HomeMy WebLinkAboutCDP 96-10; North Batiquitos Sewage Force Main; Coastal Development Permit (CDP) (7)October 22, 1996
TO: MICHAEL HOLZMILLER, PLANNING DIRECTOR
FROM: District Engineer
SUBJECT: NORTH BATIQUITOS SEWAGE FORCEMAIN AND WATER
PIPELINE REPLACEMENT, ENVIRONMENTAL REVIEW - CMWD
PROJECT NO. 85-401
Dear Michael:
Enclosed are the "Land Use Review Application" and the "Environmental Impact
Assessment Form-Part I" for the subject project. This project constructs a
replacement pipeline for an existing 14-inch sewage forcemain and an 8-inch
water pipeline located on the north side of Batiquitos Lagoon and crossing Tract
89-19.
Supplemental information is enclosed for reference purposes. This information
includes the "Biological Technical Report" prepared by RECON discussing the
impacts of various pipeline alignments. Also, included is a copy of the letter
report prepared by Daniel Boyle Engineering, Inc. presenting design engineering
data on various pipeline alignments. We have selected Alignment No. 3A for the
forcemain. Presently, Daniel Boyle Engineering is preparing the plans and
specifications for this alignment. The water pipeline will be located in the same
position as the existing pipeline.
We are requesting commencement of the environmental review process for the
subject project.
If you have any further questions or need additional information, please feel free
to contact me.
Sincerely,
WILLIAM E. PLUMMER, P.E.
WEP:jm