HomeMy WebLinkAboutCDP 00-61; Sprint Four Seasons Site; Coastal Development Permit (CDP) (2)CITY OF CARLSBAD
LAND USE REVIEW APPLICATION
1} APPLICATIONS APPLIED FOR: (C
| ) Administrative Permit - 2nd
Dwelling Unit
Q] Administrative Variance
^M Coastal Development Permit
jo^jy Conditional Use Permit
I | Condominium Permit
I | Environmental Impact
Assessment
I | General Plan Amendment
I | Hillside Development Permit
I | Local Coastal Plan Amendment
Q Master Plan
I | Non-Residential Planned
Development
I | Planned Development Permit
HECK BOXES)
(FOR DEPARTMENT
USE ONLY)
CD^OO-41
CUf oo H5
[~j Planned Industrial Permit
f I Planning Commission
Determination
[~1 Precise Development Plan
[~l Redevelopment Permit
Q Site Development Plan
O Special Use Permit
f~) Specific Plan
Q3 Tentative Parcel Map
Obtain from Engineering Department
C] Tentative Tract Map
[~| Variance
Q Zone Change
Q List other applications not
specified
(FOR DEPARTMENT
USE ONLY)
I
2)
3)
4)
ASSESSOR PARCEL NO(S).:
PROJECT NAME:
215-750-01-00
SPRINT PCS - AVIARA
BRIEF DESCRIPTION OF PROJECT:Unmanned telecommunications facility.
5) OWNER NAME (Print or Type)
Aviara Resort Associates, L.P..
MAILING ADDRESS
7100 Four Seasons Point
CITY AND STATE ZIP TELEPHONE
Carlsbad, CA 92009 (760) 603-6800
1 CERTIFY THAT 1 AM THE LEGAL OWNER AND THAT ALL THE ABOVE
INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY
KNOWLEDGE.
Pbx*v <&K n-focWt #K\Wi3echor\ . ^
SIGNATURE DATE ^
6) APPLICANT NAME (Print or Type)
SPBINT PCS / JK Consulting Group (agent)
MAILING ADDRESS
7747 Opportunity Road
CITY AND STATE ZIP TELEPHONE
San Diego, CA 92111 858-573-7355
1 CERTIFY THAT 1 AM THE LEGAL REPRESENTATIVE OF THE
OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND
CORRECT TO THE BEST OF MY KNOWLEDGE.
\~~~^ ^> \V W /CO
JSte^ATUBJ^-1^ DATF.
7) BRIEF LEGAL DESCRIPTION Lot 1 of Cit
Area 2A and a portion of 2B in the City of Catsbad, accor
NOTE: A PROPOSED PROJECT REQUIRING MULTIPLE APPLlCATQNSJlE_EU
lity^tiCarlsbg?K
~M
xTte
Tract No. 95-02. Unit 1 Planning
g to Map No. 13335.
ST BE SUBMITTED PRIOR TO 3:30 P.M.
A PROPOSED PROJECT REQUIRING ONLY ONE APPLICATION BE FILEDTlWDsTBE SUBMITTED PRIOR TO 4:00 P.M.
CCQl <=i
Form 1 6 PAGE 1 OF 2
8)LOCATION OF PROJECT:
ON THE
BETWEEN
7100 Four Seasons Point
west
STREET ADDRESS
SIDE OF Four Seasons Point
(NORTH, SOUTH, EAST, WEST)
Aviara Parkway AND
(NAME OF STREET)
9) LOCAL FACILITIES MANAGEMENT ZONE
1 0) PROPOSED NUMBER OF LOTS
1 3) TYPE OF SUBDIVISION
1 6) PERCENTAGE OF PROPOSED
PROJECT IN OPEN SPACE
19) GROSS SITE ACREAGE
22) EXISTING ZONING
11) NUMBER OF EXISTING
RESIDENTIAL UNITS
14) PROPOSED IND OFFICE/
SQUARE FOOTAGE
1 7) PROPOSED INCREASE IN
ADT
20) EXISTING GENERAL
PLAN
23) PROPOSED ZONING
(NAME OF STREET)
Aviara Drive
(NAME OF STREET)
12) PROPOSED NUMBER OF
RESIDENTIAL UNITS
15) PROPOSED COMM
SQUARE FOOTAGE
18) PROPOSED SEWER
USAGE IN EDU
21) PROPOSED GENERAL
PLAN DESIGNATION
24)IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY
STAFF, PLANNING COMMISSIONERS, DESIGN REVIEW BOARD MEMEBERS OR CITY COUNCIL MEMBERS
TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. I/WE CONSENT
TO ENTRY FOBJIHJS-eUBEpSE
SIGNATURE
FOR CITY USEUDNlY
FEE COMPUTATION
APPLICATION TYPE
TOTAL FEE REQUIRED
• FEE REQUIRED
CiTYOFCARLSDAD
DATE STAMP APPLICATION RECEIVED
RECEIVED BY:
DATE FEE PAID RECEIPT NO.
Form 1 6 PAGE 2 OF 2
City of Carlsbad
1635 Faraday Avenue Carlsbad CA 92008
Applicant: JM CONSULTING GROUP
Set Id: S000000506
Description Amount
CDP00061 140.00
CUP00043 2,680.00
Total: 2,820.00
Receipt Number: R0016470
Transaction Date: 11/13/2000
Pay Type Method Description Amount
Payment Cash 2,820.00
Transaction Amount: 2,820.00
PROJECT DESCRIPTION/EXPLANATION
PROJECT NAME: SPRINT PC.* - AVTAPA
APPLICANT NAME: Gerald Moorer (agent) JM Consulting Group
Please describe fully the proposed project by application type. Include any details
necessary to adequately explain the scope and/or operation of the proposed project.
You may also include any background information and supporting statements regarding
the reasons for, or appropriateness of, the application. Use an addendum sheet if
necessary.
Description/Explanation:
Please see the attached Project Description.
Project Description 10/96 Page 1 of 1
4 SUPPLEMENTAL APPLICATION FORM FOR ALL
COASTAL DEVELOPMENT PERMITS
4 APPLICATION CHECKLIST FOR SINGLE FAMILY
REGULAR & MINOR COASTAL DEVELOPMENT PERMITS
(Application checklist for Non-Single Family Regular Coastal Development Permits covered under separate handout)
This supplemental application is to be filed for any development requiring a Coastal
Development Permit issued by the City of Carlsbad.
I. GENERAL BACKGROUND
A. Estimated Cost of Development:
Development costing $60,000 or more does not qualify as a Minor Coastal
Development Permit. The Planning Director shall make the final determination
regarding a project's cost of development.
The primary basis for determining cost of development will be the application of
dollar costs per square foot for different types of residential construction. These
costs are set by the International Conference of Building Officials (ICBO) and
are applied throughout San Diego County.
Please complete the following information to assist in the determination of this
project's cost of development (Contractor proposals may also be submitted for
consideration by the Planning Director).
=> New Residential Square Footage:
square feet x $78.00/sq. ft. = $
=> Residential Addition Square Footage:
square feet x $94.00/sq. ft. = $
=> Any Garage Square Footage:
square feet x $22.00/sq. ft. = $
=> Residential Conversion Square Footage:
square feet x $26.00/sq. ft. = $
=> For Non-Residential Uses, use the following figures for calculations:
Retail/Store @ $38.00/sq. ft.; Restaurant @ $69.007 sq. ft.; Office @
$55.00/ sq. ft.; Manufacturing/Warehouse @ $24.00/sq. ft.:
square feet x $ /sq. ft. = $
COST OF DEVELOPMENT ESTIMATE: $ Pleasee see attached cost estimate.
B. Do you wish to apply for:
1. A Minor Coastal Development Permit (Under $60,000)
2. A Regular Coastal Development Permit ($60,000 or more)
C. Street address of proposed development
7100 Four Seasons Point, Carlsbad, CA 92009
Form 15 6/00 Page 1 of 7
D. Assessor's Parcel Number of proposed development
215-750-01-00 '
E. Development Description:
Briefly describe project: SPRINT PCS proposes to develop, operate, and
maintain a telecommunications base station, to consist of four (k)
panel antenna stealth mounted on the rooftop of the existing
Four Seasons Resort Hotel.
F. Describe the present land uses (i.e. Vacant land, single family homes,
apartments, offices, etc.) that surround the proposed development to the:
North: residential
South: open-space
East: residential
West:open-space
G. Is project located within a 100 year flood plain? | |Yes xxxxx No
PRESENT USE OF PROPERTY
A. Are there existing structures on the property? ixxkYes | | No
If yes, please describe.
The Four Seasons Resort Hotel and associated facilities.
B. Will any existing structure be removed/demolished? Q]Yes Qx No
If yes to either question, describe the extent of the demolition or removal,
including the relocation site, if applicable (also show on plans).
LOT COVERAGE
A. Existing and Proposed
Existing New Proposed Total
Building Coverage sq. ft. sq. ft. sq. ft.
Landscaped Area sq. ft. sq. ft. sq. ft.
Hardscape Area sq ft sq ft sq ft
Unimproved Area
(Left Natural) sq.ft. sq.ft. sq.ft.
Form 15 6/00 Page 2 of 7
B. Parking: Number of existing spaces
Number of new spaces proposed
Existing/Proposed TOTAL:
Number of total spaces required
Number of covered spaces
Number of uncovered spaces
Number of standard spaces
Number of compact spaces
Is tandem parking existing?
Is tandem parking proposed?
C. Grade Alteration:
Is any grading proposed?
If yes, please complete the following:
1. Amount of cut
Amount of fill
not applicable
2.
3.
4.
5.
6.
Maximum height of fill slope _
Maximum height of cut slope
Amount of import or export _
Yes#
Yes#
No
No
Yes
cu. yds.
cu. yds.
feet
feet
cu. yds.
Location of borrow or disposal site
Form 15 6/00 Page 3 of 7
Weather: [ Clear & Sunny
Site ID: I SD35XC119
Sheet Number 14 of 15
Site Candidate ID:A Site Name: Four Seasons Resort Aviara
Construction Cost Estimate
CONSTRUCTION ESTIMATE PROPOSED
SERVICE PERFORMED
1 DEMOLITION
2 STEEL FRAMING
3 STRUCTURAL IMPROVEMENTS
4 SITE WORK
5 ACCESS ROAD IMPROVEMENTS
6 STEALTH ENCLOSURES
7 EQUIPMENT FOUNDATION
8 POLE/TOWER FOUNDATION
9 POLE/TOWER ERECTION
10 CRANE RENTAL COST
11 COAX CABLE AND RACEWAY
12 ANTENNA MOUNTING SUPPORTS
13 FENCING
14 LANDSCAPING
15 TRENCHING
16 SITETELCO
17 ELECTRICAL WORK
18 GROUNDING WORK
19 ANTENNA INSTALLATION
20 PERMITTING
TOTALS
PROJECT CONTINGENCY @ 1 5%
ESTIMATED PROJECT COST
LABOR
$1,500
$1,500
$12,000
$3,150
$3,500
$250
$2,500
$9,000
$4,000
$4,500
$41,900
MATERIALS
$1,500
$1,500
$12,000
$3,150
$3,500
$250
$2,500
$6,000
$2,000
$32,400
TOTAL
$3,000
$3,000
$24,000
$6,300
$7,000
$500
$5,000
$15,000
$6,000
$4,500
$2,000
$76,300
$1 1 ,445
$87,745
Version I Sprint PCS - West Region
Proprietary and Confidential
8/31/00