Loading...
HomeMy WebLinkAbout1276 CHESTNUT AVE; ; CBR2025-1703; PermitBuilding Permit Finaled Residential Permit Print Date: 06/25/2026 Job Address: 1276 CHESTNUT AVE, CARLSBAD, CA 92008 Permit No: Status: {city of Carlsbad CBR2025-1703 Closed -Finaled Permit Type: BLDG-Residentia I Work Class: Second Dwelling Unit Parcel#: 2051203100 Valuation: $123,650.10 Occupancy Group: #of Dwelling Units: 1 Bedrooms: Bathrooms: Occupant Load: Code Edition: Sprinkled: Project Title: Description: NICHOLS: (630 SF) DETACHED ADU Track#: Lot#: Project#: Plan#: Construction Type: Orig. Plan Check#: Plan Check#: Applied: 07/09/2025 Issued: 11/05/2025 Finaled Close Out: 06/08/2026 Final Inspection: 06/08/2026 INSPECTOR: Renfro, Chris Applicant: Property Owner: Contractor: BEN LELAND CONSTRUCTION INC CYNTHIA HARDIN CO-OWNERS STUDER MARIE C AND NICHOLS BEN LELAND CONSTRUCTION INC191 CALLE CHARLES L MAGDALENA, # STE 225 270 N EL CAMINO REAL, # 297 ENCINITAS, CA 92024-2874 (760) 436-1506 1274 CHESTNUT AVE ENCINITAS, CA 92024-3750 CARLSBAD, CA 92008 (760) 436-1506 (619) 224-6075 FEE BUILDING PLAN CHECK BUILDING PLAN REVIEW -MINOR PROJECTS (LOE) BUILDING PLAN REVIEW -MINOR PROJECTS (PLN) CERTIFICATE OF OCCUPANCY SB1473 -GREEN BUILDING STATE STANDARDS FEE SFD & DUPLEXES STRONG MOTION -RESIDENTIAL (SMIP) SWPPP INSPECTION TIER 1 -Medium BLDG SWPPP PLAN REVIEW TIER 1 -Medium Total Fees: $3,041.17 Total Payments To Date: $3,041.17 Balance Due: AMOUNT $893.10 $209.00 $110.00 $22.00 $5.00 $1407.00 $16.07 $292.00 $87.00 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow t hat procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition . You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov C cicyof Carlsbad R ~c es10ENTIAL su1to1NG C ERtPilrAPPLICATION FOR CITY USE ONLY Plan Check No.:~f7o_s PC Deposit: , J '# JUL OD 2C25 8-1 Date: 7/q/,95 CITYoFc D '"' I This form shall be completed to initiate a re;idei tial building permit application. The building permit application is not a buBding permit. No work shall start until a building permit is duly issued. /~71:, Job Address:-l,2i.a Chestnut Avenue Unit#: ____ APN: _2_04_-_12_0_-3_1-_o_o ____ _ Description of Work: New Construction of a 630 SF ADU Project Valuation: $175,000 Is there an active code enforcement violation on this site? 0 Y ii N Are Planning permits required?: 0 Y O N Case File Nos.: ______________ _ Please indicate the type of application(s) requested and provide the applicable information: 0 New SF: Living SF, _6c.::3c.::0 ___ ~· Deck SF, ____ ...a· Patio SF,----~· Garage SF,----~ Is this to create a new ADU/JADU? RY D N. New fireplace? DY RN. D Remodel: ______ SF of affected area. Is the area a conversion or change of use? DY D N. □ Pool/Spa: ______ SF. Addition.al Gas or Electrical Features? ____________ _ 0 So:lar: ____ KW, ____ Modules. Mounted: 0 Roof O Ground. Tilt: □ Y □ N. RMA: □ Y O N. Battery: D Y D N. Panel Upgrade: D Y R N. Electric Meter Number: ____________ _ R Plumbing, Mechanical, Electrical: new ADU with Plumbing, Mechanical, and Electrical. No panel upgrade. D Other: ---------------------------------- APPLICANT (PRIMARY CONT ACT}: Name: Ben Leland Construction, Inc. Address: 270 N. El Camino Real, Suite 297 City: Encinitas State:~ Zip: 92024 Phone: 760-436-1506 Email: cynthia@benlelandconstructioninc.net DESIGN PROFESSIONAL: Name: Larry Lipkin Address: 13607 Powers Road City: Poway State: CA Zip: 92064 Phone: 858-774-1957 Email: llipkin@cox.net State License: ___________ _ PROPERTY OWNER: Name: Charles and Tracy Nichols Address: 1274 Chestnut Avenue City: Carlsbad State:~ Zip: 92008 Phone: 619-459-5958 Email: aceytracy@gmail.com CONTRACTOR: Name: Ben Leland Address: 270 N. El Camino Real, Suite 297 City: Encinitas State:~ Zip: 92024 Phone: 760-436-1506 Email: cynthia@benlelandconstructioninc.net CSLB License#: 770409 Class:_B __ City Business License#: BL051241590 Billing Party: D Applicant D Property Owner R Contractor D Other: _____________ _ Page 1 of 4 rev 11/24 The construction, addition, or alteration of buildings is governed by the California Contractors License Law (commencing with Business Professions Code section 7000). The law has an exemption that allows a person who is not a California licensed Contractor to construct a single-family residential structure and engage in home improvements and repairs, provided they meet certain requirements. (Form 8-61 provides information about the requirements that apply to Owner-Builders makes you aware of your responsibilities and possible risk you may incur by having a permit issued to an Owner-Builder.) Permits for multi-family projects are only to be issued to California licensed Contractors. Refer to Form 8-16 for other frequently asked questions. APPLICANT (PROPERTY OWNER, CONTRACTOR, OR AGENT) CERTIFICATIONS: CHECK EACH BOX [Z] [Z] I/We certify that I/we a legal right, interest, or entitlement to the use of the property that is the subject of this application. I/We understand that State law mandates the Applicant to provide an estimated value of all work proposed (B-29 form). I/We hereby certify the construction valuation provided is accurate and includes all proposed work such as all structural work, finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevator, labor costs, and all permanent equipment and systems. If the valuation is underestimated, the permit may be denied, unless the Applicant can show detailed estimates to meet the approval of the Building Official. If the Applicant is not the Property Owner, both the Property Owner and Applicant (authorized Contractor or authorized Agent of the Property Owner/Contractor) must sign below. By signing this declaration, the Property Owner authorizes the Applicant listed in this application to act as the Property Owner's Agent on all matters before the city pertaining to development on this property. I/We understand that State law requires construction to be done by a l icensed Contractor and the Property Owner may apply for an Owner-Builder permit under an exemption from the law. ~ A. If the Contractor is the Applicant, the License Contractor Declaration on page 4 must be completed. 0 B. If the Applicant is an Owner-Builder, an Owner-Builder affidavit is required and must be submitted (Form B-61). The city will not issue a building permit until this form has been submitted. The License Contractor Declaration on page 4 does not need to be submitted. I ✓ I I/We have read this application form in its ent irety and reviewed the building permit application and the information I/we have provided is t rue and correct to the best of our knowledge. Grade lines as shown on drawings accompanying this application are assumed to be correct. This certifies that the description of the project and all the plans and supporting documentation; including the location and labeling of all existing and proposed buildings, structures, access roads, and utilities and easements; are accurate in all material respects as of the date when made. I/We understand that it is my responsibility to ensure that statements and representations are not misleading. I/We agree to promptly remove, correct, or add information as needed to correct any misleading or materially inaccurate information. I/We understand that any misstatement or omission of the requested information or of any information subsequently requested might be grounds for rejecting the application, denying the application, suspending or revoking a permit issued on the basis of these or subsequent representations, or for the seeking of such other and further relief as deemed appropriate [Z] by the City of Carlsbad. If a digital submittal is made or required, I/we certify that the submittal package includes digital files that follow the city's electronic submissions standards.) Failure to submit correctly formatted electronic files may result in the submittal being returned, which will delay intake and/or review. Page 2 of 4 rev 11/24 [Z] [Z] [Z] [Z] [Z] I/We certify that I am (we are) aware of all permit requirements and will not willfully deviate from the approved plan. I/We agree to comply with all applicable city and county ordinances and state laws relating to building construction. I/We assume full responsibility for the satisfactory completion of all work authorized under the permit(s), including work performed prior to assuming control. After construction begins, I/we understand that a height certification, pad certification, or boundary certification may need to be submitted to the Building Inspector, when required. I understand that a building permit application will expire If a permit has not been issued/obtained within one year from the application date (original filing date), unless an extension of time has been granted (Form B-25). With some limited exceptions, if a building permit application expires and there is interest in proceeding with the same project, a new application will be required and the project will be subject to new fees and regulations that are in effect at the time the new application is submitted. After submitting the application, the Billing Party designated as part of the application will be sent future city invoices for above referenced building permit(s). I understand that if a permit fee or development impact fee refund is issued, the check will be mailed to the financial responsible party (the actual person or company that paid the invoice). If the information on file for the financially responsible party is outdated or inaccurate, it must be corrected before the refund can be sent. Form 8-498 may be completed to update the financially responsible party's contact information. I/We agree to waive, release, and discharge the City of Carlsbad ("City") and its officers, elected or appointed officials, employees, volunteers and agents (the "Indemnified Parties") from all claims and demands, rights and causes of action of any kind with respect to the building permit application, the purpose of which is to challenge, attack set aside, void, modify, or annul the approval or denial of the application, or the processing thereof, except liability caused by the Indemnified Parties' sole negligence or willful misconduct, in which case the indemnity received by the city shall be reduced by the amount: (a) that the city's active negligence contributed to the liability on a comparative basis; or (bl such other amount as may be required by law. This obligation is effective without reference to the existence or applicability of any insurance coverages which may have been required by city or any additional insured endorsements which may extend to Indemnified Parties. Property Owner(s) and Applica nt, on behalf of themselves and all parties claiming under or through them, waive all rights of subrogation and contribution against the Indemnified Parties while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed, regardless of any prior, concurrent or subsequent passive negligence by the Indemnified Parties. By signing below, I acknowledge that I have completely read, understand, and agree to the declarations above and accept all terms set forth herein. (This section must be signed by both parties if not the same individual.) -~i ~ Signature ofp operty Owner Date:. _ __,_7 /_%--L...@6 __ -__ _ Signatu~nt D July 7, 2025 ate: __________ _ Page 3 of 4 rev 11/24 CONTRACTOR CERTIFICATIONS: License Contractor Declarations CHECK EACH / @ I hereby affirm under penalty of perjury that I am a licensed under provisions of Chapter 9 ommencing with section 7000) of Division 3 of the Business and Professions Code, and the license is full force and effect. ARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. Place a check mark next to the declaration regarding the workers' compensation coverage that applies. Check only one (A), (B), or (C): 0 A. I have and will maintain a certificate of consent to self-insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issuer ctri: I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is i ensation insurance carrier and policy number are: 9 O "7 -ol.!:,- D C. I certify that, in the performance of t he work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forth with comply with t hose provisions. ~ I hereby affirm under penalty of perjury that there is a construction lending agency for the rformance of the work for which this permit is issued (Civil Code section 3097). If not using a nstruction lending agency write N/A: Lender: />I /4 • nderstand that I will need a current Carlsbad busin~ss license to obtain the building permit. By signing below, I acknowledge that I have completely read, understand, and agree to the declarations above and accept all terms set forth herein. Date: __ ~...:...~-'-,z_,_/4_'c?._6_-___ _ Signature Co FOR CITY USE ONLY Receipt Acknowledgement: ____________ _ Date: _________ _ BUILDING STAFF Page 4 of 4 rev 11/24 PERMIT INSPECTION HISTORY for CBR2025-1703 Permit Type: BLDG-Residential Application Date: 07/09/2025 Owner: CO-OWNERS STUDER MARIE C AND NICHOLS CHARLES L Work Class: Second Dwelling Unit Issue Date: 11/05/2025 Subdivision: THUM LANDS Status: Closed -Finaled Expiration Date: 09/21/2026 Address: 1276 CHESTNUT AVE IVR Number: 64653 CARLSBAD, CA 92008 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status 3/19/2026 03/19/2026 BLDG-17 Interior Lath/Drywall 311208-2026 Passed Chris Renfro Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 3/24/2026 03/24/2026 BLDG-18 Exterior Lath/Drywall 311594-2026 Passed Chris Renfro Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 5/7/2026 05/07/2026 BLDG-Final Inspection 315205-2026 Partial Pass Chris Renfro Reinspection Incomplete Checklist Item BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final COMMENTS Passed Partial pass missing air gap at dishwasher, EV charger No breakers need to be GFCI breaker protected and final paperwork for construction waste management and recycling receipts required Yes Yes Yes Yes 6/8/2026 06/08/2026 BLDG-Final Inspection 317783-2026 Passed Chris Renfro Thursday, June 25, 2026 Checklist Item BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final COMMENTS Passed Yes Yes Yes Yes Yes Complete Page 2 of 2 Building Permit Inspection History Finaled {city of Carlsbad PERMIT INSPECTION HISTORY for CBR2025-1703 Permit Type: BLDG-Residential Application Date: 07/09/2025 Owner: CO-OWNERS STUDER MARIE C AND NICHOLS CHARLES L Work Class: Second Dwelling Unit Issue Date: 11/05/2025 Subdivision: THUM LANDS Status: Closed -Finaled Expiration Date: 09/21/2026 Address: 1276 CHESTNUT AVE CARLSBAD, CA 92008 Scheduled Actual Date Start Date 2/13/2026 02/13/2026 IVR Number: 64653 Inspection Type Inspection No. Inspection Primary Inspector Status BLDG-21 308522-2026 Partial Pass Chris Renfro Underground/Underfloor Plumbing Checklist Item COMMENTS BLDG-Building Deficiency Partial pass underground, plumbing for ADU. Main connection tie in pending. 2/23/2026 02/23/2026 BLDG-11 309028-2026 Passed Chris Renfro 3/3/2026 03/03/2026 3/13/2026 03/13/2026 Thursday, June 25, 2026 Foundation/Ftg/Piers (Rebar) Checklist Item BLDG-Building Deficiency COMMENTS BLDG-83 Roof Sheatlng, 309762-2026 Exterior Shear (13, 15) Checklist Item COMMENTS BLDG-Building Deficiency BLDG-13 Shear Panels-HD (ok to wrap) BLDG-15 Roof Sheathing- Reroof BLDG-84 Rough Combo 310633-2026 (14,24,34,44) Checklist Item COMMENTS BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting- Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts- Dampers Passed Chris Renfro Passed Chris Renfro Re inspection Re inspection Passed Yes Passed Yes Passed Yes Yes Yes Passed Yes Yes Yes Yes Yes Inspection Incomplete Complete Complete Complete Page 1 of 2 August 13, 2025 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. Carlsbad, CA 92008 Plan Review: New ADU Construction Address: 1276 Chestnut Ave Applicant Name: Ben Leland Construction, Inc Applicant Email: cynthia@belelandconstructioninc.com OCCUPANCY AND BUILDING SUMMARY: Occupancy Groups: R-3/U Occupant Load: N/ A Type of Construction: V-B Sprinklers: No Stories: One Area of Work (sq. ft.): 630 sq. ft. The plans have been reviewed for coordination with the permit application. Valuation: Confirmed Scope of Work: Confirmed Floor Area: Confirmed Attn: Building & Safety Department, True North COMPLIANCE SERVICES City of Carlsbad -FINAL REVIEW City Perm it No: CBR2025-l 703 True North No.: 25-018-711 True North Compliance Services, Inc. has completed the final review of the following documents for the project referenced above on behalf of the City of Carlsbad: 1. 2. Drawings: One (I) copy dated June 13, 2025, by Design Decision. Structural Calculations: One (1) copy, by Brian H. Qualls. The 2022 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2021 IBC, UMC, UPC, and 2020 NEC, as amended by the State of California), 2022 California Green Building Standards Code, 2022 California Existing Building Code, and 2022 California Energy Code, as applicable, were used as the basis of our review. Please note that our review has been completed and we have no further comments. We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any questions or ifwe can be of further assistance. Sincerely, True North Compliance Services Review By: Marc Khaled -Plan Review Engineer Quality Review By: Alaa Atassi -Senior Plan Review Engineer True North Compliance Services, Inc. 8369 Vickers Street, Suite 207, San Diego, CA 92111 T / 562.733.8030 rfrue North COMPLIAN CE-SERVIC ES July 21, 2025 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. Carlsbad, CA 92008 City of Carlsbad-FIRST REVIEW City Pennit No: CBR2025-l 703 True North No.: 25-018-711 Plan Review: New ADU Construction Address: 1276 Chestnut Ave, Carlsbad CA Applicant Name: Ben Leland Construction Applicant Email: cynthia@benlelandconstructioninc.net True No11h Compliance Services, Inc. has completed the review of the following documents for the project referenced above on behalf of the City of Cartsbad. Our comments can be found on the attached list. 1. 2. 3. Drawings: Electronic copy dated June 3, 2025, by Design Decisions Structural Calculations: Electronic copy dated July 9, 2025, by Qualls Engineering. Geotechnical Report: Electronic copy dated July 7, 2025, by Sierra GeotechnicaJ Services inc. Attn: Permit Technician, the scope of work on the plans has been reviewed for coordination with the scope of work on the permit application. See below for information if the scope of work on plans differs from the permit application: Valuation: Scope of Work: Floor Area: Confirmed Confirmed Confirmed Our comments follow on the attached list. Please call if you have any questions or if we can be of further assistance. Sincerely, True North Compliance Services Review By: JuanCarlos Jimenez -Plan Review Engineer Quality Review By: Areli Sanchez -Plan Review Supervisor True North Compliance Services, Inc. 8369 Vickers Street, Suite 207, San Diego, CA 92111 T / 562.733.8030 New ADU Construction 1276 Chestnut Ave J uly 21, 2025 RESUBMITT AL INSTRUCTIONS: Plan Review Comments City of Carlsbad-FIRST REVIEW City Pennit No.: CBR2025-1703 True North No.: 25-018-71 1 Page2 Please do not resubmit plans until all departments ha,,e completed their re\'icws. For status. JJlease contact building@carlsbadca.gov Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). Corrected sets can be submitted as follows: Deliver THREE corrected sets of plans and TWO corrected calculations/reports directly to the City of Carlsbad Building Division, 1635 Faraday Ave., Carlsbad, CA 92008, (442) 339-2719. The city will route tJ1e pla11s to True North, Planning and Land Development Engineering Departments (if applicable) for continued review. Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific instructions for resubmittal review. The city will not route plans back to Dennis Grubb & Associates for continued Fire Prevention review. GENERAL INFORMATION: A. The following comments are referred to the 2022 California Building, Mechanical, Plumbing, Electrical Codes, California Green Building Standards Code, and Energy Code (i.e., 2021 IBC, UMC, UPC, and 2020 NEC, as amended by the State of California). B. There may be other comments generated by the Building Division and/or other City departments that will also require your attention and response. This attached list of comments, then, is only a portion of the plan review. Contact the City for other items. C. Respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which details, specification, or calculation shows the required information. Your complete and clear responses will expedite the re-check. D. Where applicable, be sure to include the architect and engineer's stamp and signature on all sheets of the drawings and on the coversheets of specifications and calculations per CBPC 5536.l and CBPC 6735. This item will be verified prior to plan approval. If you have any questions regarding the comments below, please contact JuanCarlos Jimenez via email juancarlosj@tncservices.com or telephone (562) 733-8030. OCCUPANCY & BUlLDING SUMMARY: Occupancy Groups: Occupant Load: Type of Construction: Sprinklers: Stories: Area of Work (sq. ft.): R-3/U NIA V-B No One 630 sq. ft. ARCHITECTURAL COMMENTS: A I. New construction is proposed at 5 feet or closer to the property line, as such a boundary survey repori is required. A licensed surveyor is required ro complete Carlsbad form B-60C and provide it to the Building inspector at the foundation inspection. ~ """ c.-, New ADU Construction 1276 Chestnut Ave City of Carlsbad-FIRST REVIEW City Pennit No.: CBR2025-1703 True North No.: 25-018-711 Page3 July 21, 2025 l,.-\ A2. A3. https://w\\<w .carlsbadca.gov/home/showpublisheddocument/ I 8273/63859746392 ! 470000 Provide the following note on the cover sheet of the plans: A boundary survey report is required for th.is project. Concrete placement will not be approved until a boundary survey showing compliance to the approved plans is provided to the Building Division. On sheet C-1 , please provide all Designer's Infonnation (ie. Structural, Geotechnical, and Title 24). Please clearly delineate the location of the one-hour fire rated construction. ~tat> a) Walls less than 5 feet of the property line shall be of one-hour fire rated. Provide a construction detail with basis of approval (i.e., UL design #, G.A. file #) for the rated wall and cross reference onto the plans. CRC Table R302. I (I). E 90.13' (N) ADU -------7 I :r-2· EAVE TO PROP LINE A4. On sheet A-2, please provide an eave connection detail as referenced in the strucrural drawings that is project specific. The current connection details reference a truss, which does not apply. The eave span is specified to be !ft but the connection detail is only 4". (2 2x + 7/8" stucco). Please ensure to provide information for the outrigger carrying the facia board. llOTE lfl'PICAI. I IHISDEIAl FOR SHl.o.R l~CRO'llY SE -\RClflECruRA.. DR~V,ll'IGS ~OR EAVE COt.NECl ION '-"'" r... ""''-lnlL.. ) FIRE RESISTIVE RAKE DETAIL ew ADU Construction 1276 Chestnut Ave July 21, 2025 MECHANICAL COMMENTS: City of Carlsbad-FIRST REVIEW City Pennit No.: CBR2025-l 703 True North No.: 25-018-711 Page 4 Ml. In addition to the mini-split in the living room, please provide an additional mini-split unit in the bedroom. CRCR303.IO t"\l~\~q'-\T ~ --<> \Y<l::>~ 0~ ~ .,..~\ ELECTRICAL COMME TS: El. Please provide an electrical load calculation for the existing 200 Amp panel that includes the new I 00amp subpanel for the new ADU. ~ ~~ E2. On sheet E-1, please address the following: a) Utility Notes #16, please revise code reference to the 2022 CEC instead of the 2019 NEC ass currently shown. ~~ El. 1n addition to the GFCI outlet in the front, please also provide a GFCl, waterproof, and tamper resistant receptacle outlet at the rear of the building per CEC 210.8, 406.9(8), 406.12, and 210.52(E). ~~ PLUMBING COMME TS: No comments. GREEN BUILDING COMMENTS: M f°"''-GI. Update the Cal Green sheets in the plan set to the current Residential Mandatory Measures Checklist with I ' 1_ July 2024 Supplement. ...,., r\(' a) https:1/aiacalifomia.org/learn-grow-practicc/practiccs/calgrccn-checklist. ~"'\J4) ENERGY COMPLIANCE COMMENTS: No comments. STRUCTURAL COMMENTS: ~ S'1v,,.oc;cv\7~ ~ ~ J~ ~ <Zc:>~~ s I. S2. Please incorporate the conclusions and recommendations given in the Geotecbnical letter on the plans. Detail 14/S 1.3, please specify the ICC ESR number for the Hilti "X-u·• shotpins. (ESR-2269) S3. On sheet S-2, please address the following: a) For clarity, please revise the roof rafter label to coordinate with the structural calculations . ... ,, t t \\ "5\-~5 New ADU Construction 1276 Chestnut Ave July 21, 2025 City of Carlsbad-FIRST REVIEW City Pennit No.: CBR2025-1703 True North No.: 25-018-711 Page5 S4. Detail 2/SDI, please provide infonnation for the outrigger to carry the fascia, please coordinate with the architectural designer to provide eave connection. l!OOrSHl'C-II r['iOIWTtRwU.P / I PER SW SCHEil '·~ PC.,.11 I.Off • IY1'1C.,,.1 -SHEAA;v.,. 1~11$ DI.TA roq S>il.AA 1 RM.SHR O'll' SE ARC It ll:CTUAAI. DAAV•lNGS FOR EAvE CON-.ECTIOI'< S5. Detail 3/SD I, please specify the l 0-mil vapor barrier centered on the 2"/2" of clean sand to coordinate with the geotechnical letter. If you have any questions regarding the above comments, please contact JuanCarlos Jimenez via email juancar1osj@tncservices.com or telephone (562) 733-8030. (END] oi.n M ON Q .,-0 ('l')N .....___ ocr5 •-­N N ~ .,--I t.,!') r-- 0 Ln N N 0 N ~ al (..) Nichols Residence 1274 Chestnut Ave, Carlsbad, CA 92008 Structural Calculations-25124 Qualls Engineering Structural Engineering Services Design Decisions 13607 Powers Road Poway, CA 92064 Phone: (858) 77 4-1957 Fax: (858) 748-6908 Qualls Engineering Structural Engineering Services Project: Nichols ADU Engineer: _P_H _______ _ Correction Responses Correction S1: Sheet Job#: Date: 1a 25124 See incorporated recommendations based on the Geotechnical letter, dated July 7, 2025. Correction S2: See detail 14/S1 .3 with ICC ESR number referenced. Correction S3(a): See updated label on the structural calculations (sheet 3). Correction S4: See updated detail 2/SD1. Correction S5: See structural foundation plan (sheet S-2) for the slab callout that follows the recommendations of the geotechnical letter. Note to the Engineering Reviewer: Please feel free to reach out to me directly if there are any items that may require further consideration. We find it is simpler and clearer to coordinate with you directly and hope to avoid another round of formal corrections. Thanks for your partnership in providing our client the most streamlined approach possible. Patrick Harrington patrick@quallseng .com (619) 349-6426 Qualls Engineering Structural Engineering Services GOVERNING CODE: CONCRETE: REINFORCING STEEL: SAWN LUMBER: Project: Nichols Residence Engineer: _P_H _______ _ DESIGN BASIS 2022 CBC f c = 2,500 psi (MINIMUM) ASTM A615, Fy = 60 ksi Sheet 1/7 ---- Job#: 25124 Date: 07-28-25 DOUGLAS FIR LARCH, ALLOWABLE STRESS DESIGN PER 2022 CBC. PROJECT SCOPE Project consists of a proposed approximately 630 square foot 1-story accessory dwelling unit (ADU) located at 1274 Chestnut Ave, Carlsbad, CA, 92008. The proposed residence is primarily constructed utilizing wood frame construction with 2x stick framed roof and typical slab on grade with turned down footings. There has not been a soils report provided for this project. Therefore, the foundation design will be based on minimum soils values per 2022 CBC chapter 18. REVISION SCOPE The revision consists of implementing a geotechnical site and plan review letter, dated 06/07/25, and incorporating the recommendations. Additionally, detail 14/S1 .3 and 2/SD1 were revised based upon the plan check review. Qualls Engineering Structural Engineering Services Design Loads: Roof: Dead Load ( DL ) Roofing 1 /2" Plywood Wood Framing Insulation 1/2" Gyp. Bd. Mech./Elec. Misc. Project: Nichols Residence Engineer: -=-P...:...H.:....._ _______ _ 5.0 psf 1.3 psf 4.0 psf 0.5 psf 2.2 psf 0.5 psf ___ 1_.5_ psf LDL = 15.0 psf Walls: Live Load (LL) LL = ___ 2~0 .... 0"""psf (Reducible) DL + LL =I 35.0lpsf Stud Walls Exterior Stud Walls Interior Stud Walls 15.0 7.0 psf psf Allowable Soils Bearing Pressure: Sheet: _2 ___ _ Job #: 25124 Date: ASBP = 1,500 psf@ 12 inches below lowest adjacent finished grade Seismic: Site Class: D Ss = 1.050 S1 = 0.381 SMs = 1.260 SM1 = - Sos = 0.840 So1 = - Response Redundancy Occupancy Category Importance Mod. Facto, Factor Factor, le R p II 1.00 6.5 1.3 Wind Load: (Simplified Envelope Procedure) Basic Wind Speed: 97 mph Exposure: C MWFRS P = 0.6*A*K2tPs30 (LRFD): P = (ASD): p =I 16.7 psf 10.0Ipst Components & Cladding P = 0.6*A*Kz1*Pnet3o (LRFD): P = (ASD): p =I 20.4 psf 12.3lpst A= 1.21 Kz1 = 1.0 Ps30= 13.8 Pnet30= 16.9 pCs Sosl(R/1) ( LRFD ) ( ASD) 0.168 I 0.120 Qualls Engineering N, .(rio 1~ Sheet: 3 Structural Engineering Services Project: R tr;,'d 1,n u .. Job#: ;;)5f).'f Engineer: rt Dare: Vertical Design J .evel: Raof 0 1.= /> psf L R= r;,,.(> psf LL = -psf Member: ;</ I ~w, w 1= 1. s3 • f -JS'pJ ) :: '1& i-pll \v2= t t P1= ~I' P2= Use: 2x12 v t,, Yruax = '11o lbs 2,531 1 1 v.11 = lbs R.1. = 1./ 10 Jbs l\1max = J,J ?'! ft-lbs M,11= 3,790 ft-Jbs RR = ttro lbs l req'd = t do (j in4 l = 178 in4 Member: f< H-I ~ ---___/(J, W'1=(;J,1°/{) )(J~J{) =-3<,, 1 _ 1i r Jr \X/2= t t P1= lf y /() r. JS P2= Use: v t,, '1~5 l/, r;~ 1 1 V "'" = lbs V,11= lbs R1 = ~,:;-lbs ;\l ma. = L, :;i t.~ ft-lbs M,11= ~;),/'! ft-lbs RR = c;~;; lbs l req'd = It 'J. in4 I= 'JJ' in4 Member: W ,= \Y/2= t t P1= P2= Use: v 1 Lt 1 \TmJ'\ = lbs V,11= lbs R, = lbs fma. = ft-lbs M.u = ft-lbs RR= tbs l n:q'd = 111• 1 = in4 Member: \Xl 1= t W 2= t P1= P2= Use: I, I, V m:u:= lbs V a11= lbs 1 'I R1.= tbs l\1max = ft-lbs l\1.u = ft-lbs RR = lbs l rcq'd = in4 1 = in4 Qualls Engineering Structural Engineering Services Project: Nichols Residence Sheet: 4 ---- Job #: 25124 Engineer: -'-P-'-H-'----------Date: Lateral Analysis Tributary Area (ft") Level Component Weight (psf) Tributary Tributary Weight I:Weight Length (ft) Height (ft) (lbs) (lbs) Roof 15 630 9,450 Roof Exterior Wall 15 105 9.0 14,175 18,113 Interior Wall 7 50 9.0 3,150 c. (ASD) W (lbs) V (lbs) V (psf) 0.120 18,113 2,174 3.5 Wind Check I Ps I 10.0 North-South East-West Level Height (ft) Diaphragm v. (psf) Level Height (ft) Diaphragm V, (psf) Deoth (ftl Depth (ft) Roof Peak 14 --Roof Peak 14 -- Roof 9 30 3.2 Roof 9 r 21 4.5 Direction Governing Load North-South Seismic 3.5 psf East-West Wind 4.5 psf Qualls Engineering Structural Engineering Services Project: Engineer: M ·c hd Is Res, Jen<-{', fH Sheet: Job#: Date: Shearwall Design Direction: /V -) Level: R0 d ( V p,f (Unit Shear): J. S psf (Seismic) Gridline: A LL,., = ;J. r 1 5 · S" + l( ::--I 6 ----ft ,\. (frib. Arca) = --'-&_J ...... o'--/_Q __ ~ __ 3_1!i ________ ft2 F. (Lateral Load) = _\....,l1_rl'_v~l_l1_= _ _,f ._l_O_J ________ 1bs Vp1r(Unit Lateral Load)= fv / I. v -"-/ / 0 plf H:W t\djustment (Vp1rx h/2w) = plf SWType: ro£ V.u= J-~{J HD Type: /fDU'J. 5 plf Overturning Force: T.u = _..::;..;J.c.....()_]...:...'J-_ lbs d ,;-/tt ?v min l~ =_.,_ft Uplift= '--' Gridline: __ B __ _ ft A, (frib. Area) = __ .1'_1_O_/_'.,! __ -__ J_r_s--__________ ft2 F, (Lateral Load) = _J,~C~5f_1_i _t __ __,./~,~-()_:; ________ lbs -/01J-\'p1,(lin.it Lateral Load)= 1..,. /I• plf H:W Adjustment (Vp1,x h/2w) = plf Overturning Force _ OK by inspection ( ~ -f IQ. 'S I 1' • rl 14" = ..:0._ ft Uplift =1 O ., • 1 ? tJ ) 0 i{ t )I d, ., '/'l,...,1/ lbs ~]50 Gridline: ___ _ 1 ... = --------------fc A, ([rib. Arca) = __________________ ft~ r, (Lateral Load) = _________________ lbs Vp1r (Unit Lateral Load)= _______________ plf H:\'<1 Adjustment (Vp1rx h/2w) = ____________ plf Overturning Force _ OK by inspection l,,,.. = __ ft Uplift= ________________ lbs Gridline: ___ _ lw = ______________ ft r\, (Trih. J\n'a) = ________________ ft2 F, (Lateral Load) = _________________ lbs Vp1r (Unit Lateral Load)= _______________ plf H:W Adjustment (Vp11x h/2w) = ____________ plf Overturning Force _ OK by inspection L,. = __ ft Uplift= ________________ lbs SWType: tf V,11= ,,. /.9~ HD Type: ___ _ T.11 = U, 00 SW Type: Vnu= HD Type: T.11= SW Type: V.11 = HD T ype: T.11 = plf lbs plf lbs plf lbs Qualls Engineering Structural Engineering Services Project: Engineer: M ~ A Q Is !f esi'/11"~ { l'H Sheet: ---"6 __ _ Job#: ~'5/~3/ Date: Shearwall Design Level: ----'-/?.---'o-•_.f ____ _ Direction: £ ~ U Vp,r (Unit Shear): 4.) psf (w,~ I Gridline: __ 1 __ I:L.. = _ __:_'J_O _________ ft A, (f rib. Area) = _t_30_/_~_::: __ s_lf _______ ft2 F, (Lateral Load) = ..:..A_._· _t _· -"-V.cce'=-'----/-'-, If-'-/-"! ________ lbs v plf (Unit Lateral Load) = ..... G.:..c.-t..;.../_;(c...:,<,/;___-_ _;l_o.:c,___:1 ______ plf H:W Adjustment (Vplt'X h/2w) = ____________ plf Overturning Force: _ OK by inspection min L,.. = d-0 ft Uplift= __._I_O_ . ..:..1_7.-el ..... ~ _=o __ ~_(.,_r _______ lbs Gridline: --~---5 t 5 /0 lw = _____________ ft A, (frib. Area)= _(._;~_J_o_/L-.J'J.-=-_-~ __ -1_.,,_l _~ _________ ft2 F. (Lateral Load) = /J• · J,,.( ~ /, '/I! lbs Yp1r(Unit Lateral Load)= 1& /, v :. /<(I. ! plf H:W Adjustment (\'pirx h/2w) = ____________ plf Overturning Force _ OK by inspection L,. = _!1_ ft Uplift= (t ({ 'I· l'J ) ~ 6'/] lbs Gridline: ___ _ _____________ ft A, (f rib. Area) = _________________ ft2 F, (Lateral Load) = _________________ lbs Vp1t'(Unit Lateral Load)= plf H:\X1 Adjustment (Vp1rx h/2w) = ____________ plf Overturning Force _ OK by inspection k = __ ft Uplift = _______________ lbs Gridline: ___ _ lw = _____________ ft /\, (f rib. Area) = ____ ft2 F, (Lateral Load) = _________________ lbs Vp1r(Unit Lateral Load)= _______________ plf H:W Adjustment (V plf x h/2w) = ____________ plf Overturning Force _ OK by inspection I.,,..= __ ft Uplift = _______________ lbs ---- SW Type: 0£ j.).f, V .n = _____ plf HD Type: ___ _ T,11 = l, (}() lbs SWType: (ot V.u = "J:J S-plf HDType: 1./DU'J T,11 = (n O{) lbs SW Type: v .11= plf HD Type: T.n= lbs SW Type: V.11 = plf HD Type: T,u= lbs Qualls Engineering Structural Engineering Services Project: Nichols Residence Sheet: _7 __ _ Job#: 25124 Engineer: ..:.P....:...H:..__ ______ _ Date: FOUNDATION DESIGN Allowable Soils Bearing Capacity 1,500 psf Foundation design b = 12 d = 12 12 12 2 #4 inch wide x inch deep footing with top and bottom _J 1!:===== Allowable Max Line Load w max = b x ASBP Allowable Max Point Load = 1,500 pit Pmax =bx 2d x ASBP = 3,000 lbs Spread Footing Design Pmax = b2 x ASBP F2 = 2 foot square footing with 3 # 4 each way @ btm Pmax = 6,000 lbs F2.5= 2.5 foot square footing with 3 # 4 each way@ btm Pmax = 9,375 lbs F3 = 3 foot square footing with 4 # 4 each way @ btm Pmax = 13,500 lbs F3.5 = 3.5 foot square footing with 4 # 5 each way@ btm Pmax = 18,375 lbs F4= 4 foot square footing with 5 # 5 each way @ btm P max = 24,000 lbs F5 = 5 foot square footing with 6 # 5 each way@ btm Pmax = 37,500 lbs OLD M ON O .,.-o C'0 N t--o-0) N -­.,.... I"-' L(') I ~ In N 0 N ~ ca (.) Nichols Residence 1274 Chestnut Ave, Carlsbad, CA 92008 Structural Calculations -25124 Qualls Engineering Structural Engineering Services Design Decisions 13607 Powers Road Poway, CA 92064 Phone: (858) 774-1957 Fax: (858) 748-6908 Qualls Engineering Structural Engineering Services GOVERNING CODE: CONCRETE: REINFORCING STEEL: SAWN LUMBER: Project: Nichols Residence Engineer: ..:...P-=--H'--------- DESIGN BASIS 2022 CBC f c = 2,500 psi (MINIMUM) ASTM A615, Fy = 60 ksi Sheet: 1(1 ---- Job#: 25124 Date: 06-12-25 DOUGLAS FIR LARCH, ALLOWABLE STRESS DESIGN PER 2022 CBC. PROJECT SCOPE Project consists of a proposed approximately 630 square foot 1-story accessory dwelling unit (ADU) located at 1274 Chestnut Ave, Carlsbad , CA, 92008. The proposed residence is primarily constructed utilizing wood frame construction with 2x stick framed roof and typical slab on grade with turned down footings. There has not been a soils report provided for this project. Therefore, the foundation design will be based on minimum soils values per 2022 CBC chapter 18. Qualls Engineering Structural Engineering Services Design Loads: Roof: Dead Load ( DL ) Roofing 1 /2" Plywood Wood Framing Insulation 1/2" Gyp. Bd. Mech./Elec. Misc. L DL = Live Load (LL) Project: Nichols Residence Engineer: --'-P--'-H'---------- 5.0 psf 1.3 psf 4.0 psf 0.5 psf 2.2 psf 0.5 psf 1.5 psf 15.0 psf LL =.----2~0!!""!.0!!"lpsf (Reducible) DL + LL =I 35.0IPsf Walls: Stud Walls Exterior Stud Walls Interior Stud Walls Allowable Soils Bearing Pressure: 15.0 7.0 psf psf Sheet: 2 ---- Job #: 25124 Date: ASBP = 1,500 psf @ 12 inches below lowest adjacent finished grade Seismic: Site Class: D Ss = 1.050 S1 = 0.381 Fa = 1.200 Fv = - SMs = 1.260 SM1 = - Sos = 0.840 So1 = - Response Redundancy Occupancy Category Importance Mod. Factor Factor Factor, le R p II 1.00 6.5 1.3 Wind Load: (Simplified Envelope Procedure) Basic Wind Speed: 97 mph Exposure: C MWFRS P = 0.6*A*K2t Ps30 (LRFD): P = (ASD): p =I 16.7 psf 10.0Ipsf Components & Cladding P = 0.6*A*Kz1*Pne130 (LRFD): P = (ASD): p =I 20.4 psf 12.3!psf Pnet3o= 1.21 1.0 13.8 16.9 pCs Sos/(R/1) (LRFD) (ASD) 0.168 I 0.120 Qualls Engineering /1/,'c/-i o /,; Sheet: 3 Structural Engineering Services Project: Re q,'d., n <-<. Job#: -;;r1?.t1 Engineer: {:tt Date: Vertical D esign Level: Raof DL= 15" psf LR= ',)._ () psf LL = ~ psf Member: 8B-I ~Wi W1= /. ~ 3 I/ Ji'pd ) :: '!&-:,-plf W2= t t P1= ?/' P2= Use: 2x12 v It Vm,. = 1110 lbs 2,531 1 'l v .11 = lbs R1.= '+10 lbs l\1max = J,fl'! ft-lbs M.11= 3,790 ft-lbs RR= Lf'f(J lbs l rcq'd = t Q() in4 I = 178 in4 Member: RH -I W1=(:;J.1'/{) )(3¥I I)::. 3l1., rll ~ cJ, W2= t t P,= lfy; /() r _l P2= Use: v .J~ It '1~5" l /1 v "j~ 1 ,, Vm,., = lbs v.n = lb R1.= ~,~ lbs t\1m1' = t:;. (,,(p ft-lbs M.11= ~ ;)j 1 ft-lbs RR= 7~;; lbs l rcq"d = /t'J in4 1= 211 in4 Member: W1= \'</2= t t P,= P2= Use: I, I, Ym» = lbs Va11 = lbs ,, ,, R1.= lbs M max = ft-lbs M .11= ft-lbs RR= lbs l rcq'd = in4 I = in4 Member: W,= W 2= t t Pi= P2= Use: v It 1 ,, Ym., = lbs v.u= lbs R1.= lbs M ma. = ft-.lbs M,n= ft-lbs RR= lbs l,.._.q'd = in4 I = in4 Qualls Engineering Structural Engineering Services Project: Nichols Residence Sheet: 4 ---- Job#: 25124 Engineer: ""'"P-'-H-'----------Date: Lateral Analysis Tributary Area (ft2) Level Component Weight (psf) Tributary Tributary Weight I:Weight Lenath (ft\ Heiaht (ft\ libs\ libs\ Roof 15 630 9,450 Roof Exterior Wall 15 105 9.0 14,175 18,113 Interior Wall 7 50 9.0 3,150 C1 (ASD) W (lbs) V (lbs) V (psf) 0.120 18,113 2,174 3.5 Wind Check I Ps I 10.0 North-South East-West Level Height (ft) Diaphragm v. (psf) Level Height (ft) Diaphragm v. (psf) Depth (ft) Depth (ft) Roof Peak 14 --Roof Peak 14 -- Roof 9 30 3.2 Roof 9 r 21 4.5 Direction Governing Load North-South Seismic 3.5 psf East-West Wind 4.5 psf Qualls Engineering Structural Engineering Services Project: Engineer: M ·c h.d / S )\e.5, JRn<-c fH Sheer: 5 Job#: Date: Shearwall Design Direction: rJ -5 Level: Ro dt Vp,r (Unit Shear): J. S psf (Seismic) Gridline:_A __ LL...= :J,r t 5. 5" 1-'1 ::-16 ft foJ:1 Q ::: J/!i A1 (frib. Area) = ___.;;;___.u..,___ ______________ ft2 F X (Lateral Load) = \1r -r ~ /11 -I, l OJ lbs Vp11(Unit Lateral Load)= f., / l..J .,. /I O plf H:W Adjustment (Vp1rx h/2w) = ____________ plf Overturning Force: _ OK by inspection. min L.. = I" '5 ft Uplift = JtJ'< 'I ~:: ) -( 0. 1 'i · 17 )( '4.').)' />p~f ) lbs -::-/,I 1t Gridline: B I,.. = / tJ S--ft -~----------- A 1 (frib. Area)= II' 10 f,../ -JtS-ft2 F, (Lateral Load) = Vr~f At I , I OJ lbs Vp1r(UnitLateralLoad)= l.,,./tJ •_ /0 1:J-plf H:W Adjustment (Vp1rx h/2w) = ____________ plf Overnirning force L,. = _,_._ ft Uplift = _ OK by inspectio~1 /;o:;J...i?5} fo tt IQ'lS)(1d ;:,hn01bs ~]Sb Gridline: ___ _ I,.= _____________ ft A, (frib. Area) = _________________ ft~ F, (Lateral Load) = _________________ lbs Vr1r(Unit Lateral Load) = ______________ plf H:\X' Adjustment (Vp1rx h/2w) = ____________ plf 0Yerturning Force _ OK by inspection L .. = __ fr Uplift= _______________ lbs Gridline: ___ _ lw = _____________ ft A, (Trih Are,i) = ________________ ft:2 F, (Lateral Load) = ________________ lbs Vpu(Unit Lateral Load)= ______________ plf H:\X' Adjustment 0,1p1rx h/2w) = ____________ plf Overturning Force _ OK by inspection L,.. = __ ft Uplift = _______________ lbs SWType: to£ V a11 = _')~C,~0~_ plf HD Type: tf f)U~ T,n = __ J-'-. ()_]_~-_ lbs SW/Type: tf v .11 = ...). &tJ HD Type: ___ _ T.u= UJ 0 0 SW Type: v .u= HD Type: T,.i1= SW Type: V,11= HD Type: Tall= plf lbs plf lbs plf lbs Qualls Engineering Structural Engineering Services Project: M ~A ols 8es,·J11"( ~ Sheet: 6 ---- Job#: ';;1'5 l'),'f Engineer: ___ fH:...:..._ _______ _ Date: Shearwall Design Level: ___..f?._c_•_f ____ _ Direction: £ ~ U Vp,f (Unit Shear): 4. S' psf ( w i ... I ') Grid.line: ---=1'-----EL,. = ___ ;J_O _________ ft t:,Jo /~ :: 11r A, (frib. Area) = _________________ ft2 Fx (Lateral Load) = --'A-'-'-t _-....,,11..z::.e=-~ '-__ -__:./..:..' ..:..~ /_,!'----------lbs Vp1r(Unit Lateral Load) = ~G~.,-_/_{_w __ -__ /"-0__,1'-------plf H:W Adjustment (Vp1fX h/2w) = plf Overturning Force: _ OK by inspection min L.. = 1-0 ft Uplift = ~/_0_7~' ~'--"' _~_G_T ______ lbs Gridline: --~--lw = __ 5_t_5" __ -_I _0 ______ ft A, (f rib. Area) = _l..::....:.1_0_,/c_.Jj"J,c,__-_~ __ >_l_;; ________ ft2 F, (Lateral Load) = A~ · I • ,( ;: /, 1/ I! lbs 't,_ /.L -/ '(I_ .} V plf (Unit Lateral Load) = __..,_,Y:_;__.;..'--_' ------'~"--------plf H:W Adjustment (Vp1rx h/2w) = plf Overturning Force _ OK by inspection r_,,_.. = fl_ ft Uplift = (Nt F· l'J ) -~ !1/ J lbs Grid.line: ___ _ lw = _____________ ft A, (frib. Area) = _________________ ft2 F, (Lateral Load) = ________________ lbs Vp1f(Unit Lateral Load)= plf H:W Adjustment (Vp1rx h/2w) = ____________ plf Overturning Force _ OK by inspection I__,,_..= __ ft Uplift= _______________ lbs Grid.line: ___ _ lw = _____________ ft A, (frib. Area) = ____ _ ___ ft2 F, (Lateral Load) = _________________ lbs Vprr(Unit Lateral Load) = _______________ plf H:W Adjustment (Vprrx h/2w) = ____________ plf Overturning Force _ OK by inspection Lw = __ ft Uplift= _______________ lbs SWType: ~£ Van= __ ]_J._S-__ plf HD Type: ___ _ T.11 = (.. {}() SWType: {oE V1111 = '):ZS- HD Type: t/DU'J. lbs plf T a11 = {" 06 lbs SW Type: V.u= plf HD Type: T,11= lbs SW Type: V,11 = plf HD Type: T.11 = lbs -------~ II ' • • Qualls Engineering Structural Engineering Services Project: Nichols Residence Sheet: Job#: 7 25124 Engineer: ..:...P-=--H=-----------Date: FOUNDATION DESIGN Allowable Soils Bearing Capacity 1,500 psf Foundation design b = 12 d = 12 12 12 2#4 inch wide x inch deep footing with top and bottom ~ ,~=== Allowable Max Line Load W max = b X ASBP Allowable Max Point Load = 1,500 pit P max = b x 2d x ASBP = 3,000 lbs Spread Footing Design Pmax = b2 x ASBP F2 = 2 foot square footing with 3 # 4 each way@ btm Pmax = 6,000 lbs F2.5 = 2.5 foot square footing with 3 # 4 each way@ btm Pmax = 9,375 lbs F3 = 3 foot square footing with 4 # 4 each way @ btm Pmax = 13,500 lbs F3.5 = 3.5 foot square footing with 4 # 5 each way @ btm Pmax = 18,375 lbs F4= 4 foot square footing with 5 # 5 each way@ btm Pmax = 24,000 lbs F5 = 5 foot square footing with 6 # 5 each way @ btm Pmax = 37,500 lbs ( City of Carlsbad PURPOSE CLIMATE ACTION PLAN CONSISTENCY CHECKLIST B-50 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www .carlsbadca.gov This checklist is intended to help building permit applicants identify whi mate Action Plan (CAP) ordinance requirements apply to their project. This completed checklist (B-50) and summary (B-55) must be included with the building permit application. The Carlsbad Municipal Code (CMC) can be referenced during completion of this document. NOTE: The following type of permits are not required to fill out this form ❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool The B-50 checklist was originally developed several years ago to support implementation of the CAP. Recent updates to the California Building Standards Code have imposed newer performance standards on building permit applications. Therefore, the applicant is advised to review all applicable code sections and apply the maximum performance standard, which may exceed the CAP consistency checklist requirements Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate certification includes, but is not limited to: Licensed , practicing Architect, Engineer, or Contractor familiar with Energy compliance, IECC/HERS Compliance Specialist, ICC GB Energy Code Specialist, RESNET HERS rater certified, certified ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen Inspector/Plans Examiner, or Green Building Residential Plan Examiner. If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, check N/A and provide an explanation or code section describing the exception. The project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and Green Code sections. f\;,,t.::• .... >$-!'-• ;•>t-,.~· ~,• .-. .;H;..-~~~,;i;.~,,1.,,• ,.:!•·\f~~wr~~WM~·.1.i.,•.;: •• 'l.V~"·1~,~ ·~ir,(:.:::•~ -f~;,:c •• '2n· .. " ,~·,;_,.,.:~/'\;.,., . ., .(:~c-. ~;~-: .:. '• .::.:.'. _::_;'i~\:· ',;::~r:/:r /; :.,.·._,. /··' ' ·. ;-~~i Project Name/Building Permit No.: NICHOLS ADU BP No.: Date: 6.20.25 PropertyAddress/APN: 1274 CHESTNUT AVENUE ApplicantName/Co.: Ben Leland Construction, Inc. ApplicantAddress: 270 N. El Camino Real, Suite 297 Contact Phone: 760-436-1506 Contact Email: aceytracy@gmail.com Contact information of person completing this checklist (if different than above): Name: LARRY LIPKIN Contact Phone: 858. 77 4.1957 Company name/address: DESIGN DECISIONS 13607 POWERS~ Contact Email: LLIPKIN61@GMAIL.COM B-50 Page 1 of 7 Revised 12/22 Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For alterations and additions to existing buildings, attach a Permit Valuation breakdown on a separate sheet. For purposes of determining valuation, the amount should be upon either the actual contract price for the work to be permitted or shall be determined with the use of the current "ICC Building Valuation Data" as published by the International Code Council, whichever is higher (refer to Section 18.04.035 of the CMC). Building Permit Valuation (BPV) $ breakdown ___________ _ Construction Type Complete Sectlon(s) Notes: [I] Residential !!!I New construction 2A*, 3A*, 4A* *Includes detached, newly constructed ADU □ Additions and alterations: □ BPV < $60,000 NIA All residential additions and alterations □ BPV.? $60,000 1A, 4A 1-2 family dwellings and townhouses with attached garages □ Electrical service panel upgrade only only. *Multi-family dwellings only where interior finishes are □ BPV.? $200,000 1A, 4A* removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed 2B* *Multi-family dwellings only where ~$1,000,000 BPV AND BPV ~ $1,000,000 affecting ~75% existing floor area D Nonresidential and hotels/motels □ New construction 1 B, 2B, 3B, 4B and 5 □ Alterations: □ BPV.? $200,000 or additions ~ 1B, 5 1,000 square feet □ BPV ~ $1,000,000 1B, 2B, 5 Building alterations of.? 75% existing gross floor area ~ 2,000 sq. ft. new roof addition 2B, 5 1 B also applies if BPV ~ $200,000 Instructions: 1. Choose first between residential or non-residential based on the type of project being submitted. 2. Next chose between new construction or addition/alteration for residential or non-residential. 3. The columns to the right of your selection will determine which sections of the CAP program are applicable to your project. 4. Appropriate details must be included on the plans for selections made. EXAMPLE: Scope of work includes a new, 2 story, single family residential structure. I The selections would be: Residential and New construction in the table above. For a 2-story structure, CAP sections 2A, 3A and 4A would be applicable. (Solar PV, water heating, EV charging) The • indicates that new detached ADU's are included. EXAMPLE: Scope of work includes a tenant improvement (i.e., alterations) valued at over one million dollars. The selections would be: Non-residential and Alteration BPV.? $1 ,000,000. CAP sections 1 B, 2B and 5 would be applicable to this project. (Energy efficiency, Solar PV and Transportation Demand Management (TOM)*) It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. 3 Checklist Item Check the appropriate boxes, explain al not applicable and exception items, and provide supporting calculations and doctlnentation as necessay. 1. Energy Efficiency Please refer to Section 18.30.060 of the Carlsbad Municipal Code (CMC) and Section 150.2 of the CEC for more information. Appropriate details and notes must be placed on the plans according to selections chosen in the design. A. 0 Residential addition or alteration 2: $60,000 building permit valuation. Details of selection chosen below must be placed on the plans referencing CMC 18.30.060. l!!I N/A DETACHED ADU □ Exception: Home energy score 2: 7 ( attach certification) Year Built Single-family Requirements Multi-family Requirements □ Before 1978 Select one option: □ Attic insulation □ Duct sealinq □ Attic insulation □Cool roof □ 1978 and later Select one option: □ Lighting package □ Water heating package □ Between1978-1991 Select one option: □ Duct sealinq □ Attic insulation D Cool roof □ 1992 and later Select one option: □ Liahtina oackaae □ Water-heatinq package B. 0 New Nonresidential construction (including additions over 1,000sf), new hotel/motel construction AND alterations 2: $200,000 building permit valuation. See Section 18.21.050 of the CMC and CAL Green Appendix A5. At least one measure from each applicable building component required. 0 N/A _______ _ AS.203.1.1 Choose one: D Outdoor lighting D Restaurant service water heating (Section 140.5 of the CEC) D Warehouse dock seal doors D Daylight design PAFs D Exhaust air heat recovery D NIA _______ _ AS.203.1.2.1 Choose one: □ .95 Energy budget (Projects with indoor lighting OR mechanical) □ .90 Energy budget (Projects with indoor lighting AND mechanical) 0 NIA ________ _ AS.211.1 ... □ On-site renewable energy: 0 NIA AS.211.3 .. □ Green power: (If offered by local utility provider, 50% minimum renewable sources) □ N/A AS.212.1 □ Elevators and escalators:(Project with more than one elevator or two escalators) 0 NIA AS.213.1 □ Steel framing: (Provide details on plans for options 1-4 chosen) 0 N/A. ________ _ * High-rise residential buildings are 4 or more stories. ** For alterations<? $1,000,000BPV and affecting> 75%existing gross floor area, OR alterations that add 2,000 square feet of new roof addition: comply with Section 18.030.040 of the CMC (section 2B below) instead. 4 2. Photovoltaic Systems A. Iii Residential new construction. Refer to Section 150.1 (c)14 of the CEC for single-family requirements and Section 170.2(d) of the CEC for multi-family requirements. If project includes installation of an electric heat pump water heater pursuant to CAP section 3 below (residential water heating), increase system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional CFA ors.ARA #d.u. Calculated kWdc* Exception sheets if necessary) A1 630 1 1.99 □ D □ □ Total System Size: 1.99 kWdc kWdc = (CFAx.572) / 1,000 + (1.15 x#d.u.) *Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type If proposed system size is less than calculated size, please explain. B. 0 Nonresidential, hotel/motel and multifamily additions, alterations 111d repairs of these projects ~$1,000,000 BPV AND affecting ~75% existing floor area, OR addition that increases roof area by ~2,000 square feet. Please refer to Section 18.30.040 and 18.30.070 of the CMC when completing this section. Choose one of the following methods: (Gross floor area or Time-Dependent Valuation method) □ Gross Floor Area (GFA)Method GFA: Min.System Size: kWd □ If< 10,000s.f. Enter: 5 kWdc □ If ~ 1 O,000s.f. calculate: 15 kWdc x (GFA/10,000) ** **Round building size factor to nearest tenth, and round system size to nearest whole number. □ Time-Dependent Valuation Method C. □ Annual TDV Energy use:*** ______ .x .80= Min. system size: _____ """kWdc ***Attach calculation documentation using modeling software approved by the California Energy Commission. •All newly constructed non residential, hotel/motel 111d hlghrise multlfanily buildings that are required by CEC section 140.10(a) to have a PV system shall also have a battery storage system meeting CEC section 140.10(b). Non residential, hotel/motel and rnultlfanily additions, atsralions or repairs that trigger solar due to the Cartsbad Climate Action Plan will NOT require battery storage. Battery storage is required when triggered by CEC section 140.10(a) and/or 170.2(g). 5 3. Water Heating A. Residential. Refer to Section 18.30.050 of the CMC and Sections 150.1(c)8 or 170.2(d) of the CEC when completing this section. Provide complete details on the plans. Residential new construction and alterations: l!!!!I Required: 60% of energy needed for service water heating from on-site solar or recovered energy. For systems serving individual units, choose one system: D Single 240-volt heat pump water heater AND compact hot water distribution AND Drain water heat recovery (low-rise residential only) l!!!!I Single 240-volt heat pump water heater AND PV system .3 kWdc larger than required. D Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher. D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors D Gas or propane system with a solar water hearing system and recirculation system. For systems serving multiple units, choose one system: D Heat pump water heating system with recirculation loop tank and electric backup. D Solar water heating system that is either: D .20 solar savings fraction D .15 solar savings fraction, plus drain water heat recover OR: D System meets performance compliance requirements of section 150.1(d) or 170.2(d) and deriving at least 60% of energy from on-site solar or recovered energy. D Exception: ______________________________________ _ B. Nonresidential and hotel/motel new construction. This section also applies to high-rise residential. Refer to Sections 18.030.020 and 18.040.030 of the CMC and Sections 140.5 and 170.2 of the CEC when completing this section. Provide complete details on the plans. 1. Non-residential: D Required: Water heating system derives at least 40% of its energy from one of the following: D Solar-thermal D Photovoltaics D Recovered energy D Required: High-capacity service water heating system 2. Water heating system is (choose one): D Heat pump water heater D Electric resistance water heater(s) D Solar water heating system with .40 solar savings fraction 3. Hotel/motel: D Required: High-capacity service water heating system (meeting Section 170.2(d) of the CEC) D Required: Located in garage or conditioned space Exception: 6 4. Electric Vehicle Charging A. [ii Residential -New construction and major alterations.* This section also applies to hotel/motel projects. Refer to Section 18.21.030 of the CMC and Section 4.106.4 of the GBSC when completing this section. Choose one: □ One and two-family residential dwelling alterations with attached private garage. (not required if a panel upgrade would be needed) I!!! New detached ADU. (no EV space required when no additional parking facilities are added) □ New one and two-family residential dwellings and townhouse with attached private garage. □ One EV Ready parking space required □ Exception: __________ _ □ New and major citerations to multi-family and hotel/motel projects: □ Exception: ________________ _ Total Parking Spaces Proposed EVSE Spaces EV Capable (10% of total) I EV ReaJv (25% of Total) I EV charaers (5% ofTotal) I I *Major alterations are: (1) for one and two-family dwellings and for town houses with an attached garage, alterations have a building permit valuation ~$60,000 or include an electrical service panel upgrade. (2) for multifamily dwellings (three un~s or more without attached garages), alterations have a building permit valuation~ $200,000, i nteriorfinishes a re removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are p reposed. B. D Non-Residential -New construction □ Exception : _____________ _ Please refer to Section 18.21.040 of the CMC when completing this section Total Parking Spaces Proposed EV Capable I EVCS (Installed with EVSE) I EV Ready (optional) I EV Space (optional) I I I Calculation: Refer to the table below: Total Number of Parking Spaces provided Number of required EV Capable Spaces Number of required EVCS Qnstalled with EVSE) □ 0-9 1 1 □ 10-25 4 1 □ 26-50 8 2 □ 51-75 13 3 □ 76-100 17 5 □ 101-150 25 6 □ 151-200 35 9 D 201 andover 20 percent of total 25 percent of Required EV Spaces Calculations: Total EV Capable spaces= .20x Total parking spaces proposed (rounded up to nearest whole number) EVSE Installed= Total EVSE Spaces x .25 (rounded up to nearest whole number) EVSEothermaybe "EV Ready" or "EV Space" 7 5. D Transportation Demand Management (TDM): Nonresidential ONLY An approved Transportation Demand Management (TDM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT. City staff will use the table below based on your submitted plans to determine whether your permit requires a TOM plan. If TOM is applicable to your permit, staff will contact the applicant to develop a site-specific TOM plan based on the permit details. Acknowledgment: Employee ADT Estimation for Various Commercial Uses Office ( all)2 20 Restaurant 11 Retaib 8 Industrial 4 Manufacturing 4 Warehousing 4 1 Unless otherwise noted, rates estimated from /TE Trip Generation Manual, 1QlhEdition 13 11 4.5 3.5 3 1 2 For all office uses, use SANDAG rate of 20 ADT/1 ,000 sf to calculate employee ADT 3 Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Other commercial uses may be subject to special consideration Sample calculations: Office: 20,450 sf 1. 20,450 sf/ 1000 x 20 = 409 Employee ADT Retail: 9,334 sf 1. First 1,000 sf = 8 ADT 2. 9,334 sf -1,000 sf= 8,334 sf 3. (8,334 sf / 1,000 x 4.5) + 8 = 46 Employee ADT I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should my permit require a TOM plan and understand that an approved TOM plan is a condition of permit issuance. Applicant Signature: Larry Lipkin Name: LARRY LIPKIN Date: 6 .20.25 Phone No.: 858. 77 4.1957 8 . ' .. {'Cityof Carlsbad CLIMATE ACTION PLAN {CAP) COMPLIANCE CAP Building Plan Template 8-55 Development Services Building Division 1635 Farad ay Avenue 760-602-2719 www.carlsbad ca.gov The following summarizes project compliance with the applicable Climate Action Plan ordinances of the Carlsbad Municipal Code and California Green Building Standards Code (CALGreen), current version. The following certificate shall be included on the plans for all building permits that are required to comply with the CAP measures: 1. ENERGY EFFICIENCY APPLICABLE: □YES [i] NO Complies with CMC 18.30.060 or 18.21.050 O Yes liJN/A Existing Structure, year built: ____ _ Prepared Energy Audit? D es O No Energy Score: _____ _ Efficiency Measures included in scope: 2. PHOTOVOLTAIC SYSTEM APPLICABLE: [ijYES □ NO Complies with CMC section 18.30.040 and 2022 California Energy Code section 150.l{c)14 Ii] Yes D IA Size of PV system (kWdc): 1.99 Sizing PV by load calculations If by Load Calculations: D Yes [i]No Total calculated electrical load: 80% of load: Exception Requested Exception Approved BYes~ Yes ONo 3. ALTERNATIVE WATER HEATING SYSTEM APPLICABLE: Ii] YES □ NO 4. 5. Complies with CMC sections 18.30.020 18.20.030 and/or 18.30.050? Alternative Source: □ Electric I!! Passive Solar Exception Requested Exception Approved D Yes 0 Yes ELECTRIC VEHICLE {EV) CHARGING APPLICABLE: □YES Complies with CMC section 18.21.030? Panel Upgrade? Total EV Parking Spaces: No. of EV Capable Spaces: No. of EV Ready Spaces: No. of EV Installed Spaces: Hardship Requested Hardship Approved O Yes [Z]N/A D Yes O No Required Provided ---Oes □Yes TRAFFIC DEMAND MANAGEMENT APPLICABLE: Compliant? TDM Report on file with city? \1NC. GEOTECHNICAL •GEOLOGY• HYDROGEOLOGY • MATERIALS TESTING• INSPECTION Ben Leland Construction 270 N. El Camino Real #297 Encinitas, CA 92024 July 7, 2025 Subject: GEOTECHNICAL SITE AND PLAN REVIEW Detached Single-Story ADU 1274 Chestnut Avenue Carlsbad, California -.1'l'' , ...., ' C;-,.. '-() .J ,, ,, '-' f3 I y Q <.t, >i:- LJ/I_D ;::-C/ '-v l/1,G 111'1..sD D1v,s o,,qD '0tv Sierra Geotechnical Services Inc. (SGS!) has reviewed the following project related plans and calculations for site-specific applicability to the geotechnical environment. • Site Plan and Cross Sections -Detached ADU for Nichols Residence, 12 7 4 Chestnut Avenue, Carlsbad. Prepared by Design Decisions. PDF dated June 3, 2025. • Foundation Plans-Nichols Residence, 1274 Chestnut Avenue, Carlsbad. Prepared by Qualls Engineering. Plan Check Submittal PDF dated June 11, 2025. Site Review: The developed property includes a single-story, single-family residence with a detached 512-sf garage, and two storage sheds. The site's overall topography as well as the proposed ADU area are relatively flat. Project Description: The project will include construction of a new 630-sf, single-story, detached, Accessory Dwelling Unit (ADU) to be located near the northeast corner of the subject property (Figure 1). An existing shed will be removed and replaced with the ADU and associated parking. Foundations will include a shallow, continuous, 12" wide by 12" deep, reinforced concrete perimeter footing, and a 4" thick reinforced slab-on-grade, with a 10-mil vapor barrier centered between 2"/2" of clean sand. Earthwork will include excavation for the new foundation, as well as shallow removal and replacement of any disturbed soils. Geology and Geotechnical Considerations: The site area is located near the western margin of the coastal terrain and mapped as by Old paralic deposits, Units 2 through 4, composed of reddish-brown, strandline, beach, estuarine, and colluvial deposits, composed of siltstone, sandstone, and conglomerate (Kennedy and Tan, 2007, Figure 2). MAMMOTH OFFICE: PO BOX 5024, MAMMOTH LAKES, CA 93546 • Phn: (760) 937-4608 BISHOP OFFICE: 169 WILLOW STREET, BISHOP, CA 93514 • Phn: (760) 937-4789 CARLSBAD OFFICE: 7040 A VEN/DA ENCINAS, SUITE 104-469, CARLSBAD, CA 92011• Phn: (760) 937-4608 www.sas;.us , INC. 1274 Chestnut Ave. ADU Project Number 3.32207 July 7, 2025 Based on our experience in the site vicinity, a review of in-house geotechnical data, and geotechnical reports obtained through a City of Carlsbad public records search within a 0.25- mile radius, site soils are anticipated to consist of minor surficial materials (typically less than 12 to 24 inches thick) overlying relatively dense Paralic deposits. The Paralic soils are expected to exhibit very low to low expansion potential and are considered non-corrosive. During our site visit we did not note any obvious signs of geologic hazards, groundwater, or other geomorphic or soil related features causing distress to the property. The groundwater table is expected to be below a depth that will influence any planned improvements. The site is not located within any designated geologic hazard zones, including fault rupture, landslide, liquefaction, or tsunami hazard areas. The primary geotechnical consideration for development is the potential for strong ground shaking resulting from regional seismic activity. The nearest active fault is the Newport-Inglewood-Rose Canyon Fault Zone (Oceanside section), located approximately 5.2 miles southwest of the site. Plan Review: SGS! reviewed the referenced foundation plans for consistency with the site's geotechnical conditions. As noted in Foundation Notes 2 and 3 on Sheet Sl.0, and Detail 3 on Sheet SD-1, the following parameters were used in the foundation design: Footini:s Bearing = 1500 psf Width= Min 12" Embedment = Min 12" Seismic design parameters, as noted on plan Sheet SN1 Design Criteria, Seismic Design, include the following: SEISMIC DESIGN CATEGORY D SITE CLASS: D SEISMIC GROUND MOTION VALUES MAPPED ACCELERATION PARAMETERS: SITE COEFFICIENTS DESIGN SPECTRAL ACCELERATION PARAMETERS Ss = 1 050. S1 = 0 381 F1 = 1 200 F = Sos = 0 840. Sot = Conclusions and Recommendations: Based on our assessment, the soil design parameters and seismic design values incorporated into the foundation design appropriate for the site's conditions and underlying soils. Construction of the proposed improvements is considered feasible from a geotechnical standpoint, provided that the recommendations presented below are properly implemented during construction. • Although we do not anticipate significant issues with expansive or corrosive soils based on current information, we recommend testing the subgrade soils at the start 1274 Chestnut Ave ADU ( 1274 Chestnut Ave. ADU Project Number 3.32207 July 7, 2025 of foundation excavation. Should the testing reveal expansive and/or corrosive characteristics, appropriate mitigation measures will be provided. • The project area is expected to be underlain by minor surficial soils, possible disturbed soils once the shed et al. is removed, and granular Old Paralic deposits. Surficial and disturbed soils are not considered suitable for support of foundations or additional fill and should be removed and replaced with compacted fill within all structural areas. • All footing excavations should be observed by the geotechnical consultant prior to placement of reinforcing steel, to verify proper embedment into suitable soils. • Footings shall be moisture conditioned and compacted to at least 90-percent of the maximum dry density obtained using ASTM D1557 as a guideline. • General earthwork and grading recommendations which include guidelines for site preparation fill compaction, slope work, temporary excavations, and trench backfill are provided in the attached Appendix. We appreciate the opportunity to be of service to you. Should you have any questions regarding this report, please do not hesitate to contact us. Respectfully, SIERRA GEOTECHNICAL SERVICES, INC. Joseph A. Adler Principal Geologist CEG 2198 (exp 3/31/2027) 1274 Chestnut Ave ADU Thomas A. Platz Principal Engineer PE C41039 (exp 3/31/2027) NOT TO SCALE SIER Jtttn'W 1\1 ti 'V9f"W~ C:.)t ~~ ............ ~ 0 7> (U 0 .. , .. :,.," < . I PROJECT• CDDR])o 0 \ « 0 • ' , • er 6 • l . ~". -·· \ u PROJECT' SITE M w 0 \ ~ .. .. l -""-"-' fl, i,A",: ....... 0 >. .. ,.,,., f:~ !()GAi~ ITJ!. -~ r r f 111 WD i i I Ch+1'M"1 ,..._,, .. ,.. I l;!fl~ / VICINITY MAP 1274 CHESTNUT A VENUE DATE• 33. 1596, -11 7. 3356 7/2025 DRAw'INGo FIGURE 1.DWG DRAw'N BY• JAA JOB ND.• 3.32207 rIGURE• FIGURE 1 Old p,11~k depustts undtvkt•d. Units 2 • • NOT TO SCALE PROJECT, SITE GEOLOGIC MAP 1274 CHESTNUT A VENUE COOR!) 33. 1596, -117. 3356 DATE:O 7/2025 DRA'w!NG, FIGURE 2.DWG DRA'wN BY• JAA JOB NO,, 3.32207 rIGURE• FIGURE 2 SI ',INC. GENERAL EARTHWORK AND GRADING General These general earthwork and grading specifications are for the grading and ear thwork shown on the approved grading or construction plan(s) and/or indicated in the geotechnical report(s). These Specifications shall be used in conjunction with the Geotechnical Report for the project prepared by SGS!. In the case of conflict, the recommendations contained in the text of the Geotechnical Report are a part of the earthwork and grading specifications and shall supersede the provisions contained hereinafter. Earthwork and grading should be conducted in accordance with applicable grading ordinances, the current California Building Code, and the recommendations of this report. The following recommendations are provided regarding specific aspects of the proposed earthwork construction. These recommendations should be considered subject to revision based on field conditions observed by the geotechnical consultant during grading, Geotechnical Consultant of Record Prior to commencement of work, the owner shall employ the Geotechnical Consultant of Record. The Geotechnical Consultant shall be responsible for reviewing the approved geotechnical report(s) and accepting the adequacy of the preliminary geotechnical findings, conclusions, and recommendations prior to the commencement of grading or construction, During grading and earthwork operations, the Geotechnical Consultant shall observe, map, and document the subsurface exposures to verify the geotechnical design assumptions. If the observed conditions are found to be significantly different than the interpreted assumptions during the design phase, the Geotechnical Consultant shall inform the owner, recommend appropriate changes in design to accommodate the observed conditions, and notify the review agency where required. Subsurface areas to be geotechnically observed, mapped, elevations recorded, and/or tested include natural ground, after it has been cleared for receiving fill but before it has been placed, bottoms of all "remedial removal areas, all key bottoms, and benches made on sloping ground to receive fill. The Geotechnical Consultant shall observe the moisture-conditioning and processing of the subgrade and fill materials and perform relative compaction testing of fill to determine the attained level of compaction. The Geotechnical Consultant shall provide the test results to the owner and the contractor on a routine and frequent basis. The Earthwork Contractor The Earthwork Contractor shall be solely responsible for performing the grading in accordance with the plans a nd specifications. The Earthwork Contractor shall review and accept the plans, geotechnical report(s), and these Specifications prior to the commencement of grading. The Earthwork Contractor shall have the sole responsibility to provide adequate equipment and methods to accomplish the earthwork in accordance with applicable grading codes and agency ordinances, these Specifications, and the recommendations in the approved geotechnical report(s) and grading plan(s). If, in the opinion of the Geotechnical Consultant unsatisfactory conditions, such as unstable soil, improper moisture condition, inadequate compaction, adverse weather, etc. are resulting in a quality of work less than required in these Specifications, the .INC. Geotechnical Consultant shall reject the work and may recommend to the owner that construction be stopped until the conditions are rectified. Site Preparation Clearing and Grubbing: Site preparation includes removal of deleterious materials, unsuitable materials, and existing improvements from areas where new improvements or new fills are planned. Deleterious materials, which include vegetation, trash, and debris, should be removed from the site, and legally disposed of off-site. Unsuitable materials include loose or disturbed soils, undocumented fills, contaminated soils, or other unsuitable materials. The Geotechnical Consultant shall evaluate the extent of these removals depending on specific site conditions. Earth fill material shall not contain more than 1 percent of organic materials (by volume). No fill lift shall contain more than 5 percent of organic matter. Nesting of the organic materials shall not be allowed. If potentially hazardous materials are encountered, the contractor shall stop work in the affected area, and a hazardous material specialist shall be informed immediately for proper evaluation and handling of these materials prior to continuing to work in that area. As presently defined by the State of California, most refined petroleum products (gasoline, diesel fuel, motor oil, grease, coolant etc. have chemical constituents that are hazardous waste. As such, the indiscriminate dumping or spillage of these fluids onto the ground may constitute a misdemeanor, punishable by fine and/or imprisonment and shall not be allowed. Any existing subsurface utilities that are to be abandoned should be removed and the trenches backfilled and compacted. If necessary, abandoned pipelines may be filled with grout or slurry cement as recommended by, and under the observation of, the Geotechnical Consultant. Excavation After clearing and grubbing of organic matter and other unsuitable material, loose or porous soils shall be removed to the depth recommended in the Geotechnical Report. The depth of removal and compaction should be observed and approved by a representative of the Consultant. The exposed surface shall then be plowed or scarified to a minimum depth of 6 inches and until the surface is free from uneven features that would tend to prevent uniform compaction by the equipment to be used. Remedial removal depths are estimates only. The actual extent of removal shall be determined by the Geotechnical Consultant based on the field evaluation of exposed conditions during grading. All areas to receive fill, including removal and processed areas, key bottoms, and benches, shall be observed, mapped, elevations recorded, and/or tested prior to being accepted by the Geotechnical Consultant as suitable to receive fill. The Contractor shall obtain a written acceptance from the Geotechnical Consultant prior to fill placement. A licensed surveyor shall provide the survey control for determining elevations of processed areas, keys, and benches. Slopes Where the slope ratio of the original ground is steeper than 5:1 (horizontal:vertical), or where recommended by the Consultant, the original ground should be benched in accordance with the following illustration: TYPICAL BENCHING DETAIL Finish Grade Remove All Unsuitable Matenal As Recommended By Consultant Slope To Be Such That Sloughing Or Sliding Does Not Occur On91nal Ground / F1rnsh Slope Surface See Nole 2 No Scale 1) Key width "B" should be a minimum of 4-feet. The bottom of the key should be graded horizontal or inclined slightly into the natural slope. 2) The outside of the key should be below a minimum of at least 2-feet deep into dense formational material. 3) Bench heights shall not exceed 2-foot vertical. Fill placed on ground sloping flatter than 5:1 shall also be benched or otherwise overexcavated to provide a flat subgrade for the fill. Compaction of slopes shall be accomplished by backrolling of slopes with sheepsfoot rollers at increments of 3 to 4 feet in fill elevation, or by other methods producing satisfactory results acceptable to the Geotechnical Consultant. Upon completion of grading, relative compaction of the fill, out to the slope face, shall be at least 90 percent of maximum density per ASTM Test Method D1557. Cut and fill slopes shall be a maximum of 2:1 (horizontal to vertical) unless approved by the Geotechnical Consultant. Planting and irrigation of cut and fill slopes and/or installation of erosion control and drainage devices should be completed due to the erosion potential of the soil. Fill Material Material to be used as fill shall be essentially free of organic matter and other deleterious substances evaluated and accepted by the Geotechnical Consultant prior to placement. Soils of poor quality, such as those with unacceptable gradation, high expansion potential, or low strength shall be placed in a reas acceptable to the Geotechnical Consultant or mixed with other soils to achieve satisfactory fill material. Any import soils shall be tested fo r suitability in advance by the project Geotechnical Engineer. Oversize rock material, or other irreducible material with a maximum dimension greater than 8 inches, shall not be buried or placed in fill unless location, materials, and placement methods are specifically accepted by the Geotechnical Consultant. Placement operations shall be such that nesting of oversized material does not occur and such that oversize material is completely .INC. surrounded by compacted or densified fill. Oversize material shall not be placed within 10 vertical feet of finish grade or within 2 feet of future utilities or underground construction. Compaction All fill and backfill associated with the proposed construction should be placed at a minimum relative compaction of 90% of the material's maximum dry density, and slightly above optimum moisture content, using equipment capable of producing a uniformly compacted product throughout the entire fill lift. Fill materials below optimum moisture content should be moistened and mixed to achieve a uniform condition above optimum moisture. Overly wet fill materials can be aerated by blading or other suitable methods or mixed with drier materials to reach the required moisture content. The fill and backfill should be placed in horizontal lifts with a loose thickness not exceeding 8 inches, appropriate for spreading, mixing, and compacting with the available equipment. Retaining wall backfill should consist of granular material (maximum particle size :5 3 inches) with an expansion index (EI) of no greater than 50 and a sand equivalent (SE) greater than 30. No fill materials shall be placed during unfavorable weather conditions. If work is interrupted by inclimate, fill operations should not resume until the Geotechnical engineer confirms through field testing that the moisture content and density of the fill comply with the specified requirements. Adherence to these procedures will ensure proper compaction and long-term stability of the fill. Compaction Testing Field-tests for moisture content and relative compaction of the fill soils shall be performed by the Geotechnical Consultant. Location and frequency of tests shall be at the Consultant's discretion based on field conditions encountered. Compaction test locations will not necessarily be selected on a random basis. Test locations shall be selected to verify adequacy of compaction levels in areas that are judged to be prone to inadequate compaction (such as close to slope faces and at the fill/bedrock benches). Tests shall be taken at intervals not exceeding 2 feet in vertical rise and/or 1,000 cubic yards of compacted fill soils embankment. In addition, as a guideline, at least one test shall be taken on slope faces for each 5,000 square feet of slope face and/or each 10 feet of vertical height of slope. The Contractor shall assure that fill construction is such that the testing schedule can be accomplished by the Geotechnical Consultant. The Contractor shall stop or slow down the earthwork construction if these minimum standards are not met. Temporary Excavations Temporary excavation shall be made no steeper than 1:1 (horizontal to vertical). The recommended slope for temporary excavations does not preclude local raveling and sloughing. Where wet soils are exposed, flatter excavation of slopes and dewatering may be necessary. In areas of insufficient space for slope cuts, or where soils with little or no binder are encountered, shoring shall be used. All large rocks exposed above temporary cuts shall be removed prior to foundation excavation. In addition, any rocks exposed during development from raveling and sloughing should be removed immediately. ',INC. All excavations should comply with the requirements of the California Construction and General Industry Safety Orders and the Occupational Safety and Health Act and other public agencies having jurisdiction. Trench Backfill Exterior trenches, paralleling a footing and extending below a 1:1 plane projected from the outside bottom edge of the footing, s hall be compacted to a minimum of 95-percent per ASTM D1557. All trenches in structural areas and under concrete flatwork shall be compacted to a minimum of 95-percent per ASTM D1557. All trenches in non-structural areas shall be compacted to a minimum of 85-percent per ASTM D1557. All material used for trench backfill shall be approved by the Geotechnical Engineer prior to placement. All bedding and backfill of utility trenches shall be done in accordance with the applicable provisions of Standard Specifications of Public Works Construction. Bedding material shall have a Sand Equivalent greater than 30 (SE>30). The bedding shall be placed to 1-foot over the top of the conduit and densified by jetting. Backfill shall be placed and densified to a minimum of 95-percent of maximum from 1-foot above the top of the conduit to the surface. Lift thickness of trench backfill shall not exceed those allowed in the Standard Specifications of Public Works Construction unless the Contractor can demonstrate to the Geotechnical Consultant that the fill lift can be compacted to the minimum relative compaction by his alternative equipment and method. The Geotechnical Consultant shall test the trench backfill for relative compaction. At least one test should be made for every 300 feet of trench and 2 feet of fill. Regulations of the governing agency may supersede the above, and all trench excavations should conform to all applicable safety codes. The Contractor shall follow all OSHA and Cal/OSHA requirements for safety of trench excavations. Subdrain Installation Subdrain systems shall be installed in accordance with the approved geotechnical report(s), the grading plan, and the Standard Details. The Geotechnical Consultant may recommend additional subdrains and/or changes in subdrain extent, location, grade, or material depending on conditions encountered during grading. All subdrains shall be surveyed by a land surveyor/civil engineer for line and grade after installation and prior to burial. Sufficient time should be allowed by the Contractor for these surveys. CUT-FILL TRANSITION LOT OVEREXCA VAT/ON RDIO~ UNSUITABLE~ ---- ~ - -COMPACTEDFILL--- - - ---_:=:::::::::. _- ---- -_-_-_-_-___ ~----_-_-_ ------~ ----------MT=ri=n:,:o--J -:---_-_-_-_-~ _- PROJECT, CUT-FILL TRANSITION LOTS DATE• NTS DRA\ilNCio DRA\iN BY• JOB NO., fIGURE• APPENDIX (Cityof Carlsbad '''')I I CERTIFICATION OF SCHOOL FEES PAID This form must be completed by the City, the applicant, and the appropriate school districts and returned to the City prior to issuing a building permit. The City will not issue any building permit without a completed school fee form. Project# & Name: A/1Mt>.J A/Jl{ Permit#: CBR2025-1703 ------------------- Project Address: 1276 CHESTNUT AVE ------------------- Assessor's Parcel#: 2051203100 ------------------- Project Applicant: CO-OWNERS STUDER MARIE C AND NICHOLS CHARLES (Owner Name) Residential Square Feet: New/Additions: ------------------- Second Dwelling Unit: 630 ------------------- Commercial Square Feet: New/Additions: ------------------- City Certification: City of Carlsbad Building Division Date: 10/27/2025 Certification of Applicant/Owners. The person executing this declaration ("Owner") certifies under penalty of perjury that (1) the information provided above is correct and true to the best of the Owner's knowledge, and that the Owner will file an amended certification of payment and pay the additional fee if Owner requests an increase in the number of dwelling units or square footage after the building permit is issued or if the initial determination of units or square footage is found to be incorrect, and that (2) the Owner is the owner/developer of the above described project(s), or that the person @ Carlsbad Unified School District 6225 El Camino Real Carlsbad CA 92009 Phone: (760) 331-5000 D Encinitas Union School District 101 South Rancho Santa Fe Rd Encinitas, CA 92024 Phone: (760) 944-4300 x1166 D San Dieguito Union H.S. District 625 N. Vulcan Ave. Encinitas, CA 92024 Phone: (760) 753-6491 Ext 5514 (By Appt. Only) D San Marcos Unified Sch. District 255 Pico Ave Ste. 100 San Marcos, CA 92069 Phone: (760) 290-2649 Contact: schoolfees@smusd.org (By Appt.only) D Vista Unified School District 1234 Arcadia Drive Vista CA 92083 Phone: (760) 726-2170 x2222 SCHOOL DISTRICT SCHOOL FEE CERTIFICATION (To be completed by the school district(s)) THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS FOR THE PROJECT HAVE BEEN OR WILL BE SATISFIED. The undersigned, being duly authorized by the applicable School District, certifies that the developer, builder, or owner has satisfied the obligation for school facilities. This is to certify that the applicant listed on page 1 has paid all amounts or completed other applicable school mitigation determined by the School District. The City may issue building permits for this project. Signature of Authorized School District Official:_..::.th __ ._~-------=-{j) _ _;_t5_~.;__ ___ +/ __ ,:r+--,------- Title· (: l • ,_,, ., ,,.;T P A J ~ Date ; /J/2-5 • u ~BAO UNIFIED SCHOOL DISTRICT ' ' Name of School District: ____ 6=2=25'-"E=L-=CA=M=IN,_,_,O'"--'R=E"-"AL,.__ _____ Phone: 16 (J ' 3 3 / -SDO O CARLSBAD, CA 92009 COMMUNITY DEVELOPMENT -Building Division 1635 Faraday Ave I Carlsbad, CA 92008-7314 I 442-339-2719 I building@carlsbadca.gov I www.carlsbadca.gov STORM WATER POLLUTION PREVENTION NOTES 1. All NECESSARY EOU1PIAENT ANO t.lATERIALS SHALL 8( AV,tJLABlf ON SITE TO FACILITATE RAPID INSTAUATia-1 Of EROSION ANO stOlt.lENT CONTROL 81.iPs 't\tl£N R,tJN IS EMNENT. 2 THE Ol'lt<ER/CONTRACTOR SHALL RESTORE AU EllOSION CONTROL OEIACES TO WORKING ORDER TO TH£ SATISFACTION Of THE OTY INSPECTOll Af'TER EACH RUN-OFF PROOUCltlG RAtlrALL. 3. THE O~/CONmACTOR SHAU 14ST "Ll AOIMTIONAL EROStON C()ITROL loCEASURES AS MAY BE RCOUIRED BY THE CITY INSPECTOR OU( TO INCQl.lPLEn: GRADING OPERA T10NS OR UtsFORES([N CIRCUIISTANC£S 'M<,CH IAAY ARIS(. 4 All REMOVABLE PRO TECTI'vt: OE\1C£S SHALL B£ IN PLACE AT TH( ENO Of EACH WORKING DAY v.ti[N THE FWE (~) DAY RAIN PROOABIUTY FORECAST EXCEEDS FORTY P£C£NT ( 40!1.). SILT ANO OTHER DEBRIS SHALL BC RD,101/EO AFTER EACH R"JNFALL !> AU CRA'vt:L BAGS SHALL CONTA.~ J/4 1r,.CH WIN 111.N ACCR[GATE 6. AOWJA TE EROSION ANO SEDIMENT CON TR0L ANO PERIUETtR PROll:CllON GEST l.lANAG(MENT PPACTICE l.l(ASURES lotUST BE INSTALLED AND WAJNTAINEO 7, THC CITY INSPECTOR SHALL HA',{ "<( AUTHORIT'I' TO ALTER THIS PLAN DURING OR BEFORE CONSTRUCTION AS NEEOCD TO ENSURE COMPLIANCE \lt1TH O"'f STORM \liA TI:R OOAUTY REGULATIONS. O\li. ER~C'ERnACATE: I UNOCRSTANO ANO ACl(NO\UDCC TliA I I WUST· (1) IWPl.(l.l(NT BEST UANAGOIENT PRACTIC£S (811PS) CURING CONSTRUCTlON ACTI\IITIES TO lltE lotAXIIIUl.l (Xl[NT PkACIICABU: TO A'IOID 11£ W(BJ2ATlON <S PCUUTANTS SU~ AS SEDIMENT ANO TO AVOID 11£ EXPOSURE <S STORM WAllJ! TO CONSTRIJCTl()j ACLATro POUUTANTS; AND (2) AOH(R( TO, AND AT AU TIMES. COMl'l Y '1111\i THIS CITY APPRO~ TIER I CCINSTRUCOON Sv.PPP TlflOJGtOUI THE DURATION <S W CONSTRUCTlON ACTI\IITES UN11l ™E: CONSTRUCTlON WORK IS CO.,f'I.[ 1£ ANO APPRO',{D BY M CIIV <S CARLSBAD ~ L..c:.~ 0~~~1) ~~SlGN4TURC) 0Al£ STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP E-29 CB ____ _ SW BEST MANAGEMENT PRACTICES (SMP) SELECTION TABLE E,-Coel,ol -Cami-1~ Nol>SlannW.w w_........,....a_ '™"' eo,-.,i II.Ill's ~81,1Ps -ColwolllMPs I j ! ~ i i & . 6 ~ e ~ { 1-Fr g 0 1 ;; l i :a ~ ~I .? • ]'. !! ] l s <:. & i' Best Manilgemenl Prachce' <II It t"',l ~ II .... j i 'fl ti~ i ~ ' l ' ij 1 6 'ii * ~ii (BMP) Oew,pbOn ➔ l! :i t:f ! i i ~' 8' ~~ 'i~ Ii ~5 0 :, ·t i i !~ 0 "' -e1 u i ti '§ §-'§ t .E-g ig l i ! 1 i!J s.ll !§ --n ,! l ~ -ll 1 !I ~I! ~ .:, Vil VI Ji "'"" itt l8 l >o j~ :a VI }~ Jl:::r ~~~ .... .., 0, .., .. "' "' .... ., 2 N ;,i; .., .... ., "i "' .., .. .n I I I "i • I I I l,! I I I "i I I I J, I I I I ~ ~ u u 1)1 ll! I)! bi I)! I)! I)! e e VI VI i i i i i ~~ .... .... z z z z Oistwbonct X V T,.,,d,,no/f,ca..,t,on I StocQMl~"'a I >c: n.z.,.~ Ccncntt • t s.,;.'.;;11""1 I Conutto llotwat I Po- ConQ,lt ,...,. lnslolollon -Stucco/ Mortar 'fl<lri< ... nc -----7'.'.: -·· , __ St,,,...,, ~.y 0o .. ,., .. ~,. -[N•-.,t lloftt-O!ld Fuolina I ..,.,... Hc."Crdcus S.bstonu Use JStcrooo I o....,,..,. Site Ac:«U Acrou Dirt I 01 .... (li,t} ~~ I tr,stNtllons: t C!lodi tho bo, to tho !tit of all oppHcable conslluclion oclMly (fi"t column) e,p<cled to occur dutfl9 -•lrucl,on 2 Loc:ated olOllg lh• top ,f tho 814P Table i• a hsl of BMP's Mlh ,t', torrt5ponding Col,fomio Storm.alot 0uo1:1~ 4uo .. iol,on (CASOA) desigo0t1CO number. 0-onso on, or more llllPs you "'"'"' 10 use l!Ur~ <Ollslruttlon ~cm the st Oio th• bo, ...,.,, th• ct,.,.., octi,.ty ••• i'-totucts w'th the 811P colum,. l. !!.for 10 th• CAS0A c tnxtion hon«>ook for 111fom,otoon and dltais of lho cho,.n llWl's ond •ow lo apply thorn lo ~ p,o,e<:t SHOW THE LOCATIONS OF ALL CHOSEN BMPs ABOVE ON THE PROJECTS SITE PLAN/EROSION CONTROL PLAN. SEE THE REVERSE SIDE OF THIS SHEET FOR A SAMPLE EROSION CONTROL PLAN. PROJEtT LNFORMA TION so,, Addreu: \2..7(.,, C,iK<il\)rt Mt€ As,,.ssor's Porte! Number ZOO\ 12.V :'.?,1 00 [metqency Conlocl Name: ~ \,d Ad'> ~ ~- if !ti :i::::r "' I i - x 24 H°"' Phon~ / Consltucl,on Threot to Stnnn Y.ote, Ouooty (Oieck Bo,) 0 ll(OIUII }!(ow I i~ 3' is . ;; h .., I I i j- I I !-x+-- I i I i I ( 29 _____________________ P_o9_e_1 o_t _, ______________________________ RCI 02/16 E NGINE ERING NOTES , Oll'M(Jt '° 0rlMil 00NS1IUCTION ll(JlWf ..., "' ~ OOWll'NOff Al LI.ASt 4" IGltS ,... lO -...C .. M ~ -..n~or--,. rMWllt 1D 00 ID WU IIDU..l • 'bC ~ Ol4n:P.-CNCJ91CC-~~n:ts. 16M ~O,MOIN(Jl,O QIOll'...._K......,., LMSU>CAJU. l. liO 0DHCDITMD ...._ f\.0ltlS ,_ '1':JMntD 0-0 IO..NXNt _.,... 4 WJt1 G lO OMitlM/li.'t rtlDM fMl S'l~Ra ........ Qf )IUI Al l P01COn lrM ■ ~ 10 ,-,. ~ ~ rtlQM $. ~~~:U'°=&~'°~ ~ :.:t~~lD~ ~~'°===-~ Dm)(fOf w.~ ~ .. WS1 At.tO K rQ.LDIIO ,0 l'.Nl5I.III: NO ClONViCt Of ...._TO ~ WJ1JWU 1KiU W.Y ~ 1D .U QU11UtT ~'°='='~°-~~~~ ~A'l'IMOl,ll ... aa:) .. :;_~,~~~~~~ _,.._Sl.cHASIIOOf',IIIIIXW ...... Dl'IM:IMT.MOPll(D. .. -...0 ~ • UNrf'O Ollf n« sm: """"' WX1' 0CNIO ~ ,,. Ol:SIICJr,lll.llD lUIIF lrllCA1,. IIMDt lmD'l MKlf" _...Noe~ nDW WO'IIQIS ,,,.,,.__ """" #I> ~ --M1 ,. OOGMt.11:D ro,t IW"1: IHlril • CllN>'ff.tl ON PViN$ NG NO'lt flUQ'D C11 l'\Ne ~ ..ownTOt a-__,,..._ or 'ft€ .. \NCl!'J0IM: ~ wmolt A CffT POWT. STORM WATER Q UALITY NOTES CO NSTRUCTION BM P'S ~~~~~~~...::".:=..:."' Si~"::=--:.~-=-.. -:....~-=--=-~­£=-..:....~-=---=---=-~-~--=--=-... --=-~~~~~-¼ :s~~~-=::-::.-=::.:---=:-- :!.~~~:§;~~~-=-=­ ~::;.:_~:a.~~~.l::::Sr~ ~--==-. -• c.;,, ----~fi~~~~-:~k~~~::~-=-~::., FIRE D E PT NOT ES PROJECT DATA ASSCSS0RS PARtn NO, : X)!, -120 -JI -00 SITC ACRCAG( , .J6 .CRCS lONING : ~I l.AM'O VS( 0[5«.~Tw:>M : R-4 OCNSITV , _ D<I/.CRC BIJl.OING C()V[lW.£ PCRCEKfAGC • '2 llS IIJILOING to.'[ffll(;:[ MEA : 3.~2 sr SCHOOi. ~ : ~~DISTRICT WATER DIST"1CT : CAAl.58'.D IIUHtCH'Al WATCR lllSlRIC1 ScwtR 0IST1IICT , CAAI.SIW> SCW01 DIST1l1Cl Cl fMAJI &CJKlN P1 AN CPMPt. WC( .. C0t&S'TCNf 1lf04 DUSTN2 QOEl,\L fll.Nf Vr,MD ust IMO ZOtN: -'fts l CHC $'t\.Of MOWCD -NO .,_ [N[JICY un:c,,cr IIICOURQC:N'I' -NO • l"HOlOliOLtMC RCOU1ttWCN1 -'l'D & nrCUIIC 'f'DCl.C ti,WQr,1C IIICOUIW:wtHT ... MO • HO'f •TO: IQ,-.C --~ -'t'D t, ffW11C: DCl,,MH) ••••• .... CU4CH1 llltOUMO -NO ~~ ="" -::.r ... (t)OC-fflfl'I' LEGAL DESCRIPTION Pc. 1'IIICT' 1JI W# ,., MAIi! WCII ,0 .,. IOJJ -~ .. "°"°'~ COIJN'N OI ..... OltOOr,, SUTl fl' ~ SCOPE O F WORK ~ DCUOn> flCCOS0ll'I' CIIC1.I.M .,.. CUD son. •~·-,· MIOl4) .O~~D A REA CALC ULATIONS U)t CA t).1)) SO n {.lfi ~ oo -~u,,Mo..,.... :u«10 n <O l:lt'UOC ~ «> S\:r • n (t)flQllll,l,(;I '114(• 11,,on PIWJPOSCOKJAJ AACA:llOS0 n -Wtllil IQ,,!lt {U«) • C,;r,l!t,l,Clf {all) • ltO (II•) <w»t,._~ ~<~l:r:;~o;•~ err:,,g;13CfQWf ffl ~ {lll71) • (D CON: ......,.~ f»al • (l) Mftt <W01 • J.111 90 n Cl) 111"'0M01,& ..-,a NlllA OO~(UO) •UJ ta nM ....,.,.,,....,.Q~ 10t.1i1,. ~ S1,1¥,u MP -,.na ,o n SHEET IND EX ... , ,_, 1N•' ...... .... , -·• s--,_. ..... ►t.l .. u ... .. , ....... -~~ fUIOltfll-.--~MCI .,.....,,.._ 8UUIM' tlttQt ... ll(1J,U ..,.,_ .... c,-1•,-. -­"'"""'­c-1.GIIUJIS" ......... _,.__, ,_....,. ,__..,... ~fl\NII .,_...,.. ll~IUIMTll,oln • lflt(IIM(Glal ... "'6.Cc'I CQOll1[ PUitflil)ft tl!ll.l. .. -~"""' ... ~ --.n~Cl0llfluirrllC:IO ... ~ ...... -~ lOMllllJINltwSOll >, "' ~ "O C: ~ "O 0 0 ~ <;-' ~&7=~7.:E~~-:,--=~ PROPERTY Q WNER STRUC_T. ENGINEER ----·--··--•~flllOll-..--.- -::an1 ~:-=--=-~~-::=--....,,.. ,..._ <lln ----., It M ra .• __,,,. .-it!;~ -~----..i..._-.--..x:--.~ .... ~~"""' _,.•....u--..."------------~ .,u,.,.. ..... _ _._....,.oio__...._'---•-.,._-t...._ 11'!: ..... CJWIIL.(J,l«M)l,S 111•~~ ~ (A t:tOOe ti,.,..,. ...... ,_ "4.>IWOOIOI""" ....r am OCM"-OlU!DN 'JIIOAN--t317 ~~~~~~~_, PLAN PRl:PA RA TION ENERGY CONSUL TA NT MU~~w•,s.,,u IIIMMl':l,MISC#lf. ..... wut'f, 0, .,,w !.,• -=---==-~ ~,-:•1 ... ..u..::_ -=---~ .:.-=.. .....,.. • ....._,caa...-v--~..-. .. o-... ·--,~-~ ...... ..,...~-------.._._.OU_ .................. _._ ---· ... _.....,_._ ......... GENERAL NOTES h4IS .....-c., .,_l (.ICWl.'f ... M: IOU 0JUiJltaM. .... C00C: K IC» C,ltlUIIN,I, lillOWCN. CICIDt. M ICIU ~ ~ QDlt. ltClCltt~m:clW.llCCl:it.MJQ:U~OCJIZJa.c,. ~ !OD OiltftllW ,_ COllr.. K Mn~ ~ c:oor. "9IIO lie: a,n Olil.ftllllt. IIIEIN ~ coot. l. --..,IPCOtdtll.aOI ... -.LKIU'IQ.O. l. OWMDt 10 oatNN COIC7ll,CIDf Hall! ,__ 11« OlliallUJaC DC~Aflb.Sf .. ~,__tD--.C•N...-.c: ...,,-0,-11.M', r~ 'tO IQ to 11U. IDIAT • N. -..ct OI A ~--1«:fflCt ... ~ flt:JNl f'tt$. a CltC ~~MCIIN:Jt'fOOO" ... lK"'°"°"' -·-4 .....,,._ OCIO.IWOff1 ,. ocrtNll'D --.n"IN.. ~ ~. -......TCDlOkJW:OffllUDCSOll'll0f'DSOIIL..O~K"C.W'TI<» MG ~ 'tO M ---.C Of'nail. MM,\, JCIIN'OM .aca.ac-N,T 1"C or..rtMr:0 ...... oco.,c,m-hlilWt llt,, ............ IMU a,a:y' IWC' IO)f ""-"G 1D ... 00CM. CDlftllllWCI ... -.,,. a, -----nQl' tlOS ..U. IO K MW1D 1,1(1:1,_ Nit lilQljillri .tfClo ._..., OOQ.cM1 ~an~•-----~ "°" "' S"t'STEW C-• _, s. ...... ....,,. .w.&. • a.ur._y....., ... " nu, AClffllC M Stll,C9l,M. -«M" ~-\DCA-"ta Off ~~=~"==,r:t:...~ ll'OIMNC)ff~ .............. ~0,.-­................... fO.a (l)IJOIWUlllla(MfOIIICSCl("ilt\flll....,_ --..i fflllOI(( 1'Glr'M OI 1r,· NC) """1. ~ •I ~ -•~101 ~ ea:ao,,s ... """""'" lJIIOI 1,JIOJ ~II) ,.,.,,,o,..,... ..._n,1911 -·-GEOTECH ENGINEER TITLE 24 NOTES ---......... -~------------... ......... ..._.. ....... _..._ ... .,.. ............. ---___, .... --.--..... c--...... ..... "-'IOIPM'l~~ ...... IMJJ .....--r,,.,.,~---('11,:(A)--...... ,..... .... ~ .... ~ ........................ ....... ::::..:.=---..:::::r.---............ --..... . ... .... ..,.,~ 11,111 , .... ~0t.U011 -·- ICM f'V.Nlt ......... ... ....... ._.__,., _ __,_ ... ___ ,...,...,.... ... --== ::-... .:..::=-~ ~ =-: ?J~-:=-=:.=:-;:~~-o~ ~-.....i~(QII) ......................... ----------............... _(X,).,.,.,, ........... ,... ............ ~ ......................... 1111 -...... .,_ IM !\l (IU.,I) •Doc-....., ................ "" ---.... f;K.J,,1,,.a1 ..... •••• r.i rrY11J (N) ADU l ( ::: :gfj\(1b~)-------7 ~ :::: ::i ::>::>::>:::::·· ~ / I ··+··f ~ .?!:.!!.~ L:!•h !!:!J:-:!'":-·~L·_:...:_:_\i: • r--r ---~ ~ I ~<!> t/ ~• ~~ .[]· ··: ·~·~:~,-';~pl/I i, I • ~ I ,' ~ ~b-=-t-l-1lt--.--+-,i, (' '1 r ~ ,r~-L.:. <<t~r ····. ·j ···:·:•:C· :\ft: :·:•:•:•I·: ~ :::::<;:::: al ··· T • .,:;_;·.....J I · ... .;re -.-:-:-~ I ([)~l!IO I (E) GAR I I .-:-:-:-:c .•.• ~ .---.Lr\ .. -J: Y ~ :y•I•:~ ~ .,,..,. (E) SFD :f)' J· •. more-◄--, •• L> ll...,.:jff ~~01~--~⇒-~±2l I ·.·.·•:~"·'··'"-'-''···hf... I . ·r~<:-::::: • • .·., .... "" --""" --_, ·-... <l2: ~~:<\iL~:;r:~~~--- ►w ~ ', J I•. ;,,; • :.,: L··;-;;_~•;:· .... ·.:.1 l•ll.?• • .·~ '°''' c ... ---'t Chestnut Avenue _J ___ -/ SITE PLAN -1~ 11'11 .. ., 80 NO, .. "' 'i ,c, ~ ... i ~ ,~. i; -rll ~ 0 ¥ h ~ ~]i l ~ ~~t ~ ~~~ ~ ;.q g:::: .. ..... i~ :'.?~ ~ "' Cl) 0 ... 0 t: QI QI O z U :::i N ::, C: c:°' lf ~ QI CII i ·_; ~ 'i: Q) ~ 0 0::: :::i - I Ill c:::: o iii o .c ~ • ~ ~ u ~ z .., _g s a, ,.._ ell z .r:. N "t: ~ I-.... cu ~ u SITE PLAN ::ru......,. ----• -J -~ ~ ,· • 10·-o· -~--.- C -1 STORM WATER STANDARDS {_ City of Carlsbad ~ E c r: • Development Services Land Development Engineering 1635 Faraday Avenue 442-339-2750 www.carlsbadca.gov .QUESTIONNAIRE E-34 JUL O ~ 2C25 CITY OF CA'.1LSB INSTRUCTIONS: To address post-development pollutants that may be generated from development proje , th efty requires that new development and significant redevelopment priority projects incorporate Permanent Stor Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'STANDARD PROJECT' requirements, "PRIORITY DEVELOPMENT PROJECT (PDP) requirements or not considered a development project. This questionnaire will also determine if the project is subject to TRASH CAPTURE REQUIREMENTS. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently PROJECT INFORMATION PROJECT NAME: NICHOLS ADU APN: ADDRESS: 1274 CHESTNUT AVE, CARLSBAD, CA, 92008 204-120-31-00 The project is (check one): lg] New Development 0 Redevelopment The total proposed disturbed area is: 630 ft2 ( ) acres The total proposed newly created and/or replaced impervious area is: 630 ft2 ( ) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID SWQMP#: Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. This Box for City Use Only YES NO Date: Project ID: City Concurrence: □ □ By: E-34 Page 1 of 4 REV 12/2024 STEP1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a "development project", please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building □ ~ or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered "yes" to the above question, provide justification below then go to Step 6, mark the box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): If you answered "no" to the above question, the project is a 'development project', go to Step 2. STEP2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; OR □ ~ b) Designed and constructed to be hydraulically disconnected from paved streets or roads; OR c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in □ 18] accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? □ ~ If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 6, mark the second box stating "my project is EXEMPT from PDP ... " and complete applicant information. Discussion to justify exemption (e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered "no" to the above questions, your project is not exempt from PDP, go to Step 3. E-34 Page 2 of 4 REV 12/2024 ITEP3 10E 009LETED FORAU. WOAIIIPGIMLOPllllf dlOJECl'I To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1)): YES NO 1. Is your project a new or redevelopment project that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed □ [8] use, and public development projects on public or private land. 2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of □ [8] impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a □ [8] facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious □ [8] surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a □ [8] land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious street, road , highway, freeway or driveway surface collectively over the entire project □ [8] site? A street, road, highway, freeway or driveway is any paved impervious surface used for the transoortation of automobiles, trucks, motorcvcles, and other vehicles. 7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally □ [8] Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).• 8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair □ [8] shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes □ [8] RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land □ [8] and are expected to generate pollutants post construction? 11 . Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC □ 18] 21 .203.040) If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, complete the trash capture question. If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT'. Go to step 5, complete the trash capture question. .. • Environmentally Sens1t1ve Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. E-34 Page 3 of 4 REV 12/2024 .. STEP4 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = sq. ft. □ □ Total proposed newly created or replaced impervious area (B) = sq. ft. Percent impervious area created or replaced (B/A)*100 = % If you answered "yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, complete the trash capture question. If you answered "no," the structural BMP's required for PDP apply to the entire development. Go to step 5, complete the trash capture question. STEPS TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS Complete the question below regarding your Project (SDRWQCB Order No. 2017-0077): YES NO Is the Project within any of the following Priority Land Use (PLU) categories? R-23 (15-23 du/ac), R-30 (23-30 du/ac), Pl (Planned Industrial), CF (Community Facilities), GC (General □ 18] Commercial), L (Local Shopping Center), R (Regional Commercial), V-B (Village-Barrio), VC (Visitor Commercial), 0 (Office), VC/OS (Visitor Commercial/Open Space), Pl/O (Planned Industrial/Office), or Public Transoortation Station If you answered "yes", the 'PROJECT' is subject to TRASH CAPTURE REQUIREMENTS. Go to step 6, check the first box stating, "My project is subject to TRASH CAPTURE REQUIREMENTS ... "and the second or third box as determined in step 3. If you answered "no", Go to step 6, check the second or third box as determined in step 3. STEP& CHECK THE APPROPRIATE BOX(ES) AND COMPLETE APPLICANT INFORMATION D My project is subject to TRASH CAPTURE REQUIREMENTS and must comply with TRASH CAPTURE REQUIREMENTS of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP). 18] My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project. If my project is subject to TRASH CAPTURE REQUIREMENTS, I will submit a TRASH CAPTURE Storm Water Quality Management Plan (TCSWQMP) per E-35A. D My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) per E-35 template for submittal at time of application. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. D My project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Applicant Name: Cynthia Hardin Applicant Title: VP/Ben Leland Construction, Inc. Applicant Signature: ~#cua¼, Date: July 7, 2025 E-34 Page 4 of 4 REV 12/2024 C City of Carlsbad Project ID: STANDARD PROJECT REQUIREMENT CHECKLIST RECEl\/f=QE-36 . Project lnfonnation DWG No. or Building Permit No.: Development Services Land Development Engineering 1635 Faraday Avenue 442-339-2750 www.carlsbadca.gov Baseline BMPs for Existing and Proposed Site Features Complete the Table 1 -Site Design Requirement to document existing and proposed site features and the BMPs to be implemented for them. All BMPs must be implemented where applicable and feasible. Applicability is generally assumed if a feature exists or is proposed. BMPs must be implemented for site design features where feasible. Leaving the box for a BMP unchecked means it will not be implemented (either partially or fully) either because it is inapplicable or infeasible. Explanations must be provided in the area below. The table provides specific instructions on when explanations are required. Table 1 -Site Design Requirement A. Existinq Natural Site Features (see Fact Sheet BL-1) 1. Check the boxes below for each existing feature on 1. Select the BMPs to be implemented for each identified feature. Explain the site. why any BMP not selected is infeasible in the area below. SD-G SD-H Conserve natural Provide buffers around waterbodies features □ Natural waterbodies LJ LJ □ Natural storaqe reservoirs & drainaqe corridors LJ -- 0 Natural areas, soils, & veQetation (incl. trees) l.!.I -- B. BMPs for Common Impervious Outdoor Site Features (see Fact Sheet BL-2) 1. Check the boxes below for each 2. Select the BMPs to be implemented for each proposed feature. If neither BMP SD-B nor proposed feature. SD-I is selected for a feature, explain why both BMPs are infeasible in the area below. SD-8 SD-I Minimize size of Direct runoff to pervious Construct surfaces from impervious areas areas permeable materials D Streets and roads u u I!] Check this box to confirm □ Sidewalks & walkways l.!.I LJ that all impervious areas on the site will be minimized O Parking areas & lots l.!.I LJ where feasible. D Driveways l.!.I LJ If this box is not checked, □ Patios, decks, & courtyards u l.!.I identify the surfaces that cannot be minimized in area D Hardcourt recreation areas □ u below, and explain why it is E-36 Page 1 of 4 Revised 04/23 O Other: _____ _ □ u infeasible to do so. C. Mi BMPs for Rooftop Areas: Check this box if rooftop areas are proposed and select at least one BMP below. (see Fact Sheet BL-3) If no BMPs are selected, explain why they are infeasible in the area below. ~ SD-8 Direct runoff to pervious areas D SO-C Install green roofs D SD-E Install rain barrels D. □ BMPs for Landscaped Areas: Check this box if landscaping is proposed and select the BMP below □ SD-K Sustainable Landscaping (see Fact Sheet BL-4) If SD-K is not selected, explain why it is infeasible in the area below. Provide discussion/justification for site design BMPs that will not be implemented (either partially or fully): N/A -NO LANDSCAPING PROPOSED Baseline BMPs for Pollutant-generating Sources All development projects must complete Table 2 -Source Control Requirement to identify applicable requirements for documenting pollutant-generating sources/ features and source control BMPs. BMPs must be implemented for source control features where feasible. Leaving the box for a BMP unchecked means it will not be implemented (either partially or fully) either because it is inapplicable or infeasible. Explanations must be provided in the area below. The table provides specific instructions on when explanations are required. Table 2 -Source Control Requirement A. Management of Storm Water Discharges 1. Identify all proposed outdoor work areas below ~ Check here if none are proposed D Trash & Refuse StoraQe D Materials & Equipment Storage E-36 2. Which BMPs will be used to prevent materials from contacting rainfall or runoff? (See Fact Sheet BL-5) Select all feasible BMPs for each work area SC-A SC-B SC-C Overhead Separation Wind covering flows from protection adjacent areas u u u u u u Page 2 of 4 3. Where will runoff from the work area be routed? (See Fact Sheet BL-6) Select one or more option for each work area SC-D SC-E Other Sanitary sewer u u Containment system u u Revised 04/23 u u □ Loadinq & Unloadinq □ □ □ □ LJ □ □ Fueling □ LJ □ □ □ □ D Maintenance & Repair □ □ □ n □ □ D Vehicle & Eauipment Cleanina □ □ □ □ □ □ 0 Other: □ □ □ LJ □ □ B. Management of Storm Water Discharges (see Fact Sheet BL-7) Select one option for each feature below: • Storm drain inlets and catch basins ... Iii are not proposed □ will be labeled with stenciling or signage to discouraae dumoina (SC-F) • Interior work surfaces, floor drains & Iii are not proposed □ will not discharge directly or indirectly to the MS4 sumps ... or receiving waters • Drain lines (e.g. air conditioning, boiler, Iii are not proposed □ will not discharge directly or indirectly to the MS4 etc.) ... or receiving waters • Fire sprinkler test water ... Iii are not proposed □ will not discharge directly or indirectly to the MS4 or receivina waters Provide discussion/justification for source control BMPs that will not be implemented (either partially or fully): E-36 Page 3 of 4 Revised 04/23 .. This E-36 Form is intended to comply with applicable requirements of the city's BMP Design Manual. I certify that it has been completed to the best of my ability and accurately reflects the project being proposed and the applicable BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the review of this form by City staff is confined to a review and does not relieve me as the person in charge of overseeing the selection and design of storm water BMPs for this project, of my responsibilities for ro"ect desi n. Date: July 7, 2025 E-36 Page 4 of 4 Revised 04/23