HomeMy WebLinkAbout2001-12-05; Planning Commission; ; CT 01-08|PUD 98-01A - NORTH POINTE WESTI r 9
The City of Garlsbad Planning Department
A REPORT TO THE PLANNING COMMISSION
Item No. (S)
P.C. AGENDA OF: December 5, 2001
Application complete date: October 18, 2001
Project Planner: Michael Grim
Project Engineer: Michael Shirey
SUBJECT: CT G1-08/PUD 98-01(A) - NORTH POINTE WEST - Request for a Tentative
Tract Map and Non-residential Planned Unit Development Amendment to allow
the subdivision of 14.6 acres into eight (8) Non-residential Planned Unit
Development lots and the constmction of one (1) industrial building on each lot,
on property generally located north of Corte de la Pina, between Corte del Cedro
and El Camino Real in Local Facilities Management Zone 5.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolution No. 5094,
ADOPTING the Negative Declaration issued by the Plaiming Director, and ADOPT Plaiming
Commission Resolutions No. 5095 and 5096, APPROVING Tentative Tract Map CT 01-08 and
Non-residential Planned Unit Development Permit Amendment PUD 98-01(A), based upon the
findings and subject to the conditions contained therein.
IL INTRODUCTION
The proposal involves a Tentative Tract Map and Non-residential Planned Unit Development
Amendment to allow the subdivision of 14.6 acres into eight (8) Non-residential Planned Unit
Development lots and the constmction of one (1) industrial building on each lot. A Tentative
Tract Map is required for the subdivision of land into over four parcels. A Non-residential
Planned Unit Development Amendment is needed to create parcels that do not front directly onto
a publicly dedicated street. The project meets all applicable regulations and staff has no issues
with the proposal.
III. PROJECT DESCRIPTION AND BACKGROUND
Smith Consulting Architects is requesting approval of a Tentative Tract Map and Non-residential
Planned Unit Development Amendment to allow the subdivision of 14.6 acres into eight Non-
residential Planned Unit Development lots and the constmction of one industrial building on
each lot on property located at the eastem terminus of Corte de la Pina. A Planned Industrial
Permit Amendment, also included with the project, is ready for Planning Director approval
subject to approval of the other discretionary permits. The project site is designated Plarmed
Industrial (PI) in the General Plan Land Use Element and is zoned Planned Industrial (P-M).
The property is located north of Corte de la Pina, between Corte del Cedro and El Camino Real,
and is surrounded by industrial land uses.
The property has been previously subdivided and graded in accordance with the Lincoln North
Pointe industrial subdivision (CT 98-07/PUD 98-01/PIP 98-07); the site is located on a lower pad
CT 01-08/PUD 98-01(A) - NORTH POINTE WEST
December 5, 2001
Page 2
area east of the remainder of the subdivision. As part of the Lincoln North Pointe project, an
access road was created along the westem edge of the graded pad leading from Corte de la Pina
uphill to the development adjacent to El Camino Real. To the west of the access road is a
surface drainage channel with vegetation.
The Lincoln North Pointe industrial subdivision (also know as Legacy North Pointe) was
approved on August 19, 1998 and involved the subdivision of 50.23 acres into 12 non-residential
lots. The project included a Non-residential Planned Unit Development and Planned Industrial
Permit to allow the creation of lots without direct access to a public street and the constmction of
buildings on the industrial lots. Eight of the lots were located on the upper portion of the site,
adjacent to El Camino Real. Three two-story office buildings have been constmcted on three of
these upper lots. Four of the twelve lots were located on the lower portion of the site, along the
westem boundary. The area covered by these four lots is the subject of this North Pointe West
industrial subdivision project.
The eight proposed Non-residential Planned Unit Development lots would range in size from 1.3
acres to 2.4 acres in size. All lots would contain an industrial building, surface parking,
landscaping, and an outdoor employee eating area. The site would be covered by a reciprocal
access easement, allowing vehicular and pedestrian circulation and parking access throughout the
site. The existing North Pointe project is covered by an Owner's Association and CC&Rs to
provide common area maintenance and the proposed subdivision would be a part of that
Association. The proposed buildings would range in size from 13,300 square feet to 21,200
square feet and would contain office, research and development, and warehouse uses. The
architecture would be of a similar style to the existing buildings within the North Pointe project
and the buildings would measure 32 feet in height to the top ofthe roof parapet.
The project site would take direct access off of Corte de la Pina and would also gain access from
the two existing entrances to the North Pointe project off of El Camino Real. The project
proposes balanced earthwork of 20,000 cubic yards cut and 20,000 cubic yards of fill. All
facilities needed to serve the project are already in place or will be provided concurrent with
constmction. The project includes Best Management Practices, such as fossil filters and
vegetative swales, to address storm water quality in accordance with the National Pollutant
Discharge Elimination System Permit requirements. No major soils, drainage, sewer or
improvement issues are associated with the project.
The North Pointe West project is subject to the following regulations:
A. General Plan;
B. Planned Industrial (P-M) Zone (Chapter 21.34 of the Zoning Ordinance);
C. Subdivision Ordinance (Title 20 of the Carlsbad Municipal Code);
D. Inclusionary Housing Ordinance (Chapter 21.85 of the Zoning Ordinance);
E. Non-Residential Planned Development Ordinance (Chapter 21.47 of the Zoning
Ordinance);
F. Growth Management Ordinance (Chapter 21.90 of the Zoning Ordinance);
G. Zone 5 Local Facilities Management Plan.
CT 01-08/PUD 98-01(A)
Decembers, 2001
Page 3
NORTH POINTE WEST
IV. ANALYSIS
The recommendation for approval of this project was developed by analyzing the project's
consistency with the applicable policies and regulations listed above. The following analysis
section discusses compliance with each of these regulations/policies utilizing both text and
tables.
A. General Plan
The North Pointe West project is consistent with the applicable policies and programs of the
General Plan. Particularly relevant to the residential development request are the Land Use,
Circulation, Noise, Housing, and Public Safety elements. Table 1 below indicates how the
project complies with these particular elements of the General Plan.
TABLE 1 - GENERAL PLAN COMPLIANCE
Element Use Classification, Goal,
Objective or Program
Proposed Use and
Improvements Compliance
Land Use Site is designated for planned
industrial uses.
Proposed project involves
office, research and
development and warehouse
uses which are consistent with
the Planned Industrial land use
designation
Yes
Circulation Provide safe, adequate and
attractively landscaped parking
facilities.
The project includes parking
facilities that provide safe and
adequate access and
landscaping.
Yes
Noise Attempt to control noise primarily
at its source.
The project must comply with
the City's construction noise
ordinance and the noise
performance standards ofthe
P-M zone.
Yes
Housing Balance the number of local jobs
created relative to the availability
of housing affordable to the
wages offered by those jobs.
The project is conditioned to
pay a non-residential housing
linkage fee, if adopted by the
City Council prior to issuance
of building permits.
Yes
Public Safety Provision of emergency water
systems and all-weather access
roads.
All necessary water mains, fire
hydrants, and appurtenances
must be installed prior to
occupancy of any unit and all-
weather access roads will be
maintained throughout
construction.
Yes
Given the above, the North Pointe West industrial project is consistent with the City's General
Plan.
CT 01-08/PUD 98-01(A) - NORTH POINTE WEST
December 5, 2001
Page 4
B. Planned Industrial (P-M) Zone
The North Pointe West project site is located within the Planned Industrial (P-M) zone and,
therefore, subject to the provisions of Chapter 21.34 of the Zoning Ordinance. The proposed
industrial development containing office, research and development, manufacturing and
warehouse uses is consistent with those uses allowed within the P-M zone. Once constmcted
and occupied, all uses would be subject to the performance standards of the P-M zone which
regulate issues such as noise, odor, vibration, humidity and heat, air quality, and outdoor storage.
The project's conformance with the development standards ofthe P-M zone is shown in Table 2
below.
TABLE 2 - P-M ZONE COMPLIANCE
Standard Proposed Conformance
Building Height: Maximum of 35 feet. All buildings measure a maximum of
32 feet to the top of parapet.
Yes
Setbacks: All structures must be setback
from a local street a minimum of 35 feet.
All structures must be setback from the
side and rear property lines by a
minimum of 10 and 20 feet, respectively.
The closest structure to a local street is
115 feet from Corte de la Pina. Given
the Planned Development lot configu-
ration, all structures are setback a
minimum of 10 feet from one property
line and 20 or more feet from all other
property lines.
Yes
Lot Area: For standard industrial
subdivisions, the minimum lot area is
one acre. For Planned Developments, no
minimum lot area is required.
Despite the Planned Development
proposal, all lots would be over one
acre in area. Yes
Lot Coverage: Maximum coverage of
50 percent.
The proposed lot coverage ranges from
29.4 percent to 10 percent.
Yes
Employee Eating Areas: A minimum
of 300 square feet for every 5,000 square
feet of building area.
All proposed buildings include an
outdoor employee eating area equal to,
or greater than 300 square feet per
5,000 square feet of building area.
Yes
Given the above, the proposed North Pointe West industrial project is consistent with the
requirements of the Planned Industrial (P-M) zone.
C. Subdivision Ordinance
Since the North Pointe West project involves a subdivision of land, the proposal is subject to the
regulafions of Title 20, the Subdivision Ordinance. Chapter 20.16 ofthe Subdivision Ordinance
addresses the requirements for a major subdivision, that being a subdivision that creates more
than four parcels. These requirements mostly deal with providing the drainage, sewerage and
circulation dedications and improvements needed to serve the subdivision. There are also
requirements conceming consistency with Title 21, the Zoning Ordinance, which is addressed in
the other sections of this staff report.
CT 01-08/PUD 98-01(A)
December 5, 2001
Page 5
NORTH POINTE WEST
The proposed North Pointe West industrial subdivision would provide all necessary facilities
prior to, or concurrent with, constmction. The hydrology report, submitted by the applicant,
indicates that all mnoff can be controlled on-site and conveyed into existing and proposed storm
drain facilities. The project mnoff would then be conveyed to the existing drainage channel after
being processed in accordance with the requirements of the National Pollutant Discharge
Elimination System Permit (NPDES). The on-site sewer system would be connected with the
existing system in Corte de la Pina. Water distribution would involve looped service from
existing lines in the existing Legacy North Pointe project and Corte de la Pina. No standards
variances are needed to approve the project. Given the above, the proposed subdivision would
provide all necessary facilities and improvements without producing land title conflicts, therefore
the project is consistent with the Subdivision Ordinance.
D. Non-residential Planned Development Ordinance
The proposed North Pointe West project involves the creation of industrial lots that do not front
on publicly dedicated streets or thoroughfares and, therefore, the project is subject to the Non-
residential Planned Development Ordinance, Chapter 21.47 ofthe Zoning Ordinance. The Non-
residential Planned Development Ordinance does not contain any specific development
standards. Rather, it refers to the standards contained in Title 20 (the Subdivision Ordinance)
and the underlying zoning designation (i.e. Planned Industrial). Compliance of the project with
the Subdivision Ordinance is discussed in Section C above and compliance with the Planned
Industrial zoning designation is discussed in Section B above. Given the project's conformance
with these ordinances, the project is consistent with the Non-residential Planned Development
Ordinance, Chapter 21.47 of the Zoning Ordinance.
E. Growth Management Ordinance
The North Pointe West industrial project is not a residential project, therefore, many of the
facilities regulated by the Growth Management Ordinance are not affected. Table 3 below
details the project's conformance with the applicable Growth Management facility requirements.
TABLE 3 - GROWTH MANAGEMENT COMPLIANCE
Standard Impacts/Standards Compliance
City Administration N/A N/A
Library N/A N/A
Waste Water Treatment 68 EDU Yes
Parks N/A N/A
Drainage PLDAC Yes
Circulation 891 ADT Yes
Fire Station # 5 Yes
Open Space N/A N/A
Schools Carlsbad Unified Yes
Sewer Collection System 68 EDU Yes
CT 01-08/PUD 98-01(A) - NORTH POINTE WEST
Decembers, 2001
Page 6
TABLE 3 - GROWTH MANAGEMENT COMPLIANCE
Standard Impacts/Standards Compliance
Water 14,960 GPD Yes
F. Zone 5 Local Facilities Management Plan
The North Pointe West project site is located within the Local Facilities Management Zone 5.
There are no special development conditions that apply to this non-residential project, except for
the requirement for a 40 cents per square foot fee for the provision of park facilities. All public
facilities needed to serve the development are already in place or will be provided prior to, or
concurrent with, constmction. In addition, the project is conditioned to pay a Traffic Impact Fee
as required for the proposed stmctures as well as conform to all current and future requirements
of the Zone Plan. As is standard practice, a Public Facilities Fee will be collected for the new
constmction at the time of building permit issuance. Given the above, the proposed North Pointe
West project is consistent with the Zone 5 Local Facilities Management Plan.
V. ENVIRONMENTAL REVIEW
Earlier analysis of the North Pointe West project site has been conducted on previous occasions.
The earliest analysis was the Master Environmental Impact Report for the 1994 General Plan
Update (MEIR 93-01), which reviewed the potential impacts associated with buildout of the
City's General Plan, including transportation and air quality impacts. The next environmental
review document was the Mitigated Negative Declaration for the Lincoln North Pointe industrial
subdivision (CT 98-07/PUD 98-01/PIP 98-07), which reviewed the potential impacts associated
with the subdivision of 50.23 acres into 12 industrial lots and constmction of industrial buildings
on those lots. The subject area was approved as four lots, with up to 124,475 square feet of
office/research and development/warehouse uses. The maximum traffic generation allowed for
these four lots was 891 average daily trips (ADT). The mitigation measures contained in the
previous Mitigated Negative Declaration dealt with the replacement of impacted southem
Maritime Chaparral and the removal of pampas grass from the existing drainage channel on the
westem edge ofthe site. Since the site is already graded and the pampas grass has been removed
from the drainage channel, these mitigation measures do not apply to the current proposal.
The current proposal is very similar to that approved through the Lincoln North Pointe
subdivision (CT 98-07/PUD 98-01/PIP 98-07). The graded area would remain the same with no
encroachment into any adjacent slopes. The proposed pad height would remain within five feet
of the existing graded pad height. The proposed buildings would contain office/research and
development/warehouse uses and would total 146,800 square feet. While the total square
footage of buildings would increase from the original approval, the total traffic generation would
remain the same, with a maximum of 891 ADT. Based upon the environmental analysis, there
will be no significant adverse environmental impact due to the proposed subdivision and
development. Therefore, the Planning Director issued a Negative Declaration on November 5,
2001. No comments were received during the 20-day public notice period.
CT 01-08/PUD 98-01 (A) - NORTH POINTE WEST
December 5, 2001
Page 7
ATTACHMENTS:
1. Planning Commission Resolution No. 5094
2. Planning Commission Resolution No. 5095
3. Planning Commission Resolution No. 5096
4. Location Map
5. Disclosure Statement
6. Local Facilities Impact Assessment Form
7. Background Data Sheet
8. Exhibits "A" - "N", dated December 5, 2001
MG:mh
SITE
NORTH POINTE WEST
CT 01-08/PUD 98-01 (A)/PIP 98-07(A)
•FR'JM •:• K?.S ENGINEERING PHONE NO. : 619 296 5564 Mar. 04 2001 11:12PM P2
City of Carlsbad
Planning Department
DISCLOSURE STATEMENT
Applicant's statement or disclosure of certain ownership mteresis on all applications which wil! require j
discretionary action on rhe pan of the City Council or any appointed Board. Commission or Commmee. {
The following information MUST be disclosed at the time of apphcation siibminal. \ou\- project cannoi
be reviewed until this information is completed. Please print.
Note:
Person is defmed as "Any mdividual, finn, co-partncTship, joint venture, association, social club, fratemal
organization, corporation, estate, trust, receiver, syndicate, in this and any other count>. cit>- and counry. cit\
mimicipality, district or other political subdivision or any other group or combination acting as a unit."
Agents may sign this doctiment; however, the legal name and canty of the applicanl and property- owner must be
provided below.
1. APPLICANT (Not the applicant's agent)
Provide the COMPLETE. LEGAL names and addresses of ALL persons havmg a financial
interest in the application. If the applicanl includes a corporation or parmership. include the
names, title, addresses of all individuals owning more lhan 10% of the shares. IF NO
INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-
APPLICABLE (N/A) IN THE SPACE BELOW If a publicIv-owned corporation, inciude the
names, titles, and addresses of the corporate officers. (A separate page may be attached if
necessary.)
Person.
Tiile_
See Attachment
Address.
Corp/Part Carltas Ccmpany
Titte CA limited partnership
Address 5600 Avenida Encinas Ste. 100
Carlsbad, CA 92008
OWNER (Not die owner's agent)
Provide the COMPLETE. LEGAL names and addresses of ALL persons having any ownership
interest in the property involved. Also, provide the namre of the legal ownership (i.e.
parmership, tenants in common, non-profit, corporation, etc.). If the ownership includes a
corporation or partnership, include the names, title, addresses of all individuals owning more
than 10% of rhe shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES,
PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-
owned corporation, include the names, titles, and addresses of the corporate officers. (A separate
page may be attached if necessary.)
Person.
Title_
See Attachment
Address.
Corp/Tan Carltas Company
Jitle CA limited partnership .
Addrg.ss 5600 Avenida Encinas Ste. 100
Carlsbad, CA 92008
1 635 Faraday Avenue - Carlsbad. CA 92003-7314 . (760) 602-4600 - PAX (760) 602-8559 @
:p,:,r^ .:. K&S ENGINEERING ^ PHONE ND. : 619 296 5564
3. -N'O.N-PROnT ORGANIZATION OR TRUST
Mar. 04 2001 11;12PM P3
If any person identified pursuant to (1) or (2) above is a nonprofit orgamrranor. or a trus:. i;<-. -.-x-
names and addresses of A>rv' person ser-'ing as an officer or director of ihe non-profn
organization or as tmstee or beneficiary of the.
Non Profit/Trust N/A Non ProfitTrust
Title ^_ Title
N/A
Address Address
Have you had more than S250 worth of business transacted with any member of Cit> staff
Boards. Commissions, Comminees and/or Council withm the past twelve (12) months'*
I I Yes No If yes, please indicate person(s):
NOTE: Attach additional sheets if necessary.
I cenify that all the above information is true and correct to the best of my knowledge.
Signature of owner/date Signature of applicant/date
Print or type name of owner Print or type name of applicanl
Carltas Conpany, a CA limited partnership
by: Cay^ltas Management Conpany, a CA corporation, general partner
ler/aMfticant's agent if applicable/date
2r(C. J^lkins, President
owner/applicant's agem
esident
H:A;3MIN\C0UNT£R\C3ISCL0SURE STATEMENT 5/98 Page 2 of 2
City of Carlsbad Planning Department
Disclosure Statement
ATTACHMENT
1) Applicant
a) Individuals owning more than 10%:
i) Paul Ecke, Jr. - limited partner
P.O. Box 230488
Encinitas, CA 92023-0488
ii) Paul Ecke, III - limited partner
P.O. Box 230488
Encinitas, CA 92023-0488
iii) Lizbeth A. Ecke - limited partner
P.O. Box 234293
Leucadia, CA 92023-4293
iv) Sara Ecke May - limited partner
6 Elm Ridge Lane
Greensboro, NC 27408
2) Owner
a) Individuals owning more than 10%:
i) Paul Ecke, Jr. - limited partner
P.O. Box 230488
Encinitas, CA 92023-0488
ii) Paul Ecke, III - limited partner
P.O. Box 230488
Encinitas, CA 92023-0488
iii) Lizbeth A. Ecke - limited partner
P.O. Box 234293
Leucadia, CA 92023-4293
iv) Sara Ecke May - limited partner
6 Elm Ridge Lane
Greensboro, NC 27408
S:UIM\MEMOS\MISC\City of Carlsbad Planning Department Disclosure Stmt Attachment.doc
CITY OF CARLSBAD
GROWTH MANAGEMENT PROGRAM
LOCAL FACILITIES IMPACTS ASSESSMENT FORM
(To be Submitted with Development Application)
PROJECT IDENTITY AND IMPACT ASSESSMENT:
FILE NAME AND NO: North Pointe West - CT 01-08/PUD 98-01 (A)
LOCAL FACILITY MANAGEMENT ZONE: 5 GENERAL PLAN: PL
ZONING: P-M
DEVELOPER'S NAME: Smith Consulting Architects
ADDRESS: 12220 El Camino Real. Suite 200. San Diego CA 92130
PHONE NO.: (858) 793-4777 ASSESSOR'S PARCEL NO.: 213-100-09.-10.-11.-12
QUANTITY OF LAND USE/DEVELOPMENT (AC, SQ. FT., DU): 14.6 acres
ESTIMATED COMPLETION DATE: November. 2003
n/a
n/a
68 EDUs
n/a
891 ADT
A. City Administrative Facilities: Demand in Square Footage =
B. Library: Demand in Square Footage =
C. Wastewater Treatment Capacity (Calculate with J. Sewer)
D. Park: Demand in Acreage =
E. Drainage: Identify Drainage Basin = PLDA C
(Identify master plan facilities on site plan)
F. Circulation: Demand in ADT =
(Identify Trip Distribution on site plan)
G. Fire: Served by Fire Station No.
H. Open Space: Acreage Provided =
I. Schools:
(Demands to be determined by staff) n/a
J. Sewer: Demands in EDU
(Identify tmnk line(s) impacted on site plan)
K. Water: Demand in GPD = 14.960 GPD
#5
n/a
Carlsbad Unified
68 EDU
BACKGROUND DATA SHEET
CASE NO: CT 01-08/PUD 98-01 (A)
CASE NAME: North Pointe West
APPLICANT: Smith Consulting Architects
REQUEST AND LOCATION: Subdivision of 14.6 acres into eight (8) Non-residential
Planned Unit Development lots and constmction of one (1) industrial building on each ofthe lots
on propertv generally located at the eastem terminus of Corte de la Pina, west of El Camino Real
LEGAL DESCRIPTION: Lots 9 through 12 of Carisbad Tract No. 98-07. according to Map
No. 13716, filed in the Office of the County Recorder on December 31. 1998, in the City of
Carlsbad. County of San Diego, State of Califomia
APN: 213-100-09. -10. -11. -12 Acres: 14.6 Proposed No. of Lots/Units: 8
GENERAL PLAN AND ZONING
Land Use Designation: Planned Industrial
Density Allowed: n/a Density Proposed: n/a
Existing Zone: P-M Proposed Zone: P-M
Surrounding Zoning, General Plan and Land Use:
Zoning General Plan Current Land Use
Site P-M PI Vacant
North P-M PI Industrial
South P-M PI Industrial
East P-M PI Industrial
West P-M PI Industrial
PUBLIC FACILITIES
School District: Carlsbad Water District: Carlsbad Sewer District: Carlsbad
Equivalent Dwelling Units (Sewer Capacity): 68
ENVIRONMENTAL IMPACT ASSESSMENT
Negative Declaration, issued November 1, 2001
I I Certified Environmental Impact Report, dated_
I I Other,