Loading...
HomeMy WebLinkAboutCDP 98-35; Keystone Lot 5 & 6 Consolidation; Coastal Development Permit (CDP) (3)Van Lynch City of Carlsbad 2075 Las Palmas Dr. Carlsbad,Ca. 92009-1576 5-26-98 Re: MS 9803 or CDP 98-35 (Proposed Development at west end of Chinquapl Ave.) Dear Mr Lynch: The purpose of this letter is to bring to your attention two items of concern regarding any proposed development at this location. If a little thought is given to these questions now, then potential problems may be averted in the future. These items are as follows: 1. Pedestrian Access There is an existing foot trail extending from the west end of Chinquapin which connects to the sidewalk on the east side of Carlbad Boulevard at a point near the lagoon bridge. This trail has been in use on a daily basis for at least ten years (to my personal knowledge) and probably for many times that long. If this trail is lost due to home construction, the simplest way to address the problem is to replace it with some form of pedestrian access located in the public right of way for Chinquapin Avenue. 2. View Corridor The mandated view corridor should be preserved at its full width with no above- ground obstructions, and with no reductions in the required building setbacks on either side. In my opinion, based on my knowledge of the neighborhood, possible problems involving the City or the Builder can be avoided if attention is paid to these issues. Sincerely Giles Blair 182 Chinquapin Ave. #C Carlsbad 92008 TENTATIVE PARCEL MAP ^SSFSSS:SMSS—rr- POT!. FAL&ADES. NO. TWO MAP NO K03 ALTA CONSULTANTS jl^^r