HomeMy WebLinkAbout5930 PRIESTLY DR; ; AS000175; Permit618126, 3:45 PM
Job Address:
Permit Type:
Parcel No:
Lot#:
Reference No.:
PC#:
Project Title:
Applicant:
about:blank
Fees($)
860.5
AS000175 Permit Data
City of Carlsbad
Sprinkler Permit
Permit No: AS000175
5930 PRIESTLY DR Status:
SPRINK Applied
2122400800 Approved:
0
Issued:
Inspector:
CARLSBAD RESEARCH CENTER
Add'I Fees ($)
0
Owner:
Total($)
860.5
VOID
11/15/2000
Balance($)
860.5
1/1
LIFEGUARD FIRE PROTECTION
2613 TEMPLE HEIGHTS DR. SUITE B
OCEANSIDE, CA 92056
760-806-9997
C-16 #758459
Hydraulic Design Information Sheet
Name: LOT 12 CARLSBAD RESEARCH CENTER Date: I 0-20-00
Location: PREIESTL Y DRIVE CARLSBAD, CA
Building: BUILDING B BUILDINGS C,E,F,H ARE TYPICAL TO B
Contractor: LIFEGUARD FIRE PROTECTION
System No. ..:.1...:O:..::F..;1;.._ ____ _
Contract No.
Calculated By: LIFEGUARD FIRE PROTECTION
Construction: t:8J Combustible D Non-Combustible
Drawing No.
Ceiling Height 20' -0" -----Ft.
SYSTEM DESIGN
~ NFPA 13: U Light Hazard Ordinary Hazard Group LJ 1~2LJ3 LJ Extra Hazard
0 NFPA231 □ NFPA231C: Figure: Curve:
D Other (Specify)
□Specific Ruling Made By Date
Area of Sprinkler Operation 1500 System Ty11e
Density .20 [81 Wet □ Dry D Deluge D Pre-Action
Area Per Sprinkler 130 S11rinkler or Nozzle
Hose Allowance GPM: Inside 100 Make csc Model A
Hose Allowance GPM: Outside 400 Size ½" K-Factor: 5.6
Rack Sprinkler Allowance Temperature Rating 155
CALCULATION SUMMARY
GPM Required _4.;c6...:6.c:.2...:4 ______ PSI Required _7""6:..;..5...:5 ______ At Base of Riser
"C" Factor Used: Overhead 120 Under ound 140
WATER SUPPLY
Water Flow Test Pum11Data Tank or Reservoir
Date& Time 9-28-00 Rated Capacity NIA Capacity
Static PSI 106 At PSI Elevation NIA
Residual PSI 104 Elevation
GPMFlowing 1450 Well
Elevation 0 Proof Flow GPM
Location CITY MAlN IN PRIESTLY DRIVE
Source ofinformation FLOW TEST LIFEGUARD FIRE & CARLSBAD FIRE
COMMODITY STORAGE
Commodity NIA Class -----------Storage Height Area
Location
-------Aisle Width
Storage Method: Solid Piled % Palletized ¾Rack ---------------i
Rack
D Single Row D Conventional Pallet
D Double Row D Slave Pallet D Multiple Row D Open
Flue S11acing In Inches
Longitudinal --,----~--,-Transverse
Horizontal Barriers Provided
D Automatic Storage
□ Solid Shelving
D Encapsulated D Non-Encapsulated
Clearance From To11 of Storage to Ceiling
Ft. -------------In.
----------------------------~
SUBMITTAL SERIAL N0:2932HY7
LOT 12 CARLSBAD RESEARCH CENTER
BUILDING B
LOT 12 BUILDING B
SECOND FLOOR
.20/1500
FLOW TEST RESULTS
Water Supply
STATIC 95.40 PSI
RESIDUAL 93.60 PSI @ 1450.00 GPM
CITY PRESSURE AVAILABLE AT 866.2
SUMMARY OF SPRINKLER OUTFLOWS
ACTUAL MINIMUM
SPR FLOW FLOW K-FACTOR --------
34 28.81 26.00 5.60
35 28.75 26.00 5.60
37 27.41 26.00 5.60
38 27.35 26.00 5.60
39 32.53 26.00 5.60
40 26.57 26.00 5.60
41 26.51 26.00 5.60
42 32.05 26.00 5.60
43 26.17 26.00 5.60
44 26.11 26.00 5.60
45 31.92 26.00 5.60
46 26.05 26.00 5.60
47 26.00 26.00 5.60
TOTAL WATER REQUIRED FOR SYSTEM
OUTFLOWS AT 3
OUTSIDE HOSE STREAMS AT 0
TOTAL WATER REQUIREMENT
PRESSURE REQUIRED AT 0
MAXIMUM PRESSURE UNBALANCE IN LOOPS
MAXIMUM VELOCITY FROM 12 TO 31
GPM 94.71 PSI
PRESSURE --------
26.47
26.36
23.95
23.86
33.75
22.51
22.42
32.76
21. 83
21. 74
32.49
21. 65
21. 56
366.24 GPM
100.00 GPM
400.00 GPM
866 .24 GPM
86.07 PSI
0.00 PSI
18.47 FPS
10-14-2000 PAGE 1
SUBMITTAL SERIAL NO:2932HY7 10-14-2000 PAGE 2
LOT 12 CARLSBAD RESEARCH CENTER
BUILDING B
Location Flow Pipe Fittings Equiv Friction Pressure
in Size & Length Loss Summary
From To GPM IN Devices Ft PSI/Ft PSI
44 47 1. 728 L 10.00 C=120 PT 21.56 ( 47)
Q 26.00 F=0 F 0.00 PE 0.00
BN T 10.00 0.0186 PF 0.19
41 44DQ 26.11 1.728 L 10.00 C=120 PT 21.75 ( 44)
Q 52.11 F=0 F 0.00 PE 0.00
BN T 10.00 0.0673 PF 0.67
38 41DQ 26.51 1.728 L 10.00 C=120 PT 22.42 ( 41)
Q 78.63 F=0 F 0.00 PE 0.00
BN T 10.00 0.1441 PF 1.44
35 38DQ 27.35 1. 728 L 10.00 C=120 PT 23.86 ( 38)
Q 105.98 F=0 F 0.00 PE 0.00
BN T 10.00 0.2503 PF 2.50
32 35DQ 28.75 1.728 L 41.00 C=120 PT 26.36 ( 35)
Q 134.73 F=T F 8.74 PE 0.00
BN T 49.74 0.3902 PF 19.41
13 32 1. 728 L 1.00 C=120 PT 45.77 ( 32)
Q 134.73 F=T F 8.74 PE 0.43
NR T 9.74 0.3902 PF 3.80
12 13 3.314 L 12.00 C=120 PT 50.00 13)
Q 134.73 F=0 F 0.00 PE 0.00
NCl T 12.00 0.0164 PF 0.20
PT 50.20 12)
------------------
43 46 1.728 L 10.00 C=120 PT 21.65 46)
Q 26.05 F=0 F 0.00 PE 0.00
BN T 10.00 0.0187 PF 0.19
40 43DQ 26.17 1. 728 L 10.00 C=120 PT 21.84 ( 43)
Q 52.22 F=0 F 0.00 PE 0.00
BN T 10.00 0.0676 PF 0.68
37 40DQ 26.57 1. 728 L 10.00 C=120 PT 22.52 ( 40)
Q 78.79 F=0 F 0.00 PE 0.00
BN T 10.00 0.1446 PF 1.45
34 37DQ 27.41 1.728 L 10.00 C=120 PT 23.97 ( 37)
Q 106.20 F=0 F 0.00 PE 0.00
BN T 10.00 0.2513 PF 2.51
31 34DQ 28.81 1.728 L 41. 00 C=120 PT 26.48 ( 34)
Q 135.01 F=T F 8.74 PE 0.00
BN T 49.74 0.3917 PF 19.48
SUBMITI'AL SERIAL N0:2932HY7 10-14-2000 PAGE 3
LOT 12 CARLSBAD RESEARCH CENTER
BUILDING B
Location Flow Pipe Fittings Equiv Friction Pressure
in Size & Length LOSS Sununary
From To GPM IN Devices Ft PSI/Ft PSI
12 31 1.728 L 1.00 C=120 PT 45.96 ( 31)
Q 135.01 F=T F 8.74 PE 0.43
NR T 9.74 0.3917 PF 3.82
11 12DQ 134.73 3.314 L 12.00 C=120 PT 50.21 12)
Q 269.73 F=O F 0.00 PE 0.00
NCl T 12.00 0.0591 PF 0.71
PT 50.92 11)
------------------
42 45 1. 728 L 10.00 C=120 PT 32.49 45)
Q 31.92 F=O F 0.00 PE 0.00
BN T 10.00 0.0272 PF 0.27
39 42DQ 32.05 1. 728 L 10.00 C=120 PT 32.76 ( 42)
Q 63.97 F=O F 0.00 PE 0.00
BN T 10.00 0.0984 PF 0.98
36 39DQ 32.53 1.728 L 10.00 C=120 PT 33.74 ( 39)
Q 96.50 F=O F 0.00 PE 0.00
BN T 10.00 0.2105 PF 2.11
33 36 1.728 L 10.00 C=120 PT 35.85 ( 36)
Q 96.50 F=O F 0.00 PE 0.00
BN T 10.00 0.2105 PF 2.11
30 33 1. 728 L 41.00 C=120 PT 37.96 ( 33)
Q 96.50 F=T F 8.74 PE 0.00
BN T 49.74 0.2105 PF 10.47
11 30 1.728 L 1.00 C=120 PT 48.43 ( 30)
Q 96.50 F=T F 8.74 PE 0.43
NR T 9.74 0.2105 PF 2.05
10 llDQ 269.73 3.314 L 19 . 10 C=l.20 PT 50.91 ( 11)
Q 366.24 F=O F 0.00 PE 0.00
NCl T 19.10 0.1041 PF 1.99
7 10 3.314 L 29.00 C=l.20 PT 52.90 ( 10)
Q 366.24 F=T F 20.00 PE 0.00
FM3 T 49.00 0.1041 PF 5.10
6 7 3.314 L 14.00 C=120 PT 58.00 7)
Q 366.24 F=E F 7.70 PE 6.07
FM2 T 21.70 0.1041 PF 2.26
5 6 3.314 L 7.00 C=120 PT 66.33 6)
Q 366.24 F=T,E F 27.70 PE 0.00
FMl T 34.70 0.1041 PF 3.61
SUBMITTAL SERIAL NO:2932HY7 10-14-2000 PAGE 4
LOT 12 CARLSBAD RESEARCH CENTER
BUILDING B
Location Flow Pipe Fittings Equiv Friction Pressure
in Size & Length Loss Summary
From To GPM IN Devices Ft PSI/Ft PSI
3 5 3.314 L 12.00 C=120 PT 69.94 5)
Q 366.24 F=GV F 1.54 PE 5.20
FR T 13.54 0.1041 PF 1.41
2 3DQ 100.00 8.450 L 120.00 C=l40 PT 76.55 3)
Q 466.24 F=4E F 126.48 PE 0.00
UN T 246.48 0.0013 PF 0.32
1 2 8.450 L 10.00 C=140 PT 76.87 2)
Q 466.24 F=0 F 0.00 PE 9.10
UN T 10.00 0.0013 PF 0.01
COMMENT: 21 FEET ELEVATION FOR 9 PSI RPZ LOSS
0 1 8.450 L 5.00 C=140 PT 85.98 1)
Q 466.24 F=T,GV F 68.52 PE 0.00
UN T 73.52 0.0013 PF 0.10
PT 86.08 0)
LOT 12 CARLSBAD RESEARCH CENTER
125
120
115
110
105
100
95
90
85
80
75
70
85
60
65
50
45
40
35
30
25
20
15
10
5
•
~I-
I-
I! ~ -i ... "
t
t
1-• Hose.a r¼
T
0 200 400 600 800
System Demand ..
Sprinkler 0e•and 85.92 PSI
Additional Flows
Hose at Source
Total 0e•and 86.07 PSI
1000 1200
II 366,24 GPM
100.00 GPM
400.00 GPM
II 866.24 GPM
•
1400
Waler Flow (GPM)
Sigma Dynamioa Corporation
7700 Supply / Demand Graph
' Margin
Pressure 8.64 PSI
rlow 2659,46 GPM
:s'
1600 1800
Water Supply ..
Static 95.40 PSI
Residual 93.60 PSI
Elevation 0.00 PSI
II 1450,00 GPM
~
'--
t,11.85
2000
•