yard bin - extra pick-up (per occurance)[1]132.69$
411 6-yard bin - one pick-up per week [1]510.07$
412 6-yard bin - two pick-ups per week [1]1,005.37$
413 6-yard bin - three pick-ups per week [1]1,501.55$
414 6-yard bin - four pick-ups per week [1]1,998.27$
415 6-yard bin - five pick-ups per week [1]2,495.21$
416 6-yard bin - six picks-up per week [1]2,992.25$
417 6-yard bin - extra pick-up (per occurance)[1]207.42$
20June 16, 2026 Item #6 Page 321 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Commercial Organics Recycling
418 32 gal cart - one pick-up per week [1]26.48$
419 32 gal cart - two pick-ups per week [1]52.99$
420 32 gal cart - three pick-ups per week [1]79.49$
421 32 gal cart - four pick-ups per week [1]102.63$
422 32 gal cart - five pick-ups per week [1]125.89$
423 32 gal cart - six pick-ups per week [1]149.13$
424 64 or 96 gal cart - one pick-up per week [1]28.99$
425 64 or 96 gal cart - two pick-ups per week [1]57.98$
426 64 or 96 gal cart - three pick-ups per week [1]86.96$
427 64 or 96 gal cart - four pick-ups per week [1]112.31$
428 64 or 96 gal cart - five pick-ups per week [1]137.76$
429 64 or 96 gal cart - six pick-ups per week [1]163.17$
430 64 or 96 gal cart - extra pick-up (per occurance)[1]13.66$
431 1-yard bin - one pick-up per week [1]76.38$
432 1-yard bin - two pick-ups per week [1]129.74$
433 1-yard bin - three pick-ups per week [1]183.30$
434 1-yard bin - four pick-ups per week [1]236.68$
435 1-yard bin - five pick-ups per week [1]290.35$
436 1-yard bin - six pick-ups per week [1]343.93$
437 1-yard bin - extra pick-up (per occurance)[1]36.73$
438 1.5-yard bin - one pick-up per week [1]90.08$
439 1.5-yard bin - two pick-ups per week [1]156.18$
440 1.5-yard bin - three pick-ups per week [1]222.40$
441 1.5-yard bin - four pick-ups per week [1]288.46$
442 1.5-yard bin - five pick-ups per week [1]354.76$
443 1.5-yard bin - six pick-ups per week [1]420.98$
444 1.5-yard bin - extra pick-up (per occurance)[1]43.32$
445 2-yard bin - one pick-up per week [1]103.77$
446 2-yard bin - two pick-ups per week [1]182.60$
447 2-yard bin - three pick-ups per week [1]261.49$
448 2-yard bin - four pick-ups per week [1]340.24$
449 2-yard bin - five pick-ups per week [1]419.16$
450 2-yard bin - six pick-ups per week [1]498.04$
451 2-yard bin - extra pick-up (per occurance)[1]49.90$
452 3-yard bin - one pick-up per week [1]140.96$
453 3-yard bin - two pick-ups per week [1]257.03$
454 3-yard bin - three pick-ups per week [1]373.06$
455 3-yard bin - four pick-ups per week [1]498.04$
456 3-yard bin - five pick-ups per week [1]605.13$
457 3-yard bin - six pick-ups per week [1]721.20$
458 3-yard bin - extra pick-up (per occurance)[1]66.97$
459 4-yard bin - one pick-up per week [1]187.96$
460 4-yard bin - two pick-ups per week [1]351.03$
21June 16, 2026 Item #6 Page 322 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
461 4-yard bin - three pick-ups per week [1]514.16$
462 4-yard bin - four pick-ups per week [1]677.21$
463 4-yard bin - five pick-ups per week [1]840.29$
464 4-yard bin - six pick-ups per week [1]1,003.37$
465 4-yard bin - extra pick-up (per occurance)[1]80.13$
Commercial Bin Compactor - Organics Recycling
466 3-yard bin - one pick-up per week [1]197.60$
467 3-yard bin - two pick-ups per week [1]370.03$
468 3-yard bin - three pick-ups per week [1]542.44$
469 3-yard bin - four pick-ups per week [1]714.85$
470 3-yard bin - five pick-ups per week [1]887.28$
471 3-yard bin - six picks-up per week [1]1,059.74$
472 3-yard bin - extra pick-up (per occurance)[1]80.36$
473 4-yard bin - one pick-up per week [1]326.30$
474 4-yard bin - two pick-ups per week [1]625.19$
475 4-yard bin - three pick-ups per week [1]924.52$
476 4-yard bin - four pick-ups per week [1]1,223.79$
477 4-yard bin - five pick-ups per week [1]1,523.18$
478 4-yard bin - six picks-up per week [1]1,822.61$
479 4-yard bin - extra pick-up (per occurance)[1]132.69$
480 6-yard bin - one pick-up per week [1]510.07$
481 6-yard bin - two pick-ups per week [1]1,005.37$
482 6-yard bin - three pick-ups per week [1]1,501.55$
483 6-yard bin - four pick-ups per week [1]1,998.27$
484 6-yard bin - five pick-ups per week [1]2,495.21$
485 6-yard bin - six picks-up per week [1]2,992.25$
486 6-yard bin - extra pick-up (per occurance)[1]207.42$
Special Haul Bin Rate
487 3-yard bin - one pick-up per week [1]215.40$
488 3-yard bin - two pick-ups per week [1]336.63$
489 3-yard bin - three pick-ups per week [1]457.86$
490 3-yard bin - four pick-ups per week [1]579.09$
491 3-yard bin - five pick-ups per week [1]700.34$
492 3-yard bin - six pick-ups per week [1]821.57$
493 3-yard bin - extra pick-up [1]70.33$
Construction and Demolition Recycling
494 Special Haul Bin (no Storm Water Fees) 1 week or less [1]152.12$
495 2-yard temporary C&D Recycling Bin [1]177.37$
496 3-yard temporary C&D Recycling Bin [1]180.27$
497 4-yard temporary C&D Recycling Bin [1]195.92$
498 6-yard temporary C&D Recycling Bin [1]202.40$
22June 16, 2026 Item #6 Page 323 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Other Fees and Charges
499 Bin Exchange [1]98.45$
500 Bin Lock Set Up Fee [1]61.52$
501 Locking Fee [1]23.39$
502 Overloaded Bins [1]84.76$
503 [1]169.44$
504 Bin Relocation (first 25 feet free)11.69$
505 Special haul bin delivery [1]67.85$
506 [1]531.13$
507 [1]109.16$
508 Copy Fee - The charge for copies requested by customers [1]2.32$
509 Delivery of extra cart [1]19.01$
510 [1]5.85$
Pull out rate for carts (For MFD / Commercial)[1]45.72$
Pull out rate for front load bins (more than 25 ft)[1]79.73$
511 Bulky Item - Exceeding 5 per pick up - First item [1]69.11$
512 Bulky Item - Exceeding 5 per pick up - each addl item [1]17.71$
513 Per Bulky Item - first item [1]69.11$
514 Per Bulky Item - each additional item [1]17.71$
515 Bulky Item requiring 2 people to handle [1]99.25$
516
Contamination Fee - to recover costs for separating solid waste
placed in a recycling or green waste container or for arranging a
special, unscheduled collection due to contamination.
[1]88.12$
517 Scout service per bin per service [1]79.73$
518 Residential Return to Service Fee - The return to service fee for two
or more calls in a one-month period by a residential customer [1]55.51$
519 [1]33.30$
Roll off Service
520 Service Fee - Roll off service [1]361.59$
521 Disposal Fee per Ton (pass through)[1]63.15$
522 Recycling Processing Fee per Ton (pass through)[1]41.70$
523 Organics Processing Fee per Ton (pass through)[1]90.57$
524 C&D Processing Fee per Ton (pass through)[1]85.23$
525 Contaminated Load (per occurrence)[1]361.59$
526 Roll off - Demurrage Per Day Charge [1]7.70$
Single and Multi-Family Resident Bulky Item Pick-Ups - 5 items maximum per pick up
Commercial Bulky Item Pick-Ups
23June 16, 2026 Item #6 Page 324 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
527 Delivery [1]93.05$
528 Delivery Demo (includes signage) [1]98.38$
529 Relocation Charge onsite [1]72.71$
530 Relocation Charge offsite [1]103.71$
531 Wash Out Receiver Boxes [1]83.17$
532 Dead Run charge [1]124.67$
533 Standby charge per minute, after 5 minutes [1]3.30$
[Notes]
[1] Set per contract by Republic Services. These rates are effective July 1, 2026.
24June 16, 2026 Item #6 Page 325 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
534 Discontinuation of Service - Non-Payment (Shut-off)each [2]92$
540 Service Reconnection for Non-Payment (Next Day) Business Hours
(Next Scheduled Day Turn-On)each [2],[3]115$
535 Service Reconnection (Non-Payment) - Same Day / Non-Business
hours (After Hours Turn-On)each [2],[3]290$
538 Door Hanger Notice for Nonpayment each [2]53$
537 Electronic Notice (in lieu of door hanger)each [2]3$
541 New Account Service Connection - (Same Day) Business Hours (Same
Day Turn-On)each [2]194$
539 New Account Set Up (Admin)each [2]48$
536 Continuity of Service each [2]12$
Water Services Fees
542 Utility Standards and Specifications each [1],[2] Actual Cost
543 Potable Water Meter - Construction Meter Deposit deposit [1],[2]1,300$
544 Potable Water Meter - Construction Meter Installation each [2]544$
545 Potable Water Meter - Construction Meter Relocation each [2]272$
546 Annual Potable Backflow Preventer Certification - 1st Notice [1],[2]3$
547 Annual Potable Backflow Preventer Certification - 2nd Notice per month [1],[2]25$
548 Annual Potable Backflow Preventer Certification - 3rd Notice per month [1],[2]59$
549 Potable Water Shutdown (8 hours)each [1],[2]2,722$
Potable Water Shutdown (in excess of 8 hours)
0 - 2 hours each [1],[2]544$
Over 2 hours each [1],[2]1,633$
Recycled Water Fees
550 Cross-Connection Inspection - County Department of Environmental
Health (CDEH) each [2] Actual Cost
551 Cross-Connection Reinspection each [2] Actual Cost
552 Recycled Water Meter - Construction Meter Deposit deposit [1],[2]1,300$
553 Recycled Water Meter - Construction Meter Installation each [2]544$
554 Recycled Water Meter - Construction Meter Relocation each [2]272$
555 Recycled Water Shutdown (8 hours)each [2]2,722$
Recycled Water Shutdown (in excess of 8 hours)
0 - 2 hours each [1],[2]544$
Over 2 hours each [1],[2]1,633$
Wastewater Fees
556 Fats, Oils, and Grease (FOG) Fee [2]175$
557 Temporary Discharge to Sewer (city processing fee, plus actual cost) per permit [6]545$
25June 16, 2026 Item #6 Page 326 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Third Party Hydraulic Modelling Fees
558 Third Party Hydraulic Modeling - Consultant Cost (All Water Systems) per project [1],[4] Actual Cost
Processing Fees - Wastewater
559 1-4 units residential and commercial < 9,400 s.f.per project [2],[5]816$
560 All others per project [2],[5]1,089$
Processing Fees - Potable Water
561 System Pressure Check each [2]544$
562 1-4 units residential and commercial < 9,400 s.f.per project [2],[5]816$
563 All others per project [2],[5]1,089$
Processing Fees - Recycled Water
564 System Pressure Check each [2]544$
565 1-4 units residential and commercial < 9,400 s.f.per project [2],[5]816$
566 All others per project [2],[5]1,089$
Utilities Department Fees
567
Fees for services not listed will be determined on a case-by-case
basis. It will be based on the fully burdened hourly rate and the time per hour [2]279$
[Notes]
[1] Set per City policy
[2]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region
Urban CPI.
[3] Set per CA Health and Safety Code 116914(a)(1)
[4] Total fee will reflect actual consultant billings
[5] Staff cost is in addition to actual consultant billings
[6]city processing fee.
[7] Additional Penalties may apply
26June 16, 2026 Item #6 Page 327 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Utility Meter Installation Fees
Potable Water (meter size, inches)
568 5/8" Ultrasonic per [1]480$
569 Fire Protection – 5/8" Ultrasonic per [1]480$
570 3/4” Ultrasonic per [1]476$
571 1” Ultrasonic per [1]608$
572 1-1/2” Ultrasonic per [1]740$
573 1-1/2” Turbo per [1]898$
574 2” Ultrasonic per [1]1,051$
575 2” Turbo per [1]1,106$
576 3" Ultrasonic per [1] Actual Cost
577 4" Ultrasonic per [1] Actual Cost
578 6” Ultrasonic per [1] Actual Cost
579 8” Ultrasonic per [1] Actual Cost
580 10” Ultrasonic per [1] Actual Cost
581 12” Ultrasonic per [1] Actual Cost
Recycled Water (meter size, inches)
582 5/8" Ultrasonic per [1]480$
583 Fire Protection – 5/8" Ultrasonic per [1]480$
584 3/4” Ultrasonic per [1]476$
585 1” Ultrasonic per [1]608$
586 1-1/2” Turbo per [1]898$
587 2” Turbo per [1]1,106$
588 3" Ultrasonic per [1] Actual Cost
589 4" Ultrasonic per [1] Actual Cost
590 6” Ultrasonic per [1] Actual Cost
591 8” Ultrasonic per [1] Actual Cost
592 10” Ultrasonic per [1] Actual Cost
593 12” Ultrasonic per [1] Actual Cost
residential water meter is required to be 1” due to a fire sprinkler requirement, the Connection Fee, SDCWA
System Capacity Charge and the Water Treatment Capacity Charge will be based on the size of the meter
necessary to meet the water use requirements, not the actual meter size of 1”. These fees are in addition to the
27June 16, 2026 Item #6 Page 328 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Utility Potable and Recycled Water Connection Fees (meter size, inches)
Ultrasonic
594 5/8” each [1]5,865$
595 3/4”each [1]8,361$
596 1”each [1]13,197$
597 1-1/2”each [1]24,928$
598 2”each [1]37,541$
599 3”each [1]63,512$
600 4”each [1]98,797$
601 6”each [1]183,479$
602 8”each [1]216,858$
Turbo (All Irrigation Meters)
603 1-1/2”each [1]29,265$
604 2”each [1]46,923$
605 3”each [1]98,797$
606 4”each [1]282,277$
607 6”each [1]564,541$
608 8”each [1]790,630$
[Notes]
[1] Set per City policy
These fees are in addition to the Meter Installation Fees and SDCWA Fees.
28June 16, 2026 Item #6 Page 329 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
San Diego County Water Authority (SDCWA) Fees
SDCWA System Capacity Charge (meter size, inches)
609 Fire Protection per [1]
610 5/8" Displacement per [1]6,501$
611 3/4” Displacement per [1]6,501$
612 1” Displacement per [1]10,402$
613 1-1/2” Displacement per [1]19,503$
614 1-1/2” Turbo per [1]19,503$
615 2” Displacement per [1]33,805$
616 2” Turbo per [1]33,805$
617 3” per [1]62,410$
618 4” per [1]106,616$
619 6”per [1]195,030$
620 8”per [1]338,052$
621 10”per [1]507,078$
622 12”per [1]858,132$
Water Treatment Capacity Charge (meter size, inches)
623 Fire Protection per [1]
624 5/8" Displacement per [1]182$
625 3/4” Displacement per [1]182$
626 1” Displacement per [1]291$
627 1-1/2” Displacement per [1]546$
628 1-1/2” Turbo per [1]546$
629 2” Displacement per [1]946$
630 2” Turbo per [1]946$
631 3” per [1]1,747$
632 4” per [1]2,985$
633 6”per [1]5,460$
634 8”per [1]9,464$
635 10”per [1]14,196$
636 12”per [1]24,024$
[Notes]
[1]
The following language is based on Carlsbad Municipal Water District Ordinance 45: Where a single family
residential water meter is required to be 1” due to a fire sprinkler requirement, the Connection Fee, SDCWA
System Capacity Charge and the Water Treatment Capacity Charge will be based on the size of the meter
necessary to meet the water use requirements, not the actual meter size of 1”.
These fees are set by San Diego County Water Authority, effective January 1, 2026, and are in addition to the Meter Installation Fees and
Potable and Reclaimed Connection Fees.
29June 16, 2026 Item #6 Page 330 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Section 2
Development Related
Service Fees
June 16, 2026 Item #6 Page 331 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Planning Department Fees
638 Amendments and Revisions to Approved Projects flat [1] 50% of current
a lication fee
639 Appeals to Planning Commision/City Council [2] 1,440$
Building Plan Review
640 Minor Projects, per permit each [3]122$
641 Major Projects, per permit each [4]363$
642 City Planner Determination each [1]1,305$
Coastal Development Permit (CDP)
643 2 - 4 unit or lot subdivision / multifamily project per permit [2]8,304$
644 5 or more units or lot subdivision / multifamily project per permit [2]14,996$
645 Emergency flat [2]3,035$
646 Exemption flat [2]401$
647 Minor Permit flat [2]3,974$
648 Non-Residential flat [2]4,162$
649 Single Family Home flat [2]5,639$
650 Single Family Home w/bluff per permit [2]8,757$
Conditional Use Permit (CUP)
651 Within Biological Habitat Preserve flat [2]3,594$
652 Minor flat [2]3,817$
653 Regular flat [2]12,416$
654 Daycare Permit (7 - 14 Children)flat [2]581$
Environmental Impact Assessment (EIA)
655 Initial Study - NEGATIVE DECLARATION flat [2]3,406$
656 Initial Study - MITIGATED NEG DEC flat [2]8,066$
657 Initial Study - checklist for streamlining or within the scope
determinations 15152 - 15168 and 15183 flat [2]2,870$
658 Initial Study - addendum for MNDs or NDs flat [2]3,714$
Environmental Impact Report (EIR)
Addendum
659 First 20 hours of project planner base fee
flat [2]5,393$
660 >20 hours of project planner per hour [2]137$
Focused/Supplemental (requiring a public hearing)
661 First 120 hours of project planner and 20 hours of project
en ineer
base fee
flat [2]22,081$
662 >120 project planner hours and >20 project engineer hours per hour [2]315$
31June 16, 2026 Item #6 Page 332 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
FULL EIR
663 First 180 hours of project planner and 40 hours of project
en ineer
base fee
flat [2]34,053$
664 >180 project planner hours and >40 project engineer hours per hour [2]315$
Fish & Game Fee
665 Environmental Impact Report (EIR)flat [5]4,278$
666 Environmental Document pursuant to a Certified Regulatory
Pro ram CRP flat [5]1,487$
667 Negative Declaration (ND)/Mitigated Negative Declaration
MND flat [5]3,094$
668 Extensions to projects in process flat [1] 25% of current fee
669 General Plan Amendment
Base Fee
First 200 hours of project planner and 60 hours of project
en ineer
base fee
flat [2]20,394$
>200 project planner hours and >60 project engineer hours per hour 374$
Habitat Management Plan (HMP)
670 Amendment to Plan Document - Major - first 60 hours of
ro ect lanner
base fee
flat [2]10,160$
671 >60 hours of project planner per hour [2]137$
672 Amendment to Plan Document - Minor flat [2]5,667$
673 Permit - Major -first 40 hours of project planner base fee
flat [2]7,401$
674 >40 hours or project planner per hour [2]137$
675 Permit - Minor - first 20 hours of project planner base fee
flat [2]1,523$
676 >20 hours of project planner per hour [2]137$
677 Permit - MINOR W/MINISTERIAL PERMIT flat [2]942$
678 Hillside Development Permit - Major - first 40 hours of project
lanner
base fee
flat [2]8,356$
679 Hillside Development Permit - Minor - first 20 hours of project
lanner
base fee
flat [2]2,808$
Historic Preservation Permit
680 Local Register Application each [2],[7]No Fee
681 Mills Act Application each [2],[7]No Fee
682 Concurrent Local Register and Mills Act Applications each [2],[7]No Fee
683 Third Party Technical Report Review - Contractor Cost each [2],[7]No Fee
684 Mills Act Inspections each [2],[7]No Fee
Landscape Plan Check/Inspection Fees
687 City Processing Fee per project [2]490$
688 Contractor Cost per project [1] Actual Cost
32June 16, 2026 Item #6 Page 333 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
689 Local Coastal Plan - Amendment
Base Fee
First 200 hours of project planner and 60 hours of project
en ineer
base fee
flat [2]14,648$
>200 project planner hours and >60 project engineer hours per hour [2]374$
691 Local Facilities Management Plan/Amendment
Amendment to Plan Document - Major - first 60 hours of
ro ect lanner
base fee
flat [1]10,432$
>60 hours of project planner per hour 137$
Master Plan
692 Master Plan - New
693 First 200 hours of project planner and 100 hours of project
en ineer
base fee
flat [2]46,910$
694 >200 project planner hours and >100 project engineer
hours per hour [2]401$
Major Amendment
695 First 100 hours of project planner and 40 hours of project
en ineer
base fee
flat [2]22,890$
696 >100 project planner hours and >40 project engineer hours per hour [2]374$
Minor Amendment
697 First 30 hours of project planner and 7 hours of project
en ineer
base fee
flat [2]4,763$
698 >30 project planner hours and >7 project engineer hours per hour [2]374$
699 Non-Conforming Construction Permit flat [2]1,306$
700 Notice Fee (+ postage)flat [1] Actual Cost
701 Substantial Conformance Review [2]1,187$
702 Planned Development (residential/non-residential) - 5 or more
lots/units - Ma or Subdivision per project [2] 18,649$
703 Planned Development (residential/non-residential) - 4 or fewer
lots/units per project [2]9,593$
704 Planning Commission Agenda and Minutes (+ postage)per page [1] Copy Charge
705 Planning Commission Determination-other flat [2]2,812$
706 Postage (All)flat [1]
Current Postage
Rate x Number of
labels
707 Precise Development Plan flat [2]18,535$
708 Preliminary Plan Review - Major (Other)flat [2]1,380$
709 Preliminary Plan Review - Minor (SFD)flat [2]471$
Preliminary Plan Review - SB330 flat [2]242$
710 Re-Recording or Cancellation of an Instrument on Real Property
cit rocessin fee, lus actual cost each [1]286$
33June 16, 2026 Item #6 Page 334 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Reversion to Acreage (Consistent with city payroll records charged
a ainst a $3,100 de osit
711 First 25 hours of project planner and 20 hours of project
en ineer
base fee
flat [2]7,801$
712 Satellite Antenna Permit flat [2]714$
Sign Program
714 Sign Permit (including non-commercial)flat [2]100$
715 Sign Program flat [2]2,018$
716 Modified Minor Sign Program flat [2]1,386$
717 Modified Regular Sign Program flat [2]3,312$
Site Development Plan
719 Minor - Residential, less than or equal to 4 units/lots or as
re uired er CMC/PLAN flat [2] 7,569$
720 Major - 5 or more units/lots or as required per CMC/PLAN flat [2]23,164$
721 Special Use Permit - Other flat [2]7,467$
Special Use Permit - Open Space Encroachment flat [2]1,057$
Special Use Permit - Floodplain flat [2]6,749$
Specific Plan
Base Fee
723 First 200 hours of project planner and 60 hours of project
en ineer
base fee
flat [2]44,642$
724 >200 project planner hours and >60 project engineer hours per hour [2]374$
Amendment - Major
725 First 180 hours of project planner and 30 hours of project
en ineer
base fee
flat [2]34,644$
726 >180 project planner hours and >30 project engineer hours per hour [2]374$
Amendment - Minor
727 First 20 hours of project planner and 7 hours of project
en ineer
base fee
flat [2]5,222$
728 >20 project planner hours and >7 project engineer hours per hour [2]374$
729 Street Name Change flat [2]2,589$
Tentative Maps
730 Tentative Parcel Map - Minor Subdivision - 0- 4 Lots/Units flat [2]9,652$
731 Tentative Tract Map - 5 - 49 units/lots flat [2]15,230$
732 Tentative Tract Map - 50 + units/lots flat [2]21,675$
733 Tentative Tract Map Litigation Stay flat [1] 25% of current fee
Third Party Review
734 Processing Fee per project [2]1,222$
735 Consultant Cost per project [1] Actual Cost
736 Variance flat [2]5,980$
34June 16, 2026 Item #6 Page 335 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
737 Variance - Minor flat [2] 2,144$
742 Wireless Communication Third Party Review flat [1] Actual Cost
Zone Change
Base Fee
First 200 hours of project planner and 60 hours of project
en ineer
base fee
flat [2]15,161$
743 >200 project planner hours and >60 project engineer hours per hour [2]374$
744 Zone Code Compliance Letter flat [2]219$
745 Research Fee per hour [2]202$
746
Fees for services not listed will be determined on a case-by-case
basis. It will be based on the fully burdened hourly rate and the
time of service provided.
per hour [2]202$
TOTAL
[Notes]
[1] Set per City policy
[2]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region
Urban CPI.
[3] Minor: residential new/remodel, commercial/ industrial tenant improvement
[4] Major: Commercial/ industrial new
[5]
Set by Department of Fish and Wildlife. Fish & Game fees are additional to the EIA/EIR
fees. Includes $50.00 County Clerk processing fee. Updated with new fees effective
Jan. 1, 2026.
[6]
When multiple entitlement and/or permits occur within the same project that require
combined legislative actions, a combination project discount applies. The highest fee
will be charged at 100%, followed by a 50% discount on each concurrent entitlement
and/or permit application
[7]Historic Preservation Permit fees are temporarily waived, pursuant to Resolution No.
2025-122, adopted by City Council on June 10, 2025.
35June 16, 2026 Item #6 Page 336 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Appeal Fee each [2]2,061$
747 Adjustment Plat per project [2]2,156$
Building Plan Review
748 Minor Projects, per permit each [3]393$
749 Major Projects, per permit each [4]850$
Certificate
750 Certificate of Compliance each [2]2,036$
751 Certificate of Compliance In Lieu of Parcel Map each [2]4,324$
752 Certificate of Correction each [2]1,388$
Construction Change Review - Major
753 Base Fee per project [2]1,254$
754 Plus fee per sheet per sheet [2]564$
Construction Change Review - Minor
755 Base Fee per project [2]792$
756 Plus fee per sheet per sheet [2]456$
757 deposit [13]2,039$
758 Easement Document Processing and Recording per project [2]2,080$
759 Encroachment Agreement Processing per project [2]972$
760 deposit [1]Actual Cost
Grading Plan Check Fees (cubic yard)
761 100 2,627$
762 101 3,471$
763 234$
764 1,001 5,579$
765 303$
766 10,001 8,305$
767 268$
768 100,001 10,713$
769 417$
770 200,001 14,881$
771 1,214$
772 400,001 17,308$
36June 16, 2026 Item #6 Page 337 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
773 844$
774 1,000,001 base fee at
1,000,001 CY
[2], [5],
[6], [8]22,370$
775 2,237$
Grading Permit Inspection Fees (cubic yard)
776 100 5,184$
777 101 5,189$
778 191$
779 1,001 6,909$
780 300$
781 10,001 base fee at
10,001 CY
[2], [5],
[6], [8]9,607$
782 439$
783 100,001 13,559$
784 215$
785 200,001 15,711$
786 294$
787 400,001 21,593$
788 2,126$
789 1,000,001 34,348$
790 3,435$
Improvement Plan Review Fee
791 $ 20,000 [2], [8]3,955$
792 $ 20,001 [2], [8]5,196$
793 [2], [8]657$
794 $ 50,001 [2], [8]7,167$
795 [2], [8]586$
37June 16, 2026 Item #6 Page 338 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
796 $ 100,001 [2], [8]10,096$
797 [2], [8]539$
798 $ 250,001 [2], [8]18,183$
799 [2], [8]278$
800 $ 500,001 [2], [8]25,128$
801 [2], [8]129$
802 $ 1,000,001 [2], [8]31,554$
803 [2], [8]316$
Improvement Inspection
804 $ 20,000 [2], [8]2,803$
805 $ 20,001 [2], [8]3,866$
806 [2], [8]652$
807 $ 50,001 [2], [8]5,823$
808 [2], [8]303$
809 $ 100,001 [2], [8]7,339$
810 [2], [8]237$
811 $ 250,001 [2], [8]10,887$
812 [2], [8]283$
813 $ 500,001 [2], [8]17,964$
814 [2], [8]135$
815 $ 1,000,001 [2], [8]24,712$
816 [2], [8]247$
$ 20,000 [2], [8]3,826$
$ 20,001 [2], [8]4,411$
[2], [8]524$
38June 16, 2026 Item #6 Page 339 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
$ 50,001 [2], [8]5,982$
[2], [8]351$
$ 100,001 [2], [8]7,736$
[2], [8]253$
$ 250,001 [2], [8]11,529$
[2], [8]185$
$ 500,001 [2], [8]16,157$
[2], [8]80$
$ 1,000,001 [2], [8]20,168$
[2], [8]202$
$ 20,000 [2], [8]2,349$
$ 20,001 [2], [8]3,715$
[2], [8]387$
$ 50,001 [2], [8]4,876$
[2], [8]174$
$ 100,001 [2], [8]5,745$
[2], [8]190$
$ 250,001 [2], [8]8,590$
[2], [8]156$
$ 500,001 [2], [8]12,501$
[2], [8]51$
$ 1,000,001 [2], [8]15,040$
[2], [8]150$
39June 16, 2026 Item #6 Page 340 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Mapping Fees
Final Tract Map - Major Subdivision
817 Base Fee per map [2]12,023.00$
818 Per acre fee (calculated with actual acreage)per acre [2]193.00$
819 Parcel Map - Minor Subdivision per map [2]6,138.00$
820 Neighborhood Improvement Agreements each [2]353.00$
821 Oversize Load Permit - 1 trip per trip [7]16.00$
822 Oversize Load Permit - Annual/Per Year per year [7]92.00$
823 Quitclaim of Easement each [2]1,598.00$
824 Reapportionment Fees for 1911 Act Assessment Districts each [1]Actual Cost
Retaining Wall Plan Check Fees
Retaining Wall Plan Check Valuation
825 $0 - $50,000 [2]642.00$
826 $50,001 - $250,000 [2]2,254.00$
827 $250,000+[2]3,726.00$
828 Reversion to Acreage deposit [2]5,000.00$
Right-of-Way Permit
Annual Permit Holder - Review and Processing each [2]219.00$
Annual Permit Holder - Field Inspection
Inspections (within 5 days)per site [2]222.00$
Each additional inspection (over 5 days)inspection / [2]222.00$
per project [2], [9]276.00$
per project [2], [10]276.00$
830 Minor - Construction
Inspection Fee each [2], [12]920.00$
Processing and Review each [2], [12]552.00$
Revision after Approval each [2]276.00$
829 Minor - Non-Construction
Inspection Fee
Traffic Control Only each [2]652.00$
Road Closure each [2]917.00$
Processing and Review
Non Standard Traffic Control Plan each [2]532.00$
Standard Traffic Control Plan each [2]489.00$
Road Closure each [2]842.00$
Revision after Approval each [2]259.00$
40June 16, 2026 Item #6 Page 341 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Utility
Inspection Fee
Access Facilities - No Ground Disturbance/Construction each [2], [14]610.00$
Miscellaneous Construction per project [2], [14]610.00$
New Facility Only (no trenching) (in ground/ above ground) each [2], [14]610.00$
Night & Weekend Work hourly [2], [14]723.00$
Overhead Lines, Add/Remove/Replace per project [2], [14]610.00$
Pole Placement/ Replacement each [2], [14]610.00$
each [2], [14]610.00$
Sewer Lateral each [2], [14]675.00$
Water Lateral each [2], [14]675.00$
0 to 150 Linear Feet each [2], [11]1,598.00$
151 to 1000 Linear Feet hourly [2], [11]178.00$
1001 to 10,500 Linear Feet hourly [2], [11]178.00$
Processing and Review
each [2]138.00$
Miscellaneous Construction each [2]276.00$
each [2]414.00$
Overhead Lines, Add/Remove/Replace each [2]138.00$
Pole License each [2]621.00$
Pole Placement/ Replacement each [2]207.00$
each [2]276.00$
Revision after Approval each [2]207.00$
Sewer Lateral each [2]602.00$
Water Lateral each [2]602.00$
0 to 150 Linear Feet each [2]345.00$
151 to 1000 Linear Feet each [2]828.00$
1001 to 10,500 Linear Feet each [2]1,380.00$
Use - Initial Permit
Inspection Curb and Sidewalk Café each [2]662.00$
Processing and Review
Curb Café each [2]761.00$
Sidewalk Café each [2]715.00$
Outdoor Display each [2]305.00$
Use - Annual Renewal
Curb Café each [2]276.00$
41June 16, 2026 Item #6 Page 342 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Sidewalk Café each [2]276.00$
Outdoor Display each [2]276.00$
Village Area - Curb Café (max of two parking spaces)1,200.00$
844 Secured Agreement Processing - Extension each [2]528.00$
845 Secured Agreement Processing - Replacement, plus improvement
plan revision fees if required each [2]920.00$
846 records + overhead, consultant cost and recording fee. Also see deposit [1]Actual Cost
847 (Consistent with city payroll records + overhead, consultant cost and
recording fee. Also see Streets and Highways Code Section 8760-deposit [1]Actual Cost
Storm Water Pollution Prevention Plan (SWPPP) Fees
Plan Review Fee
848 Tier 1 per site [2]92.00$
849 Tier 2 per site [2]1,104.00$
850 Tier 3- Base Fee per site [2]1,472.00$
851 Tier 3 - per acre fee (calculated with actual acreage)per acre [2]184.00$
Inspection Fee
852 Tier 1 per site [2]3,951.00$
853 Tier 2 per site [2]8,184.00$
854 Tier 3- Base Fee per site [2]9,195.00$
855 Tier 3 - per acre fee (calculated with actual acreage)per acre [2]2,073.00$
Storm Water Quality Management Plan (SWQMP) Fees
856 Plan Review - Base Fee each [2]1,574.00$
857 Plan Review - per acre fee (calculated with actual acreage) per acre [2]132.00$
858 Plan Review - Trash Capture Only each [2]1,748.00$
859 Inspection Fee - Base Fee each [2]1,250.00$
860 Inspection Fee - per acre fee (calculated with actual acreage) per acre [2]969.00$
861 Street Vacation - Street/Public Service Easement Vacation - Regular each [2]5,361.00$
862 Street Vacation - Street/Public Service Easement Vacation - Summary each [2]2,838.00$
Third Party Review
863 Processing Fee per project [2]403.00$
864 Consultant Cost per project [1]Actual Cost
42June 16, 2026 Item #6 Page 343 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
865 basis. It will be based on the fully burdened hourly rate and the time per hour [2]229.00$
[Notes]
[1] Set per City policy
[2] Set per 2026 - Cost of Service Study and Fee Schedule Update
[3] Minor: residential new/remodel, commercial/ industrial tenant improvement
[4] Major: Commercial/ industrial new
[5]
Quantities are calculated by using the greater of cut/fill, plus remedial work. Plan
checks extending more than 24 months may be assessed an additional fee of 25% of
the current plan check fee.
[6]Minor grading plan check fees are 50% of standard plan check fees. Qualifying for
minor grading plan check is subject to City Engineer approval per CMC 15.16.062
[7] Maximum limit set by CA Vehicle Code 35795(b)(1)
[8]prices. Water and sewer facilities owned by separate utility districts are not reviewed
by the city and do not need to be included in project cost estimate.
[9] Processing and traffic control review of City and CMWD projects.
[10]Processing and traffic control review of previously approved private improvement
plans (IMPs).
[11]Includes all underground utilities, wet and dry utilities regardless of construction
method, excluding stand alone sewer and water laterals, and may require securities.
[12]Minor improvements, including but not limited to curb core, sidewalk, curb & gutter,
driveway, minor street paving, and tree removal.
[13]Stand alone developer improvement agreements that are not part of a larger grading
or improvement plan.
[14] Utility Inspection Fee refers to stand alone fees that are applied independently.
43June 16, 2026 Item #6 Page 344 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
[1], [3]
Single Family Dwellings and Duplexes - (All newly constructed or
added space for residential occupancies classified as CBC Group R-3,
including custom builds and model homes for tract master plans, or
other similar residential occupancies not specifically addressed
elsewhere in this Fee Schedule)
966 1,000 [2]1,700$
967 each add'l s.f. [2]0.35$
968 2,500 [2]2,376$
969 each add'l s.f. [2]0.35$
970 4,000 [2]2,870$
971 each add'l s.f. [2]0.33$
972 6,000 [2]3,489$
973 each add'l s.f. [2]0.33$
974 8,000 [2]4,147$
975 each add'l s.f. [2]0.58$
Commercial Residential and Multifamily Residential Uses - (All
newly constructed or added space for residential occupancies
classified as CBC Group R (except R-3), or other residential
occupancies not specifically addressed elsewhere in this Fee
956 500 [2]1,393$
957 each add'l s.f. [2]0.76$
958 5,000 [2]4,522$
959 each add'l s.f. [2]0.63$
960 10,000 base fee up
to 10,000 s.f.[2]7,751$
961 each add'l s.f. [2]0.06$
962 50,000 base fee up
to 50,000 s.f.[2]10,196$
963 each add'l s.f. [2]0.17$
44June 16, 2026 Item #6 Page 345 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
964 100,000 to 100,000 [2]18,598$
965 each add'l s.f. [2]0.19$
Commercial Residential and Multifamily Residential Remodels -
Structural - (Structurally remodeled space for residential occupancies
classified as CBC Group R (except R-3), or other residential
occupancies not specifically addressed elsewhere in this Fee
Schedule)
946 500 [2]1,147$
947 each add'l s.f. [2]0.54$
948 5,000 [2]3,669$
949 each add'l s.f. [2]0.42$
950 10,000 base fee up
to 10,000 s.f.[2]5,723$
951 each add'l s.f. [2]0.08$
952 50,000 base fee up
to 50,000 s.f.[2]8,908$
953 each add'l s.f. [2]0.11$
954 100,000 to 100,000 [2]14,212$
955 each add'l s.f. [2]0.14$
Commercial Residential and Multifamily Residential Remodels -
Non Structural - (Non-Structurally remodeled space for residential
occupancies classified as CBC Group R (except R-3), or other
residential occupancies not specifically addressed elsewhere in this
Fee Schedule)
946 500 [2]1,037$
947 each add'l s.f. [2]0.34$
948 5,000 [2]2,523$
949 each add'l s.f. [2]0.50$
950 10,000 base fee up
to 10,000 s.f.[2]5,002$
45June 16, 2026 Item #6 Page 346 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
951 each add'l s.f. [2]0.06$
952 50,000 base fee up
to 50,000 s.f.[2]7,768$
953 each add'l s.f. [2]0.10$
954 100,000 to 100,000 [2]12,869$
955 each add'l s.f. [2]0.13$
Shell Buildings for all Commercial/Industrial Uses - (The enclosure
for all newly constructed or added space for non-residential
occupancies classified as CBC Group A, B, E, F, H, I, M, or other
commercial occupancies not specifically addressed elsewhere in this
Fee Schedule where the interior is not completed or occupiable)
916 500 [2]1,179$
917 each add'l s.f. [2]0.42$
918 5,000 [2]2,588$
919 each add'l s.f. [2]0.32$
920 10,000 base fee up
to 10,000 s.f.[2]4,153$
921 each add'l s.f. [2]0.03$
922 50,000 base fee up
to 50,000 s.f.[2]5,324$
923 each add'l s.f. [2]0.01$
924 100,000 to 100,000 [2]5,921$
925 each add'l s.f. [2]0.07$
Commercial/Industrial Uses - Structural (All newly constructed or
added space for non-residential occupancies classified as CBC Group
A, B, E, F, H, I, M, or other commercial occupancies not specifically
addressed elsewhere in this Fee Schedule)
866 500 [2]1,430$
867 each add'l s.f. [2]0.45$
46June 16, 2026 Item #6 Page 347 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
868 5,000 [2]3,292$
869 each add'l s.f. [2]0.53$
870 10,000 base fee up
to 10,000 s.f.[2]5,945$
871 each add'l s.f. [2]0.05$
872 50,000 base fee up
to 50,000 s.f.[2]8,021$
873 each add'l s.f. [2]0.12$
874 100,000 to 100,000 [2]14,075$
875 each add'l s.f. [2]0.14$
Commercial/Industrial Tenant Improvement - Structural -
(Structurally remodeled space for non-residential occupancies
classified as CBC Group A, B, E, F, H, I, M, or other commercial
occupancies not specifically addressed elsewhere in this Fee
Schedule where the structure is not altered)
926 500 [2]1,033$
927 each add'l s.f. [2]0.24$
928 5,000 [2]2,248$
929 each add'l s.f. [2]0.12$
930 10,000 base fee up
to 10,000 s.f.[2]2,805$
931 each add'l s.f. [2]0.07$
932 50,000 base fee up
to 50,000 s.f.[2]5,422$
933 each add'l s.f. [2]0.06$
934 100,000 to 100,000 [2]8,132$
935 each add'l s.f. [2]0.09$
47June 16, 2026 Item #6 Page 348 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Commercial/Industrial Tenant Improvement - Non-structural - (Non-
structurally remodeled space for non-residential occupancies
classified as CBC Group A, B, E, F, H, I, M, or other commercial
occupancies not specifically addressed elsewhere in this Fee
Schedule where the structure is not altered)
936 500 [2]940$
937 each add'l s.f. [2]0.24$
938 5,000 [2]2,124$
939 each add'l s.f. [2]0.06$
940 10,000 base fee up
to 10,000 s.f.[2]2,507$
941 each add'l s.f. [2]0.05$
942 50,000 base fee up
to 50,000 s.f.[2]4,732$
943 each add'l s.f. [2]0.04$
944 100,000 to 100,000 [2]6,987$
945 each add'l s.f. [2]0.07$
Low and Moderate Hazard Storage -
space for storage occupancies classified as CBC Group S, private
garages for commercial / industrial/multifamily uses, or other
886 500 [2]1,308$
887 each add'l s.f. [2]0.47$
888 5,000 [2]3,325$
889 each add'l s.f. [2]0.25$
890 10,000 base fee up
to 10,000 s.f.[2]4,622$
891 each add'l s.f. [2]0.03$
892 50,000 base fee up
to 50,000 s.f.[2]5,868$
893 each add'l s.f. [2]0.01$
48June 16, 2026 Item #6 Page 349 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
894 100,000 to 100,000 [2]6,394$
895 each add'l s.f. [2]0.07$
Attached Accessory and Utility Uses - (All newly constructed, added
or structurally remodeled space for utility and accessory occupancies
classified as CBC Group U, or other utility and accessory occupancies
not specifically addressed elsewhere in this Fee Schedule
896 200 [2]669$
897 each add'l s.f. [2]1.70$
898 400 [2]1,048$
899 each add'l s.f. [2]0.49$
900 600 [2]1,181$
901 each add'l s.f. [2]0.41$
902 1,000 [2]1,335$
903 each add'l s.f. [2]0.20$
904 3,000 [2]1,707$
905 each add'l s.f. [2]0.65$
Detached Accessory and Utility Uses - (All newly constructed, added,
or structurally remodeled space for utility and accessory
occupancies/uses not specifically addressed elsewhere in this Fee
906 200 [2]669$
907 each add'l s.f. [2]1.70$
908 400 [2]1,048$
909 each add'l s.f. [2]0.49$
910 600 [2]1,181$
911 each add'l s.f. [2]0.41$
912 1,000 [2]1,335$
913 each add'l s.f. [2]0.20$
49June 16, 2026 Item #6 Page 350 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
914 3,000 [2]1,707$
915 each add'l s.f. [2]0.65$
976 1,000 [2]1,415$
977 each add'l s.f. [2]0.23$
978 2,500 [2]1,824$
979 each add'l s.f. [2]0.18$
980 4,000 [2]2,074$
981 each add'l s.f. [2]0.24$
982 6,000 [2]2,553$
983 each add'l s.f. [2]0.24$
984 8,000 [2]2,992$
985 each add'l s.f. [2]0.43$
Duplicate Floor Plan Review - Attached or Detached Accessory and
Utility Uses flat [2]440$
Site Improvements
private parking lots which are processed separate of the structure
and include any combination of the following: Underground utilities,
parking lot lighting, accessible path of travel analysis, grading,
drainage and compliance with the City's parking and driveway
996 500 [2]647$
997 each add'l s.f. [2]0.08$
998 5,000 [2]1,335$
999 each add'l s.f. [2]0.04$
1000 10,000 base fee up
to 10,000 s.f.[2]1,653$
1001 each add'l s.f. [2]0.01$
Duplicate Floor Plan Review - Single Family Dwellings and Duplexes
50June 16, 2026 Item #6 Page 351 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
1002 50,000 base fee up
to 50,000 s.f.[2]1,930$
1003 each add'l s.f. [2]0.01$
1004 100,000 to 100,000 [2]2,366$
1005 each add'l s.f. [2]0.03$
[Notes]
[1]Valuation based on current valuation multiplier published by the San Diego Chapter of
the International Code Council. CBC 109.3 Building permit valuations.
[2]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region
Urban CPI.
[3]Plan check fee based on 65% of the current building permit fee and is due upon initial
submittal
51June 16, 2026 Item #6 Page 352 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
[3]
1006 Above Ground Storage Tank per permit [2]
Cell Site
1007 Radio over 30 ft. high each [2]
1008 Dish, 10 ft. dia. w/decoder each [2]
1009 Equipment Enclosure each [2]
1010 Awning or Canopy per permit [2]
1011 Bollards up to 4pcs per permit [2]
1012 Certificate of Occupancy per permit [2]
Temporary Certificate of Occupancy per permit [2]
Decks / Balcony
1013 Repair each [2]
1014 New/Replace each [2]
Demolition of Building
1015 Commercial each [2]
1016 Residential each [2]
EV Charging Stations
Single-Family Residential per permit [2]
Commercial / Multi-Family Residential
0-5 EV Charging Stations per permit [2]
6-10 EV Charging Stations per permit [2]
Over 11 EV Charging stations per permit [2]
1017 Fence or Freestanding Wall up to 100'each [2]
1018 Fire Damage Repair - Residential - Minor per permit [2]
1019 Fireplace Repair/Replace per permit [2]
Foundation Repair
1020 Commercial each [2]
1021 Residential each [2]
1022 Greenhouse per permit [2]
Manufactured House / Building
1023 Commercial per permit [2]
1024 Residential per permit [2]
1025 published by California Division of Housing and Community per permit [2],[7]
1026 Partition/ Wall - Interior/Non-Structural <100'per permit [2]
Patio
1027 Frame with Cover each [2]
1028 Frame with Cover & Walls each [2]
1029 Screen or Plastic Walls each [2]
1030 Plastering Outside per permit [2]
52June 16, 2026 Item #6 Page 353 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Remodel - Residential
1031 Kitchen/Bath each [2]
1032 Other - up to 500 sq. ft.each [2]
1033 Other - above 500 sq. ft.per 100 sq. ft. [2]
Repairs - Miscellaneous
1034 Commercial each [2]
1035 Residential each [2]
Retaining Wall
1036 Non-Engineered - City Standard per permit [2]
Engineered per permit [2]
Reroofing
1037 Commercial per permit [2]
1038 Residential per permit [2]
Roof Structure Repair / Reinforcement
1039 Commercial each [2]
1040 Residential each [2]
1041 Saunas (Steam)per permit [2]
Sign
1042 Wall - Illuminated per permit [2]
1043 Wall - Non-Illuminated per permit [2]
1044 Pole per permit [2]
1045 Monument per permit [2]
Skylight
1046 Commercial each [2]
1047 Residential each [2]
1048 Solar - SolarApp+ Residential per permit [1]
Add Residential Battery Back-up per permit [2]
1049 Solar - Residential (Up to 15 kW)per permit [2],[4]
1050 Per kW above 15kW per kW [2],[4]
1051 Add Residential Battery Back-up per permit [2],[4]
1052 Add Residential Panel Upgrade per permit [2],[4]
1053 Add Reverse Tilt System/ Ground Mount per permit [2],[4]
1054 Solar - Commercial (Up to 50 kW)per permit [2],[4]
1055 Per kW between 51kW - 250kW per kW [2],[4]
Solar Commercial Systems (250kW)per permit [2],[4]
1056 Per kW above 250kW per kW [2],[4]
53June 16, 2026 Item #6 Page 354 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
1057 Spray Booth Install / Clean Room per permit [2]
Stairs
1058 New/Replace First Story each [2]
1059 Additional Story each [2]
1060 Repair each [2]
Siding
1061 Stucco each [2]
1062 Stone/Brick Veneer each [2]
Storage Racks
1063 <8 ft, first 100 lf per permit [2]
1064 each add'l. 100 lf each [2]
1065 >8 ft, first 100 lf per permit [2]
1066 >8 ft, ea. Add'l 100 lf each [2]
Swimming Pool
1067 Commercial per permit [2]
1068 Residential per permit [2]
Storm Water Pollution Prevention Plan (SWPPP) Inspection Fee
Demolitions, Remodels, and Alterations [2]
New Construction [2]
All Other Inspections [2]
1069 Temporary Seating or Bleachers Install per permit [2]
1070 Trash Enclosure Install per permit [2]
Windows / Door
1071 Commercial each [2]
1072 Residential each [2]
Waste Management Plan (C&D) fee per permit [2]
Other Inspections (Per Hour)
Admin Processing Fee ( revisions and resubmittals)per permit [2]
1073 per hour [2]
1074 Re-inspection fees per hour [2]
1075 per hour [2]
1076 flat [2]
54June 16, 2026 Item #6 Page 355 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Other Building Fees
1078 Appeal of Building Official Decision per permit [1]
1079 Building Permit Revision, Fee + Third Party Hourly Charge per hour [2]
1080 Building Plan Check Fee (8% discount on repetitive plan checks) each [2],[5]
1081 Green Building Standards Plan Check and Inspection each [2]
1082 Green Building State Standards Fee (SB1473)each [1]
$1.00 per every
$25,000 in building
valuation or fraction
thereof (minimum
1083 Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard
Mapping Fee - Residential each [1]
1084 Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard
Mapping Fee - Commercial each [1]
1085 Penalty for Commencing Work Before Permit Issuance each [6]
1086
Fees for services not listed will be determined on a case-by-case
basis. It will be based on the fully burdened hourly rate and the time
of service provided.
per hour [2]
[Notes]
[1] Set per City policy
[2]Set per FY 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West
Region Urban CPI.
[3]Valuation based on current valuation multiplier published by the San Diego Chapter of
the International Code Council. CBC 109.3 Building permit valuations.
[4] Limited to maximum amounts set by AB1414
[5]Plan check fee based on 65% of the current building permit fee and is due upon initial
submittal
[6] CMC 18.20.010 and CMC 18.04.010
[7]Limited to maximum amounts consistent with Sections 1017, 1020.1 and 1020.7 of
Title 25 of the California Code of Regulations
55June 16, 2026 Item #6 Page 356 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
1087 per permit [1]
1088 Water Heater Only per permit [1]
Complex Mechanical Permits
1089 FAU less than 100,000 Btu/h per permit [1]
1090 FAU greater than 100,000 Btu/h per permit [1]
1091 Floor furnace (including vent)per permit [1]
1092 Suspended, wall, or floor-mounted heaters per permit [1]
1093 Appliance vents not included in an appliance permit per permit [1]
1094 Boiler up to 100,000 Btu/h per permit [1]
1095 Boiler 100,000 Btu/h to 500,000 Btu/h per permit [1]
1096 Compressor up to 3 HP per permit [1]
1097 Compressor up to 3 HP to 15 HP per permit [1]
1098 Other Complex Mechanical per permit [1]
Complex Electrical Permits
1099 Commercial Appliance per permit [1]
1100 Power Apparatus per permit [1]
1101 Motor not over 1 HP each [1]
1102 Motor over 1 HP and not over 10 HP each [1]
1103 Motor over 10 HP and not over 50 HP each [1]
1104 Motor over 50 HP and not over 100 HP each [1]
1105 Motor over 100 HP each [1]
1106 Generator not over 1 KW each [1]
1107 Generator over 1 KW and not over 10 KW each [1]
1108 Generator over 10 KW and not over 50 KW each [1]
1109 Generator over 50 KW and not over 100 KW each [1]
1110 Generator over 100 KW each [1]
1111 Transformer not over 1 KVA each [1]
1112 Transformer over 1 KVA and not over 10 KVA each [1]
1113 Transformer over 10 KVA and not over 50 KVA each [1]
1114 Transformer over 50 KVA and not over 100 KVA each [1]
1115 Transformer over 100 KVA each [1]
1116 each [1]
1117 Services over 600 volts or over 1000 amperes in rating each [1]
1118 Other Complex Electrical each [1]
Plumbing, Mechanical, and Electrical Permits - Not Associated with a Building Permit
56June 16, 2026 Item #6 Page 357 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Complex Plumbing Permits
1119 Fire Suppression System/Commercial Hood per permit [1]
1120 Onsite Sewer 6" & Over per permit [1]
1121 Onsite Water 6" & Over per permit [1]
1122 Onsite Storm Drain 6" & Over per permit [1]
1123 Utilities (private - main) city processing fee per permit [1]
1124 Utilities (private - main) plans examiner fee per permit [1]
1125 Other Complex Plumbing per permit [1]
Affordable Housing Credit
1138 Cassia Heights (Southeast and Southwest quadrants)per unit [2]
1139 Tavarua Senior Affordable Apartments (Northwest quadrant) per unit [2]
[Notes]
[1]Set per 2026 - Cost of Service Study and Fee Schedule Update. Indexed to West Region
Urban CPI.
[2] Set per City policy.
57June 16, 2026 Item #6 Page 358 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name
Simple Mechanical Items:
Addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating,
cooling, absorption, or evaporative cooling system.
HVAC change out - existing dwelling
Air-handling unit under 10,000 CFM
Evaporative cooler
Ventilation fan connected to a single duct
Hood and duct system
Duct systems
Miscellaneous mechanical (wall furnace, condensing units, gas outlet/gas test, etc.)
Other simple mechanical
Simple Electrical Items:
Receptacle, switch, and lighting outlets
Lighting fixtures
Pole or platform-mounted lighting fixtures
Theatrical-type lighting fixtures or assemblies
Appliances not exceeding one horsepower (HP), kilowatt (KW), or kilovolt-ampere (KVA), in rating
Busways
Trolley and plug-in-type busways - each 100 feet or fraction thereof
Signs, outline lighting, or marquees supplied from one branch circuit
Services of 600 volts or less and not over 200 amperes in rating
Miscellaneous apparatus, conduits, and conductors
Portable generators less than 10,000 W
Temporary power panel/service
Temporary power pole
Other simple electrical
Simple Plumbing Items:
Plumbing fixtures
Building sewer
Rainwater systems
Water heater
Industrial waste pretreatment interceptor
Water piping and/or water treating equipment
Repair or alteration of drainage or vent piping
Backflow devices
Atmospheric-type vacuum breakers
Gas test
Gas outlets
Residential remodel/repairs
Other simple plumbing
Simple Single or Combination Permits List
58June 16, 2026 Item #6 Page 359 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Section 3
Development Impact Fees
June 16, 2026 Item #6 Page 360 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
60June 16, 2026 Item #6 Page 361 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
61June 16, 2026 Item #6 Page 362 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
62June 16, 2026 Item #6 Page 363 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
63June 16, 2026 Item #6 Page 364 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee Level/Deposit
Planned Local Drainage Area Fees (PLDA)
1126 PLDA A, Low Runoff per acre
1127 PLDA B, Low Runoff per acre
1128 PLDA C, Low Runoff per acre
1129 PLDA D, Low Runoff per acre
1130 PLDA A, Medium Runoff per acre
1131 PLDA B, Medium Runoff per acre
1132 PLDA C, Medium Runoff per acre
1133 PLDA D, Medium Runoff per acre
1134 PLDA A, High Runoff per acre
1135 PLDA B, High Runoff per acre
1136 PLDA C, High Runoff per acre
1137 PLDA D, High Runoff per acre
Low Runoff Potential Medium Runoff Potential High Runoff Potential
CF ♦
GC ♦
L ♦
O ♦
OS ♦
P ♦
PI ♦
PI/O ♦
R ♦
R1.5 ♦
R4 ♦
R8 ♦
R15 ♦
R15/L ♦
R15/O ♦
R15/VC ♦
R23 ♦
R30 ♦
OK-TC ♦
VC ♦
VC/OS ♦
V ♦
PLDA FEE CATEGORYGeneral Plan Land
Use Designation
64June 16, 2026 Item #6 Page 365 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
65June 16, 2026 Item #6 Page 366 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
66June 16, 2026 Item #6 Page 367 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4
Fee Name Fee Type
No
t
e
s
Fee/Deposit
Affordable Housing Impact Fee
1140 Affordable Housing Impact Fee per unit [1]
1141 per unit [2]
1142 Affordable Housing In-Lieu Fee (residential development projects
proposing two to six units), per sq. ft. of net building area per unit per sq. ft. [2]
Agricultural Mitigation Fees
Agricultural Mitigation Fee [1]10,000$
Habitat Mitigation Fees, Per Acre
1143 Type D - Coastal Sage Scrub per acre [1]
1144 Type E - Non-Native Grassland per acre [1]
1145 Type F - Agricultural Land, Disturbed Land, Eucalyptus Woodland per acre [1]
Public Facilities and Community Facilities District Fees
1146 Public Facilities Fee - inside CFD per project [1]
1147 Public Facilities Fee - outside CFD per project [1]
1148 Community Facilities District #1 Fees [1]
Traffic Impact Fees
1149 Apartment (Inside of CFD 1)per ADT [1]
1150 Apartment (Outside of CFD 1)per ADT [1]
1151 Commercial/Industrial Cost Per Trip (Inside CFD)per ADT [1]
1152 Commercial/Industrial Cost Per Trip (Outside of CFD)per ADT [1]
1153 Condominium (Inside of CFD 1)per ADT [1]
1154 Condominium (Outside of CFD 1)per ADT [1]
1155 Single Family (Inside of CFD 1)per ADT [1]
1156 Single Family (Outside of CFD 1)per ADT [1]
[Notes]
[1] Set per City policy
[2] Updated via City Council Resolution; effective April 1, 2022.
67June 16, 2026 Item #6 Page 368 of 618
Docusign Envelope ID: 0E287E22-5B0D-8DEB-8003-06CA64E0D5A4