Loading...
HomeMy WebLinkAbout2026-07-06; Traffic Safety and Mobility Commission; 03; Traffic Signal Cabinet Upgrades, Capital Improvement Program Project No. 6637Meeting Date: July 6, 2026 To: Traffic Safety & Mobility Commission From: John Kim, City Traffic Engineer Staff Contact: Nestor Mangohig, Senior Engineer nestor.mangohig@carlsbadca.gov, 442-339-2793 Subject: No. 6637 District Recommended Action Support staff’s recommendation to implement the Traffic Signal Cabinet Upgrades, Capital Improvement Program, or CIP, Project No. 6637. Background Traffic signal cabinets, located along city roadways, house and protect the equipment used to operate traffic signals. This project will make improvements at several locations to enhance the safety, reliability and maintainability of the traffic signal system. Explanation & Analysis This project includes the following improvements: El Camino Real and Dove Lane The existing traffic signal cabinet was constructed on a tall foundation, likely due to the adjacent embankment slope and site access constraints. The elevated foundation makes it difficult for technicians to safely perform maintenance on the upper cabinet components and top shelf. It also increases the difficulty of lifting and replacing heavy equipment. A low retaining wall will be constructed to allow the upgraded traffic signal cabinet to be installed closer to grade. In addition, the battery backup system will be upgraded, and an accessible pedestrian system will be installed. Carlsbad Village Drive and Concord Street The existing signal cabinet is a small, older style model with no battery backup capabilities. The signal cabinet will be upgraded, a new battery backup system will be installed and an accessible pedestrian system will also be installed. El Camino Real and Hosp Lane The existing electrical service pedestal can make it difficult for pedestrians to access the pedestrian push buttons on the northwest corner of the intersection. The initial project TRAFFIC SAFETY & MOBILITY COMMISSION July 6, 2026 Item #3 Page 1 of 5 description included relocating the service pedestal. However, during preliminary design, it was determined that relocating the pedestal would be more complex and costly than anticipated because it would require demolition and reconstruction of the curb return and adjacent sidewalk. Instead, a new pedestrian pole will be installed on the northwest corner of the intersection to relocate the pedestrian pushbuttons to a more accessible location. In addition, a new accessible pedestrian system will be installed. Next Steps Following the Traffic Safety & Mobility Commission’s review, staff will finalize the plans, specifications and estimates with the goal of advertising the project for bids in summer/fall 2026. Following completion of the bidding process, staff will return to the City Council, if required based on the project cost, with a recommendation to award a construction contract to the lowest responsive and responsible bidder. Exhibits 1. Draft Plans for the Traffic Signal Cabinet Upgrades July 6, 2026 Item #3 Page 2 of 5 DATE INSPECTOR DATE REVIEWED BY: TRA F F I C TRAFFIC SIGNAL CABINET UPGRADES Exhibit 1 July 6, 2026 Item #3 Page 3 of 5 35 35 35 30 DATE INSPECTOR DATE REVIEWED BY: TRA F F I C EL CAMINO REAL HOSP WY July 6, 2026 Item #3 Page 4 of 5 DATE INSPECTOR DATE REVIEWED BY: TRA F F I C EL CAMIN O R E A L DOVE LN CARLSBAD VILLAGE D R CONCORD ST ” ’ July 6, 2026 Item #3 Page 5 of 5