Loading...
HomeMy WebLinkAboutAMEND 2017-0025; LA COSTA AVENUE STORM DRAIN IMPORVEMENT PROGRAM; Early Assessment (EA)early assessment application for PUBUG WORKS - TRANSPORTATION ENGINEERING DIVISION THIS SECflbN FOR PLANNING DMSION USE ONLYTHIS ScCnUN run ww.— ^ PROJECT (EAX: | I P*TE SUBMrTTED: | ' \(p | PLANNER; | PROJECT NAMEnTTLE: La Costa Avenue Storm Drain East of Piraeus Street PROJECT PROPONENT/DEPT. CONTACT SIGNATURE:^ dL UfArVe AUTHORIZED SIGNATURE: Please type your responses m »ie boxes pmvided below The fom, may be expankd to accommodate as much infbrmaticn as you choose to provide r-=-ii Have you aubmltttd any pterlou. teirly asaetoanent appltedloite tor thfc pioiect wdh Plaaning Metre a p.e... attach a copy of the anginal raqueat and tha Planning Dnrtawn a reaponaa. la the Ptolect part of an apptovad CIP budget or a lulute CIP budget? ff ao, plette. provide tha GIP Protect a. Yes - 6602 La Costa Avenue Storm Dram Improvement Program Ltet any pttenoua and/or anticipated futnn, Planning Cotnmlaalon or City council action, (a-g.. pannn apprcala,. - I \ Mlofiwl tn thlA nroiectList any previous aiivuvi — acfavity authorizations, etc) related to this project NoneI^UMO List any previously certified environmental documents (e.g.. EIRs, Negative ueciarations). Nons ^— Liat any technical rtudlaa that have bean prapaiad or that you anhcipat. will be piapaiad (a-g., biology, archeology, traffic, noise, etc.). The following reports are included in this EA package Biological Resources Existing Conditions Summary Junsdictional Delineaton Report Cultural Resources Technical Report la the piolect on Crty property? B not, hrte property owner authortratlon or an aaaantant been aacurad? Yes Identify the project location. Include specific parcel numbers If possible Approximately 600 Feet East of Piraeus Street on La Costa Avenue street Segment ID# 3044, Diacharging onto APN 2161103200 from existng Curb Outlet ID# 62D.S201 construction phasing, etc.). OPr**PIN/ED Project Design — May 2016 through January 2017 Prepare bid package - February 2017 ^ q 2016Bid Project-February 2017 through March 2017 Award Project-Apnl 2017 (_,ITY OF CARLSBAD Construct Project - May 2017 through June 2017 PLANNING DIVISION r^)ki'0Oo3 Revised 09/11 p.15 DESCRIPTION OF PROPOSAL - Describe the project in as much detail as possible. Use as much space as needed. Attach additional sheets (drawings, etc.) If necessary. Be sure to IdentHy, If applicable, estimat^ quantities of grading (Including Import/export), construction staging areas on and offsite, areas of sensitive vegetabon, unique construction technol^les, proposed facility technologies and byproducts, and any public art component If preliminary or conceptual ^ns or exhibits are available, please include two sets with this transmlttal. ^ I ' The project is located on La Costa Avenue approximately 600' east of Piraeus Street at a low spot in the vertical alignment of the roadway Curb outlets on the north and south side of La Costa Avenue are cumently in place to collect street flow and discharge collected storm water runoff directly into Batiquitos Lagoon (North) and a brow ditch (South) that flows west several hundred feet into a catch basin Both of these storm water coller^on facilites are undersized causing water to pond across the shoulder and encroach the dnve lanes Operation and Maintenance crews regularly place advance warning signs dunng ram events and have document^ the spread of flow reaching the centerline median in several storm events To address safety and hydroplaning concerns, we are proposing that both curb outlets be removed and to be replaced with property sized curb inlets connected by an 18 inch reinforced concrete pipe that will flow north into B^uitos Lagoon The approximate length of the proposed storm dram system is 85 feet long Work is expected to occur at night to avoid traffic impacts dunng the day P-15 Pago 3 of 3 RevBOd 09/11