HomeMy WebLinkAbout2026-07-21; City Council; 03; Continuing the Declaration of a Local Emergency Condition in the North Agua Hedionda Interceptor Sewer in the Hedionda Point Neighborhood and Authorizing the City ManagerCA Review TL
Meeting Date:
To:
From:
Staff Contact:
amanda.flesse@carlsbadca.gov, 442-372-6030
Keri Martinez, Utilities Principal Engineer
keri.martinez@carlsbadca.gov, 442-200-7376
Subject:
Agua Hedionda Interceptor Sewer in the Hedionda Point Neighborhood
and Authorizing the City Manager to Direct the Continuation of the
Repair Work Using Emergency Construction Procurement Procedures
District:
Recommended Action
Adopt a resolution continuing the declaration of a local emergency condition resulting from a
partial pipe collapse in the North Agua Hedionda Interceptor Sewer in the Hedionda Point
Neighborhood and authorizing the City Manager to direct the continuation of the repair work
using emergency construction procurement procedures.
Executive Summary
During a review of closed-circuit television inspection records of the city’s main sewer pipelines
in June 2026, city staff identified damage to a segment of the North Agua Hedionda Interceptor
Sewer in the Hedionda Point neighborhood, about 300 feet west of Cove Drive near the
shoreline of the Agua Hedionda Lagoon, as shown in Exhibit 3. The damage on the 24-inch
diameter pipe presents an imminent danger of leaking sewage into the surrounding soil and/or
of a complete pipe failure that could result in a sewage spill into the surrounding environment.
On June 24, 2026, the City Manager declared the existence of a local emergency condition
resulting from the partially collapsed sewer pipe authorizing staff to immediately proceed with
the necessary steps to repair the pipe using emergency construction procurement procedures
rather than the formal bidding process. The city hired a contractor and environmental
consultant and initiated work on June 29, 2026.
On July 7, 2026, the City Council confirmed the emergency declaration and authorized the City
Manager to have the repairs performed using emergency construction procurement
procedures, as allowed under California Public Contract Code Sections 20168, 22035 and 22050
and Carlsbad Municipal Code Sections 3.28.110(A) and 3.28.120.
July 21, 2026 Item #3 Page 1 of 12
Docusign Envelope ID: E1477406-C20B-8845-8213-C7C7A975249A
Staff are requesting the City Council to continue the declaration of the existence of an
emergency condition and continue to authorize the City Manager to have the repairs
performed using emergency construction procurement procedures, as allowed under California
Public Contract Code Sections 20168, 22035 and 22050 and Carlsbad Municipal Code Sections
3.28.110(A).
A four-fifths vote is required under Carlsbad Municipal Code Section 3.28.120 and California
Public Contract Code Section 22050.
Explanation & Analysis
Overview
The North Agua Hedionda Interceptor Sewer is a 2.8-mile long, 21- and 24-inch diameter gravity
sewer pipeline that parallels the northern shore of the Agua Hedionda Lagoon and transports
sewage from portions of the city’s northwest and northeast quadrants to the Foxes Landing
Sewer Lift Station.
The damage to the sewer pipe is in the upper part of the pipeline and classified as a partial pipe
collapse. The damage created an opening in the pipe that is exposed to the surrounding soil,
posing an imminent danger of leaking sewage under high sewer flow conditions, and/or soil
entering the opening in a heavy storm or during high tide, causing a risk of blockage. This
condition could result in sewage spilling into the surrounding environment.
The site is not readily accessible by public roads. Instead, the repair site is accessed via Cove
Drive and utility access and sewer easements on private properties. This sewer pipeline is
within a city sewer easement, which gives the city access to the site to maintain infrastructure.
The city has coordinated a right-of-entry authorization for an additional staging area adjacent
to the access easement from this private property owner. The pipe repair work requires
installing a temporary sewer bypass system, groundwater monitoring and potential draining,
excavation to remove and replace the damaged pipe segment and backfilling and compacting
the pipe trench.
As part of the emergency repair work, staff are coordinating with the:
•California Coastal Commission
•Private property owners, temporarily impacted by repairs
•A consultant biologist to provide project documentation, and a tribal monitor to provide
cultural resources monitoring during excavation activities.
The contractor conducted groundwater investigation, potholed the existing pipeline and
procured repair materials for the repair work and began excavation for the pipe repair the
week of July 13, 2026. Onsite repair work is supervised by the city’s construction management
and inspection staff. All work is expected to be completed by July 24, 2026, and potentially
sooner.
Staff are requesting that the City Council continue the declaration of the existence of an
emergency condition and authorize the City Manager to direct the continuation of the repair
work to be performed using emergency construction procurement procedures.
July 21, 2026 Item #3 Page 2 of 12
Docusign Envelope ID: E1477406-C20B-8845-8213-C7C7A975249A
Emergency declaration
The emergency repair work requires prompter action to prevent or mitigate the impairment of
health, property or essential public services and the environment as compared to what is
possible under formal bidding procedures. The estimated cost of this emergency repair work
exceeds the formal bidding threshold of $220,000, but the formal bidding process takes
approximately four to six months.
Carlsbad Municipal Code Section 3.28.110(A) implements California Public Contract Code
Section 22035, which provides for an exemption from formal bidding procedures for emergency
construction procurements. To use the emergency exemption, Carlsbad Municipal Code Section
3.28.120 and California Public Contract Code Sections 20168, 22035, and 22050 allow the City
Manager to declare a local emergency so that staff may then immediately proceed with the
repair work without following the formal bidding procedures. The declaration is subject to
confirmation by a four-fifths vote of the City Council at its next regularly scheduled meeting.
On June 24, 2026, the City Manager declared the existence of a local emergency condition
(Exhibit 4).
On July 7, 2026, City Council adopted the declaration and authorized the City Manager to
proceed with the emergency repair work without the formal bidding procedures. The staff
report that recommended the determination is provided as Exhibit 2.
Staff are requesting that the City Council continue the declaration of the existence of an
emergency condition in the North Agua Hedionda Interceptor Sewer in the Hedionda Point
neighborhood and authorize the City Manager to direct the continuation of the repair work to
be performed using emergency construction procurement procedures.
California Coastal Commission Emergency Coastal Development permit
The site is within the approximately 100-foot-wide buffer along the state waters of the lagoon
that falls under the jurisdiction of the Coastal Commission.
Under Public Resources Code Section 30611, agencies must seek emergency authorization from
the Coastal Commission if they're acting swiftly to protect life and property or fix damaged
public infrastructure in such an area during an emergency. They are required to notify the
commission’s Executive Director of the type and location of the work within three days of the
emergency or of finding the problem.
• City staff contacted Coastal Commission staff on June 19, 2026, informing them of the
emergency condition and necessary repairs and requested direction for permitting.
• On June 22, 2026, Coastal Commission staff directed city staff to proceed with repair
work and to apply for an emergency coastal development permit within seven days of
initiating the repair work.
• City staff applied for an emergency permit to the Coastal Commission on July 1, 2026.
• City staff continue to coordinate with Coastal Commission staff on requested
information regarding the repair activities.
July 21, 2026 Item #3 Page 3 of 12
Docusign Envelope ID: E1477406-C20B-8845-8213-C7C7A975249A
Fiscal Analysis
Sufficient funding is available for the work in the Sewer System Rehabilitation and
Replacement, Capital Improvement Program Project No. 5503, funded by the Sewer
Replacement Fund, as shown in the table below. Staff are not requesting any additional
appropriation at this time.
Funding available in Sewer System Rehabilitation and Replacement Program,
Capital Improvement Program Project No. 5503
Total appropriation to date $16,705,475
Total expenditures and encumbrances to date -$10,125,874
Costs and funding for North Agua Hedionda Interceptor Sewer Emergency Repair
Capital Improvement Program Project No. 5503-28
Construction contract (estimated)-$500,000
Construction contingency (estimated)-$100,000
Environmental/cultural monitoring (estimated) -$60,000
Construction management, inspection, material testing and support
services (estimated)-$120,000
Next Steps
Staff will continue to monitor the contractor’s progress on the emergency repair work, which
has an estimated completion of July 24, 2026.
Staff will return to the City Council on July 28, 2026, to review the emergency action and ask
the City Council to determine by a four-fifths vote whether there is a need to continue it.
Environmental Evaluation
The proposed action is statutorily exempt from environmental review under the California
Environmental Quality Act, or CEQA, pursuant to California Public Resources Code Section
21080(b)(2) and (4) and CEQA Guidelines Section 15269(b)-(c), which apply to emergency
repairs to publicly owned facilities necessary to maintain services essential to public health,
safety or welfare and other specific actions necessary to prevent or mitigate an emergency. The
statutory exemption covers both the declaration of local emergency and the emergency coastal
development permit.
Exhibits
1. City Council resolution
2. Staff report from July 7, 2026, City Council Meeting (on file in the Office of the City Clerk)
3. Location map
4. Declaration of Local Emergency
July 21, 2026 Item #3 Page 4 of 12
Docusign Envelope ID: E1477406-C20B-8845-8213-C7C7A975249A
Exhibit 1
RESOLUTION NO. 2026-153 .
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, CONTINUING THE DECLARATION OF A LOCAL EMERGENCY
CONDITION RESULTING FROM A PARTIAL PIPE COLLAPSE IN THE NORTH
AGUA HEDIONDA INTERCEPTOR SEWER IN THE HEDIONDA POINT
NEIGHBORHOOD AND AUTHORIZING THE CITY MANAGER TO DIRECT THE
CONTINUATION OF THE REPAIR WORK USING EMERGENCY CONSTRUCTION
PROCUREMENT PROCEDURES
WHEREAS, during a review of closed-circuit television inspection of the city’s main sewer pipelines
or interceptors in June 2026, city staff identified a partial pipe collapse along the North Agua Hedionda
Interceptor Sewer in the in the Hedionda Point neighborhood; and
WHEREAS, under existing normal pipe flow conditions sewage is being conveyed through the
existing damaged pipe; and
WHEREAS, the partial pipe collapse on a 24-inch diameter vitrified clay pipe presents an imminent
danger of leakage of sewage into the surrounding soil under high sewer flow, and/or soil entering the pipe
break under heavy storm infiltration or during high tide with a risk of blockage, and/or full pipe failure that
could result in a sewage spill into the surrounding environment; and
WHEREAS the city hired a contractor and consultant to perform emergency repair work and onsite
monitoring; and
WHEREAS, the North Agua Hedionda Interceptor Sewer is located within a 15-foot-wide city sewer
easement that extends through private properties north of the Auga Hedionda Lagoon shoreline; and
WHEREAS, the North Agua Hedionda Interceptor Sewer is located within the California Coastal
Commission Coastal Zone and requires an emergency coastal development permit; and
WHEREAS, the partial pipe collapse poses a clear and imminent danger and requires immediate
repair work, including temporarily bypassing the sewer flow; excavating, removing and replacing the pipe
segment; reconnecting and testing the repair; and restoring the site; and
WHEREAS, the estimated cost of the repair work exceeds the formal bidding threshold established
by the Public Contract Code and Carlsbad Municipal Code and the formal bidding process would take
approximately four to six months; and
WHEREAS, the repair work requires prompter action than formal bidding allows to permit the
continued conduct of the operation of essential public services and prevent or mitigate the potential
impairment of life, health, property or the environment; and
July 21, 2026 Item #3 Page 5 of 12
Docusign Envelope ID: E1477406-C20B-8845-8213-C7C7A975249A
WHEREAS, the City of Carlsbad follows the procurement processes in the California Public Contract
Code and the Carlsbad Municipal Code; and
WHEREAS, in the case of an emergency, California Public Contract Code Sections 20168, 22035 and
22050 and Carlsbad Municipal Code Sections 3.28.110(A) and 3.28.120 allow the City Council by a four-
fifths vote to authorize the repair and replacement of a public facility, take any directly related and
immediate action required by the emergency, and procure the necessary equipment, services and supplies
for these purposes without following formal bidding procedures; and
WHEREAS, as permitted by California Public Contract Code Section 22050, the City Council has
delegated the authority to declare a public emergency and authorize emergency repairs to the City
Manager, subject to review by the City Council by a four-fifths vote at its next regularly scheduled meeting
not later than 14 days afterwards; and
WHEREAS, on June 24, 2026, the City Manager declared the existence of a local emergency
condition resulting from a partial sewer pipe collapse on the North Agua Hedionda Interceptor Sewer; and
WHEREAS, staff hired a contractor and environmental consultant and initiated work on June 29,
2026; and
WHEREAS, on July 7, 2026, the City Council confirmed the declaration of a local emergency for an
emergency condition resulting from a partial sewer pipe collapse on the North Agua Hedionda Interceptor
Sewer; and
WHEREAS, staff anticipate emergency repair completion to be on or about July 24, 2026; and
WHEREAS, continuing the emergency declaration must be confirmed by a four-fifths vote of the
City Council at its next regularly scheduled meeting; and
WHEREAS, staff request that the City Council continue the declaration of a local emergency
condition and authorize the City Manager to direct continuation of the necessary repair work to be
performed using emergency construction procurement procedures; and
WHEREAS, the emergency repair is estimated to cost approximately $500,000, not including
contingency and other construction support costs; and
WHEREAS, sufficient funding is available in the Sewer Rehabilitation and Replacement Program,
Capital Improvement Program Project No. 5503; and
WHEREAS, on July 1, 2026, staff submitted the application for an emergency permit for the
emergency repair work to the California Coastal Commission staff.
July 21, 2026 Item #3 Page 6 of 12
Docusign Envelope ID: E1477406-C20B-8845-8213-C7C7A975249A
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as
follows:
1.That the above recitations are true and correct.
2.That the City Council has determined that the proposed action is statutorily exempt from
environmental review under the California Environmental Quality Act, or CEQA, pursuant
to California Public Resources Code Section 21080(b)(2) and (4) and CEQA Guidelines
Section 15269(b)-(c), which apply to emergency repairs to publicly owned facilities
necessary to maintain services essential to the public health, safety or welfare and other
specific actions necessary to prevent or mitigate an emergency. The statutory exemption
covers both the declaration of local emergency and the emergency coastal development
permit.
3.That the City Manager’s June 24, 2026, declaration of a local emergency for an emergency
condition resulting from a partial sewer pipe collapse on the North Agua Hedionda
Interceptor Sewer is continued.
4.That there is a need to continue the emergency repairs and the City Manager is authorized
to direct the continuation of the emergency repairs to be performed, take any directly
related and immediate action required by the emergency, and procure the necessary
equipment, services, and supplies for these purposes, using emergency construction
procurement procedures.
5.That the City Manager or designee is authorized to sign all other documents necessary for
regulatory compliance, to extend funding opportunities, or to otherwise implement and
finalize the emergency repair work, all of which are subject to review and approval as to
form by the City Attorney’s Office.
6.That the City Manager is directed to return to the City Council at the next regularly
scheduled City Council meeting for a determination by a four-fifths vote whether the
emergency condition continues to exist.
July 21, 2026 Item #3 Page 7 of 12
Docusign Envelope ID: E1477406-C20B-8845-8213-C7C7A975249A
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of
Carlsbad on the 21st day of July, 2026, by the following vote, to wit:
AYES: Blackburn, Bhat-Patel, Acosta, Burkholder, Shin.
NAYS: None.
ABSTAIN: None.
ABSENT: None.
_________________________________________
KEITH BLACKBURN, Mayor
_________________________________________
SHERRY FREISINGER, City Clerk
(SEAL)
July 21, 2026 Item #3 Page 8 of 12
Docusign Envelope ID: E1477406-C20B-8845-8213-C7C7A975249A
Exhibit 2
Staff report from July 7, 2026, City Council Meeting
(on file in the Office of the City Clerk)
July 21, 2026 Item #3 Page 9 of 12
Docusign Envelope ID: E1477406-C20B-8845-8213-C7C7A975249A
LOCATION MAP
PROJECT NAME PROJECT EXHIBIT
NUMBER
5503-28 3
PROJECT SITE
NORTH AGUA HEDIONDA INTERCEPTOR
SEWER REPAIR
Q:\Public Works\PW Common\Capital Improvement Program Projects\5503 & 3927 Sewer Line Replacement\5503-28 NAHI Sewer Pipe Repair\Design\CAD\NAHI Sewer Pipe Repair Location Map Exh.dwg
VICINITY MAP
AVECOSTALA
BL
V
D
CAR
L
S
B
A
D
RD
ALGA
PALOMAR AIRPORT
RD
EL
CAMINO
RE
A
L
RAN
C
H
O
SAN
T
A
F
E
RD
POINS
E
T
T
I
A
LANE
ALI
C
A
N
T
E
RD
EL
FUE
R
T
E
OLIVENHAIN RD.
MEL
R
O
S
E
DR.
FARADAY
COLLEG
E
BLV
D
PAS
E
O
DEL
NO
R
T
E
AVE
AVE
N
I
D
A
ENC
I
N
A
S
CANNON RD
MO
N
R
O
E
ST
CARLS
B
A
D
VILLAGE DR
MARRON
TAMARA
C
K
AVE
RD
LAKE
CALAVERABUEN
A
VIST
A
LAGOO
N
AGUA HEDIONDA
LAGOON
BATIQUITOS LAGOON
AVI
A
R
A
PKWY
POINSETT
I
A
LANE
PROJECT SITE
Exhibit 3
July 21, 2026 Item #3 Page 10 of 12
Docusign Envelope ID: E1477406-C20B-8845-8213-C7C7A975249A
Exhibit 4
July 21, 2026 Item #3 Page 11 of 12
Docusign Envelope ID: E1477406-C20B-8845-8213-C7C7A975249A
July 21, 2026 Item #3 Page 12 of 12
Docusign Envelope ID: E1477406-C20B-8845-8213-C7C7A975249A