Loading...
HomeMy WebLinkAboutADJ 99-15; PACKARD BOUNDARY ADJUSTMENT; Engineering ApplicationCITY 4ARLSBAD - ENGINEERO DEPA*ENT APPLICATION FOR ENGINEERING PLAN CHECK OR PROCESSING Complete all appropriate information. Write N/A when not applicable. PROJECT NAME: PCV.,4 AOs-rMer DATE: 4°) PROJECT DESCRIPTION: 'tepr o P,cei..s 11 Z, 4 OF= PPeLl?L PROJECT ADDRESS: '3 LMJB', *005 5)LL 'g. LOT NO(S).: \,'?. 3 4 MAP NO.: ?t-\ 11640 APN(S).: Zo1 - 0 61 - 11, t°),O)ZI NO. OF DWELLING UNITS: I i'eitLFMP ZONE: # LOTS: '• 4 # ACRES: OWNER: FLO' . 7Acy.ft9- APPLICANT: izoli 1cv4r Mailing Address: 4005 Mailing Address: -o' °0'r, ct4A vW4,. . czOo c,t&,4 CA. Phone Number: (70) 72°)- 5464 Phone Number: (11.0) 1t°) -7Z3 I certify that I am the legal owner and that all the above information is true a d correct to e b st of my kno le ge / Signature (ate 4y* SignaturJf//t1L.t./ Date CIVIL ENGINEER: SOILS ENGINEER: Firm: i-A cO -A Firm: Mailing Address: '?'2. CN-%)tio %6wL Mailing Address: A. 'O0°) Phone Number: (760) l-OVO Phone Nupb State Registration Number: .. S*Z -Tzt State Registration Number: LANDSCAPE ARCHITECT: ADDITIONAL COMMENTS: Firm: - Mailing Address: Phone Number: State Registratio{Number: IMPROVEMENT VALUATION What istrict is the proposed project located in (circle one)? 'N arlsba Municipal Water District Olivenhain Vallecitos " If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water improvements (if applicable)? $ What is the total cost estimate, including the 15% contingency fee, for sewer (for Carlsbad Municipal Water District only), street public (median) landscape and irrigation, and drainage improvements (if applicable)? $ What is the total cost of landscape and irrigation improvements on private property (if $ applicable)? GRADING QUANTITIES cut cy fill cy remedial cy import/export cy DOCS/MISFORMS/APPLICATION ENG PLANCIIECK OR PROCESSING REV. 6110197 FOR CITY USE ONLY Plancheck Drawing Deposit/ Fees APPLICATION FOR: (/ all that apply) Number Type Number Project I.D. Paid Adjustment Plat - ADJP.' Certificate of Compliance I COC- -' -' Dedication of Easement - / Type: 1 . Type: • Encroachment Permit ENCROACH • Engineerihg Staiidards1 Iariance ESV FinaIMap - S FM CI Gthding Plancheck S GRPC CI Grading GRADING CI Improvement Plancheck PC CI Landscape Planch'eck LPC \ - CI Parcel Map PM CI Quitclaim of Easement QUITC Type Type: CI Reversion to Acreage RTA Q Street Vacation SW CI Tentative Parcel Map MS CI Certificate of Correction CCOR CI Covenant for Easement COVE CI Substantial Conformance Exhibit SCE APPLICATION ACCEPTED BY: MASTER PROJECT ID: RECEIPT NUMBER: PRELIMINARY SIERRA SYSTEM INPUT INITIAL: 00 SIERRA SYSTEM INPUT INITIAL: R:BASE INPUT INITIAL: MASTER FILE NUMBER: F CI OTHER: DATE STAMP APPLICATION RECEIVED OOCS/MISFORMS/APPLICATION ENG PLANCHECK OR PROCESSING REV. 6/10197 PROJECT REVIEW COMPLETION The following project has been reviewed and are recommended for approval: Project Name: ) CLL L)DAIZY 41) . L( y}tr1.j 7 ProjectNo.: i5 Document No.: P l . ' (.5 Sheets No.: - through - DECLARATION OF RESPONSIBLE CHARGE I hereby declare that I have exercised responsible charge over the review of this project as defined in Section 8703 of the Business and Professions Code to determine that the project is found to be in substantial compliance with applicable codes and standards. Review of this project does not relieve the Land Surveyor or Engineer of Work of the responsibilities with state and local ordinances. Helming Engineering Co., Inc. 5962 La Place Court, Suite 245 Carlsbad, CA 92008 (760)431-5999 Signed Douglas L. elming, RC U2 874 Expiration Date 12/31/01 PROJECT REVIEW COMPLETION.doc