Loading...
HomeMy WebLinkAboutCDP 00-61; Sprint Four Seasons Site; Coastal Development Permit (CDP) (2)CITY OF CARLSBAD LAND USE REVIEW APPLICATION 1} APPLICATIONS APPLIED FOR: (C | ) Administrative Permit - 2nd Dwelling Unit Q] Administrative Variance ^M Coastal Development Permit jo^jy Conditional Use Permit I | Condominium Permit I | Environmental Impact Assessment I | General Plan Amendment I | Hillside Development Permit I | Local Coastal Plan Amendment Q Master Plan I | Non-Residential Planned Development I | Planned Development Permit HECK BOXES) (FOR DEPARTMENT USE ONLY) CD^OO-41 CUf oo H5 [~j Planned Industrial Permit f I Planning Commission Determination [~1 Precise Development Plan [~l Redevelopment Permit Q Site Development Plan O Special Use Permit f~) Specific Plan Q3 Tentative Parcel Map Obtain from Engineering Department C] Tentative Tract Map [~| Variance Q Zone Change Q List other applications not specified (FOR DEPARTMENT USE ONLY) I 2) 3) 4) ASSESSOR PARCEL NO(S).: PROJECT NAME: 215-750-01-00 SPRINT PCS - AVIARA BRIEF DESCRIPTION OF PROJECT:Unmanned telecommunications facility. 5) OWNER NAME (Print or Type) Aviara Resort Associates, L.P.. MAILING ADDRESS 7100 Four Seasons Point CITY AND STATE ZIP TELEPHONE Carlsbad, CA 92009 (760) 603-6800 1 CERTIFY THAT 1 AM THE LEGAL OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. Pbx*v <&K n-focWt #K\Wi3echor\ . ^ SIGNATURE DATE ^ 6) APPLICANT NAME (Print or Type) SPBINT PCS / JK Consulting Group (agent) MAILING ADDRESS 7747 Opportunity Road CITY AND STATE ZIP TELEPHONE San Diego, CA 92111 858-573-7355 1 CERTIFY THAT 1 AM THE LEGAL REPRESENTATIVE OF THE OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. \~~~^ ^> \V W /CO JSte^ATUBJ^-1^ DATF. 7) BRIEF LEGAL DESCRIPTION Lot 1 of Cit Area 2A and a portion of 2B in the City of Catsbad, accor NOTE: A PROPOSED PROJECT REQUIRING MULTIPLE APPLlCATQNSJlE_EU lity^tiCarlsbg?K ~M xTte Tract No. 95-02. Unit 1 Planning g to Map No. 13335. ST BE SUBMITTED PRIOR TO 3:30 P.M. A PROPOSED PROJECT REQUIRING ONLY ONE APPLICATION BE FILEDTlWDsTBE SUBMITTED PRIOR TO 4:00 P.M. CCQl <=i Form 1 6 PAGE 1 OF 2 8)LOCATION OF PROJECT: ON THE BETWEEN 7100 Four Seasons Point west STREET ADDRESS SIDE OF Four Seasons Point (NORTH, SOUTH, EAST, WEST) Aviara Parkway AND (NAME OF STREET) 9) LOCAL FACILITIES MANAGEMENT ZONE 1 0) PROPOSED NUMBER OF LOTS 1 3) TYPE OF SUBDIVISION 1 6) PERCENTAGE OF PROPOSED PROJECT IN OPEN SPACE 19) GROSS SITE ACREAGE 22) EXISTING ZONING 11) NUMBER OF EXISTING RESIDENTIAL UNITS 14) PROPOSED IND OFFICE/ SQUARE FOOTAGE 1 7) PROPOSED INCREASE IN ADT 20) EXISTING GENERAL PLAN 23) PROPOSED ZONING (NAME OF STREET) Aviara Drive (NAME OF STREET) 12) PROPOSED NUMBER OF RESIDENTIAL UNITS 15) PROPOSED COMM SQUARE FOOTAGE 18) PROPOSED SEWER USAGE IN EDU 21) PROPOSED GENERAL PLAN DESIGNATION 24)IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF, PLANNING COMMISSIONERS, DESIGN REVIEW BOARD MEMEBERS OR CITY COUNCIL MEMBERS TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. I/WE CONSENT TO ENTRY FOBJIHJS-eUBEpSE SIGNATURE FOR CITY USEUDNlY FEE COMPUTATION APPLICATION TYPE TOTAL FEE REQUIRED • FEE REQUIRED CiTYOFCARLSDAD DATE STAMP APPLICATION RECEIVED RECEIVED BY: DATE FEE PAID RECEIPT NO. Form 1 6 PAGE 2 OF 2 City of Carlsbad 1635 Faraday Avenue Carlsbad CA 92008 Applicant: JM CONSULTING GROUP Set Id: S000000506 Description Amount CDP00061 140.00 CUP00043 2,680.00 Total: 2,820.00 Receipt Number: R0016470 Transaction Date: 11/13/2000 Pay Type Method Description Amount Payment Cash 2,820.00 Transaction Amount: 2,820.00 PROJECT DESCRIPTION/EXPLANATION PROJECT NAME: SPRINT PC.* - AVTAPA APPLICANT NAME: Gerald Moorer (agent) JM Consulting Group Please describe fully the proposed project by application type. Include any details necessary to adequately explain the scope and/or operation of the proposed project. You may also include any background information and supporting statements regarding the reasons for, or appropriateness of, the application. Use an addendum sheet if necessary. Description/Explanation: Please see the attached Project Description. Project Description 10/96 Page 1 of 1 4 SUPPLEMENTAL APPLICATION FORM FOR ALL COASTAL DEVELOPMENT PERMITS 4 APPLICATION CHECKLIST FOR SINGLE FAMILY REGULAR & MINOR COASTAL DEVELOPMENT PERMITS (Application checklist for Non-Single Family Regular Coastal Development Permits covered under separate handout) This supplemental application is to be filed for any development requiring a Coastal Development Permit issued by the City of Carlsbad. I. GENERAL BACKGROUND A. Estimated Cost of Development: Development costing $60,000 or more does not qualify as a Minor Coastal Development Permit. The Planning Director shall make the final determination regarding a project's cost of development. The primary basis for determining cost of development will be the application of dollar costs per square foot for different types of residential construction. These costs are set by the International Conference of Building Officials (ICBO) and are applied throughout San Diego County. Please complete the following information to assist in the determination of this project's cost of development (Contractor proposals may also be submitted for consideration by the Planning Director). => New Residential Square Footage: square feet x $78.00/sq. ft. = $ => Residential Addition Square Footage: square feet x $94.00/sq. ft. = $ => Any Garage Square Footage: square feet x $22.00/sq. ft. = $ => Residential Conversion Square Footage: square feet x $26.00/sq. ft. = $ => For Non-Residential Uses, use the following figures for calculations: Retail/Store @ $38.00/sq. ft.; Restaurant @ $69.007 sq. ft.; Office @ $55.00/ sq. ft.; Manufacturing/Warehouse @ $24.00/sq. ft.: square feet x $ /sq. ft. = $ COST OF DEVELOPMENT ESTIMATE: $ Pleasee see attached cost estimate. B. Do you wish to apply for: 1. A Minor Coastal Development Permit (Under $60,000) 2. A Regular Coastal Development Permit ($60,000 or more) C. Street address of proposed development 7100 Four Seasons Point, Carlsbad, CA 92009 Form 15 6/00 Page 1 of 7 D. Assessor's Parcel Number of proposed development 215-750-01-00 ' E. Development Description: Briefly describe project: SPRINT PCS proposes to develop, operate, and maintain a telecommunications base station, to consist of four (k) panel antenna stealth mounted on the rooftop of the existing Four Seasons Resort Hotel. F. Describe the present land uses (i.e. Vacant land, single family homes, apartments, offices, etc.) that surround the proposed development to the: North: residential South: open-space East: residential West:open-space G. Is project located within a 100 year flood plain? | |Yes xxxxx No PRESENT USE OF PROPERTY A. Are there existing structures on the property? ixxkYes | | No If yes, please describe. The Four Seasons Resort Hotel and associated facilities. B. Will any existing structure be removed/demolished? Q]Yes Qx No If yes to either question, describe the extent of the demolition or removal, including the relocation site, if applicable (also show on plans). LOT COVERAGE A. Existing and Proposed Existing New Proposed Total Building Coverage sq. ft. sq. ft. sq. ft. Landscaped Area sq. ft. sq. ft. sq. ft. Hardscape Area sq ft sq ft sq ft Unimproved Area (Left Natural) sq.ft. sq.ft. sq.ft. Form 15 6/00 Page 2 of 7 B. Parking: Number of existing spaces Number of new spaces proposed Existing/Proposed TOTAL: Number of total spaces required Number of covered spaces Number of uncovered spaces Number of standard spaces Number of compact spaces Is tandem parking existing? Is tandem parking proposed? C. Grade Alteration: Is any grading proposed? If yes, please complete the following: 1. Amount of cut Amount of fill not applicable 2. 3. 4. 5. 6. Maximum height of fill slope _ Maximum height of cut slope Amount of import or export _ Yes# Yes# No No Yes cu. yds. cu. yds. feet feet cu. yds. Location of borrow or disposal site Form 15 6/00 Page 3 of 7 Weather: [ Clear & Sunny Site ID: I SD35XC119 Sheet Number 14 of 15 Site Candidate ID:A Site Name: Four Seasons Resort Aviara Construction Cost Estimate CONSTRUCTION ESTIMATE PROPOSED SERVICE PERFORMED 1 DEMOLITION 2 STEEL FRAMING 3 STRUCTURAL IMPROVEMENTS 4 SITE WORK 5 ACCESS ROAD IMPROVEMENTS 6 STEALTH ENCLOSURES 7 EQUIPMENT FOUNDATION 8 POLE/TOWER FOUNDATION 9 POLE/TOWER ERECTION 10 CRANE RENTAL COST 11 COAX CABLE AND RACEWAY 12 ANTENNA MOUNTING SUPPORTS 13 FENCING 14 LANDSCAPING 15 TRENCHING 16 SITETELCO 17 ELECTRICAL WORK 18 GROUNDING WORK 19 ANTENNA INSTALLATION 20 PERMITTING TOTALS PROJECT CONTINGENCY @ 1 5% ESTIMATED PROJECT COST LABOR $1,500 $1,500 $12,000 $3,150 $3,500 $250 $2,500 $9,000 $4,000 $4,500 $41,900 MATERIALS $1,500 $1,500 $12,000 $3,150 $3,500 $250 $2,500 $6,000 $2,000 $32,400 TOTAL $3,000 $3,000 $24,000 $6,300 $7,000 $500 $5,000 $15,000 $6,000 $4,500 $2,000 $76,300 $1 1 ,445 $87,745 Version I Sprint PCS - West Region Proprietary and Confidential 8/31/00