Loading...
HomeMy WebLinkAboutCDP 14-13; Hirschkoff Residence; Coastal Development Permit (CDP) (2)CITY OF CARLSBAD ENGINEERING DIVISION PRELIMINARY DRAINAGE STUDY FOR HIRSCHKOFF RESIDENCE Jefferson Street ENGINEER OF WORK VINCENT L. SAMPO - RCE 44173 PREPARED BY: SAMPO ENGINEERING, INC. 171 SAXONY ROAD, SUITE 213 ENCINITAS, CA 92024 760-436-0660 :CEIVED )L 3 0 2014 JF CARLSBAD ING DiVISION Hirschkoff Residence CDP 14-13, CDP 14-14 Standard Development Project Sampo Engineering, Inc. 7/30/2014 DRAINAGE STUDY CALCULATOR JN: 14-107 Hirschkoff DATE: July 30, 2014 EXISTING BASIN # 1 DESCRIPTION: Northeasterly portion of subject property from Jefferson Street to the rear top of slope AREA = 9,420 SF= 0.216 AC. C = (8570 sfVO.35^ + (850 sfVO.95) 9420 sf Tc1 = 1.8(1.1-.35)(220r(1/2' (7.7)^^(1/3) 20.02 1.97 0.4 10.16 MIN Ho = Iso = lioo = 7.44(1.6)(10.16)'^(-.645) 7.44(2.1)(10.16)'^(-.645) 7.44(2.5)(10.16)'^(-.645) 2.67 IN/HR 3.50 IN/HR 4.17 IN/HR QlO = (0.40)(2.67 IN/HR)(0.216 AC) Qso = (0.40)(3.50 1N/HR)(0.216 AC) Q100 = (0.40)(4.17 IN/HR)(0.216 AC) 0.23 CFS 0.30 CFS 0.36 CFS EXISTING BASIN # 2 DESCRIPTION: Southwesterly portion of the subject property from top of slope to the rear property line AREA = 4,710 SF = 0.108 AC. c = 0.35 Tcl = 1.8(1.1-.35)(53W1/2) (66)'^(1/3) 9.83 4.04 2.43 MINUTES < 5.0 USE 5.00 MINUTES ho Iso lioo = 7.44(1.6)(5.00)'^(-.645) 7.44(2.1 )(5.00)'^(-.645) 7.44(2.5)(5.00)'^(-.645; 4.22 IN/HR 5.53 IN/HR 6.59 IN/HR Q10 = (0.35)(4.22 1N/HR)(0.108 AC) Qso = (0.35)(5.53 1N/HR)(0.108 AC) QlOO= (0.35)(6.59 1N/HR)(0.108 AC) 0.16 CFS 0.21 CFS 0.25 CFS EXISTING BASIN #3 (OFF SITE) DESCRIPTION: Portion of Jefferson St, the hillside to the east and a small portion west of Jefferson St. tributary to the gutter north of the curb inlet at the northeast corner of Jefferson and Las Flores Intersection AREA = C = 78,410 SF = 0.55 1.800 AC. Td = Tc2 = iio_ Iso lioo = 1.8(1.1-.55)(100)^(1/2' (2.0)^^(1/3) 1.8(1.1-.35)(40)^(1/2) (25)^^(1/3) 7.44(1.6)(10.78)'^(-.645) = 7.44(2.1 )(10.78)'^(-.645) 7.44(2.5)(10.78)'^(-.645) = 9.90 1.26 8.54 2.92 2.57 IN/HR 3.37 IN/HR 4.01 IN/HR 7.86 2.92 MINUTES MINUTES 10.78 MINUTES TOTAL Q10 = (0.55)(2.57 1N/HR)(1.80 AC) Qso = (0.55)(3.37 IN/HR)(1.80 AC) Ql00 = (0.55)(4.01 IN/HR)(1.80 AC) 2.54 CFS 3.34 CFS 3.97 CFS o HIRSCHKOFF RESIDENCE VACANT PROPERTY ON JEFFERSON ST E LU LU z UJ o < ^1 EXISTING BASIN #4 (OFF SITE) DESCRIPTION: Offsite area tributary to the two curb inlets at the Intersection of Jefferson Street and Las Flores AREA = 3.77 acres C = 0.55 Overland Flow Tcl = 1.8(1.1-.55)(50)^(1/2) (1.0)^^(1/3) 7.00 1.00 7.00 MINUTES Tc2 = 1.8(1.1-.35)(30W1/2^ (23)^^(1/3) 7.39 2.84 2.6 MINUTES Gutter Flow Tc3 = 350 ft 3.8 ft/s X 1/60 1.5 MINUTES 11.1 MINUTES TOTAL lio = 7.44(1.6)(11.1)'^(-.645) 2.52 IN/HR Iso -7.44(2.1 )(11.1)'^(-.645) 3.31 IN/HR 1100 = 7.44(2.5)(11.1)'^(-.645) 3.94 IN/HR Q10 = (0.55)(2.52 IN/HR)(3.77 AC) Qso = (0.55)(3.31 1N/HR)(3.77 AC) QlOO = (0.55)(3.94 1N/HR)(3.77 AC) 5.22 CFS 6.86 CFS 8.17 CFS o HIRSCHKOFF RESIDENCE VACANT PROPERTY ON JEFFERSON ST CC m LU z O z LU O Q. < -li PROPOSED BASIN #1 DESCRIPTION: Northeasterly portion of subject property from Jefferson Street to the rear top of slope AREA = C = c- Tc1 = 9,420 SF = 0.216 AC. (850 sf)(0.95) + (2476 sf)(0.95) + (3102 sf)(0.35) + (2992 sfVO.45) 9420 sf 0.59 1.8(1.1-.35K 120^(1/2' (4.2)'^(1/3) 14.79 1.61 9.19 MINUTES Iio = Iso = Iioo = 7.44(1.6)(9.19)'^(-.645) = 7.44(2.1)(9.19)'^(-.645) 7.44(2.5)(9.19)'^(-.645) = 2.85 IN/HR 3.74 IN/HR 4.45 IN/HR Qio = (0.59)(2.85 1N/HR)(0.216 AC) Qso= (0.59)(3.74 IN/HR)(0.216 AC) Qioo = (0.59)(4.45 IN/HR)(0.216 AC) 0.36 CFS 0.48 CFS 0.57 CFS Determine gutter depth of flow on east side of Jefferson Street: Qioo = 3.97 CFS (Existing Basin #3) + 0.57 CFS (Proposed Basin #1) = 4.54 CFS From County of San Diego Gutter and Roadway Discharge-Velocity Chart For gutter slope = 0.5% and 0=4.54 CFS, Depth = 0.40 ft From survey data of street cross sectons at 0.4 feet gutter depth the street will flood approximately 5 to 8 feet west of the easterly curb line, which will allow for two lanes of traffic in the flooded condition and will not rise to the crown elevation of the street in a 100 yr event (See attached chart). PROPOSED BASIN # 2 DESCRIPTION: Southwesterly portion of the subject property from top of slope to the rear property line AREA = 4,710 SF = 0.108 AC. c = 0.35 Tcl = 1.8(1.1-.35V53W1/21 (66)'^(1/3) 9.83 4.04 2.43 MINUTES < 5.0 USE 5.00 MINUTES Iio Iso Iioo = 7.44(1.6)(5.00)'^(-.645) 7.44(2.1 )(5.00)'^(-.645) 7.44(2.5)(5.00)'^(-.645; 4.22 IN/HR 5.53 IN/HR 6.59 IN/HR Qio = (0.35)(4.22 1N/HR)(0.108 AC) Qso = (0.35)(5.53 1N/HR)(0.108 AC) Qioo = (0.35)(6.59 1N/HR)(0.108 AC) 0.16 CFS 0.21 CFS 0.25 CFS STORM DRAIN HYDRAULIC CALCULATION DESCRIPTION: MAXIMUM STORM DRAIN CAPACITY & HEIGHT CALCULATIONS FOR 18" ACP PUBLIC STORM DRAIN AT THE INTERSECTION OF JEFFERSON STREET AND LAS FLORES. THE PIPE DISCHARGES DIRECTLY TO BUENA VISTA LAGOON. Check Exisitng Basin 4 Calculations for Qioo = 8.17(0100 Ex. Basin 4) + 0.57 (QIOO Proposed) = 8.74 CFS Maximum Storm Drain Slope = 3.6% (see attached As-Builts) Maximum Capacitv for 18" SD (S>. 3.6% Qmax = 1.49 A R'^(2/3) 5^^(1/2) n Qmax = 1.49 (1.77) (0.376)'^(2/3) (0.036)^^(1/2) = 20.04 CFS 0.013 Qioo < Qmax OKAY Maximum Water Height in SDMH Q = CAV2g(Hw-d/2 + Va/2g)'^1/2 8.74 = (0.62)(1.77)V 2(32.2)(Hw - 0.75) 7.96= V2(32.2)(Hw-0.75) 0.98 = Hw-0.75 Hw= 1.73 ft. 7^ coMeTSter^ov t3^zafi>/v« /M.rFi» /*/7^^ -c.itr z'tM.'jjCAOea oo ZMfW jk*tr£jndi. JO- tH Tf^d COM^T^i/c-r/oM ^ ^^rsw/rr ^-*7«»<«< jwtf fmojMc-r '— ONinMiO /3.7;asas s^MU. a^s ALOArrso fiaat^vat4N^^ r»^a afaec7?ov 73^£>/osc700 Puauc MOO-A^SJ ST0.M:8 M >w?ei9W&*«r tfvaoMro,^ /fv<7*£>, <y/ cu^v»^^^s»os o /r.Ai^ ysn/Ts ^r^A MIS^ Atan/Tis-^aMVMW ro s^vcs. TO SJ^A rv^aoa^ sscT?o^ JS/^rmet^A' sr^ssr NOTE'. CONSTRUCT- 9" iV/^TER UNE IO' MIN " CLEAR D/S-TANCE mOM EXIST. 8" SCV^ER AT £MO CA/> //^XtLtAF/O/^. OO /iK>r 0/»nAea /M/Umr .^.CTAT C» ^BOe^Ctl^ S*P^ '=-^L. nMMTJiN ^'t'Oi'eff. ayXi. D.fi.V£ifiS /^tuv/C/Ai£ fMSAVfJPS. J^. s^/y a£aa. cti/j=:j, ssfoy .XUSMH tss/ •""'IICITr of CARIS9AD||»**="I • i"" ^ CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov INSTRUCTIONS: • To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carisbadca.aov/standards. Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or constmction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a projecL Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. ^A separate completed and signed questionnaire must be submitted for each new development application submission. Only one pmpleted and signed questionnaire is required when multiple developmentapplications for the same project are submitted concurrently, addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. STEP1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a priority development project, please answer the following questions: YES NO 1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? X 2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? X If you answered "yes" to one or more of the above questions, then your project Is NOT a priority development project and therefore is NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my project does not meet PDP requirements" and complete applicant information. If you answered "no" to both questions, then go to Step 2. E-34 Page 1 of 3 Effective 6/27/13 ^ CITY OF I CARLSBAD STORrA WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS To determine if your project is a priority development project, please answer the following questions: YES NO 1. Is your project a new development that creates 10,000 square feet or more of Impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. X 2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. X 3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption. X 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. X 5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. X 1 6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface 1 collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. X 7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overiand a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingles with flows from adjacent lands).* X 6. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. X 9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. X 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? X 11.1s your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? X If you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to implementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this questionnaire, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject to implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all ^ development projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to step • 4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant information. e-34 Page 2 of 3 Effective 6/27/13 CARLSBAD CITY OF STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov TO BE COMPLETED FOR REDEVELOPMENT-RRO"jE0tjS('¥HAT"AR&iPfaORITY?DE PROJECTS ONLY Complete the questions below regarding your redevelopment project: YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previouslv existing development? If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of impervious surface and not the entire development Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. CHECKTHE APPROPRIATE BOX AND'COMPLETE APPLICANT INFORMATION • My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details. 19 My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As part of these requirements, 1 will incorporate low impact development strategies throughout my project. Applicant Information and Signature Box Address: /7M-LV^ ^ Applicant Name: Accessor's Parcel Number(s): 155-180-28 l4ntA?^ 5*i>Y>^ ^*\-f'-(vf OUJKO' Applicant Signa^uge: «^ y ^ Applicant Title: Date: This Box for City Use Only City Concurrence: Date: Project ID NO * Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as presen/es or their quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. E-34 Page 3 of 3 Effective 6/27/13 1.0 Project Setting The subject property is located on the westerly side of Jefferson Street, approximately 600 feet north of the intersection with Las Flores Drive, in Carlsbad, Califomia. The property has an area of 0.28 acres and is legally described as a portion of Tract No. 2 of Laguna Mesa Tracts, according to Map No. 1719 (APN: 155-180-28). The property is bounded on the north by Carlsbad Road which is undeveloped but has not been vacated, bounded on the east by Interstate 5, bounded on the west by a single-family residence and bounded on the south by Jefferson Street. The subject property is currently vacant. The property currently descends from the right- of-way of Jefferson Street in a northerly direction to the rear slope of the property at an average grade of 8.3%. From the top of the rear slope the property continues to descend at a 1 Yi: 1 gradient to the northerly property line. The northerly slope of the property is considered environmentally sensitive and no disturbance of this area is proposed. The owner proposes to develop the property with a new single-family residence, two attached garages, permeable paver driveway, patios, planters and landscaping. The subject property will share an existing driveway cut with the neighbor to the west where there is an existing access easement in-place. Per the County of San Diego Hydrology Manual's Soil Hydrologic Group Map the project appears to have soil group B present. The soils reports from Engineering Design Group, dated 6/19/13 supports this conclusion. A C factor of 0.55 is used per MDR density of 10.9 DU/AS per table 3-1 of the San Diego Hydrology Manual. In preparation of this report, Sampo Engineering, Inc. (SEI) reviewed the existing on-site and off-site topography prepared by the owner's surveyor, additional off-site topography obtained from the city web-site and the soil report prepared by Engineering Design Group. SEI conducted a site visit and field reconnaissance on Tues April 8, 2014 to verify existing drainage pattems and potential sources of pollution. Photos were taken of the undeveloped project area, Jefferson Street and vegetation that currently exists. SEI has prepared a preliminary Hydrology Study of the existing and proposed conditions, the calculations and drainage maps, of which, are contained in this report. No evidence of erosion was observed in the upper flatter portion of the property during SEI's site visit of April 8, 2014. There was some localized erosion that was visible in the steeper northerly portion of the site that is to be left undisturbed. Very little trash or debris was observed on the property. Hirschkoff Residence Sampo Engineering, Inc. CDP 14-13, CDP 14-14 7/30/2014 Standard Development Project 2 1.1 Site Development Opportunities and Constraints Common with any proposed development, the proposed project has its own unique characteristics that present opportunities and constraints for storm water control and treatment. Some constraints that are anticipated for the proposed development of the project are based on the existing topography and underlying soil conditions. Due to the envirormientally sensitive and steep slope near the north and downstream end of the property and soil engineering concems about disturbing and replacing the slope, the owner has decided not to pursue conveying storm water via a pipe or some other storm drain system from the top of the slope to the bottom of slope near the northerly property line. For this reason storm water will be treated on-site near the bottom of the building pad and then pumped to Jefferson Street where it will be discharged into the Jefferson Street gutter, where it will flow on the surface to an existing curb inlet at the northeast comer intersection of Las Flores and Jefferson Street. The storm water is then conveyed in an existing 18 inch diameter storm drain pipe to the west to the Buena Vista Lagoon. Per the preliminary geotechnical report for the project infiltration is not recommended since the proposed residence will sit atop an existing steep slope, and therefore for the subject property. For this reason bio-retention basins and flow through planters will be lined with impermeable membranes to prevent infiltration into the adjacent soils. 1.2 Nearby Water Bodies, Existing Storm Drain Systems No existing public or private storm drain systems are located on or adjacent to the subject property. Storm water draining from the property currently travels overland westerly to the Buena Vista Lagoon before reaching the Pacific Ocean. None of the subject property currently drains to Jefferson Street. There are two curb inlets located at the intersection of Las Flores and Jefferson Street approximately 600 feet south ofthe subject property. It is these two inlets that collect all storm water in Jefferson Street and the surrounding neighborhood as shown in one of the attached drainage maps. The collected storm water is then conveyed westerly to the shore of the Buena Vista Lagoon via an 18" diameter ACP public storm drain. 2.0 Applicable Storm Water Standards The project has been determined to be classified as a Standard Development Project. Although the property is located within 200 feet of an Environmentally Sensitive Area (ESA) the project proposes less than 2500 square feet of impervious surfaces (the entire driveway surface is proposed as permeable pavers or some other permeable pavement). Priority Project requirements do not apply to this project therefore Hydromodification requirements also do not apply. Regardless, the project proposes LID and numerically sized treatment control facilities for two bio-retention basins and two flow through planters as shown on the grading plan and as supported by calculations herein. Please see attached Storm Water Standards Questionaire (E-34) Hirschkoff Residence Sampo Engineering, Inc. CDP 14-13, CDP 14-14 7/30/2014 Standard Development Project 3 3.0 Identify Pollutants of Concern The project proposes to redevelop the property by constmcting a new single-family residence, two attached garages, permeable paver driveway, planters and landscaping. Pollutants anticipated for this type of land use are sediment, nutrients, trash & debris, oxygen demanding substances, oil & grease, bacteria & vimses, and pesticides. The project lies within the Carlsbad Watershed in the Buena Vista Creek Hydrologic Area (904.2). Storm water fi-om the site drains to the Buena Vista Lagoon before reaching the Pacific Ocean. The Buena Vista Creek is listed as an impaired water body per 303 d listing for indicator bacteria, nutrients, and sedimentation/siltation. The Buena Vista Lagoon has many beneficial uses including public trails surrounding the lagoon, and fishing. Indicator bacteria, nutrients, and sediment are primary pollutants-of-concem for the proposed project and shall be mitigated with bio-retention basin and flow through planter BMP's. Hirschkoff Residence Sampo Engineering, Inc. CDP 14-13, CDP 14-14 7/30/2014 Standard Development Project 4 [on?. Me^l^#i9h^wdi»^^ yspthatltiisvw**^^ t)*T«^pf 45% to^%Df tfi6:24-^h^^ (3lPtot6brptB«^ m Drawa Br«tbrDugK ttiepoMparaH^ (a) Sbteet6d feequeiicsy 125— (h)P6^ = t. V in., P24 - —' - " (c) AdiustBd Pg^ = -^-^ • 'P24 TJ^,chartfeptecestheInter«tty-P^ isirves used:since t965i Intensity-Duration Design Chart - Template -1.5'- 2% Concrete Gutter RESIDENTIAU STREET ONE SIDE ONLY 7 8 9 10 Discharge (C.F.S.) 40 50 EXAMPLE: Given: 10 SB2.SVD Chart gives: Depth « 0.4, Velocity « 4.4 f.p.s. iURCE: San Diego County Department of Special District Services Design Manual Gutter and Roadway Discharge - Velocity Chart F I G U R L o CO LO t— o o o o O CO o 33°30^ Orange 33'30' 33° 15' 33°00' 32°45' 32°30' 32"'30' County of San Diego Hydrology Manual Rainfall Isopluvials 100 Year RainfaU Event - 6 Hours Isopluvial (inches) DPW GIS • GIS N THIS MAP IS PROVIDED WITHOLn" WARRAhfTY OF ANY KIND, EITHER EXPRESS OR IhHJED, INCLUDING, BUT NOT LIMFTED TO, THE IMPLIED WARRANTIES OF MERCHANTABIUTY AND FPFNESS FOR A PARTICULAR PU WOSE. Copyright SanGIS. All Rights Reserved. This products may contain Inforniation from the SANDAG Regional 'C Information System which cannot be reproduced wl^out the vwitten pennission of SANDAG. This product may contain Infomiation which has been reproduced with permission granted by Thomas Brothers Maps. 3 Miles o CO o o o If) •>!l-O in T— . o CO ©range 33°15' 33°30' County of San Diego Hydrology Manual Rainfall Isopluvials 100 Year RainfaU Event - 24 Hours Isopluvial (inches) DPW GIS GIS Have: San iji&o c^jvcrcd' N THIS MW IS PROVIDED WITHOUT WARRANTY OF ANY KIND, EITHER EXPRESS OR IMPUED, INCLUDING. BUT NOT UMfTED TO, THE IMPUED WARRANTIES OF MERCHANTABILTTY AND FFTNESS FOR A PARTICULAR PURPOSE. Copyright SanGIS. All Rights Reserved. This pnsducts may contain infomiation rrom the SANDAG Regjonaf Infbnnation System which cannot be repnjducad without the written pemiission of SANDAG. This product may contain Infonnation which has been reproduced with pennission granted by Thomas Brothers Maps. 3 Miles