Loading...
HomeMy WebLinkAboutAV 91-16; Banks Residence; Administrative Variance (AV) (3)"-. January 27, 1992 Alice J. & Gale C. Banks 4694 Telescope Avenue Carlsbad, CA 92008 Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Administrative Variance, application no. AV 91-16, as to its completeness for processing. The application is incomplete, as submitted. Attached are two lists. The first list is information which must be submitted to complete your application. AU list items must be submitted simultaneouslv at the Community DeveloDment Buildinn counter and a CODY of this list must be included with wur submittals. No processing of your application can occur until the application is determined to be complete. The second list is issues of concern to staff. When all required materials are submitted the City has 30 days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the application was initially filed, December 31, 1991, to either re-submit the application or submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. Please contact your staff planner, Elaine Blackburn, at (619) 438-1161 extension 4471, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, MICHAEL J. HOLZMILLER Planning Director MJH:EB:vd c: GaryWayne Robert Green Erin Letsch Bob Wojcik Data Entry Marjorie/Steve 2075 Las Palmas Drive - Carlsbad, California 92009-1 576 - (61 9) 438-1 161 @ LlsT OF ITEMS NEEDED TO COMPLETE APPLICATION: NO. AV 91-16 - BANKS RESIDENCE PLANNING: 1. The detail drawing "B" appears to be inconsistent with the elevation drawings. Also, the detail drawings must be drawn to scale. Provide a detailed description of proposed deck materials. The plans should indicate that the deck will be finished with materials which are visually compatible with the existing structure.