HomeMy WebLinkAboutCDP 00-18; Poinsettia Lane Reach C Stockpile; Coastal Development Permit (CDP) (2)ENVIRONMENTAL IMPACT ASSESSMENT FORM - PART II
(TO BE COMPLETED BY THE PLANNING DEPARTMENT)
CASE NO: CDPOO-18
DATE: May 31.2000
BACKGROUND
CASE NAME: Poinsettia Lane Reach C Stockpile Permit
APPLICANT: Arie Dei one. Jr.
ADDRESS AND PHONE NUMBER OF APPLICANT: 622 E. Mission Rd. San Marcos. CA
92069 (760) 570-0200
DATE EIA FORM PART I SUBMITTED: March 28. 2000
1.
2.
3.
4.
5. PROJECT DESCRIPTION: A Coastal Development Permit to allow the temporary stockpile of
115,000 cubic yards of fill dirt within the future alignment of Poinsettia Lane and the future
development area for the Dejong residential subdivision, on previously disturbed land located
south of Palomar Airport Road and west of Black Rail Road, in the City of Carlsbad.
SUMMARY OF ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
The summary of environmental factors checked below would be potentially affected by this project,
involving at least one impact that is a "Potentially Significant Impact," or "Potentially Significant Impact
Unless Mitigation Incorporated" as indicated by the checklist on the following pages.
Land Use and Planning X Transportation/Circulation
Population and Housing
Geological Problems
Water
| Air Quality
Biological Resources
Hazards
Noise
Public Services
Utilities & Service Systems
Energy & Mineral Resources | | Aesthetics
Cultural Resources
Recreation
| | Mandatory Findings of Significance
Rev. 03/28/96
DETERMINATION.
(To be completed by the Lead Agency)
I find that the proposed project COULD NOT have a significant effect on the
environment, and a NEGATIVE DECLARATION will be prepared.
I find that although the proposed project could have a significant effect on the
environment, there will not be a significant effect in this case because the mitigation
measures described on an attached sheet have been added to the project. A NEGATIVE
DECLARATION will be prepared.
I I find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
I | I find that the proposed project MAY have significant effect(s) on the environment, but at
least one potentially significant effect 1) has been adequately analyzed in an earlier
document pursuant to applicable legal standards, and 2) has been addressed by mitigation
measures based on the earlier analysis as described on attached sheets. An is required,
but it must analyze only the effects that remain to be addressed.
XI I find that although the proposed project could have a significant effect on the
environment, there WILL NOT be a significant effect in this case because all potentially
significant effects (a) have been analyzed adequately in an earlier Mitigated Negative
Declaration pursuant to applicable standards and (b) have been avoided or mitigated
pursuant to that earlier Mitigated Negative Declaration, including revisions or
mitigation measures that are imposed upon the proposed project. Therefore, a Notice of
Prior Compliance has been prepared.
Planner Signature ( / Date
Planning Directors Signature Date
(el 5100
Rev. 03/28/96
ENVIRONMENTAL IMPACTS
STATE CEQA GUIDELINES, Chapter 3, Article 5, Section 15063 requires that the City
conduct an Environmental Impact Assessment to determine if a project may have a significant
effect on the environment. The Environmental Impact Assessment appears in the following
pages in the form of a checklist. This checklist identifies any physical, biological and human
factors that might be impacted by the proposed project and provides the City with information to
use as the basis for deciding whether to prepare an Environmental Impact Report (EIR), Negative
Declaration, or to rely on a previously approved EIR or Negative Declaration.
• A brief explanation is required for all answers except "No Impact" answers that are
adequately supported by an information source cited in the parentheses following each
question. A "No Impact" answer is adequately supported if the referenced information
sources show that the impact simply does not apply to projects like the one involved. A
"No Impact" answer should be explained when there is no source document to refer to, or
it is based on project-specific factors as well as general standards.
• "Less Than Significant Impact" applies where there is supporting evidence that the
potential impact is not adversely significant, and the impact does not exceed adopted
general standards and policies.
• "Potentially Significant Unless Mitigation Incorporated" applies where the incorporation
of mitigation measures has reduced an effect from "Potentially Significant Impact" to a
"Less Than Significant Impact." The developer must agree to the mitigation, and the
City must describe the mitigation measures, and briefly explain how they reduce the
effect to a less than significant level.
• "Potentially Significant Impact" is appropriate if there is substantial evidence that an
effect is significant.
• Based on an "EIA-Part II", if a proposed project could have a potentially significant
effect on the environment, but all potentially significant effects (a) have been analyzed
adequately in an earlier EIR or Mitigated Negative Declaration pursuant to applicable
standards and (b) have been avoided or mitigated pursuant to that earlier EIR or Mitigated
Negative Declaration, including revisions or mitigation measures that are imposed upon
the proposed project, and none of the circumstances requiring a supplement to or
supplemental EIR are present and all the mitigation measures required by the prior
environmental document have been incorporated into this project, then no additional
environmental document is required (Prior Compliance).
• When "Potentially Significant Impact" is checked the project is not necessarily required
to prepare an EIR if the significant effect has been analyzed adequately in an earlier EIR
pursuant to applicable standards and the effect will be mitigated, or a "Statement of
Overriding Considerations" has been made pursuant to that earlier EIR.
• A Negative Declaration may be prepared if the City perceives no substantial evidence that
the project or any of its aspects may cause a significant effect on the environment.
Rev. 03/28/96
• If there are one or more potentially significant effects, the City may avoid preparing an
EIR if there are mitigation measures to clearly reduce impacts to less than significant, and
those mitigation measures are agreed to by the developer prior to public review. In this
case, the appropriate "Potentially Significant Impact Unless Mitigation Incorporated"
may be checked and a Mitigated Negative Declaration may be prepared.
• An EIR must be prepared if "Potentially Significant Impact" is checked, and including
but not limited to the following circumstances: (1) the potentially significant effect has
not been discussed or mitigated in an Earlier EIR pursuant to applicable standards, and
the developer does not agree to mitigation measures that reduce the impact to less than
significant; (2) a "Statement of Overriding Considerations" for the significant impact has
not been made pursuant to an earlier EIR; (3) proposed mitigation measures do not reduce
the impact to less than significant, or; (4) through the EIA-Part II analysis it is not
possible to determine the level of significance for a potentially adverse effect, or
determine the effectiveness of a mitigation measure in reducing a potentially significant
effect to below a level of significance.
A discussion of potential impacts and the proposed mitigation measures appears at the end of the
form under DISCUSSION OF ENVIRONMENTAL EVALUATION. Particular attention
should be given to discussing mitigation for impacts which would otherwise be determined
significant.
Rev. 03/28/96
Issues (and Supporting Information Sources).
LAND USE AND PLANNING. Would the proposal:.
a) Conflict with general plan designation or zoning?
(Source #(s): (#l:Pgs 5.6-1 - 5.6-18)
b) Conflict with applicable environmental plans or
policies adopted by agencies with jurisdiction over the
project? (#l:Pgs 5.6-1 - 5.6-18)
c) Be incompatible with existing land use in the vicinity?
(#l:Pgs 5.6-1-5.6-18)
d) Affect agricultural resources or operations (e.g. impacts
to soils or farmlands, or impacts from incompatible
land uses? (#l:Pgs 5.6-1 - 5.6-18)
e) Disrupt or divide the physical arrangement of an
established community (including a low-income or
minority community)? (#l:Pgs 5.6-1 - 5.6-18)
Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
D
D
II. POPULATION AND HOUSING. Would the proposal:
a) Cumulatively exceed official regional or local
population projections? (#l:Pgs 5.5-1 - 5.5-6)
b) Induce substantial growth in an area either directly or
indirectly (e.g. through projects in an undeveloped area
or extension of major infrastructure)? (#l:Pgs 5.5-1 -
5.5-6)
c) Displace existing housing, especially affordable
housing? (#l:Pgs 5.5-1 - 5.5-6)
n
n n
III. GEOLOGIC PROBLEMS. Would the proposal result in or
expose people to potential impacts involving:
a) Fault rupture? (#l:Pgs 5.1-1 -5.1-15)
b) Seismic ground shaking? (#l:Pgs 5.1-1-5.1-15)
c) Seismic ground failure, including liquefaction? (#l:Pgs
5.1-1-5.1.15)
d) Seiche, tsunami, or volcanic hazard? (#l:Pgs 5.1-1 -
5.1-15)
e) Landslides or mudflows? (# 1 :Pgs 5.1 -1 - 5.1 -15)
f) Erosion, changes in topography or unstable soil
conditions from excavation, grading, or fill? (#l:Pgs
5.1-1-5.1-15)
g) Subsidence of the land? (#l:Pgs 5.1-1 - 5.1-15)
h) Expansive soils? (#l:Pgs 5.1-1 - 5.1-15)
i) Unique geologic or physical features? (#l:Pgs 5.1-1 -
5.1-15)
n
n
IV. WATER. Would the proposal result in:
a) Changes in absorption rates, drainage patterns, or the
rate and amount of surface runoff? (#l:Pgs 5.2-1 - 5..2-
H)
b) Exposure of people or property to water related hazards
such as flooding? (#l:Pgs 5.2-1 - 5..2-11)
c) Discharge into surface waters or other alteration of
surface water quality (e.g. temperature, dissolved
oxygen or turbidity)? (#l:Pgs 5.2-1 - 5..2-11)
n
D
Rev. 03/28/96
Issues (and Supporting Information Sources).
d) Changes in the amount of surface water in any water
body? (#l:Pgs 5.2-1-5..2-11)
e) Changes in currents, or the course or direction of water
movements? (#l:Pgs 5.2-1 - 5..2-11)
f) Changes in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations or
through substantial loss of groundwater recharge
capability? (#l:Pgs 5.2-1 - 5..2-11)
g) Altered direction or rate of flow of groundwater?
(#l:Pgs 5.2-1 -5..2-11)
h) Impacts to groundwater quality? (#l:Pgs 5.2-1 - 5..2-
11)
i) Substantial reduction in the amount of groundwater
otherwise available for public water supplies? (#l:Pgs
5.2-1-5..2-11)
Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
Dn n
Dn
Less Than No
Significant Impact
Impact
D
V. AIR QUALITY. Would the proposal:
a) Violate any air quality standard or contribute to an
existing or projected air quality violation? (#l:Pgs 5.3-
1-5.3-12)
b) Expose sensitive receptors to pollutants? (#l:Pgs 5.3-1
-5.3-12)
c) Alter air movement, moisture, or temperature, or cause
any change in climate? (#l:Pgs 5.3-1 - 5.3-12)
d) Create objectionable odors? (#1 :Pgs 5.3-1 - 5.3-12)D
n n
n n
VI. TRANSPORTATION/CIRCULATION. Would the
proposal result in:
a) Increased vehicle trips or traffic congestion? (#l:Pgs
5.7-1-5.7.22)
b) Hazards to safety from design features (e.g. sharp
curves or dangerous intersections) or incompatible uses
(e.g. farm equipment)? (#l:Pgs 5.7-1 - 5.7.22)
c) Inadequate emergency access or access to nearby uses?
(#l:Pgs 5.7-1 -5.7.22)
d) Insufficient parking capacity on-site or off-site?
(#l:Pgs 5.7-1-5.7.22)
e) Hazards or barriers for pedestrians or bicyclists?
(#l:Pgs 5.7-1-5.7.22)
f) Conflicts with adopted policies supporting alternative
transportation (e.g. bus turnouts, bicycle racks)?
(#l:Pgs 5.7-1-5.7.22)
g) Rail, waterborne or air traffic impacts? (#l:Pgs 5.7-1 -
5.7.22)
D
D
D
n
n n
n n
X
VII. BIOLOGICAL RESOURCES. Would the proposal result
in impacts to:
a) Endangered, threatened or rare species or their habitats
(including but not limited to plants, fish, insects,
animals, and birds? (#l:Pgs 5.4-1 - 5.4-24)
b) Locally designated species (e.g. heritage trees)?
(#l:Pgs 5.4-1-5.4-24)
c) Locally designated natural communities (e.g. oak
forest, coastal habitat, etc.)? (#l:Pgs 5.4-1 - 5.4-24)n n m
Rev. 03/28/96
Issues (and Supporting Information Sources).
d) Wetland habitat (e.g. marsh, riparian and vernal pool)?
(#l:Pgs 5.4-1-5.4-24)
e) Wildlife dispersal or migration corridors? (#1 :Pgs 5.4-1
- 5.4-24)
Pot
Sig
Ir
entially
nificant
npact
Potentially
Significant
Unless
Mitigation
Incorporated
LessTl
Signifk
Impa
D
ian
;ant It
ct
No
npac
X
X
VIII. ENERGY AND MINERAL RESOURCES. Would the
proposal?
a) Conflict with adopted energy conservation plans?
(#l:Pgs 5.12.1-1 - 5.12.1-5 & 5.13-1 - 5.13-9)
b) Use non-renewable resources in a wasteful and
inefficient manner? (#l:Pgs 5.12.1-1 -5.12.1-5 & 5.13-
1-5.13-9)
c) Result in the loss of availability of a known mineral
resource that would be of future value to the region and
the residents of the State? (#l:Pgs 5.12.1-1 - 5.12.1-5
& 5.13-1-5.13-9)
D
IX. HAZARDS. Would the proposal involve:
a) A risk of accidental explosion or release of hazardous
substances (including, but not limited to: oil, pesticides,
chemicals or radiation)? (#l:Pgs 5.10.1-1 - 5.10.1-5)
b) Possible interference with an emergency response plan
or emergency evacuation plan? (#l:Pgs 5.10.1-1 -
5.10.1-5)
c) The creation of any health hazard or potential health
hazards? (#l:Pgs 5.10.1-1 - 5.10.1-5)
d) Exposure of people to existing sources of potential
health hazards? (#l:Pgs 5.10.1-1 - 5.10.1-5)
e) Increase fire hazard in areas with flammable brush,
grass, or trees? (#l:Pgs 5.10.1-1 - 5.10.1-5)
D
D
D
X. NOISE. Would the proposal result in:
a) Increases in existing noise levels? (#l:Pgs 5.9-1 - 5.9-
15)
b) Exposure of people to severe noise levels? (#l:Pgs 5.9-
1-5.9-15)
nn
XL PUBLIC SERVICES. Would the proposal have an effect
upon, or result in a need for new or altered government
services in any of the following areas:
a) Fire protection? (#l:Pgs 5.12.5-1 - 5.12.5-6)
b) Police protection? (#l:Pgs 5.12.6-1 - 5.12.6-4)
c) Schools? (#l:Pgs 5.12.7.1 - 5.12.7-5)
d) Maintenance of public facilities, including roads? (#1,
pgs 5.12.7, #2, pgs)
e) Other governmental services? (#l:Pgs 5.12.1-1 -
5.12.8-7)
D a
X
XII. UTILITIES AND SERVICES SYSTEMS. Would the
proposal result in a need for new systems or supplies,
or substantial alterations to the following utilities:
a) Power or natural gas? (#l:Pgs 5.12.1-1 - 5.12.1-5 &
5.13-1-5.13-9)D D
Rev. 03/28/96
Issues (and Supporting Information Sources).
b) Communications systems? (#1, Pgs 5.12.1-1-5.12.5)
c) Local or regional water treatment or distribution
facilities? (#l:Pgs 5.12.2-1 - 5.12.3-7)
d) Sewer or septic tanks? (#l:Pgs 5.12.3-1 - 5.12.3-7)
e) Storm water drainage? (#1 :Pg 5.2-8)
f) Solid waste disposal? (#l:Pgs 5.12.4-1 - 5.12.4-3)
g) Local or regional water supplies? (#l:Pgs 5.12.2-1 -
5.12.3-7)
XIII. AESTHETICS. Would the proposal:
a) Affect a scenic or vista or scenic highway? (#l:Pgs
5.11-1-5.11-5)
b) Have a demonstrated negative aesthetic effect? (#l:Pgs
5.11-1-5.11-5)
c) Create light or glare? (#l:Pgs 5.11-1 - 5.11-5)
Potentially Potenti
Significant Signific
Impact Unles
Mitigat
Incorpoirri
jn
ally Less Than No
;ant Significant Impac
,s Impact
ion
ated n E
i
n cri
n X
XXX
E
n
n
XIV.CULTURAL RESOURCES. Would the proposal:
a) Disturb paleontological resources? (#l:Pgs 5.8-1 - 5.8-
10)
b) Disturb archaeological resources? (#l:Pgs 5.8-1 - 5.8-
10)
c) Affect historical resources? (#l:Pgs 5.8-1 - 5.8-10)
Have the potential to cause a physical change which
would affect unique ethnic cultural values? (#l:Pgs
5.8-1-5.8-10)
Restrict existing religious or sacred uses within the
d)
e)
potential impact area? (#l:Pgs 5.8-1 - 5.8-10)
XV. RECREATIONAL. Would the proposal:
a) Increase the demand for neighborhood or regional
parks or other recreational facilities? (#l:Pgs 5.12.8-1 -
5.12.8-7)
b) Affect existing recreational opportunities? (#l:Pgs
5.12.84-5.12.8-7)
E
XVI. MANDATORY FINDINGS OF SIGNIFICANCE.
a) Does the project have the potential to degrade the
quality of the environment, substantially reduce the
habitat of a fish or wildlife species, cause a fish or
wildlife population to drop below self-sustaining levels,
threaten to eliminate a plant or animal community,
reduce the number or restrict the range of a rare or
endangered plant or animal or eliminate important
examples of the major periods of California history or
prehistory?
D
Rev. 03/28/96
Issues (and Supporting Information Sources).
b) Does the project have impacts that are individually
limited, but cumulatively considerable?
("Cumulatively considerable" means that the
incremental effects of a project are considerable when
viewed in connection with the effects of past projects,
the effects of other current projects, and the effects of
probable future projects)?
c) Does the project have environmental effects which will
cause the substantial adverse effects on human beings,
either directly or indirectly?
Potentially
Significant
Impact
Potentially
Significant
Unless
Mitigation
Incorporated
D
Less Than
Significant
Impact
No
Impact
D D
XVII. EARLIER ANALYSES.
The proposed import and placement of fill dirt within the future alignment of Poinsettia Lane and
the future Dejong residential subdivision has been previously analyzed for potentially significant
adverse impacts to the environment on two previous occasions. The first occasion was the
Master Environmental Impact Report for the 1994 General Plan Update (MEIR 93-01), which
analyzed the potential impacts associated with the buildout of the City's General Plan. The
second occasion was through the Mitigated Negative Declaration for the Dejong Property
subdivision (CT 98-05), which analyzed the potential impacts associated with the development
of a 29 units, single family subdivision including the construction of Poinsettia Lane, a General
Plan Circulation Element roadway. Both documents found that the development of the Dejong
property in accordance with the General Plan did not produce any significant negative impacts to
the environment. The proposed import and placement of fill dirt is necessary for the
development of Poinsettia Lane, and therefore, is consistent with the previous environmental
documentation.
Rev. 03/28/96
DISCUSSION OF ENVIRONMENTAL EVALUATION
The proposal involves the import and placement of 115,000 cubic yards of fill dirt on the
Dejong property, generally located east of Black Rail Road, between Aviara Parkway and
Palomar Airport Road. The dirt would be placed in the future alignment of Poinsettia Lane, an
east-west trending General Plan Circulation Element roadway, in anticipation of future
construction of the roadway. The fill would be compacted and contain erosion control measures
in accordance with City of Carlsbad Engineering Standards. The site for the fill has been
previously disturbed by agricultural uses and contains no sensitive or other native vegetation.
Since the Dejong Property residential subdivision included the construction of Poinsettia Lane in
the project description, and this fill is included in the development of the project, no additional
environmental review is necessary.
AIR QUALITY:
In 1994 the City prepared and certified an EIR which analyzed the impacts which will result
from the build-out of the City under an updated General Plan. That document concludes that
continued development to build-out as proposed in the updated General Plan will have
cumulative significant impacts in the form of increased gas and electric power consumption and
vehicle miles traveled. These subsequently result in increases in the emission of carbon
monoxide, reactive organic gases, oxides of nitrogen and sulfur, and suspended particulates.
These aerosols are the major contributors to air pollution in the City as well as in the San Diego
Air Basin. Since the San Diego Air Basin is a "non-attainment basin", any additional air
emissions are considered cumulatively significant: therefore, continued development to build-out
as proposed in the updated General Plan will have cumulative significant impacts on the air
quality of the region.
To lessen or minimize the impact on air quality associated with General Plan build-out, a variety
of mitigation measures are recommended in the Final Master EIR. These include: 1) provisions
for roadway and intersection improvements prior to or concurrent with development; 2) measures
to reduce vehicle trips through the implementation of Congestion and Transportation Demand
Management; 3) provisions to encourage alternative modes of transportation including mass
transit services; 4) conditions to promote energy efficient building and site design; and 5)
participation in regional growth management strategies when adopted. The applicable and
appropriate General Plan air quality mitigation measures have either been incorporated into the
design of the project or are included as conditions of project approval.
Operation-related emissions are considered cumulatively significant because the project is
located within a "non-attainment basin", therefore, the "Initial Study" checklist is marked
"Potentially Significant Impact". This project is consistent with the General Plan, therefore, the
preparation of an EIR is not required because the certification of Final Master EIR 93-01, by City
Council Resolution No. 94-246, included a "Statement Of Overriding Considerations" for air
quality impacts. This "Statement Of Overriding Considerations" applies to all projects covered
by the General Plan's Final Master EIR. This project is within the scope of that MEIR. This
document is available at the Planning Department.
CIRCULATION:
In 1994 the City prepared and certified a Master EIR which analyzed the impacts which would
result from the build-out of the City under an updated General Plan. That document concluded
that continued development to build-out as proposed in the updated General Plan will result in
10 Rev. 03/28/96
increased traffic volumes. Roadway segments will be adequate to accommodate build-out
traffic; however, 12 full and 2 partial intersections will be severely impacted by regional
through-traffic over which the City has no jurisdictional control. These generally include all
freeway interchange areas and major intersections along Carlsbad Boulevard. Even with the
implementation of roadway improvements, a number of intersections are projected to fail the
City's adopted Growth Management performance standards at build-out.
To lessen or minimize the impact on circulation associated with General Plan build-out,
numerous mitigation measures have been recommended in the Final Master EIR. These include:
1) measures to ensure the provision of circulation facilities concurrent with need; 2) provisions to
develop alternative modes of transportation such as trails, bicycle routes, additional sidewalks,
pedestrian linkages, and commuter rail systems; and 3) participation in regional circulation
strategies when adopted. The diversion of regional through-traffic from a failing Interstate or
State Highway onto City streets creates impacts that are not within the jurisdiction of the City to
control. The applicable and appropriate General Plan circulation mitigation measures have either
been incorporated into the design of the project or are included as conditions of project approval.
Regional related circulation impacts are considered cumulatively significant because of the
failure of intersections at build-out of the General Plan due to regional through-traffic, therefore,
the "Initial Study" checklist is marked "Potentially Significant Impact". This project is
consistent with the General Plan, therefore, the preparation of an EIR is not required because the
recent certification of Final Master EIR 93-01, by City Council Resolution No. 94-246, included
a "Statement Of Overriding Considerations" for circulation impacts. This "Statement Of
Overriding Considerations" applies to all projects covered by the General Plan's Master EIR.
This project is within the scope of that MEIR. This document is available at the Planning
Department.
In addition, the City has received its annual Growth Management Traffic Monitoring Report.
The Report has recorded an unanticipated intersection "level of service" (LOS) failure at Palomar
Airport Road (PAR) and El Camino Real (ECR) during both the a.m. and p.m. peak hours. A
mitigation measure has been identified which, if implemented, will bring the peak hours LOS
into the acceptable range. The mitigation measure involves construction of two dual right turn
lanes (northbound to eastbound and westbound to northbound). This project has agreed to a
condition to pay its fair share of the intersection "short-term improvements" thereby
guaranteeing mitigation to a level of insignificance.
EARLIER ANALYSES USED
The following documents were used in the analysis of this project and are on file in the City of
Carlsbad Planning Department located at 1635 Faraday Avenue, Carlsbad, California, 92008,
(760) 602-4610.
1. Final Master Environmental Impact Report for the City of Carlsbad General Plan Update
(MEIR 93-01), dated March 1994, City of Carlsbad Planning Department.
2. Mitigated Negative Declaration for the Dejong Property residential subdivision, (CT 98-
05), dated May 1999, City of Carlsbad Planning Department.
11 Rev. 03/28/96