Loading...
HomeMy WebLinkAboutCD 2019-0011; CARLSBAD FLORAL TRADE CENTER; Consistency Determination (CD)CITY OF CARLSBAD APPLICATION FORM FOR CONSISTENCY DETERMINATION APPLICATION CITY USE ONLY Development Number: Qe u l'2.0 3 Original Project Number: C.\J f> 11.. .. \ u Consistency Determina-t-io_.n .... N-um-b-er_:_C_0~U-l ~--."""o"""o_,,.,.,..l-- PROJECT NAME: CARLSBAD FLORAL TRADE CENTER & MARKETPLACE (CUP12-10/CDP12-19/MS12-03) Assessor's Parcel Number(s) and 211-023-11-00 Address: SOUTHEAST CORNER OF CANNON ROAD AND CAR COUNTRY DRIVE Description of proposal (add attachment if necessary): SUBMITTAL OF CONSISTENCY DETERMINATION FOR PLAN REVISIONS AND·PHASING OF PREVIOUSLY APPROVED CUP/CDP/MS. SEE ATTACHED PROJECT DESCRIPTION. Would you like to orally present your proposal to your assigned staff planner/engineer? Yes D □ Please list the staff members you have previously spoken to regarding this project. If none, please so state. DON NEU, ESTEBAN DANA, DAVE DECORDOVA, KYRENNE CHUA, KASIA TROJANOWSKA OWNER NAME (Print): CB RANCH ENTERPRISES MAILING ADDRESS: 7220 AVENIDA ENCINAS, SUITE 204 CITY, STATE, ZIP: CARLSBAD, CA 92011 TELEPHONE: {760) 431-5600 EMAIL ADDRESS: ccc@carltas.com *Owner's signature indicates pennission to conduct a preliminary review for a development proposal. IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. I/WE CONSENT TO ENTRY FOR THIS PURPOSE. I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE ~ATION IS T E AND CORRECT TO THE BEST OF MY _I . . ~/1 /1~ / ~ { APPLICANT'S REPRESENTATIVE (Print): N/A MAILING ADDRESS: CITY, STATE, ZIP: TELEPHONE: EMAIL ADDRESS: APPLICANT NAME (Print): CHRISTOPHER C. CALKINS MAILING ADDRESS: 7220 AVENIDA ENCINAS, SUITE 204 CITY, STATE, ZIP: CARLSBAD, CA 92011 TELEPHONE: (760) 431-5600 EMAIL ADDRESS: ccc@carltas.com I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. {/ I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE APPLICANT AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. SIGNATURE DATE FEE REQUIRED/DATE FEE PAID: 77'1 RECEIVED BY: P-16 Page 2 of 2 Revised 02/28/18 Mr. Don Neu City Planner City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 Subject: Consistency Determination Carlsbad Floral Trade Center & Marketplace Dear Mr. Neu: May 13, 2019 As part of our application for Consistency Determination, we request that the following conditions to the project reflect the proposed new phasing which will have no buildings or use in Phase 1 other than a seasonal parking area supporting current operations: 1. No Final Map will be recorded or building construction incident to Phase 1. The following conditions related to recordation and building to be deferred to Phase 2: 6-9, 11, 12, 14, 15, 29, 30, 38, 43, 46, 50-54 . • Conditions applied consistent with Phase 1 work to be: 16, 17, 18, 21, 23, 40, 41, 42 and 45. l. All other conditions applicable to all phases, including Phase 1, to be: 1-5, 10, 13, 19, 20, 22,24-28,31,32-37,39,44,47-49,55-60. Christopher C. Calkins President CB Ranch Enterprises Cc: R.W.Apel 7220 A VENIDA ENCINAS SUITE 204 • CARLSBAD, CA 92011 TELEPHONE (760) 930-9123 FAX (760) 431-9020 WWW.THEFLOWERFIELDS.COM • f .. : ~~~, ' .. ~' \r-··-., 4 . ''\ -'-.. . ~ ~-~ _ _) Carlsbad Floral Trade Center and Marketplace M.4Y ~: 2019 Consistency Determination Trail Protocol The purpose of this memorandum is to outline a proposed protocol for creation and management of trails affecting Lot 3 incident to the phasing of the proposed Carlsbad Floral Trade Center and Marketplace. The plan contemplates that 2 trails will be ultimately be provided: Trail A along the eastern boundary of Lot 3, and Trail B, a link to Car Country Drive from Trail A. The proposed trails are intended to function in a manner consistent with the ongoing commercial farming on Lot 3. Accordingly, management of their installation, maintenance and operation must reflect the competing requirements for farm operation and security, public safety, and public access. The trails will utilize existing farm roads generally on native soils, and will be susceptible to wear and impact from both farm operations and environmental conditions (including rain, dust, erosion, and vehicular tracking). Trails will be closed by the farm operator during farm operations that may create conflict with the public use and safety. Trails will only be open during daylight hours, and leashed dogs only allowed. Location and condition of the trails will change as the development of Lot 3 proceeds, consistent with the scope of improvements with each phase of development, as summarized below: Phase 1 -Construction of seasonal parking area and driveway at Car Country Drive (Private Access Drive 'B'). During Phase 1, substantially all of Lot 3 will continue to be used for farm operations, except during the Flower Field season when the parking area as defined for the project is utilized. • During The Flower Fields season (currently March 1-May 15), Trail A and Trail B Segment 1, will be open and accessible to the public during daylight hours except when inconsistent with proximate farming activities. Both will be gated and access closed from sunset until 8 am. • Trail A will be located adjacent to the farm road from the driveway entrance at Cannon Road to a linkage with Trail B, Segment 1. • Trail B, Segment 1 will link from Trail A to Car Country Drive via a path adjacent to the Car Country driveway (Private Access Drive 'B'). • Food safety requirements affecting some of the crops adjacent to the trail may require limiting access for users with dogs, and further limit times of usage. .. Phase 2-Construction of the Floral Trade Center & Marketplace, Microbreweries, Winery and Culinary Center. During and after construction of Phase 2, farming operations will generally be outside the 17 acre portion of Lot 3 occupied by the project, but continuing adjacent to all of Trail A and Trail B, Segment 2. • Both Trail A and Trail B Segment 2 will be generally open only during daylight hours. Trail B Segment 1 will be generally open. • Trail A and Trail B Segment 2 will be immediately adjacent to continuing farming operations and will function as farm operations roads. Both will be open from 8 am to sunset. • The location of the Trail B Segment 2 from Trail A to Trail B Segment 2 may vary according to planting, crop mix, and other farming considerations, and will be subject to restriction when inconsistent with farming operations. • Trail B Segment 1 will be surfaced consistent with the adjacent areas (for example, DG in the parking area). • Trail A and Trail B Segment 2 will continue to be natural grade, maintained to internal farm road standards. • Food safety requirements affecting some of the crops adjacent to the trail may require limiting access for users with dogs, and further limit times of usage. • Gates, fences and other control devices may be installed consistent with the plan of operation. Operational Relationship with City Given the operational requirements, the owner of Lot 3 will enter into a license agreement with the City providing for public access consistent with the plan of operation, and continued maintenance at farm road standard by the owner. Signage and delineation of the trail locations, and any changes, will be subject to reasonable City approval. In the event farming is abandoned on Lot 3 and the property converted to other uses, the owner will convey easements for both Trail A and B consistent with the foregoing and any approved alternate use. 1 • ... The Project North 40 Urban Farm Project Description May 13, 2019 : ' ,',_\/ '. (' \ ... -.' -'- The proposed project is a five phase development with a potential of approximately 123,000 square feet in four to eight buildings and 4,764 square feet in exterior patios. The project is accessed by a right- in/right-out driveway on Cannon Road and a driveway on Car Country Drive located approximately 2,000 feet south of Cannon Road. The proposed project will include: • A seasonal parking area for The Flower Fields TM and other harvest seasons. • A marketplace featuring the production and sale of a mix of floral and farm products, food and beverage. • One to three micro-breweries and a winery with public tasting rooms and patios, service, distribution, and accessory uses. • A culinary center. • Onsite farming of a mix of food and floral production crops in open agricultural fields. • Sustainable landscaping with a "farm as landscape" theme featuring useful and colorful plants, kitchen gardens, and native species. • Parking and supporting infrastructure (refuse facilities, storm water detention, utilities, etc.). • All aspects of the facilities and site improvements will be developed consistent with preservation of a farming /agricultural theme and use. Only Phases 1 and 2 are proposed for immediate development with existing approvals. Phase 1 -The Seasonal Parking Area An access driveway on Car Country Road is proposed to be constructed and an area designated as "future expansion" on the site plan will be minimally improved for use as a parking area to accommodate periods of heavy attendance during the peak Flower Fields season. The area may also accommodate other onsite harvest related special events. Two new trails will be opened for controlled public use using existing farm roads. With continuing farm operations over the entire area, access will be managed consistent with a trail protocol (attached). Phase 1 may be developed before recordation of a final map. Project Description Page 1 I • l Phase 2-The Floral Trade Center and Marketplace As an untested concept, development of a portion of the project will be a phased floral centered enterprise originating as wholesale, but open to the public. The initial physical improvements will support a booth style marketplace building with divisible coolers and administrative space, or alternatively, large wholesaler facilities. In addition to the floral vendors, the marketplace building will be developed for small specialty food vendors with onsite production facilities and sales areas for public consumption. The food producers and vendors will be encouraged to utilize, where feasible, products grown at the North 40 Urban Farm as well as from the local region. The central market area may permit a weekend farmers and crafts market along with other festival goods and services to create a public destination space. Initial Phases 1 and 2 will target 48,598 square feet of floral and food producers/retail vendors, 11,048 square feet of microbrewery, 4,486 square feet of winery production and tasting facilities including patios and gardens, and a 2,194 square foot multi-purpose culinary center. The 17 acre site that will ultimately accommodate all project phases 1 through 5 is proposed to be rough graded during Phase 2. Only the area which will accommodate the floral trade center and marketplace building, microbrewery, and winery/culinary center will be finished and improved in the near term, with the expansion area improved as a seasonal overflow parking area in Phase 1 continuing with its limited improvement from Phase 1, modified as necessary to conform to the grading and improvement of the Phase 2 improvements. The remaining area will be returned to farming until demand justifies proceeding with future phases 3 through 5. The floral trade center and marketplace building will be a farm style steel building on concrete slab with metal shed roofs and a central raised shed area roofed with metal and translucent fiberglass or similar material. The north, east, and west elevations of the building which will be visible to visitors as well as surrounding properties will be dressed with faux stone or faux wood to emphasize the agricultural character. Exterior finishes on the service road side of the building (west facing) will be metal. No equipment will be supported on the roof. Subject to food handling requirements, the building will not be insulated nor will it have any climate control other than a range of clerestory windows/vents along the central roof ridge extending the length of the building. Individual tenants will improve spaces on the perimeter to accommodate back office, support needs and address specific environmental needs. Primary tenant equipment will be compressors and related refrigeration equipment located outside the building in screened or otherwise generally not visible locations. The central floor area will be largely open with product display areas. A clear 14'-wide central path will transverse the building north-south with large entries at each end. The main building entry on the east side will front on an asphalt service road and parking area improved with a permeable surface. The building will include loading docks accommodating two trucks at a time. The service road will loop around the building providing fire access and limited tenant parking for loading and unloading on the rear (west) side of the building. The microbrewery will be an open plan farm building designed for production with front-of-house public tasting room environments and outdoor patios. One to three brewers can be accommodated in the facility. Project Description Page2 • • The culinary center is intended for the training and utilization of locally grown agricultural crops, foods and flowers. The facility will share the same building as the winery while the concept is tested for public acceptance. If acceptance is confirmed, then a permanent facility may be proposed in a future site plan amendment. Located adjacent to the culinary center is a large "kitchen garden" where vegetables, herbs, flowers and other crops will be grown for use in the culinary center and will provide a link to the onsite farm and food crop areas. The agricultural fields will continue to be planted in ranunculus and other flowers at the south end of the site, while the north end will feature food production crops including blueberries, coffee, vegetables, fruits, nuts, a large olive grove, demonstration vineyard, and hops planting. Landscaping throughout the project will focus on fruiting and flowering trees and plants that are representative of the San Diego regional agricultural and floral growing industries. The landscape of the parking area will utilize low impact design concepts and, where feasible, is seen as an extension of the proposed orchard located to the east. The parking areas will be paved with permeable decomposed granite surfacing and include vegetated bio-swales for the treatment of any excess storm water runoff. Site Improvements Consistent with the thematic land use characteristics, the site improvements away from the main building site will be minimal. The main circulation will be "farm" in character with no curb, gutter or sidewalk and with minimal lighting in the first phases of development. Additional improvements consistent with use may be proposed for later phases. In lieu of sidewalks, unimproved or partially improved trails may be proposed in additional phases, and if nighttime uses become significant, then additional lighting will be incorporated. In lieu of typical streetscape and parking lot landscape standards, the farm, orchards, vineyards and agricultural crop areas will extend right up to the roadway edges and parking areas, thereby expressing the theme of "farm as landscape." The Cannon Road deceleration lane and the access driveway apron have been constructed. The driveway will be further improved with pavement during phase 1 as shown on the plan. The addition of entry monumentation is proposed in either Phase 1 or 2. The Car Country Drive access driveway is proposed to be constructed in Phase 1. Both entries, as well as farm entry south of the seasonal parking area will be gated. Completion of the interior circulation drives will occur when traffic demand requires it in Phase 2 and later. The Car Country Drive driveway will be monumented in Phase 2 but will not have deceleration or entry lanes. Drainage management Storm water treatment/detention basin(s) will be designed with sufficient capacity to accommodate all phases of the development, but built in stages with the phasing in of the project, consistent with RWQCB standards. Project Description Page 3 Tenant Improvements For floral tenants, improvements will be of a character and scale similar to those in the current trade centers, i.e., self-contained coolers, small back office areas and miscellaneous storage areas. Standard specifications will be developed for pre-approved Tl's; others will require landlord review and compliance with City standards. Marketplace, brewery and winery tenant improvements will be consistent with each tenant's operations and the overall theme and approach of the project. Future Phases Phase 3 through 5 will build out the site with an appropriate mix of supporting uses and will be subject to future discretionary approval applications. The future phase concepts shown in this submittal are for illustrative purposes only. Phase 3 through 5 development is shown on the plans as generic building pad envelops potentially totaling 59,700 square feet of floor area, circulation, service access, and parking, all of which will be subject to future discretionary review. Each future phase is identified in a logical expansion relationship to the initial buildings and are intended to use the same architectural vocabulary. The buildings may have a greater variety of services and products related to food and flower production, such as olive oil production, beer or wine production, processed fruit and vegetable facilities and food service. The mix will be centered on the onsite agricultural production (e.g. hops for beer, grapes for wine, etc.). If seasonal parking continues to be required for the Flower Fields, future phase plans will be designed and scaled to accommodate the continued support. Agricultural Plan The project is accompanied by a proposed agricultural plan that illustrates farm areas for food production in the immediately adjacent 20-25 acres. The plan includes areas designated for a variety of tree and field crops, separated by farm roads and planting delineations. Production of locally appropriate products and those supporting key San Diego County strengths (such as hops for craft beers) will be included. The agricultural areas will be developed with an objective of creating an environment that can be made accessible to the public, both for the development and implementation of school/educational programs, as well as a direct recreational experience within a farming environment. Project Description Page4 , . Entitlement Matters Land Use: The project is proposed as a permitted and accessory agricultural and open space use consistent with (1) the Carlsbad Ranch Specific Plan and (2) the zone for Cannon Road Agricultural/Open Space Zone. Development standards: The project will include a request for a series of variances to City standards including the following: 1. Design standards that support a "farm " character to the development including internal roads without curb, gutter, or sidewalk and limited lighting, parking areas with a permeable surface, no curbs, and a landscape designed around productive plants like olives, edibles, herbs, floral and fragrance industry production. 2. A parking ratio that is consistent with the hybrid nature of the agricultural/industrial/wholesale uses but open to the public. 3. Potential roof heights above 25' (the limit in the OS zone) for certain building elements in phases 2- 5. 4. Management of trail operations and locations pursuant to a mutually agreed protocol. 5. Modifications to standard City landscape requirements (refer to conceptual landscape plan) to reflect the rural agricultural theme. Minor Subdivision: The project contemplates a minor subdivision of four lots with three lots for the proposed building development sites and one lot for the remaining farming area. Phase 1 may be developed before recordation of a final map. Project Description Page 5 May 13, 2019 Community & Economic Development Attn: Esteban Danna, Project Planner City of Carlsbad 1635 Faraday Ave. Carlsbad, CA 92008 Subject: r-w-Apel landscap~ architects me. The attached drawings are submitted for a Consistency Determination of the previously approved project "Carlsbad Floral Trade Center and Marketplace". The previous approved permit numbers were: • Consistency Determination CD 15-13 • Conditional Use Permit CUP 12-10 • Coastal Development Permit CDP 12-19 • Minor Subdivision MS 12-03. A summary of the changes from the previously approved plans are: • Revised the project phasing to include a new first phase. Refer to sheet #2. The first phase will include the construction of the access driveway from Car Country Drive, a seasonal parking area for use by visitors to The Flower Fields, two public trails, and associated grading, civil improvements and landscaping. The original Phase 1 becomes Phase 2, and so forth. • Minor revisions to the Phase 2 site plan (formerly Phase 1). Adjusted location of trash enclosures, revised parking layout to include electric vehicle charging stations and other minor dimensional shifts. The seasonal parking area will remain in Phase 2. All subsequent conceptual site plans for future phases 3-5 remain unchanged (sheet 5). • Revised the civil plans (Tentative Map, Grading, Drainage, Utilities, and Improvements) to bring them up to date with the final construction drawings that were prepared and submitted to the City for grading and building permits. • Revised the landscape plans to match the final landscape construction plans that were submitted to the City for review and approval. Please feel free to contact us if you have any questions. Best Regards, Richard W. Apel Principal 571-B Hygeia Avenue, Leucadia, CA 92024 · tel & fax (760) 943-0760 · CA License 2825 Farming Operations -Lot 3 Summary September 19, 2019 Lot 3 and Lot 1 of the Carlsbad Ranch as depicted on the attached aerial are operated as an integrated agriculture and visitor service -agritourism activity. All farm operations are conducted from the farm operations yard/center on Lot 3 The flower and bulb growing and the access for visitors extends from the entry at the southerly end adjacent to the Armstrong nursery, to the early season growing areas adjacent to Cannon Road. Substantially all of Lot 3 is in production year round. Visitor access accompanies the seasonal rotation of bloom beginning at the extreme north in March, moving south until May and then with areas of bloom on the north where selections of new seedlings are made and the area immediately adjacent to Palomar Airport Road which blooms first with the flag plantings, and last with the final bloom of ranunculas. Integrated into this experience are the new food crops as well as demonstration gardens and cymbidium growing areas. This year with the maturity of the blueberry crops located at approximately the middle of Lot 3, visitors to the fields will be able to participate in a Upick experience if they wish, when the blueberries ripen beginning in mid-April and continuing until Mothers'Oay. Support for the agricultural activity-and particularly accommodating visitor parking at peak times -is critical to assuring success. At peak times, parking for the Flower Fields exacerbated by the spring sales at the Company Stores, and now the impact of the new food hall at Palomar and Paseo Del Norte will create extreme pressure on the ability to provide access. The seasonal parking area during these peak times will directly support the sale of products from Lot 3 and the visitor service portion of the agricultural field operation. PRELIMINARY REVIEW SUBMITTAL FOR PROPOSED CARLSBAD FLORAL TRADE CENTER AND MARKETPLACE CARLSBAD RANCH LOT 3 PROJECT LOCATION CB RANCH ENTERPRISES 0 tOU 200' «JO' An.ll1t.2012 ~