HomeMy WebLinkAboutADJ 99-15; PACKARD BOUNDARY ADJUSTMENT; Engineering ApplicationCITY 4ARLSBAD - ENGINEERO DEPA*ENT
APPLICATION
FOR ENGINEERING PLAN CHECK OR PROCESSING
Complete all appropriate information. Write N/A when not applicable.
PROJECT NAME: PCV.,4 AOs-rMer DATE: 4°)
PROJECT DESCRIPTION: 'tepr o P,cei..s 11 Z, 4 OF= PPeLl?L
PROJECT ADDRESS: '3 LMJB', *005 5)LL 'g.
LOT NO(S).: \,'?. 3 4 MAP NO.: ?t-\ 11640 APN(S).: Zo1 - 0 61 - 11, t°),O)ZI
NO. OF DWELLING UNITS: I i'eitLFMP ZONE: # LOTS: '• 4 # ACRES:
OWNER: FLO' . 7Acy.ft9- APPLICANT: izoli 1cv4r
Mailing Address: 4005 Mailing Address: -o' °0'r, ct4A vW4,.
. czOo c,t&,4 CA. Phone Number: (70) 72°)- 5464 Phone Number: (11.0) 1t°) -7Z3
I certify that I am the legal owner and that all the above
information is true a d correct to e b st of my kno le ge / Signature (ate
4y*
SignaturJf//t1L.t./ Date
CIVIL ENGINEER: SOILS ENGINEER: Firm: i-A cO -A Firm:
Mailing Address: '?'2. CN-%)tio %6wL Mailing Address:
A. 'O0°)
Phone Number: (760) l-OVO Phone Nupb State Registration Number:
.. S*Z -Tzt State Registration Number:
LANDSCAPE ARCHITECT: ADDITIONAL COMMENTS:
Firm:
-
Mailing Address:
Phone Number:
State Registratio{Number:
IMPROVEMENT VALUATION
What istrict is the proposed project located in (circle one)? 'N arlsba Municipal Water District Olivenhain Vallecitos "
If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15%
contingency fee, for water and reclaimed water improvements (if applicable)? $ What is the total cost estimate, including the 15% contingency fee, for sewer (for Carlsbad Municipal Water District only), street public (median) landscape and irrigation, and
drainage improvements (if applicable)? $ What is the total cost of landscape and irrigation improvements on private property (if $ applicable)?
GRADING QUANTITIES
cut cy fill cy remedial cy import/export cy
DOCS/MISFORMS/APPLICATION ENG PLANCIIECK OR PROCESSING
REV. 6110197
FOR CITY USE ONLY
Plancheck Drawing Deposit/ Fees
APPLICATION FOR:
(/ all that apply) Number Type Number Project I.D. Paid
Adjustment Plat - ADJP.' Certificate of Compliance I COC- -' -'
Dedication of Easement -
/ Type: 1 .
Type:
• Encroachment Permit ENCROACH
• Engineerihg Staiidards1 Iariance ESV
FinaIMap - S FM
CI Gthding Plancheck S
GRPC
CI Grading GRADING
CI Improvement Plancheck PC
CI Landscape Planch'eck LPC \ -
CI Parcel Map PM
CI Quitclaim of Easement QUITC
Type
Type:
CI Reversion to Acreage RTA
Q Street Vacation SW
CI Tentative Parcel Map MS
CI Certificate of Correction CCOR
CI Covenant for Easement COVE
CI Substantial Conformance Exhibit SCE
APPLICATION ACCEPTED BY:
MASTER PROJECT ID:
RECEIPT NUMBER:
PRELIMINARY SIERRA SYSTEM INPUT INITIAL:
00 SIERRA SYSTEM INPUT INITIAL:
R:BASE INPUT INITIAL:
MASTER FILE NUMBER: F
CI OTHER: DATE STAMP
APPLICATION RECEIVED
OOCS/MISFORMS/APPLICATION ENG PLANCHECK OR PROCESSING
REV. 6/10197
PROJECT REVIEW COMPLETION
The following project has been reviewed and are recommended for approval:
Project Name: ) CLL L)DAIZY 41) . L( y}tr1.j 7
ProjectNo.: i5
Document No.: P l . ' (.5
Sheets No.: - through -
DECLARATION OF RESPONSIBLE CHARGE
I hereby declare that I have exercised responsible charge over the review of this project as
defined in Section 8703 of the Business and Professions Code to determine that the project is
found to be in substantial compliance with applicable codes and standards.
Review of this project does not relieve the Land Surveyor or Engineer of Work of the
responsibilities with state and local ordinances.
Helming Engineering Co., Inc.
5962 La Place Court, Suite 245
Carlsbad, CA 92008
(760)431-5999
Signed
Douglas L. elming, RC U2 874
Expiration Date 12/31/01
PROJECT REVIEW COMPLETION.doc