Loading...
HomeMy WebLinkAboutCT 03-09A; Ocean Bluff; Tentative Map (CT) (29)c MEMORANDUM December 26, 1997 TO: ASSOCIATE PLANNER - ANNE HYSONG FROM: Associate Engineer- Michael J. Shirey CT 93-09(A): OCEAN BLUFF (TENTATIVE MAP AMENDMENT) COMPLETENESS REVIEW AND INITIAL ISSUES STATEMENT Engineering Department staff have completed a review of the above-referenced project for application completeness and have determined that the application and plans submitted for the project are complete and suitable for continued review. Staff has also conducted a review of the project for engineering issues of concern. Engineering issues which must be resolved or adequately addressed prior to staff making a determination on the proposed project are as follows: ENGINEERING ISSUES Mapping/Land Title: 1. Please renumber the lots to coincide with the proposed project phasing (i.e., Phase I, Lot's 1 through ; Phase II, Lot's # through #, etc.). 2. On sheet 1 of 7, please delete the "(S.F.: 920 ADT, M.F.: 96 ADT)," in General Note number 9, it is no longer applicable. 3. On sheet 1 of 7, please add "in accordance with approval from the City Engineer and Planning Director.", to the end of the sentence in General Design Note number 16. 4. On sheet 4 of 7, please change the Black Rail Road improvement drawing number to 335-5. The 355-3 which is currently being shown is incorrect. 5. On sheet 4 of 7, please change Black Rail Court, to Black Rail Road, in the "Plan of proposed extension..." note. Grading and Drainage: 1. Please delete the "if required" text for the proposed temporary detention basin note, adjacent to Lot 2 in Phase III. 2. On sheet 1 of 7, where is the plan view "cut line" for storm drain section A-A? O_ ____ v,7 _____ „ _______ COMPLETENESS REVIEW AND INITIAL ISSUES A. HYSONG MEMO; DECEMBER 26, 1997 Traffic and Transportation: 1. Please add 5.5' concrete sidewalk to the "A" Street (Collector Street) cross-section. Also, add this sidewalk to the "A" Street plan view on sheet 1 of 7. 2. Please be advised, the proposed reduction to a 28' section for off-site Black Rail Road, instead of the approved 32' section, has not been approved and is still being discussed among staff. 3. On sheet 1 of 7, the 346' street elevation at the terminus of proposed "C" Street should probably be 320'. Please verify and revise. 4. On sheet 1 of 7, please delete the word "future" in the "on-site Poinsettia Lane" note. 5. On sheet 2 of 7, why have the vertical curves for proposed "B" Street been reduced from 100' to 50' and 60', respectively? If the pads and street centerline are being proportionately lowered, why do the vertical curves have to change? Please verify and revise/explain. 6. On sheet 5 of 7, add a 5' minimum A/C walkway to the Poinsettia Lane typical section. 7. On sheet 5 of 7, carry the "improvements as part of this map" designation/dimension line to Black Rail Road. 8. On sheet 6 & 7 of 7, delete the "Future Poinsettia Lane Reach 2..." note. M/sce//aA7eotys; 1 . Please be sure that any revisions which are made on one sheet, are reflected on all applicable sheets. 2. Enclosed for the applicant's review for making the requested revisions is a red-lined check print of the project. This check print must be returned with the revised plans to facilitate continued staff review. If you have any questions, please either see or call me at extension 4388. . , MICHAEL J. SHIRE^ ^ """"^ ^ - Associate Engineer - Land Development Section Attachment c: Public Works Director/City Engineer Assistant City Engineer Principal Civil Engineer - Land Development Section