Loading...
HomeMy WebLinkAboutCDP 97-49; Flower Fields Retail Sales Building; Coastal Development Permit (CDP) (8)Date: 27 January 1998 To: From: Principal Building Inspector Re: Flower Field Project Sr. Planner Don Neu, Associate Engineer Mike Shirey, Sr. Bldg Inspector Mike Peterson The City Manager received the attached FAX transmittal on January 8" from Chris Calkins related to their flower fields retail facility. I wanted to forward this information to you so you are abreast of his various communications with other City staff. Calkin's FAX does not specifically request anything, It is more of an update to Ray re: his plight. Ray's follow up e-mail to Marty, Lloyd, and Michael H. also does not specifically ask staff to expedite the project; just don't let it languish. As you know, Mr. Calkins has a propensity to blame his scheduling problems on City staff and pesky rules and standards. PATRICK KELLEY Principal Building inspector CC: Bldg Permit File Page 1 I I I I I i I I ! 1 I I 1 I I I I ! JQN . 8.1998 9: 43RM 6194319028 N0.689 P.118 - 01/08/98 - \ ro: Number of pages Including cover sheef 7 ,.", I YL",,",. CARLTAS COMPANY 5600 Avenida Encinas #700 CarJsbad California 92008 (760) 43 1-5600 Fax Phone (760) 431-9020 Fax Phone (760) 7201 9461 1 Phone) 434 2821 t cc; 1 i I 1 1 REMARKS: ursent Foryourrevlew Rep/yASAP 0 Please Comment Janua strikes. As we hcussed, the prbcessing of the flower field building and related improvements (restrobms, landscaping: etc.) has been diligevtly pursued and the building structural issues which were initially seeqi as major problems have been resolved, Some processing through plannilg and engineenrig was required, and the combination of the staff work load and required material has now createp a potential time problem. Enclosed is the tightest construction schedqle to be done before the fields are in bloom. We will have difficulty meeting this schedyle if engineering b held up by its work load in completing the review by three weeks, even ifjthere are no further corrections. The summary of submissions is also enclosed with the last cqver letters/schedrkles submitted. 7 Don Neu is out until Mojday and has said he will try to move it along then. If he cannot, we may win into a time prol$lem, Because of the high visibility of the issue at our meeting in Octobqr, I wanted to ke4p you advised at this point of our situation, t i ._ ! JFIN. 8.1998 9:44F1M 6194319020 [I - I 1 : I I 'I I I i SUBJECT: C~nsau~tion Time Line ! , TO: &s calkins i FROM: Job Tighe I DATE: J&ary 7,1998 ~ STARTDATE ' i 'I '( 1-7 I I 1-12 1 : 1-22 i : 1-26 i ! 1-27 \ 2-9 I I29 i i 2-16 J 2-18 I I II 1 4 I I I i i C.C. mecardo+ I COMPLETION DATE 1-8 2-18 2-5 2-16 1-29 2-13 2-20 2-20 2-24 N0.609 P.2/8 I TBE FZOWER FIELDS MEMO DESCRIPTION Cold Frame Removed Building Materials Arrive Fixtures Ordcrcd / Arrive Sewer & Plumbing Building Construction Foundation Pour Electrical Installation Restroom Construction Signage / Lot Painting FiniShIntnior Work I JFIN. 8.1998 9:44FIM i 6194319828 - N0.689 P.318 - THEFLOWER mLDsMEn4 0 I I TO: /FROM: 1 IDATE: /SUBJECT: ’ chriscw MikeCardosa t ?Jarmary, 1998 - Permit heenn Summary Attached is a of correspondence showing the permit procese for the retail building a. EsGil copxion list. “dated 10/8/97” b. 4 Desigqrre-submittd to the City of Carlsbad. “dated 10116w7” c. EsGl co&ion list, “dated 10/28/97” w7r 4& - d. Mer tq the City of Carhbad and resubmittal of plana with coirections and completed $upplemaaal Application Form For AU Coastal hlopmmt Permits, “&ted 10/29/97” e, BddhgPlan ChtckReview Checklist &om the City of Cadsbad ‘hc, 11/4/!37” E Letter to& City of Carlsbad and n-submittal of plans with comtiona and enclosed plpperty owner notification material, “dated 11/6/97” g. Letter *rn the City of Carlsbad raquestiag additional information and h. Letter tqthe City of Carlsbad and recsubrnittal of plans with corrections and most CUK& copy of Pnliminary Title Report. “dad 12/30/97” comctionslregiudtng CDP 9749. “rec. 12/4/9T‘ 11 just got off the p4me with Mike Shirey, the city’s plan checker in charge of reviwhg Ithe engineering re ements on our project. He stated that our file is m his que and that Ithere are !anyone else and ewcd three weeks to complete his twicw. IGC: John Tighe - J pr&& m front ofus. He said that we would need to wait our turn as r i I L . From: Ray Patchett To: Uoyd Hubbs, Marly Orenyak, Michael Holzrniller Subject: Flower Fields Building Date: iiaiga ~ZAM Good Morning Gentlemen, I got a call from Chris Calkins this morning letting me know that he is concerned about the timing for the construction of the Flower Fields Building. Apparently the building, and whatever, is in some stage of the plan check proaess. He says (not always factual) that if he can't start construction of the building by the end of January, he won't get it done in time for the flower season. I would appreciate it if you folks could shepard this through. Not necessarily expedite, but let's not let it get lost or set aside by accident. Let me know what you find out. Thanks Ray cc: Cindee Hollingsworth