HomeMy WebLinkAboutCDP 98-22; Carlsbad by the Sea LC Downs; Coastal Development Permit (CDP) (2)MEMORANDUM
March 2, 1998
TO: Planning Tech. - Greg Fisher
FROM: Engineering Tech. - Mari Sparks
CDP 98-22: SEAGROVE PRODUCTIONS
COMPLETENESS AND ISSUES REVIEW
Engineering Department staff has completed a review of the above-referenced project
for application completeness. The application and plans submitted for this proposed
project are currently incomplete and unsuitable for further review due to the
following incomplete items:
1. Please provide a vicinity map with major cross streets including a north arrow.
2. Please provide the name of the sewer, water and school districts serving this
project.
3. Please indicate a|| easements and encumbrances if applicable.
4. Please show any existing driveways, street lights, public improvements, fire
hydrants, etc., which are adjacent to and across the street from this project.
5. Show existing street improvements on both sides of street.
6. Show proposed location of sewer, water and utility services (keep meters
and laterals out of driveway).
7. Please indicate the amount of grading, i.e., cut/fill and import or export.
8. The complete property boundary must be shown on the site plan (include all
bearings and distances).
ISSUES:
1. Why are there drain stubs to the railroad property?
2. It appears that you are raising the existing grade, and using a retaining wall
which is not in compliance per the La Costa Downs specific plan.
CDP 98-22 : SEAGROVE PRODUCTIONS
COMPLETENESS AND ISSUES REVIEW
Page 2
3. The line of the drainage swale must be 5' from the building and 2' from the property
line, i.e. the house must be 7' from the property line. (Refer to Standard GS -14). As
an alternative, a letter from a registered soils engineer recommending the swale be
less than 5' from the building may be accepted.
4. Please show driveway grade break at property line.
If you or the applicant have any questions, please either see or contact me at extension
4510.
MARI SPARKS
Engineer Tech.
Land Development
o-
3 io o
ia
- PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No. QP'
Planner f^Y>H3
yft/n^ Address &\ II t~f4<nCtsc^ AM
'O Phone (61 9) 438-1 161. extension 4325
APN: Z/«-/-o £2~/£
Type of Project and
Zonino: f^- 1
CFD /in/niit) #
Use:5F &£,d
General Plan: r
^(•e
W
Date of participation:
Project Density:
Facilities Management Zone: "2-
Remaining net dev acres:
?-
Legend;
(For non-residential development: Type of land used created by
this permit: )
/\ Item Complete tff Item Incomplete - Needs your action
Environmental Review Required: YES
DATE OF COMPLETION: _
NO TYPE
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval: __ _
I | Discretionary Action Required: YES V NO
APPROVAL/RESO. NO. DATE
PROJECT NO.
OTHER RELATED CASES: '
TYPE
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval:
I I | I | | Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES ,X NO
CA Coastal Commission Authority? YES NO X
If California Coastal Commission Authority: Contact them at - 3111 Camino Del Rio North, Suite
200', San Diego CA 92108-1725; (619) 521-8036
Determine status (Coastal Permit Required or Exempt):
Coastal Permit Determination Form already completed?
If NO, complete Coastal Permit Determination Form now.
Coastal Permit Determination Log #:
YES NO
Follow-Up Actions:
1) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum
Floor Plans).
2) Complete Coastal Permit Determination Log as needed.
. ,
O, D CH Inclusionary Homing Fee required: YES X NO
k __ _ ' (Effective date of Inclusionary Housing Ordinance - May 21, 1993.)
Data Entry Completed? YES _ NO _
(Enter CB f ; UACT; NEXT12; Construct housing Y/N; Enter Fee Amount (See fee schedule for amount); Return)
Site Plan:
ED CD D 1; Provide a fully dimensional site plan drawn to scale. Show: North arrow,
property lines, easements, existing and proposed structures, streets, existing
street improvements, right-of-way width, dimensional setbacks and existing
topographical lines.
[~] [~l | | 2. Provide legal description of property and assessor's parcel number.
D
Zoning:
d 1- Setbacks:
ODD
D D D
Front:
Interior Side:
Street Side:
Rear:
2. Accessory structure
Front:
Interior Side:
Street Side:
Rear:
Structure separation
3. Lot Coverage:
Required
Required
Required
Required
setbacks:
Required
Required
Required
Required
: Required
Required
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
EH EH CD 4- Height:Required Shown
CU C] CH 5. Parking: Spaces Required
Guest Spaces Required
D D D Additional Comments /A/.J
Shown
Shown
/\f\\K WIJ
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER DATE
PROJECT REVIEW MEMO
DATE:
TO: ENGINEERING DEPARTMENT
ENGINEER: H^r/ • CBdj? I/O
NEW PROJECT
REVISED PROJECT
FROM:Planning Department
REQUEST FOR REVIEW AND RESPONSE ON APPLICATION NUMBER(S):
C f~N O Q D lf^\ /^ t~^ fo (~) G 1 fi f f\ 0 G>tD /C/ /"""" f\ /5 o £7 . 2*1*) s^f\ /D <9 G j> /\-) \ / O * i C---D r fO — ' J — ^LJT /C? "V 7 i * -Lj"! <£s f— -vi ^—^Jr IB ^ 1
s*
NOTE: Please use this number on all correspondence.
PROJECT TITLE: ^--^v ^ ^^ P^Tn-^ c>^i — 'i"
PROPOSAL: 'S'^ ^ccu^T-fe m La (
-Owx_s
^•W IWvvJ
conditions of approval to C_Kro L^Lf^if 0 »
Planning Department, 2075 Las Palmas Drive, by ^>~ / *~ / o
the Project Planner in the
. State Law requires that
the applicant be notified of any incompleteness items and issues of concern in writing within
30 days of receipt of the project submittal. This^submittal was received on 'S ~/~ 'Q
Therefore, the completeness/issues letter must be mailed out by . If the
planner has not received your items/issues by two (2) days before the necessary mail-out date,
it will be assumed that you have no incompleteness items or issues of concern or that they will
be sent out under separate cover by the Engineering Department at a later date. If you have
any questions, please contact the Project Planner at 438-1161, extension
THANK YOU
PLANS ATTACHED FRM26 - 12/97