HomeMy WebLinkAbout1994-08-17; Planning Commission; ; CT 93-10|CP 93-07| CUP 93-04| HDP 93-10|SDP 94-04 - SEAPOINTE RESORTAPPLICATION COMPLETE DATE:
JULY 29, 1994
STAFF PLANNER: CHRISTER WESTMAN
STAFF REPORT
DATE: AUGUST 17, 1994
TO: PLANNING COMMISSION
FROM: PLANNING DEPARTMENT
SUBJECT: CT 93-10 / CP 93-07 / CUP 93-04 / HDP 93-10 / SDP 94-04 - SEAPQINTE
RESORT - Recommending approval of the second amended Negative
Declaration and a two lot tract map for condominium purposes, a
condominium permit, a conditional use permit, hillside development permit
and a site development plan for a 45 foot high, 78 unit timeshare resort on
2.35 acres of an 8.02 acre site, in the commercial-tourist zone generally
located east of the intersection of Ponto (Anacapa) Road and Carlsbad
Boulevard and within Local Facilities Management Zone 22.
I.RECOMMENDATION
That the Planning Commission ADOPT Resolution No. 3690, RECOMMENDING APPROVAL
of the second amended Negative Declaration and ADOPT Resolution Nos. 3691, 3701,
3692, 3693 and 3694, RECOMMENDING APPROVAL of CT 93-10, CP 93-07, CUP 93-04,
HDP 93-10, and SDP 94-04.
II.PROJECT DESCRIPTION AND BACKGROUND
The site is located east of Carlsbad Boulevard at the intersection of Ponto (Anacapa) Road.
Total lot area is 8.02 acres, however, only a 2.35 acre portion will be used for
development.
The project is a three story timeshare resort with 78 units, a level of underground parking
for 99 cars, club house, children's pool and adult swimming pool and whirlpool. Access
to the project from Carlsbad Boulevard is via a signalized intersection at Descanso which
will be constructed as a condition of approval. No retail or restaurant use is associated
with the timeshare resort.
A Zone Code Amendment (ZCA 93-07) was approved by the City Council in June of 1994
which included timeshare hotels as a conditionally permitted use within the Commercial-
Tourist Zone. Subsequently, a General Plan Amendment (GPA 93-04), Zone Change (ZC
93-05) and Local Coastal Program Amendment (93-06) was approved by the City Council
changing the 2.35 acre Office portion of the project area to Travel Services Commercial and
CT 93-10/CP 93-07/CUP 93-04/HDP 93-10/SDP 94-04
SEAPOINTE RESORT
AUGUST 17, 1994
PAGE 2
Commercial-Tourist (C-T). With these amendments, a timeshare resort is permitted within
the C-T Zone by Conditional Use Permit.
The property is vacant, has been used in the past for agricultural production, but currently
accommodates no activity. The developable portion of the property slopes downward in
a north and northeasterly direction and varies from approximately 66 to 52 feet above sea
level. Existing access is via on and off ramps from Carlsbad Boulevard at Ponto (Anacapa)
Road and a bridge over the northbound lanes of Carlsbad Boulevard. The bridge and
ramps will be removed from service with implementation of the project.
The property immediately south is approximately Va acre, vacant and zoned Office. South
of that parcel is a vacant unimproved subdivision of approximately twenty-nine 4,500
square foot residential lots. An additional 11 lots are owned by the North San Diego
County Transit Development Board. Lanikai Lane Mobile Home Park is further south and
Solamar Mobile Home Park is about 1,000 feet north of the project construction area. East
of the project site is the North County Transit District railroad right-of-way and further east
is vacant industrial and office property. Carlsbad Boulevard is to the west as is the
northern end of the Carlsbad State Beach campground.
HI. ANALYSIS
1. Is the proposed use consistent with the intent of the General Plan and Zoning
Ordinance?
2. Does the project conform to the development standards of the Commercial-Tourist
Zone?
3. Can the findings be made for a Site Development Plan allowing the structure to
have a height of 45 feet?
4. Can the proposed use be conditioned to ensure compatibility with adjacent and
surrounding land uses?
5. Does the proposed grading conform to the standards of the hillside ordinance?
6. Is the Tentative Map in compliance with the Subdivision Ordinance?
General Plan and Zoning
General Plan Travel Service (TS) uses are those considered to serve business and industrial
areas as well as the travelling public. The uses should be accessible to inter-regional traffic
but need not have direct roadway access if they can be easily identified. Two important
CT 93-10/CP 93-07/CUP 93-04/HDP 93-10/SDP 94-04
SEAPOINTE RESORT
AUGUST 17, 1994
PAGE 3
factors to consider are maintaining a functional street system through access control and
preventing detrimental effects on or by adjacent land uses.
Access to the site will be via a signalized intersection at Descanso and Carlsbad Boulevards.
The new intersection will be an improvement to the existing Ponto Bridge access which
will increase the capabilities of moving traffic through the intersection with minimal effect
to Carlsbad Boulevard. Movement of traffic into and out of the timeshare resort will be
regulated through this intersection and will be segregated from the flow of traffic for
properties south of Descanso Boulevard. This configuration will largely eliminate the
potential traffic conflicts between the future La Costa Downs development and Seapointe
Resort.
Project review identified potential impacts on adjacent properties which include noise,
light, visual (view blockage), and traffic. As mentioned above, the circulation access and
control created by the project will minimize traffic impacts. Noise and light impacts will
not be significant since there will be an onsite operations management program and review
and approval of an exterior lighting plan is a standard City condition for projects like this.
Generally significant views will not be impaired by the project. The project is located far
enough and low enough in relation to the residential developments to the east of the
freeway that there will be no blockage. The properties located north and south of the
project have views which are oriented toward the west, and those views will not be
affected.
The intent and purpose of the Commercial-Tourist (C-T) zone is to provide certain types
of commercial business near transportation centers, recreation areas, or in close proximity
to highways and freeways used by inter-regional traffic.
Locationally the project site fulfills the intent of the C-T zone. The North County Transit
District commuter rail station near Poinsettia is close by and South Carlsbad State Beach
is across Carlsbad Boulevard to the west. Carlsbad Boulevard is designated as a major
arterial and is designed to carry inter-regional traffic.
There are elements of the proposed use which can be considered in evaluating compatibility
with the existing surrounding uses. The project will be an attractor of visitors to the
beach, similar to the camp ground, and is quasi-residential in nature. The use of the site
will be on a 24 hour basis, similar to the surrounding properties, because people will be
staying overnight. A community, although partially transient in nature, will be created by
the interaction of the timeshare residents, the camp ground residents and those local
permanent residents as they enjoy their common use of the beach.
Project Design
The project is designed with an underground garage and three levels of timeshare units.
The units are housed in five buildings offset from each other and connected by exterior
CT 93-10/CP 93-07/CUP 93-04/HDP 93-10/SDP 94-04
SEAPOINTE RESORT
AUGUST 17, 1994
PAGE 4
covered walkways. The offset creates three courtyards which will be landscaped with
varying themes:
The building design incorporates split-face masonry, stained redwood, integral color plaster,
painted metal railings and chimney flues, and asphalt shingles. The colors of these
elements are proposed in earth tones.
Some variation in roof line will be seen from the west through the use of alternating flat
and gabled roofs with clerestory windows. The dominant building element as seen from
the east is a redwood lattice used on the first and second unit levels. Cut-outs in the lattice
help create depth through the play of shadow and light.
All of the units and the common facilities, which include two pools and a clubhouse, are
oriented toward the west to take advantage of available ocean views.
As noted above, operation of the proposed facility will not have significant negative
impacts on the surrounding uses nor will the facility be significantly affected by
surrounding uses. Onsite lighting will be designed, and plans approved by the Planning
Director, to minimize overspill onto adjacent lots and excessive noise will be regulated by
the management of the timeshare hotel. No special use conditions have therefore been
included in the resolutions of approval.
Physical compatibility of the project with the surrounding uses is enhanced by the proposed
circulation system which segregates project traffic from the future La Costa Downs
subdivision to the south, the buffering provided on the north by an extensive open space
lot, the transition from single story structures within the Lanikai Mobile Home Park to two
story structures within the future La Costa Downs subdivision to the project's proposed
three story development, and the presence of Carlsbad Boulevard and the rail right-of-way
on the west and east respectively.
Development Standards
The site is subject to the development standards of the C-T zone (21.29).
The following TABLE I identifies the height and setback requirements of the C-T section
of the zoning ordinance.
CT 93-10/CP 93-07/CUP 93-04/HDP 93-10/SDP 94-04
SEAPOINTE RESORT
AUGUST 17, 1994
PAGES __^_
TABLE!
Development Standards
Maximum Height (21.29.060)
Title 21
Standard
45 feet*
Proposed
45 feet
Minimum Setbacks: (21.29.060(b)
Front
Side
Side
10 feet*
10 feet*
10 feet*
20+ feet
10+ feet
10 feet
* Subject to Site Development Plan
* One foot required for every foot of building height over 35 feet.
As seen in the table, the proposed project falls within the height and setback limits which
are subject to City Council approval.
Site Development Plan
The C-T zone allows habitable building height up to 35 feet. However, through a Site
Development Plan, the City Council may approve a habitable building height of up to 45
feet if four findings can be made. The project as designed has habitable space which
reaches 45 feet in height and is therefore subject to the City Council findings for a Site
Development Plan. They are: 1) The building does not contain more than three levels;
2) All required setbacks shall be increased at a ratio of one horizontal foot for every one
foot of vertical construction beyond 35 feet. Also, the additional setback area will be
maintained as landscaped open space; 3) The building conforms to the requirements of
Section 18.04.170 (Building Codes and Regulations) which describes how to provide fire
protection to habitable structures over 35 but under 55 feet in height; and 4) The allowed
height protrusions as described in Section 21.46.020 (Yards) do not exceed 45 feet.
1) The project has been designed with underground parking as defined in 21.04.370
(Definitions). Because underground parking is not considered a "story" (21.04.33)
the building is defined as having three levels.
2) Within The C-T zone buildings which are 35 feet in height or less have no building
setback requirement. However, clerestory and screening elements of this proposal
reach 45 feet above grade. Because Section 21.29.060 requires one additional foot
of setback for every foot of building height over 35 feet, setbacks of 10 feet are
required for the proposal.
The minimum setback provided is 10 feet, however, the majority of the project has
a greater than minimum setback from property line.
CT 93-10/CP 93-07/CUP 93-04/HDP 93-10/SDP 94-04
SEAPOINTE RESORT
AUGUST 17, 1994
PAGE 6
3) The proposal is conditioned to comply with the requirements of Section 18.04.170.
4) No part of the building is over 45 feet in height.
Conditional Use Permit
The project use, timeshare, is allowed within the C-T zone through the issuance of a
Conditional Use Permit, the intent of the CUP is to guarantee compatibility with the
surrounding land uses.
The project has been designed to fit within the developable area of the site and complies
with all of the applicable development standards.
Operation of the timeshare will not have adverse effects on the adjacent properties. The
anticipated noise created onsite will be no different than noise created by the campground
and mobile home parks. Lighting within the project is designed to limit overspill.
The location is appropriate for a timeshare because the tourist orientation has been
established by the campground and the close proximity to the ocean.
Parking
The Parking Ordinance [21.44.020(10)] requires a minimum of 1.2 spaces per unit subject
to the approval of a Conditional Use Permit. The following table compares the parking
required and provided.
TABLE H
Parking Requirement for 78 timeshare units
regulatory source
21.44.010(10)
ratio
1 .2 per unit
required
94 spaces
provided
99 spaces
There are other timeshare hotels within the City that were designed with the same parking
standard and are operating successfully. Staff has determined that there are no special
circumstances which could require additional parking onsite and therefore, Staff
recommends that the 99 spaces provided is adequate to meet the need.
Access
Access to the project site and the adjacent southerly properties will be provided via a new
signalized intersection at Descanso and Carlsbad Boulevards in lieu of the Ponto Bridge.
This new at-grade intersection will accommodate north and southbound access to these
properties and will also provide signalized pedestrian access to the west side of the
boulevard and the beach.
CT 93-10/CP 93-07/CUP 93-04/HDP 93-10/SDP 94-04
SEAPOINTE RESORT
AUGUST 17, 1994
PAGE 7
Project and non-project traffic will separate at the Descanso Boulevard and Ponto
(Anacapa) Road intersection. Traffic associated with the timeshare and vacant Vz acre
office parcel will use the north and west legs of the intersection and traffic associated with
the La Costa Downs will use the east, south and west legs of the intersection.
Traffic volumes generated by the project will be relatively small. San Diego Association
of Governments (SANDAG) average daily traffic (ADT) generation rates for a resort hotel
are 8 per room. The proposed 78 units would therefore equate to 624 ADT. These trips
are calculated for a 24 hour period and are assumed to be weighted during daytime hours
at full occupancy.
The effects of the new intersection at Descanso are not considered to be negative since the
projected cumulative ADT generated by the proposal, future development of the V6 acre
parcel and La Costa Downs is 1150 and falls within the capacity limits the street's design
which is capacity up to 10,000 ADT. The anticipated volume of traffic generated by the
project and adjacent properties at buildout will not warrant a signal at the Descanso
Boulevard/Anacapa Road intersection. The Carlsbad Boulevard/Descanso Boulevard
intersection will operate at a level of service (LOS) which is the lowest rating.
Hillside Ordinance
Hillside conditions were identified and the northernmost edge of the project development
area is subject to the Hillside Ordinance because it includes slopes which are greater than
15%. However, project development is primarily within an area that has slopes less than
15%. There is no restriction to the development of the 15 - 40% slopes along the
northernmost edge because they do not contain sensitive plant species and they do not
encroach into the designated open space.
Discussion of Findings
The project design includes a retaining wall along the northernmost edge. The western
half of the wall is 2 feet high and will be visible from the project side (south). The eastern
half of the wall varies towards the east from 0 to 6 feet in height and is visible from the
north. The retaining wall visible from the north is the result of a six foot fill necessary to
establish a consistent basement floor at a grade of 54 feet above sea level. This same
grade is established at the opposite corner of the building (southwest) by excavating ten
feet. The grading concept is consistent with the intent of the Hillside Ordinance which
acknowledges that fill as well as cut within slope is necessary for the development of
properties which slope.
The use of the retaining wall at this location is reasonably within the intent of the Hillside
Ordinance. The wall eliminates the need to "chase" grade and thereby minimizes grading
and preserves the adjacent existing slope. Project landscaping along the northerly retaining
wall will also provide visual transition from the existing slopes to the building which is
consistent with the Hillside Development Guidelines.
CT 93-10/CP 93-07/CUP 93-04/HDP 93-10/SDP 94-04
SEAPOINTE RESORT
AUGUST 17, 1994
PAGE 8
Tentative Map
The Tentative Map creates two lots. One lot will be the northerly Open Space portion of
the site and the second will be developed as the 78 unit airspace condominium. The map
has been processed consistent with the Subdivision Map Act and Carlsbad Title 20, the
Subdivision Ordinance. As noted previously, the project design as well as the Tentative
Map comply with the General Plan and all applicable specific plans. The site is physically
suitable for the project and the project complies with all the requirements of hillside
development regulations.
None of the property is subject to a Williamson Act contract nor does the property meet
the requirements of Section 66474.4 of the State Government Code for definition as
sustainable agricultural land.
In addition, the map has been conditioned to provide all of the infrastructure and service
needs necessary to accommodate the timeshare development in accordance with the City
of Carlsbad Growth Management Plan. The necessary improvements will be provided
either through actual construction or an in-lieu fee and those improvements will not
conflict with public access easements nor cause serious health problems.
As noted below, the project complies with all of the requirements of the California
Environmental Quality Act.
Coastal Development Permit
The site is within the Mello II segment of the Coastal Zone and will require a Coastal
Development Permit. The project land use is consistent with the policies: encouraging
lateral access to the beach (Policy 7-3), visual access (Policies 7-13 and 8-1), and the
inclusion of a limited amount of hotel/motel within the study area (Policy 6-5).
Consistent with the intent of the LCP, access to the beach is considered a priority.
Development of the site shall include a designated pedestrian crossing of Carlsbad
Boulevard. The development is also sensitive to views of the ocean and coast line. The
buildings have been sited away from Carlsbad Boulevard and are located a sufficient
distance away from the residential developments east of the freeway so as not to impact
vistas. The goal of providing hotel/motel within the Coastal Zone is achieved through
implementation of the proposal.
IV. ENVIRONMENTAL REVIEW
Development is proposed solely within disturbed lands and there is no evidence of sensitive
species. No significant environmental impacts were identified as a result of the proposed
development and a second amended Negative Declaration was issued by the Planning
Director on March 22, 1994.
CT 93-10/CP 93-07/CUP 93-04/HDP 93-10/SDP 94-04
SEAPOINTE RESORT
AUGUST 17, 1994
PAGE9
The Negative Declaration was first amended on March 22,1994, to correct a typographical
error within one of the case file numbers. The correction had no effect on the project, did
not create new impacts or require mitigation.
The second amendment to the Negative Declaration includes the disclosure that the project
includes a Site Development Plan; that there is additional discussion of the project within
the Part II; that the inclusion of the Site Development Plan does not create changes to the
project; that there are no new impacts; and that there are no required mitigation measures.
V. SUMMARY
The proposed timeshare hotel is a use which is permitted in the C-T zone with a
conditional use permit. The project complies with the development standards of the zone
which includes the requirement of City Council approval for the building height. No
significant adverse environmental impacts have been identified and a Negative Declaration
has been issued by the Planning Director.
ATTACHMENTS
1. Planning Commission Resolution No. 3690
2. Planning Commission Resolution No. 3691
3. Planning Commission Resolution No. 3701
4. Planning Commission Resolution No. 3692
5. Planning Commission Resolution No. 3693
6. Planning Commission Resolution No. 3694
7. Location Map
8. Disclosure Statement
9. Background Data Sheet
10. Local Facilities Impact Assessment
11. Exhibits "A" - "T", dated August 17, 1994.
CW:lh:vd
June 30, 1994
I
City of Carlsbad
CT 93-10/CP 93-077
>UP 93-04/HDP 93-10/
SEAPOINTE RESORT SDP 94-04
City of Carlsbad
Planning Department
DISCLOSURE STATEMENT
APPLICANTS STATEMENT! OF DISCLOSURE OF CERTAIN OWNERSHIP INTERESTS ON ALL APPLICATIONS WHICH WILL REQUIRE
DISCRETIONARY ACTION ON THE PART OF THE CfTY COUNCIL OR ANY APPOINTED BOARD. COMMISSION OR COMMITTEE.
(Please Print)
The following information must be disclosed: .".'..'" 2 ^
1. Applicant
List the names and addresses of all persons having a financial interest in the application.
Owner
Listthe names and addresses of
0632.17
I persons having any ownership interest in the property involved.
KCL •
If any person identified pursuant to (1) or (2) above is a corporation or partnership, list the names arc
addresses of all individuals owning more than 10% of the shares in the corporation or owning any pannersrr.p
interest injhe partnership.
If any person identified pursuant to (1) or (2) above is a non-profit organization or a trust, list the names anc
addresses of any person serving as officer or director of the non-profit organization or as trustee or beneficiary
of the trust.
FRM00013 8/90
2O75 Las Palmas Drive • Carlsbad. California 92OO9-<*859 • (619i 438-1 161
Disclosure Statement
(Over)
Page 2
5. Have you had more^-than S250 worth of business transacted with any member of City staff. Boarcs
Commissions, Committees and Council within the past twelve months?
Yes No IXlf yes. please indicate person(s)
Person i* dafined •*: 'Any individual, firm, copartnership, joint venture, association, social club, fraternal organization, corporation, vital* trust.
receiver, syndicate, thie and any otn«r county, city and county, city municipality, diatnct or other political subdivision, or any otn«r grouo or
combination acting aa a unit*
(NOTE: Attach additional pages as necessary.)
Signature of Owner/ date
PETER DANIELb
Rresidfint ,I
Print or type name of owner
Signature of applicant/date
CONTINENTAL COMMERCIAL CORPORATION
Print or type name of applicant
FRM00013 8/90
BACKGROUND DATA SHEET ~~
CASE NO: CT 94-10/CP 93-07/CUP 93-04/HDP 93-10/SDP 94-04
CASE NAME: Seapointe Resort
APPLICANT: Continental Commercial
REQUEST AND" LOCATION: 78 unit timeshare resort hotel located east of Carlsbad
Boulevard at Ponto (Anancapa) Road.
LEGAL DESCRIPTION: Lots 1 and 2 infractional Section 20. Township 12 south, range 4
west. San Bernardino base and meridian, in the City of Carlsbad, in the County of San
Diego, State of California, according to the official plat thereof.
APN: 214-010-01 Acres 8.02 Proposed No. of Lots/Units 2 lots/78 units
(Assessor's Parcel Number)
GENERAL PLAN AND ZONING
Land Use Designation OS/TS
Density Allowed N/A Density Proposed N/A
Existing Zone OS/CT Proposed Zone OS/CT
Surrounding Zoning and Land Use: (See attached for information on Carlsbad's Zoning
Requirements)
Zoning Land Use
Site OS/CT OS/TS - Vacant
North RMHP RHM/Solamar Mobilehome Park
South O Office/Vacant
East TC TC/RR right-of-way
West OS Beach
PUBLIC FACILITIES
School District Carlsbad Water District Carlsbad Sewer District Carlsbad
Equivalent Dwelling Units (Sewer Capacity) 78
Public Facilities Fee Agreement, dated August 12. 1993
ENVIRONMENTAL IMPACT ASSESSMENT
_X Negative Declaration, issued March 18. 1994. amended March 22. 1994 & second
amendment August 10, 1994
Certified Environmental Impact Report, dated
Other,
CW:vd
CITY OF CARLSBAD
GROWTH MANAGEMENT PROGRAM
LOCAL FACILITIES IMPACTS ASSESSMENT FORM
(To be Submitted with Development Application)
PROJECT IDENTITY AND IMPACT ASSESSMENT:
FILE NAME AND NO: Seapointe Resort - CT 93-10/CP 93-07/CUP 93-04/HDP 93-10/SDP 94-04
LOCAL FACILITY MANAGEMENT ZONE: 22 GENERAL PLAN: OS/TS
ZONING: Open Space/Commercial/Tourist
DEVELOPER'S NAME: Continental Commercial Corporation
ADDRESS: 5050 Avenida Encinas
PHONE NO: (619) 431-8500 ASSESSOR'S PARCEL NO: 214-010-01
QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 8.02 Acres
ESTIMATED COMPLETION DATE:
A. City Administrative Facilities: Demand in Square Footage = N7AT
B. Library: Demand in Square Footage = N/A
C. Waste-water Treatment Capacity (Calculate with J. Sewer) N/A
D. Park: Demand in Acreage = N/A
E. Drainage: Demand in CFS = N/A
Identify Drainage Basin = N/A
(Identify master plan facilities on site plan)
F. Circulation: Demand in ADTs = 624 APT
(Identify Trip Distribution on site plan)
G. Fire: Served by Fire Station No. = 4 w/i 5 minutes
H. Open Space: Acreage Provided - 6.37
I. Schools: Fee
(Demands to be determined by staff)
J. Sewer: Demand in EDUs - 78
Identify Sub Basin - N/A
(Identify trunk line(s) impacted on site plan)
K. Water: Demand in GPD - 17.160