February 22, 2000
Kevin A. Noel1
Kelly Ranch Corporate Center I, LLC
2141 Palomar Airport Road, Ste. 300
Carlsbad, CA 92008
SUBJECT: SDP 97-25/CDP97-52 - KELLY CORPORATE CENTER REVISIONS TO TRAFFIC
MITIGATION MEASURE
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department
has reviewed your Environmental Impact Assessment Form and revised Traffic Study sections,
application no. SDP 97-25/CDP 97-52, as to its completeness for processing.
The application is incomplete, as submitted. Attached are two lists. The first list is
information which must be submitted to complete your application. This list of items must be
submitted directly to your staff planner by appointment. All list items must be submitted
simultaneously and a copy of this list must be included with your submittals. No processing of
your application can occur until the application is determined to be complete. The second list
is issues of concern to staff. When all required materials are submitted the City has 30 days to
make a determination of completeness. If the application is determined to be complete,
processing for a decision on the application will be initiated. In addition, please note that you
have six months from the date the application was initially filed, January 25, 2000, to either
resubmit the application or submit the required information. Failure to resubmit the application
or to submit the materials necessary to determine your application complete shall be deemed to
constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn,
a new application must be submitted.
Please contact your staff planner, Don Neu, at (760) 602-4612, if you have any questions or
wish to set up a meeting to discuss the application.
MJH:DN:mh
c: Adrienne Landers
Frank Jimeno
John Kim
File Copy
Data Entry
Planning Aide
Stuart Fisk
Hofman Planning Associates
5900 Pasteur Court, Suite 150
Carlsbad, CA 92008
Harve Filuk
P.O. Box 912
Del Mar, CA 92014
LIST OF ITEMS NEEDED
TO COMPLETE THE APPLICATION
No. SDP 97-25/CDP 97-52 - KELLY CORPORATE CENTER PROPOSED RIVISION TO THE
TRAFFIC MITIGATION MEASURE
Engineering & Planning:
1. The application cannot be accepted as complete until a completely updated revised
report which is based on the latest traffic counts is submitted, reviewed and
accepted by the Engineering Department staff. The traffic study shall include in
accumulative analysis other projects proposed in the area such as the Costco Store
Expansion, Costco Gasoline Station Expansion, and Oscar’s Restaurant planned for
the existing pad adjacent to the main access point to the Costco site.
ISSUES OF CONCERN
Engineering and Planning:
1. The required traffic study must demonstrate that the circulation system functions
within the Growth Management Program Circulation Performance Standard in order
for city staff to recommend revising the traffic mitigation measure requiring the
construction of Cannon Road prior to the issuance of building permits.
2. Environmental documents cannot be prepared and a finding noticed until a traffic
study is submitted and approved by the Engineering Department staff.
3. Planning Commission approval is required to revise the traffic mitigation measure.