Loading...
HomeMy WebLinkAbout2026-07-06; Traffic Safety and Mobility Commission; 02; Maverick Way and Camino De Los Coches Traffic Signal Modification,Capital Improvement Program Project No. 6332Meeting Date: July 6, 2026 To: Traffic Safety & Mobility Commission From: John Kim, City Traffic Engineer Staff Contact: Nestor Mangohig, Senior Engineer nestor.mangohig@carlsbadca.gov, 442-339-2793 Subject: Capital Improvement Program Project No. 6332 District Recommended Action Support staff’s recommendation to implement the Maverick Way and Camino De Los Coches Traffic Signal Modification, Capital Improvement Program, or CIP, Project No. 6332. Background In response to a request from La Costa Canyon High School, left-turn control at the traffic signal on Camino De Los Coches at Maverick Way and the Stagecoach Park entrance was changed from permissive to protected operation in 2016. Explanation & Analysis When the intersection was modified from permissive to protected left-turn operation, the existing mast arm lengths prevented the left-turn signal heads from being positioned directly over the left-turn lanes. This project will replace the signal poles and mast arms on the Camino De Los Coches approaches, allowing the left-turn signal heads to be properly aligned with their respective left-turn lanes. This project will also reconstruct the curb ramps at all four corners of the intersection to bring them into compliance with the Americans with Disabilities Act, or ADA. Because the curb ramps will be reconstructed, the project also provides an opportunity to improve the alignment of the left-turn signal heads with the left-turn lanes. In addition to the signal pole and mast arm replacements and the curb ramp improvements, the project includes the following traffic signal upgrades: •Traffic signal cabinet replacement •Vehicle detection system replacement •Battery backup system replacement •Accessible pedestrian signal (audible) •Yellow retroreflective signal head backplates TRAFFIC SAFETY & MOBILITY COMMISSION July 6, 2026 Item #2 Page 1 of 5 •Emergency vehicle preemption detection system with confirmation light Next Steps Following the Traffic Safety & Mobility Commission’s review, staff will finalize the plans, specifications and estimates with the goal of advertising the project for bids in summer/fall 2026. Following completion of the bidding process, staff will return to the City Council with a recommendation to award a construction contract to the lowest responsive and responsible bidder. Exhibits 1.Draft Construction Plans for the Maverick Way & Camino De Los Coches Traffic Signal Modification July 6, 2026 Item #2 Page 2 of 5 CAMINO DE LOS COCHES & MAVERICK WAY TRAFFIC SIGNAL MODIFICATION DATE INSPECTOR DATE REVIEWED BY: TRA F F I C “”“”“” “” ”“”” Exhibit 1 July 6, 2026 Item #2 Page 3 of 5 DATE INSPECTOR DATE REVIEWED BY: TRA F F I C July 6, 2026 Item #2 Page 4 of 5 POLE SCHEDULE EXISTING PHASE DIAGRAM CONDUCTOR SCHEDULE POLE LOCATION DETAIL LEGEND DATE INSPECTOR DATE REVIEWED BY: TRA F F I C July 6, 2026 Item #2 Page 5 of 5