Loading...
HomeMy WebLinkAboutCDP 98-15; Sammis-Rosalena Lot 22; Coastal Development Permit (CDP) (6)CITY OF CARLSBAD ENGINEERING DEPARTMENT LAND USE REVIEW TO: Senior Planner - Chris Decerbo May 18, 1998 FROM: Associate Engineer - Clyde Wickham RE: CDP 98-15, SAMMIS - Rosalena Lot #22 VIA: /*-l4/ Principal Civil Engineer - Land Use Review The Engineering Department has completed its review of the above referenced project and is recommending: X That the project be approved subject to the conditions as listed on the attached sheet. _ That the project be denied for the following reasons: Grading: Quantities: Grading quantities were not identified on plans. Because of the p re- graded pads, It appears that a permit will be not be required. Grading plans will be part of the building permit process. Permit Required: No Offsite Approval required/obtained: Possible / NO Hillside Grading Requirements met: No Preliminary Geotechnical Investigation Performed by: If required, will be part of building permit process Comment: No major grading issues are associated with this proposed project except that limits of grading and lot drainage to the street are critical. Again, no grading concept was shown. Drainage and Erosion Control: Drainage Basin: DA Preliminary Hydrology Study Performed by: N/A Erosion Potential: Low if pad drains to street and open space is not graded. Land Title: Conflicts with existing easement: No Easement dedication required: No Site boundary coincides with land title: Yes Comment: No major land title issues are associated with this proposed project. Improvements: Frontage Improvements Required: No Standard Variance Required: No Comment: Navigator Circle exists as a fully improved roadway. Engineering Conditions General Note: Unless specifically stated in the condition, all of the following engineering conditions, Prior to the issuance of building permits. Fees/Agreements 33.C. Building permits will not be issued for development of the subject property unless the District Engineer determines that sewer facilities are available. 50. The developer shall pay all current fees and deposits required. 47. The owner of the subject property shall execute an agreement holding the City harmless regarding drainage across the adjacent property. Grading 57. Prior to hauling dirt or construction materials to or from the site, the developer shall submit to and receive approval from the City Engineer for the proposed haul route. The developer shall comply with all conditions and requirements the City Engineer may impose with regards to the hauling operation. 58. The developer shall exercise special care during the construction phase of this project to prevent offsite siltation. Planting and erosion control shall be provided in accordance with the Carlsbad Municipal Code and the City Engineer. 47. Rain gutters must be provided to convey roof drainage to an approved drainage course or street. The developer shall submit a letter from the project Soils Engineer supporting the proposed 3' distance to drainage swale from building, to the satisfaction of the City Engineer. If not approved by the Soils Engineer the project shall be redesigned to conform to City Standards. CN •aa Q * s I » 0 O (JcJSa PLANNING DEPARTMENT BUILDING PLAN CHECK REVIEW CHECKLIST Plan Check No. CB iBZlf^ Planner APN: Address "75 £ Z NaM^opn Phone (619) 438-1161, extension Type of Project and Use: YCZoning:. CFD iin/nutl # Circle One General Plan: Date of participation: Project Density: Facilities Management Zone: / Remaining net dev acres: (For non-residential development: Type of land used created by this permit: ) Legend:Item Complete (_) Item Incomplete - Needs your action Environmental Review Required: YES V NO DATE OF COMPLETION: Compliance with conditions Conditions of Approval: Discretionary Action Requ APPROVAL/RESO. NO. PROJECT NO. ot, state conditions OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: I I Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES A NO CA Coastal Commission Authority? YES N If California Coastal Commission Authority: Contact them at - 3111 Camino Del Rio North, Suite 200, San Diego CA 92108-1725; (619) 521-8036 Determine status (Coastal Permit Required or Exempt): Coastal Permit Determination Form already completed? YES NO If NO, complete Coastal Permit Determination Form now. Coastal Permit Determination Log #: Follow-Up Actions: 1) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum Floor Plans). 2) Complete Coastal Permit Determination Log as needed. I I Inclusionary Housing Fee required: YES NO A (Effective date of Inclusionary Housing Ordinance - May 21, 1993.) Data Entry Completed? YES NO (Enter CB #; UACT; NEXT!2; Construct housing Y/N; Enter Fee Amount (See fee schedule for amount); Return) Site Plan: [ | | | 1. Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width, dimensional setbacks and existing topographical lines. | | | | 2. Provide legal description of property and assessor's parcel number. Zoning: LZ1 [U 1. Setbacks: Front: Interior Side: Street Side: Rear: Required Required Required Required |~| | I 2. Accessory structure setbacks: Front: Required Interior Side: Required Street Side: Required Rear: Required Structure separation: Required D 3. Lot Coverage: Shown Shown Shown Shown Required Shown Shown Shown Shown Shown Shown D 4. Height:Required Shown 5. Parking: Spaces Required Guest Spaces Required I I [_J Additional Comments. Shown Shown OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER DATE