Loading...
HomeMy WebLinkAbout2014-11-05; Planning Commission; ; CT 14-01|RP 14-01 - STATE MIXED USE 30fe City of Carlsbad Planning DivisioT A REPORT TO THE PLANNING COMMISSION Item No. (^^^2^ Application complete date: May 15, 2014 P.C. AGENDA OF: Novembers, 2014 Project Planner: Jason Goff Project Engineer: Steve Bobbett SUBJECT: CT 14-01/RP 14-01 - STATE MIXED USE 30 - Request for a recommendation of approval of a Tentative Tract Map and Major Review Permit to allow for 1) the demolition of all structures onsite located at 3068 State Street, 3080 State Street and 542 Oak Avenue (APNs 203-297-06, 203-297-08 and 203-297-09); and 2) construction of a four-story mixed-use building consisting of 14 residential units, 13 timeshare units, 4,529 square feet of commercial and an enclosed at-grade parking garage situated on a 0.413-acre project site comprised of three properties addressed as 3068 State Street, 3080 State Street and 542 Oak Avenue, and located within District 1-Carlsbad Village Center ofthe Village Review (VR) Zone and Local Facilities Management Zone 1. The project qualifies as a CEQA Guidelines Section 15332 (In-Fill Development Projects) Class 32 Categorical Exemption. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7073 RECOMMENDING APPROVAL of Tentative Tract Map CT 14-01 and Major Village Review Permit RP 14-01 to the City Council based on the findings and subject to the conditions contained therein. II. PROJECT DESCRIPTION AND BACKGROUND Proiect Site/Setting: The 0.413-acre project site is comprised of three legal parcels (APNs 203-297-06, 203-297-08 and 203- 297-09) generally located on the northeast corner of State Street and Oak Avenue. More specifically, these three properties are addressed as 3068 State Street, 3080 State Street and 542 Oak Avenue. Two of these properties front on State Street, while the third is a corner lot fronting both State Street and Oak Avenue. The Tyler Street Alley, extending from Oak Avenue to Carlsbad Village Drive, bounds the project site along the eastern side. The project site is located within Land Use District 1-Carlsbad Village Center of the Village Master Plan and is located outside of the Coastal Zone. The properties are currently developed with a mix of attached and detached residential uses with various accessory shed type structures. Table 1 below summarizes the existing onsite land uses. TABLE 1 - EXISTING LAND USES Address APN Occupant 3068 State Street 203-297-06 Four (4) residential units within two (2), one-story two-family residential dwellings, plus one (1) small detached accessory structure. 3080 State Street 203-297-07 Two (2) residential units within a single one-story two-family residential dwelling. 542 Oak Avenue 203-297-08 One-story single-family residential dwelling. CT 14-01/RP 14-01 - STATE M Novembers, 2014 Page 2 l^lfc) USE 30 Table 2 below identifies the General Plan designations, zoning and current land uses of the project site and surrounding properties. TABLE 2 - SURROUNDING LAND USES Location General Plan Zoning Current Land Use Site Village (V) Village Review (V-R) Two-family and one-family residential uses (seven (7) residential units total). North Village (V) Village Review (V-R) Single-family residential. South Village (V) Village Review (V-R) Oak Avenue, City of Carlsbad Public Works, restaurant (i.e.. Cafe Panini) and automotive repair/smog shop. East Village (V) Village Review (V-R) Tyler Street Alley, multi-family residential, single-family residential, parking lot, and restaurants (i.e.. New York Pizzeria and Cafe Topes). West Village (V) Village Review (V-R) State Street, public parking lots C and D, hair salon, antique shop and office uses. Proiect Proposal: In general, the project applicant is requesting approval of a Tentative Tract Map (CT) and Major Village Review Permit (RP) to demolish all existing structures located on the above-noted properties and to construct in place a 33,732 square foot four-story mixed-use building consisting of 14 residential units (two of which are affordable), 13 timeshare units, one (1) ground floor commercial unit (4,529 square feet) and a roof deck (4,211 square feet). The project also includes construction of an enclosed at-grade parking garage with 23 parking spaces accessed from Oak Avenue, plus 10 additional tuck under parking spaces adjacent to and accessible from the Tyler Street Alley for a total of 33 on-site parking spaces. The project is proposing to purchase an additional 20 spaces through the Village Parking In-Lieu Fee Program and is satisfying its inclusionary housing obligation onsite through the construction of two (2) affordable three-bedroom units. The proposed density of this project is 33.8 dwelling units per acre and will generate a net increase of 341 average daily trips. Grading for the proposed project includes 500 cubic yards of cut and no fill. As a result, a total of 500 cubic yards of material is proposed to be exported. In addition to the 4,529 square foot of commercial space fronting State Street and 33 on-site parking spaces accessed from Oak Avenue and the Tyler Street Alley; development of the ground floor uses will also include a separate lobby area (174 sq. ft.) with stairs and elevator access to the residential and timeshare units above. Frontage improvements along both State Street and Oak Avenue propose to include new curb, gutter, sidewalks, bike racks, street trees and enhanced landscaping. The proposed commercial space will accommodate multiple tenant opportunities along State Street with a majority of the space having been designed to 46 foot depths for purposes of supporting legitimate and quality commercial uses within the Village. Aside from recreational amenities in the form of a pool and spa located on the second floor terrace and a 4,211 square foot roof deck, the three upper floors (i.e., 2"", 3"^, and 4*^ floors) more or less mimic the other in orientation, design and use. These three floors are oriented one atop the other in a horseshoe configuration with 21 units overlooking State Street and Oak Avenue, and the remaining six (6) units overlooking the Tyler Street Alley and the interior courtyard. The north side of the building is open to an interior courtyard and/or walkways above. Each unit includes a private balcony or deck overlooking the center courtyard or the State Street/Oak Avenue frontage, as well as a separate enclosed storage closet CT 14-01/RP 14-01 - STATE M Novembers, 2014 Page 3 USE 30 within a centralized storage area located on each floor. Table 3 below provides a unit summary of each ofthe upper floors: Table 3-UNITSUMMARY Floor Level Use No. of Units No. of Bedrooms Living Area 2nd Residential 2 1 bedroom 778 sq. ft. to 858 sq. ft. 2 2 bedroom 987 sq.ft. to 1,360 sq.ft. Timeshare 4 2 bedroom 740 sq. ft. to 837 sq. ft. 1 3 bedroom 1,115 sq.ft. 3rd Residential 2 1 bedroom 778 sq. ft. to 858 sq. ft. 2 2 bedroom 987 sq. ft. to 1,360 sq. ft. (Affordable) 1 3 bedroom 1,115 sq. ft. Timeshare: 4 2 bedroom 740 sq. ft. to 837 sq. ft. 4th Residential: 2 1 bedroom 778 sq.ft. to 858 sq.ft. 2 2 bedroom 987 sq.ft. to 1,360 sq.ft. (Affordable) 1 3 bedroom 1,115 sq.ft. Timeshare: 4 2 bedroom 740 sq.ft. to 837 sq.ft. The proposed architectural design is characterized as coastal contemporary and utilizes form, materials and colors to reinforce this theme. The entire lower floor ofthe proposed building incorporates two (2) types of natural brick with ledge stone banding contrasted by enhanced landscaping and flowering street trees to provide a rich pedestrian experience along both streetscapes. To provide pedestrian scale, the massing of the three upper floors has been stepped back; and to enliven the street scene below, private balconies and decks have been added for residents and timeshare occupants. Material changes and clearly defined offsets are utilized to break the building into smaller vertical units so as to be consistent with the village character. Such material changes include natural brick; ledge stone banding, horizontal composite redwood paneling; vertical wood paneling; stucco; green tinted glass and metal adornments and awnings. Tower elements with decorative metal outriggers have been added at each corner of the building, and most importantly at the intersection of State Street and Oak Avenue as a means of grounding the end of the street and providing an important visual beacon for pedestrians and shoppers. A Tentative Tract Map (CT) is required to merge the three (3) existing legal parcels into one (1) common lot and 28 airspace condominium units consisting of 14 residential units (two of which are affordable), 13 timeshare units, and one (1) ground floor commercial unit (4,529 square feet). The Major Review Permit (RP) is required for new construction of a building within the Village Area that has a building permit valuation greater than $150,000. Both permits require a Planning Commission recommendation and City Council approval. III. ANALYSIS The proposed project is subject to the following ordinances, standards, and policies: A. Village (V) General Plan Land Use designation; B. Village Review (V-R) Zone (C.M.C. Chapter 21.35), Land Use District 1 - Carlsbad Village Center (Village Master Plan and Design Manual); C. Inclusionary Housing Ordinance (C.M.C. Chapter 21.85); D. Subdivision Ordinance (C.M.C. Title 20); and E. Growth Management Ordinance (C.M.C. Chapter 21.90), Local Facilities Management Plan Zone 1. CT 14-01/RP 14-01 - STATE M Novembers, 2014 Page 4 USE 30 A. Village (V) General Plan Land Use Designation The subject property, comprised of three (3) legal parcels, has a General Plan Land Use designation of Village (V). As discussed in the Village Master Plan, properties within the Village Area do not have an assigned residential density as it relates to Growth Management Plan compliance. Therefore, the minimum and maximum densities for residential development are established in the Village Master Plan. For mixed use projects, the minimum density is calculated based on 50% ofthe developable area. Timeshares are considered commercial living units for purposes of temporary lodging and do not count towards project density. Table 4 below identifies the permissible density range for properties located within Land Use District 1. TABLE 4 - PROJECT DENSITY Gross Acres Net Acres Allowable Density Range; Min/Max Dwelling Units per Village Master Plan Project Density; Proposed Dwelling units 0.413 ac N/A 28-35 du/ac; 6-14 dwelling units 33.89 du/ac; 14 dwelling units Pursuant to the Housing Element ofthe General Plan, because a Growth Management Control Point has not been established for residential development in the Village, all residential units approved in the Village must be withdrawn from the City's Excess Dwelling Unit Bank. The City's Excess Dwelling Unit Bank is implemented through City Council Policy No. 43. Pursuant to City Council Policy No. 43, an applicant for an allocation of dwelling units shall agree to provide the number of inclusionary units as required pursuant to C.M.C. Section 21.85.050 and shall execute an affordable housing agreement prior to recordation of the final map pursuant to C.M.C. Section 21.85.140. As discussed in Section C below, the proposal to construct two (2) inclusionary units onsite is consistent with the inclusionary housing requirements as set forth in City Council Policy No. 43. In addition, the project is accordingly- conditioned to require the execution of the affordable housing agreement prior to recordation of the final map. In approving a request for an allocation of excess dwelling units, the project shall meet the findings identified in City Council Policy No. 43. Specifically, the project location and density shall be found to be compatible with adjacent land uses and applicable provisions ofthe General Plan and other applicable planning documents. As discussed in the attached Planning Commission Resolution No. 7073, the proposed project meets these findings. As the proposed project requires approval from City Council, the City Council is the final decision-making authority for the allocation from the Excess Dwelling Unit Bank. The following Table 5 describes how the proposed project is consistent with the various elements ofthe Carlsbad General Plan. CT 14-01/RP 14-01 - STATE M November 5, 2014 Page 5 USE 30 TABLE 5 - GENERAL PLAN COMPLIANCE ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY Land Use Goal A.l-A Citv which preserves, enhances and maintains the Village as a place for living, working, shopping, recreation, civic and cultural functions while retaining the Village atmosphere and pedestrian scale. Goal A.2 - A City which creates a distinct identity for the Village by encouraging activities that traditionally locate in a pedestrian-oriented downtown area, including offices, restaurants and specialty retail shops. Goal A.3 - A City which encourages new economic development in the Village and near transportation corridors to retain and increase resident- serving uses. Goal A.4-ACity that encourages a variety of complementary uses such as a combination of residential and commercial uses to generate a lively, interesting social environment and a profitable business setting. The proposed mixed-use development not only provides mutually supportive uses in the form of residential, timeshare and commercial opportunities, but reinforces the pedestrian- orientation desired for the downtown area by providing new residents and timeshare occupants an opportunity to walk to local shopping, dining, recreation, and mass transit functions; its close proximity to existing bus routes and mass transit help to further the goal of providing new economic and residential development near transportation corridors; and lastly, will contribute to the revitalization of the Village area in the form of a new building at the southern end of State Street; new commercial lease space, new employment opportunities and new consumers. Yes CT 14-01/RP 14-01 Novembers, 2014 Page 6 • STATE M USE 30 TABLE 5-GENERAL PLAN COMPUANCE (CONTINUED) ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY Housing Policy 3.1 - Require affordability for lower income households of a minimum 15 percent ofall units approved for a qualified subdivision (as defined in the Inclusionary Housing Ordinance.) The project has been conditioned to enter into an Affordable Housing Agreement to construct two (2) inclusionary housing units onsite. The applicant has voluntarily set aside two (2) ofthe larger three (3) bedroom units for inclusionary housing purposes. Policv 3.4 - Adhere to City Council Policy Statement 43 when considering allocation of units from the Excess Dwelling Unit Bank. In approving a request for an allocation of excess dwelling units, the project shall meet the findings identified in City Council Policy No. 43. Specifically, the project location and density shall be found to be compatible with adjacent land uses and the project is consistent with the General Plan and any other applicable planning document. As discussed in the attached Planning Commission Resolution No. 7073, the proposed project meets these findings. Yes Circulation Objective B.l Provide adequate circulation infrastructure concurrent with or prior to the actual demand for such facilities. The proposed project has been designed to meet all ofthe circulation requirements, which includes but is not limited to, improving the Tyler Street Alley frontage, as well as providing new frontage improvements along both State Street and Oak Avenue in the form of curb, gutter and sidewalk with street trees. Yes Public Safety Policv C.l - Design all structures in accordance with the seismic design standards ofthe California Building Code (CBC) and State building requirements. The proposed building is required to be designed in conformance with all seismic design standards ofthe California Building Code (CBC) and State building requirements. Policv B.4 - Review new development proposals to consider emergency access, fire hydrant locations and fire flow requirements. The proposed project design is consistent with all of the applicable fire safety requirements. Additionally, the entire building is designed to be sprinkled in accordance with National Fire Protection Agency Standard 13 and City of Carlsbad regulations. Yes Yes CT 14-01/RP 14-01 - STATE M Novembers, 2014 Page 7 USE 30 TABLE 5-GENERAL PLAN COMPUANCE ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY Noise Policv C.5 - Interior noise standard of 45 dBA CNEL and exterior noise standard of 60 dBA CNEL for residential land uses. A Noise Impact Study (February 2014) in accordance with the City of Carlsbad's Noise Guidelines was prepared by Rincon Consultants, Environmental Scientists, Planners and Engineers to address any potential noise and/or ground-borne vibration/noise impacts occurring as a result of 1) the project sites close proximity to the railroad tracks located approximately 250 ft. to the west, and 2) traffic noise associated with an urban environment. No significant adverse ground-borne vibration and/or ground-borne noise impacts were identified. Additionally, no significant adverse noise impacts were identified that would not be reduced by standard construction practices prescribed by the California Energy Code Title 24 standards. Yes B. Village Review Zone (C.M.C. Chapter 21.35), Land Use District 1 Master Plan and Design Manual) Carlsbad Village Center (Village The subject property is located within Land Use District 1 - Carlsbad Village Center of the Village Master Plan. Mixed-use (residential and commercial uses) is a permitted use, while timeshares are identified as a provisional land use. No special considerations, findings or conditions for the timeshare use is listed in the Village Master Plan. The specific development standards for new development within Land Use District 1 and the project's compliance with these standards are shown in Table 6 below: TABLE 6 - VILLAGE MASTER PLAN, LAND USE DISTRICT 1 (CARLSBAD VILLAGE CENTER) STANDARD REQUIRED/ALLOWED PROPOSED COMPLY Setback: Front Yard (State St.) No minimum; 10 ft. maximum for the first at grade floor. Setback areas not occupied by a driveway shall be landscaped and/or contain semi-public amenities such as courtyard or outdoor seating areas. Ground Floor: 0 ft. to 4 ft. Upper Floors: 0 ft. to 11 ft. All setbacks have been landscaped. Raised planters with seat walls (22" tall max.) have been placed along the public pedestrian frontage to provide places for pedestrians to rest. Yes CT 14-01/RP 14-01 - STATE M Novembers, 2014 Page 8 1^^ USE 30 TABLE 6 - VILLAGE MASTER PLAN, LAND USE DISTRICT 1 (CARLSBAD VILLAGE CENTER)(CONTINUED) STANDARD REQUIRED/ALLOWED PROPOSED COMPLY Setback: Side Yards (North Side/Oak Avenue) No minimum or maximum Ground Floor: North: 6 inches to 4 ft. South (Oak Ave.): 1 ft. to 6 ft. Upper Floors: North: 6 inches to 4 ft. South (Oak Ave.): 1 ft. to 11 ft. Yes Setback: Rear Yard (Tyler St. Alley) No minimum or maximum Ground Floor: 4 ft. Upper Floors: 3 inches to 1 ft. Yes Open Space: 20% = 3,601 sq. ft. Open space may be public or private and may be dedicated to landscaped planters, open space pockets and/or connections, roof gardens/patios, balconies, other patios and outdoor eating areas. 66% (11,916 sq. ft.) Landscape/Planters: 3,517 sq. ft. Private Balconies: 2,577 sq. ft. Pool Deck: 2,067 sq. ft. Roof Deck: 4,211 Yes Building Coverage: 100% 89.7% Yes Building Height: 45 ft. maximum Pursuant to C.M.C. 21.46.020, the following project related architectural features are considered allowed protrusions above height limits and are therefore exempted from the maximum building height standard: Parapet walls, tower elements, and clear glass guard rail. Roof Line: 43'-6" Parapet walls: 45'-2" to 46'-6" Clear Glass Guardrail: 47'-0" Towers: 49'-6" to 50'-10" Yes Property Line Walls/Fences: 6 ft. max No property line walls or fences are proposed. Yes CT 14-01/RP 14-01 - STATE M November 5, 2014 Page 9 USE 30 TABLE 6 - VILLAGE MASTER PLAN, LAND USE DISTRICT 1 (CARLSBAD VILLAGE CENTER)(CONTINUED) STANDARD REQUIRED/ALLOWED PROPOSED COMPLY Parking: Multi-family Dwellings (Outside Coastal Zone): One (1) space per studio or 1- bedroom; or two (2) spaces per 2- bedrooms or more. Guest: No spaces required for properties located outside of coastal zone For condominiums, at least one space must be covered. Residential development must provide its parking onsite. 14 Residential Condo. Units: 6 units = 1-bedroom 8 units = 2-bedrooms or more 1 space X 6 units = 6 spaces 2 spaces x 8 units = 16 spaces 6 + 16 = 22 22 spaces required (11 must be covered) Time Share: 1.2 spaces per unit 13 Timeshare units proposed 13x1.2 = 15.6 = 16 16 spaces required Commercial: One (1) space per 300 sq. ft. of net floor area. 4,529 sq. ft. v 300 sq. ft. = 15 15 spaces required Total Spaces Required: 22 + 16 + 15 = 53 spaces 22 spaces must be provided onsite for the 14 residential units proposed. The remaining spaces can be provided onsite, or satisfied via the Village Parking In-Lieu Fee Program. 53 spaces provided. 33 parking space are provided onsite via an enclosed at-grade parking garage and tuck under parking. These spaces satisfy the project's requirement to provide 22 residential parking spaces onsite, all of which are covered spaces. The remaining 11 onsite parking spaces will be dedicated to the timeshare use. Therefore, all required commercial parking (15 spaces) plus the remaining timeshare parking (5 spaces) for a total of 20 spaces will be provided through the participation in the Village Parking In-Lieu Fee Program. Public Parking Lots C (50 spaces) and D (78 spaces) are located directly across State Street to the west. In addition to Parking Lots C and D, Lots A (55 spaces), E (39 spaces) and F (43 spaces) are also located within 600 feet of the project site. Findings of support are discussed below and also in Planning Commission Resolution No. 7073. Yes CT 14-01/RP 14-01 - STATE M Novembers, 2014 Page 10 USE 30 TABLE 6 - VILLAGE MASTER PLAN, LAND USE DISTRICT 1 (CARLSBAD VILLAGE CENTER)(CONTINUED) STANDARD REQUIRED/ALLOWED PROPOSED COMPLY Compact Parking A maximum 40% ofthe total number of parking spaces provided on-site may be constructed to meet the requirements of a small or compact vehicle. 40% of 33 spaces = 13 spaces 8 compact spaces provided. Yes As discussed in Table 6 above, the project proposes to satisfy its requirement to provide 20 parking spaces off-site through participation in the Village Parking In-Lieu Fee Program. The fees collected from the Village Parking In-Ueu Fee Program are deposited into an earmarked, interest bearing fund to be used for construction of new, or maintenance of existing, public parking facilities within the Village Area. For the purposes of determining participation in the program, the Village has been divided into two (2) parking zones (i.e.. Zone 1 and Zone 2). Outside of the Coastal Zone, a property/business owner is eligible to participate in the program if located in either of these zones regardless of proximity to an existing or future public parking lot. The subject property is located within Zone 1 and is also located within 600 feet of five (5) existing public parking lots (i.e.. Lots A, C, D, E and F), which combined have a total of 265 parking spaces (see Attachment No. 3 - Village Public Parking Lots). Lots C and D, which are located directly across State Street to the west, consists of 128 parking spaces. In accordance with the standards set forth in the Village Master Plan, developers/property owners within this zone may be allowed to make an in-lieu fee payment for up to one hundred percent (100%) of the on-site parking requirement for proposed new development, conversion and/or intensifications of use. The project applicant is requesting participation in the Village Parking In-Lieu Fee Program for 20 parking spaces or 37% ofthe total required parking for the project. As a condition of project approval, the applicant shall be required to enter into an agreement to pay the parking in-lieu fee prior to the issuance of building permits for the project. The current fee is $11,803 per required parking space to be provided off-site. In order to participate in the Village Parking In-Lieu Fee Program the following findings must be made by the appropriate decision-making authority: 1. The proposed project is consistent with the goals and objectives of the Village Master Plan and Design Manual; 2. The proposed use is consistent with the land use district in which the property is located; 3. Adequate parking is available within the Village to accommodate the project's parking demands; and 4. The In-Lieu Fee Program has not been suspended or terminated by the City Council. Justification for the above referenced findings is as follows: 1. The project is consistent with Village Review Master Plan and Design Manual in that the project assists in satisfying the goals and objectives through the following actions 1) the mixed-use project stimulates property improvements and new development in the Village by constructing a new permitted mixed-use building in an area with a mix of dated buildings and increasing the intensity of development within the Village; 2) it establishes Carlsbad Village as a quality shopping, working and living environment by providing new employment opportunities; attracting additional tourist- serving uses; increasing the number, quality, diversity and affordability of housing units within the Village; and reinforcing pedestrian retail continuity within the Village commercial areas; and 3) improves the physical appearance of the Village Area by redeveloping an underutilized site along CT 14-01/RP 14-01 - STATE MWD USE 30 Novembers, 2014 Page 11 state Street with a new attractive building that adheres to the land use regulations and design guidelines set forth for the area; 2. The proposed use is consistent with the goals and objectives set forth for Land Use District 1 of the Village Master Plan and Design Manual in that the mixed-use development not only provides mutually supportive uses in the form of residential, timeshare and commercial uses along State Street, but reinforces the pedestrian-orientation desired for the downtown area by providing new residents and timeshare occupants an opportunity to walk to local shopping, dining, recreation, and mass transit functions; furthermore, its close proximity to existing bus routes and mass transit help to further the goal of providing new economic and residential development near transportation corridors; and lastly, it will contribute to the revitalization of the Village area in the form of a new building at the southern end of State Street; new commercial lease space, new employment opportunities and new consumers; 3. Adequate parking is available within the Village to accommodate the project's parking demands. Based on the most recent parking study dated August 2012, the average occupancy for all public parking lots is 63%. This utilization ratio allows for continued implementation ofthe parking in-lieu fee program because it is less than the 85% threshold for maximum utilization set by the City Council; and 4. The In-Lieu Fee Program has not been suspended or terminated by the City Council. Based on these findings, it is staff's recommendation that the proposed project warrants granting participation in the Parking In-Lieu Fee Program for a maximum of 20 parking spaces. If the City Council grants participation in the Parking In-Ueu Fee Program the project will satisfy its parking requirement as set forth in the Village Review Master Plan. C. Inclusionary Housing The City's Inclusionary Housing regulations (C.M.C. Chapter 21.85) require that a minimum of 15% of all proposed ownership units in any residential project be restricted to lower income households. As a result, the proposal to construct 14 residential units requires a total of two (2) inclusionary units. The applicant proposes to construct two (2) three-bedroom inclusionary units onsite. One affordable unit is located on the third floor and the other is located on the fourth floor. As required by C.M.C. Chapter 21.85, the project has been accordingly-conditioned to require the approval of an Affordable Housing Agreement prior to recordation ofthe final map. D. Subdivision Ordinance The project currently spans three (3) legal parcels (APNs 203-297-06, 203-297-08 and 203-297-09). As part of the proposed project, the lots are proposed to be merged into one (1) common lot that will accommodate 28 airspace condominium units, consisting of 14 residential units (two of which are affordable), 13 timeshare units, and one (1) ground floor commercial unit. As conditioned, design of the proposed tentative tract map and the improvements are consistent with and satisfy the requirements of the General Plan, Village Master Plan, Titles 20 and 21 of the Carlsbad Municipal Code, and the State Subdivision Map Act. In addition, the design of the subdivision and the required improvements will not conflict with easements of record or easements established by court judgment, or acquired by the public at large, for access through or use of property within the proposed subdivision. All easements have been identified and none are affected by the proposed subdivision. CT 14-01/RP 14-01 - STATE MWD USE 30 November 5, 2014 Page 12 E. Growth Management The proposed project is located within Local Facilities Management Zone 1 in the northwest quadrant of the city. The impacts on public facilities created by the project, and its compliance with the adopted performance standards, are summarized in Table 7 below. TABLE 7 - GROWTH MANAGEMENT COMPLIANCE STANDARD IMPACTS COMPLIANCE City Administration 48.67 sq. ft. Yes Library 25.96 sq.ft. Yes Waste Water Treatment 30 EDU Yes Parks 0.10 acres Yes Drainage 1.8 CFS/Basin B Yes Circulation Existing: 56 ADT Proposed: 397 ADT Net increase: 341 ADT Yes Fire Station 1 Yes Open Space N/A N/A Schools (Carlsbad) Elementary = 2.39 Middle = 1.18 High School = 1.02 Yes Sewer Collection System 6,492 GPD Yes Water 7,792 GPD Yes Properties located within the boundaries ofthe Village Master Plan do not have a Growth Management Control Point or an allocation for dwelling units. Pursuant to the Village Master Plan, based upon the gross 0.413 acres on the site, up to 14 residential dwelling unit may be built. Therefore, as 14 residential dwelling units are proposed, a total of 14 residential dwelling units are proposed to be deducted from the City's Excess Dwelling Unit Bank. Pursuant to Planning Commission Resolution No. 7073, the allocation from the Excess Dwelling Unit Bank can be supported. IV. ENVIRONMENTAL REVIEW The City Planner has determined that the project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment, and it is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to Section 15332 (In-Fill Development Projects) Class 32 Categorical Exemption of the State CEQA Guidelines. The project is consistent with the General Plan, the Village Master Plan, and the Zoning Ordinance; the project site is within the City limits, is less than 5 acres in size, and is surrounded by urban uses; there is no evidence that the site has value as habitat for endangered, rare, or threatened species; approval ofthe project will not result in significant effects relating to traffic, noise, air quality, or water quality; and the site can be adequately served by all required utilities and public services. In making this determination, the City Planner has found that the exceptions listed in Section 15300.2 of the state CEQA Guidelines do not apply to this project. A Notice of Exemption will be filed by the City Planner upon final project approval. CT 14-01/RP 14-01 - STATE MWPb USE 30 November 5, 2014 Page 13 ATTACHMENTS: 1. Planning Commission Resolution No. 7073 2. Location Map 3. Village Public Parking Lots 4. Disclosure Statement 5. Reduced Exhibits 6. Full Size Exhibits "A - Q" dated November 5, 2014 N NOT TO SCALE SITEMAP State Mixed Use 30 CT 14-01 / RP 14-01 RUE DES CHATEAUX : BEACVI'AeC* L Parking Lot Jl Spaces A 55 . B C 50 D 78 ' E 39 F 43 / G 26 s H 30 I 12 J 469 , 600-Foot Radius ffl CHESTNUT AV nrrrn JAcbgis\pra(luots\planning\Public NoBce\2014 Public Notice Maps\CT 14-01_PARKING Village Public Parking Lots <; n Y Of DISCLOSURE STATEMENT Develotimen t .Seryjces Planning Division 1635 Foradoy Avenue (760) 602-4610 www.carlsbadca.gov Applicant's statement or disclosure of ~f r'liri «f"iz require discretionary action on the pari of '(•-:•=! C tv or Committee. r^t' p interests on all applications which will inundl or any appointed Board, Commission The following information MUST be disclosed at the time of appiication submittal, cannot be reviewed unlil ihia inrotintdioM it v^uuipisjitu. Fiecase pi ini. Your project Note: Person is defined as "Any individuai, firm, cr.-ps, 'n£r-'r''|-;, joinl venture., association, social tlub, fraternal organization, corporation, estate, tiusi, ie\.tt:iju, bynd.uuLe:, ii; this and any other county, cit/ and county, city municipality, district or other political suLciiv ••,.,n:\ j .; n / oli-ier group or oqmtination actlni j as a.unit/' Agents may sign this document; however, ihe legal name and entity of the applicant and, pfpperty owner must be provided beiow 1. APPLICANT (Not the applicant'? agent) Provide the COMPLETE, Lli.3AL nan^ei financial interest in tne apnlic?.','n. include the names title? .'Vj'fjr<^Hf' ana addresses of ALL oersoms i:ii t includes a porporatiop or 0" al inrf'urdua!? o^fiii.na more than shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHAREIS N THF SPACE BELOW. a having a partnership. INDICATE NON-/iPPLICAB!.P_ (N/A) ' corporation, 'ncludo ihe ^ar.^6s, titles, separate page ir=ay oe ar'airi-.e-.i -.J • letiJi Person Title Address and addressfrs of Jhe :;o-porate (pfficers. (A ^roParl OWINit-.R (Noi trse Ovvner ^ aC^tiCitji _iyEGAL iiaunea anu jidjiet>5»e!i> ol ALL ptrsons Provide tiie COMV LBW- ownership mlefest m tne piopeuy ici'^oived Aiso, provide the nature ownership (i.e, paitneiship, eiianh ir r.nrmpr non-profit, corporation, ownership mcludeis a cor^cisli:or r: in^:t:roi_vp mclude the namsf;, t.ttes, all individuals owning n.oit t,-i,,:.: . . . >r,:i.es. 1!' =N"J f'JDVILVjA.LS THAN 10% OF THE SHAKIii. ^-•LL:A.:/- SPACE BELOW. If a Dublic^/jDW.ne(.i _corpoi^^ include the names, adc K'i•? of l;'^? c(. ipojait . "lu r.s separate page may be attached if i having any if the legal iAc). If the addresses of OWN MORE MON-.sPPLIC.ABLb (|v|/A) IN THE titles, and ) Person ^_ Title f_ £^ Addre<ss GDrp,'r"Art_ ne(;essary. itic p-1 (A) 0% of the PLEASE publiclv-owned T£ST9S90S3T Reuised 07/10 :aioj-j S2:0T: A003-0i;-AbU NON-PROFIT ORGANIZATION OR TRUST If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust, list the names and addresses of ANY person serving as an officer or director of the non- profit organization or as trustee or beneficiary of the. Non Profit/Trust Non Profit/Trust Title Title Address Address Have you had more than $500 worth of business transacted with any member of City staff, Boards, Commissions, Committees and/or Council within the past twelve (12) months? I I Yes S^o If yes. please indicate person(s): NOTE: Attach additional sheets if necessary. certify thal/allAhe pbove information is true and correct to the best of my knowledge. Signature of applicant/date ,^-?a-L^ /^^^^ iriofu.£^ Print or type name of owner Print or type name of applicant Signature of owner/applicant's agent if applicable/date Print or type name of owner/appiicant's agent P-1 (A) Page 2 of 2 Revised 07/10 S^i:>K-£N , V8u S?^ 8/S"d s(700fi; •^^g.j: 01 ipptqc;q0c;PT :IU0J-I CP:RT J ITIPIP-ITiT-JIHI.I STATE MIXED USE 30 MIXED USE DEVELOPEMENT ai«i/RPi+oi MAA Architects 6tV». SUKT / www BBCflOMH LH uwacM-ceaiaTTnAM L-4 H*THl«; 9oeo STATE »n«er MONC COOE DATA: 300 cM.jpomu Rl i»u» TO M "iwwBr ne ME M^TiM Ih* TIC MS VUMBMMfHIV-W VHi>«B KWW PWdPW W IMiUBlV IMPfC KMOO. iMsrvci TRBMSKM RTMI. / M»*aiCM. / l*lMKm MOM AID «0]K1B) WAm USftg IKW. DEsaumoH eOSTWft HMCtHnM. LOTS (9 TOTiH. LOTtt -ueBi-AffiA. IOM»H>(M9HAC«vE «AMDE . Mloncr^ HAA ANCMTKTB, MC. aB 9ALK AvwEjum a CAM.SBW, CAm«HA « MCM STATE snver •l},CM.RMAOOI 9»7<jVAN)3cnj|!a). -j««»CBmM.ceteaiHTs- cu a ERMOCM t Cti i HSMXM -<tt RcaMNTM. vMnMMnMtT. n]9eeE«0W,v<iviieM9J!Mm -(«C<»<«UIM.T>tBhMCMre. r4t3eB3KKM -sTowacfwsar) 4THfwe«(ii»mwT*u, -M)M9«omALceHEiciutn< c» 3 iraioa<i • lU i erowoM -fU KBMCBnvw.'^MmwiiWT. (VsnMEMMdrreavAaEiMn? HO* ort« Be 1^ swMoaw m* iwi »TAWMO s A» TEfTAt, FAmweAME AMSA. Ncrc 0Amm«UHeu««i»nwAitKiw^nH>A«sia«oi<Fio3itn>i« CAttRCIAL l"e»A».(4Ml «F /30M aMCKw. mesHMe ns iHn X u MLn pAHtr Anwrnoffcu ectw. IMTS xaj MLn rAMi.YcoKo fSH worn itm x a itt.li wir cntw ib-3 MK Ufts X a -WWAie: fo PAOTMS arAOS pwiflCHJ- ^ nMouw SPAces fKvcBi (M iWAL PwwBor ofw BF COWDOMMUMNOTI wAiaiiciaKnE pfOKTOK cr nnjc WM3 wi>a ccHMPc pgise&^PwMcmicK'.M. Ai£nfltftm.KftBMnB> IKSKATNSME icMiM KK tw icoesT Km M AMLTSS AU. IW nmic iNTS er Aa (wwasmAL AW (WWwiAUBWia c«»e»«i^ WJS tcrai TD DRBMC1W liMM AW era cr MHlTBt MUC kcnn APPROVED TlflS !S -niO APPROVED TENTATIVE MAP-SITE l.AfJ FOR PROJI-XT NO ?fR CONDH ION NO OF PLANNING COM.MISSION RESOLUTION SO o m UJ Q UJ K TITLE SHEET A0.1 a 1+01 / RP 1+01 IN MAA Archilecl! O rn D ! UJ ! PM. AJ IUVWM. ^ PUWXO T«iA4 SITE flAH A1.1 rriJiTLA.1 ' uxorcMia^r*9Merrr a wn / RP i4<n MAA Artbitect! O Q S UJ t! >< ^ 2 s '^^jtt. STATE « OAK 1(>-*II-A2J FIRST FLOOR PIAN FIRST FLOOR PIAN A2.1 a 1+01 / RP 14«l IH MAA Archilecl! O ro UJ 3| Q S >< ^ to 5 tVcjtt. STATE > <W NOTE; Aa UNITS R-2 occ. i^lLINS f€!i5hT TTPE 1115 CONSTWC-TION wfei*. A f-MAWiUfl 1.3*14 SfCOND FLOOR PIAN SCAL^T . I'-O" NORTH • SECOND FLOOR PLAN A2.2 a 1+01 / RP 1+01 IH- MAA Architects NOTEt ALL UNITS R-2 OCO. 'i-O- CEILING HEliSHT rrPE 1MB CONSTT3JCTION THIRD FLOOR PIAN mm JL. SCALE, l/ft' « l-O' ^5^^ o m Q S UJ i±: 2 s A THIRD FLOOR PIAN A2.3 PUAWER BELOW NOTE, AU UNITS R-2 OCC. I-O' CEIU'*5 HEISHT TYTT II !B CONSTIiUOTION a 1+01 / RP 1+01 MAA ArchiKCls O ro UJ ti; ruu**» %34^-' FOURTH FLOOR PLAN FOURTH FLOOR PIAN A2.4 a 1+01 / RP 1+01 IN MAA Aithiieds O ro 3| Q S UJ e; |l CO STATE 1 iSAK A p^wwe iJ/JCinS Pvo«No ioor* A TOTAL FOOT AR&\ - -7^3 5<3tSARE FEET EhMtTSle ROOF PLAN ROOF PLAN SCALE. " r-O" NORTH A2.5 nomiomK. corosre MSHOCD rAMawe A«OIT SKWW SniCCt* TtT^CAL - VCKnCli I«9l30 FAtCUM - LMC cr 47 CUMIOLASS «M(CML " JMCeLOKDSHSOW.SKCe cectxuTMc Mft' perAi. HUH DttCKAITve >CTAL (WTtiMet ' K WOP ITTAJl aLAZlW iwf: M9l TKAMUSCBir CAKTT W ce^KArvf »CTAc ewwaoHM LN: isr ExtsTW ftiSN SKAce . 50(yrH ELEVATION SC-ALHi i/»- • r-O" HATWAi Bwoc - WTOCWA4. HAiuM. cemsTTt nxojw A£<2W SMajw snjciu Tme* wwiiMrAL coroms itcmceo wtmjm - UNE er «• MR* OfM SLW tUWKAL )L ccw»TE wee rAmxs a 1+ot / RP 1+01 /// MAA Archilecti O ro UJ to BUILDING ELEVATIONS SCALE; 1/6' • r-O' A3.1 wrt- Ajicireciii(At.nATiM9enm«««'-o-swu. NPT wtAat n AW my K« stwiitwr BE /eeoanns! NTH TW kNrs EB.CH a 1+01 / RP 1+0) MAA Architects NORTH ELEVATION lion, AKMTW1UCAL PEA11RS9 BUmMtS 4!'.^ WAU. M3T S USCAflLE tl>Wr MAT NM 9MJ. nn- SCALE, i/b' » r-O" o 1« LM <r DOSIMS fWISH W« •• £45rHfW\r/ON SCALE. I/*' « I'-O" BUILDING ELEVATIONS A3.2 OTY OF OCtWISlOE TENTATIVE MAP - "STATE MIXED USE 30" LEGAL DESCRIPTION A PORKH a IHACI 106 » CAIP.SflAO lAWDS, ), CQUNiy » SMI WW SIA'E » CAl»CRHA. A tr OTFICF OF W CfWHIV WCtMDf.H Of OWNER/DEVELOPER 3068 STATE SWET, ILC 539 CARISBAD MLIAOE ORW. SUITE 100 CARlSaW, CA Kooe (760) 434~W00 CONTACT: JOW 5WCM5 TOPOGRAPHY s^JR^CY K * s EteaNEEJaw.»«. 7501 UtSSKW CENIER COURT, SUTE 100 SAN C^GO CA, 921Ca (819) 298-55S5 BENCHM/^K DESCflFTWN; !5* B» CARLSBAD CT- 1-1-01 / RP H-Oi SHEET 1 OF 3 SHEETS SITE ADDRESS: 30B8. 3080 STAIE STIEET. S*0 OAK AVCMX, CimsOtD CA 92008 ASSESSOR'S PW^CEL NO.: 2OS-M7-08. 08 » 09 EXISTING ZONING-: w - ytxtix REcev. LM) USE OIST fi EXISTING L;WD USE.: RtSCEHTIAI. PROPOSED lAUO USE: un<ED \m 1? RLSntNIIAL IMTS (CONDOMINMilS) 2 RESOENTM. IMIS {AFF0f9)Aat£) 13 BE^CENHAL LHfTS (TWE WARE) 1 C0lilU»)OAL RETAIL UMTS (492« SF) EXISTING NUMBER OF LOTS: THREE (3) ill- EMSr. AC PAYMENT-' - DSST. RBBON a'TTES ALLEY TYPICAL SECTION NOT TO SCAII EWST. aOEWAtK-^ EWST, CURB « ' EaSI. AC WrtlCPtT -'-EMST, SOEWAIK •T^ QF C*nSB*D ait PT «a. 130 NAJIff: OBS-IJO LS 6!'5 ElEVAIKW 43.067 ftAVDSa DATUW: I1I.S-L MEAN 5E* iXVEL STORMWATER 0 OH IWS PROJECT TO «340VE PCUUTMITS PUBLIC UTILITIES OAS ft ELECWC: TElEPMOtf: nPE PROIECTWH: SCHOaSt WAHft SE<CR! STORM DR*M: SAN KGO GAS k ELECTRIC SBC CLCeAl/ATTAT art OF CARISBAD r>«ISB«D IMFIFO SCHOOI [USTRICT CAHISBAD UUHrafAl WAUR IKirHICr nr( Cf CARISBAD SHEET INDEX PUL SHEET T aJADStC PIAN 9«n J EWBIS/OETAH SMEO 3 PROPOSED NUMBER OF LOTS: ow(0 TOTM. BUILDING COVERAGE: 16.1» 50. rr. (BS.7X) BUILDING SQUARE FOOTAGE: 53,731 SO. n. USABLE LANDSOtf'ING SQUARE FOOTAGE: 3,3" SO FT. (t9.5X) PARKING: 33 (BKUIDtfi 2 IK) GRADING: AS sfrm PROJECT WATER USAGE: fitSBENTlAL 250 GPO K 27 0<J - S.7» GPD COiMERaAl: JJ CPD/SF | «,529 SF- 1.0*1 GFO BUILDING TOTAL 7.79? GPt> / U« - 5.41 GPH PROJECT SEWER USAGE: OAK A\^NUE TYPICAL SECTION NOT TO SCAli CA I EHST. AC PAVEMWT-' EXIST. snEWAlK STATE AVENUE TYPICAL SECTION NOT TO 5C«£ AVERAGE DAILY TRAFFIC: • fiOBSiTlAL 8 TRIPS/DU t 30 IWTS • 210 WT ' flETAR.: 4/1000 SO. FT.- 0.04 X 4529 SF - tBI AOT TOTM. ACT - Ali CONDOMINIUM NOTE: TWS IS A MAP Of A Ce»«)«*NtUll PROJECT AS DEFWED M SECTICH 1350 Et SEO, Of WE 0«L CODE OF THE STATE OF CAUFORMA AHC IS FRIT PURSUAKT TO WE SUenvi9CM ACT. TW NUVeEX OF CONDOHMKM UMTS ts 28. 14 R£S»£NTI.AL UWTE, 13 TK SHARE UMTS ANO 1 COMIBKIAL WfT. TOTAL DISTURBED AREA: 18.006 S», 0.4^3 AC (lOM CF THF Sti MASTER DRAINAGE BASIN: BAsm e PROPOSED DR/MNAGE DISCHARGE: i.a CFS APPROVED OF PLANNING COMMISSION ReSCH.LmON NO PLWflNQ fWia^ON DATE ENGINEER OF WORK {6?9) 296-5565 01. 2014 Fcx: [B19) 296-556^ TENTATIVE MAP - "STATE MIXED USE ,30" A { EXSTSTBUCTLBE | •(?' CARLSBAD CT- 14-01 / RP M-01 SHEET 2 OF 3 SHEETS pROPran- m. tasrm wm SERV. <' Ensmc SEVER wv./co VKTm SEND) UAW EVSKW) MIER IWUN E»SltNC GAS HMt EXBItW TaCFHONE L«E EUSDNG OMERHCAO ELECTRIC UNE €asim POKR POX WTK UOUNTED STREET UGHT Eiasi?its CONCRETE EnSIMG TREE EaSlWC WWEWV £>Km OOOO FEHCC EXISTMS CURM CUTIED TO BE REMOWO PROPOSED IMPROVEIiOffS MM 6* OTO * GUTTER PIR RSD G-2 SIDEWAIX PER RSD &-7 2*' mai D»«1*Y PEH RSD G-I« SnXWUt UNOERDRAm PDl RSD D-27 THE AmKANT SHAU SUBWT A LETTER REPORT MDOTMG THE REA50N[S) FOR THE REQUEST (TOR GOOD CAUST) AlCHO WW M Mti.'m OF AH »C FIXninE UMTS OF AU RESlDOim MD co«i«Ra*L/onicE COHDOI«?«JIIIS SEBVQ> ar KASIEB PUBUC METERS. THS *HAITSIS IS USED TO DETERMRC THE WJMBER AHD SZE OF HASIED PIMIC SatR LATERAL coHESix: «ATE« seiyicE mw BFP DRieATKW WATER SERVICE WIH BFP CONSTRUCTiON NOTES 0caNStmjcTe' cum k currED PER ASDC-Z (DcONSHtUCI SMFWAIK PER RS) B-7 Al.ONG THE HJTIIS PROJECT fWNTACf ® COMStRUCr 24' WOE DfitWWAY PER RSD SOC -IAA ® COKSIRUCI FIOW THROUGH RAHIIR (Sd DETM. SIFEI 3) CD CJOSIMB CURS RWP TO REHAIN ® COKSMtCT cure RAW TYI% 0 PER SOG-136 WIH TRUttCATQ) DOME PB1 fBD SOG-130 SmKfK. EXtSlWi; DRnCWAY CONSTRUCT SSCVUIK UNOQIORAIN PER RSO Ef-27 ® CCMSTRUCT NEW WATER SERVICE (SIZE TBD) SEE NOTE AT RGHT ®E»STING fOKH POt£ TO SC ROIOVED (|$E»STMG SEVER UIERAL 10 BE WMXMED @ CONSTRUCT SACK FLOW PREtGlIER OEWC MTH FCC ASSEMBLY CONSTRUCT NEW fl' SEWDI LATERAL EffiTING SEWffi SFRWE. CCMNECT BASFWNT DRAWAGE Eiasr IMnCAD ELECIK UNES IO BE UNDER OtOUNOED MXNG THE PROJECT FRONIAO: CONSTRUCT lANDSCAPE 1RFF mi. W/D GRAIE PAvEien AUMG Aurr TO IHE SAWACDOK or tsnM GRAPHIC SCALE i DUST. 5D ' AtJniW UL91C ENGINEER OF WORK Wi IClS»l Ccnii (619) 296-5565 in Diej), tk nm Foa: {6t9} 296-5564 TENTATIVE MAP - "STATE MIXED USE 30" FLO* THROUGH PIAITER {TiP) SEE DETAI RIGHT CARLSBAD CT- H-01 / RP H-01 SHEET 3 OF 3 SHEETS Itf otAvtL (j/r m s/lT) wt APPTCWn UAIQUL HRFCRATED PW TO RIM tOKHT ROOF DRAINAGE/BMP EXHIBIT scAj;.- r-20' DETAIL FLOW THROUGH PUtfjTER MOT SC«i SITE DISTANCE/ FIRE HYDRANT EXHIBIT SCAl£: l'-20' APPROVED ENGINEER OF WORK THIS IS THE APPROVED TENTATIVE MAP/SITE PLAN FOR PROJECT NO PER CONDITION NO OF PLANNING COMMISSION RESOtUTION NO IP K&S ENGtNEERING, INC. TWrwg_Bm»&rt^ Strvayfcig Y O:^^^" qrfiSb* 01. 20i« THIS IS THE APPROVED TENTATIVE MAP/SITE PLAN FOR PROJECT NO PER CONDITION NO OF PLANNING COMMISSION RESOtUTION NO (619) 295-5565 Fo>: [619) 296-5564 PLAWflNO OtVlSICN DATE B^GINeERWG WVISIOM DAT! (619) 295-5565 Fo>: [619) 296-5564 NORTH SinCl«!^DSCAPING PLANT SCHEDULE BCWiSSNAffl EXISTING TREES EXISTiNGUTILIIIESfWieR, SEWER, ETC) IN COWLICT WITH PFOPOSH) TREES SHALL BE PELOC'lEOASHEQUIFUiD ICW LANDSCAPE l^i RWSED PLAffTE! HEVi LANOrrf-JSPE TD BE SI (ORT l« EiATUHE !0MAIMAINBUHDING V/INDOiV VISASILITV [cJ PROPOSEO S^REH TREES i • NEW JACAR,\NOA TF^ES IH muPf^SED PLANTING VVEi LS .^ONG STATE 1 OAK STRFFTS PROfcPTY L<Nt I SO"; OF THE SHRUBS SHAa 8E A MiNIWUMS GALLOW SIZE - FOR TTIE ENTIPE SITE. I eiiH-D:NaF^OH'AGt; CARLSBAD CT U-01 / RP 14-01 JACWWfflAMIMOSIFaiA WOO'-ETlABffyRCATA BOTANICM. ^^A^.g COkftlON HAV<E azE DtAHaLATASWANtCA SILVER STFSA!* VARIEGATED FLM Lfl-V 5 GAL DIETESX NCLAAIBA STRtLiTZIAREGINAE GROUWD COVB^S BOTANICAL NA>.g KATRINA AFRICAN iR!S 5 GAL BiPDOFPAPiACH^ 15 CCm^ NAME CONT SPfCm CTV CALII-OHWA MEADWV SfcDGb 1 GAL 24* o.c 144 TRACHELOSPERMUM JASMIHOIDES STAR JASMINE INERT/HARDSCAPE LEGEND SVIilSa DESCRIFTiON r BLACK 8E,*CH PEBBLE SimX DESCR1P7I0W I 2-WDWOOO MULCH lAYH? NOTE: 11* SPECIPIC IM5ICATED Dt MAINTENANCE RESPONSIBILITY: CHWcR IS RESP0NSI8LE FOR THL fflllRE DEvaOPHSKT INCiyDING AU FtV/ATE ANO COmON AP£AS CONCEPT NOTES: FLOw-rmcjGH PLANTER ALL NEW LANMCAPB AND iRRlGAI ION SHALL BE IN CONFORMANC* WITH iHE CiiV Of- CARLSBAD LANDSCAPE MATiUAL, OTJINWCE AND BEWPEKIEWS. ALL LANDSCAPE AREAS ARE TO BE IftRKJA.TH) BT A COMPIETELY AI/TOM.ATED IRRIGATiOT SYSTEM - UTIt.f7ll4GAKAUTC»1ATPCCONTRaiER REMOTE CONTROI VAL VPS, iOWPRFCIPTFATIOtl HEADS AND L»«tRGR0UN!3 PIPING THt DOMtSHC SVSttMWH.L BE l^OlSCtH) BV A RfeDUCfcD PRESSUt^BACKFLWlf^VEhTTER WATER SOURCE IS EXISTING THE SYSTEM WdL BE PROGRAMMED AND OPERATED TO MAXIMIZE TfC^FiCIENCV THE SYSfl AND UMIT WATFR CDNKjMPTKDN THE SYSTFMVVIU BF DESIGNED TO ACHffilVE 100% COVER; PLANTMG «?EAS TO RECEIVE A 2' tAJLCH LAYEH OF fOP^ST HUES «GR1 SERVICE FfOOLICr^ E'JUAL Tb€FRC*ERn OWNERS WILL BE RESPONSIBLE FORTHE MAINTENANCE OFTHE PROJECT LANDSCAPE AHD IRPJGAT10N SYSTEMIS) WOODY a^RUBS SHALL BE PLANTED OVER HERBACEOUS GROUUDCC^^fi «!EAS TO COVER 60^ OF THE GROUND COVER AREA (AT MATURE EIZEI EVERGREEN RjlNIS 8E USED TO GCFttEN UHSiGHIiV ELEt-IKTS AND SiiAti 8E SPACED TO PROVIDE icon SCREENING WITHIN TWO (2) YEARS OF WSTALLATION TREES SHAU. NOT 8E PLANTED WITHIN A PUBLJC UTILITY E/.SEt.'ENT UNLESS OTHERWISE APPRC'>tD BY THE CITY AVCfl} RENTING TREES ANO LARGE SHRUBS ABOVE OR HEAR SFiVER lATERAlS WATER MAINS. I.IETER 80)15 AND OTTiEn UTS.ITES ESYeiBI^ STREET TREE NOTES: A MfNIWJM OF SEvej (Tl FEET FROM «<Y S£mR LINE IN AREAS THAT DO NOT CONFfLCT WII« PUK.K; UTILITIES OUTSfDE OF Si&n DISTANCE AREAS A MNIMUM or THREI (3) FOn" Ol/TS(CE THE PUBUC RIGHT OT WAY, UNLESS APPROVED OTKER\WSE BY Ttffi CITY STATE MIXED USE 30 3068 State Street, Carlsbad, CA LANDSCAPE CONCEPT PLAN t AM FAWLWR WITH IWE t«OUIREI«NTS FOR L*MiSCAPE ANO IRRtGATlON PLANS CONT AWED « THE CITY OF CAFa.S8A0 3 LAHDSC*i=^ lAAHUAl A^•D WA'^ EFFICJENT LANDSCAPE REGULATIONS ! HAVE PREPARED THIS PLAN IN COMPLIANCE WTM THOSE REGUU^'IONS AND THE UND3CAPE KUNUAl AND AGREE ID CW^Y ftlTH ALL REGumaCMTS WHEN SUBMITTING CONSTRUCTION DOCUMENTS I CERTIFY THAT THE R.AN IM=NEMENTS THOSE REaJLATIONS TO PROVItS EFFICENT uS€ OF L1 MflPIIHSCHWm RtA N V I R O N S I' I • -1 <• ;: r IJ CARLSBAD CT1M1;RP IMI p.! I L i i .1 SECOND FLOOR THIRD FLOOR PLANT SCHEDULE - SECOND AND THIRD FLOORS Q o G COMMON NMC SLUE FIAME AGAVE FLAME KAFFIR ULY WRKANIRIS BOTWICAINAME AGAVE XBtlK FLAME- CLMAMWIATA-RAME™ OETESVEtSTA DI<WCLLACAERta£A'Lrm.EeeCCA-TM UTTLE BECC* FLAX ULY 1 GAL lMPATlENSW«.l£fflAMA BUSYLtZM LIRIOPE MUSCAH VARIEQA !A VAREOAT^ ULY Tu(^ NANMNA OOMESTICA •COMPACTA OWARF TO\VEM.Y BAMBOO OPHOPOGONJAPCNICUS MONOO(»ASS PEURGOMUM PELTAniM 'LAVENDER' LAVBIDB! IVY GERAMUM PfflLOKMMWX XANADU' F+flLODENKTON 5GAL PLANT SCHEDULE - SECOND AND THIRD FLOORS (CONT.) 5XC«^«MS BOTANiCM.HAME CHAM«=DORfAHFGANS PW^faXROEBR.ENH .^tWNDCO^, BPTAWCALJM^/ NAME PAWOfiPAfM PYGMY DATFPALM lOSAt. n CONT SPACING ROS*lflINflS0FFICINAU8'W«ITNOTONCAF5tT''-HimTiNGTONC«^reiROSEH*HY 1 G«. 3ro.c € IPT«fl(^M*MEi..O0^^ CCSfT SPACING QTV. ^ BOUOAINVlLLEAXBARBARARWSr BARBARA KWST BOUGAWVILlfA WQAL Iffo.c. 9 STATE MIXED USE 30 3068 State Street, Carlsbad, CA LANDSCAPE CONCEPT PLAN - SECOND AND THIRD FLOORS rj-i I M HSW If sc«i.r=iG--fl' - ENVIRONS L2 I Dicia CA CARLSBAD CT 14.01/RP 14-01 I I FOURTH FLOOR I PLANT SCHEDULE - FOURTH FLOOR o o DIETESVE(%TA DWCLIA CAS^EA 'UTTLE KCCA TM umpi vmcm 'VARSGATA' l«W*VH,lASAN0ERl'SCMa.FTF1li«^RNE['TM NANONA DCWESTKA GOWACTA* PELARGONIUM PEITATUM lAVeffiER' CYCAS REVOLUTA STROiraAREGIHAE ACCmT PALMS BOTANICAL NAME DMV^DOREAaEGANS PHCSJKROEBB-ENIt CYCAD&PALMS BOT WMCAl NAME HOWEAFORSISIiANA WODYETIAWFURCATA TTW:HaOS:>BWM JA5MIN0IDES AFRICAN IRIS LITTIEBECCAHJWLILY 1 VARIEGATED ULY rURF MMffiEVILlA DWARF HEA^^V BAt.eOO LAVBff}Bt IW GERMUUM JM^ANE^SAGOPAiM i BIF^OFP^DtSE COMMON WRg S PARLOR PALM 10 PYiarfYOATIPALM KENTIAPALM FOXTAIL PALM Sg.E, ,OTY 5 GAL 19 cgwr SPACWG STATE MIXED USE 30 3068 State Street, Carlsbad, CA LANDSCAPE CONCEPT PLAN - FOURTH FLOOR 'mm. L3 N V I R O N S CARLSBAD CT 14-01/RP 14-01 PLANT SCHEDULE-ROOF BO'TWICALNAME COMMON NAInS CfflfT OTY TRACKYCARWSFcmUNEI WINDMHXPALM tOGAL 4 SHfnBS BOTANICAL COtWOW NWE SIS AGAVE X'BLUE FLAW K.UE FIW« AGAVE 10 QAL INERT/HARDSCAPE LEGEND SVMBq DESCRIPTION ^^§,^1 ' •3'BlACKBEACS^ PEBBLE ROOF STATE MIXED USE 30 3068 State Street, Carlsbad, CA LANDSCAPE CONCEPT PLAN - ROOF scyiE:r=ifr-<r L4 ENVIRONS DROUGHT TW^RANT PbWTPWETTE DRIP IRRIGATION CARISBAD CT 14-01/RP 14-01 INTERIOR TRCWCM. TRW1CW-PLMJTBB MOCERAre WATER R>NT PALETTE DF»>IRreGATK3N ENHANCED PLANTING PALETTE DK\P IRRIGATION FOR SHRUBS Buem.FR IRRKATKW FOR TRFFS f LC«Y o SITE PUN -i-l iTltii: INTETOCK TTtOPtCAL INTERK3R DROUGHT TaHWiT TRORCW. low WATBl USF IHANTiNOPAlEHE DraPlRraGATION TROPICAL RJiNIlNG fdCXKRATE WfireR PLANT PALETre DRIP IRRIGATION SECOND FLOOR ffj| II INTERIOR IWOIKJHT TO^RANT TRffl-*CAL tow WATER Uffi' PLANTING PAl£TTE -1 I THIRD FLOOR HYDROZONE LEGEND: •STREET FRCWTAGE' - OfW AVE AND STREET IRKS • 7KS,F, • MODERATE WATER USE PLANT PALETTC • DRa>)fmi6AriON •STREET fiWHTAGE- - STATE ST M« NORTH SIDE OF ffifllDING • ?9IS.F. • LOWWATER USE PLANl PALETTE • DfHPHWIGATION •wreaoR IROPICAL-• iseesF. • MODERATE WATER USE PLAI*T PALETTE • DfW>«RIGAT10N •WrenjOR DROUGHT TOLERANT • sns.F. • LOW WA'reR USE PLANT PAIETTE . D«P IRRIGATION •POa'SPA' . 138 ST. • HKat WATER HYDROZONE • SPECIAL LAM)SCAre«*EA WATER SUPPLY: • EM8TIN6 WATCH SOURCE-POTABLE WATER CONSERVATION FEATURES: . \m PUTTING DESIGN UTIUZING REGIONALLY AfWOPRlATE. LOWTOMOCSRATE U^ PLANT MATERIAL • COMPLETE CW5ITE SOIL «*ALYSIS/TESTING • tfiSTAU.'DE^ ROOr TT»E8UBBl^S . tfiSTWlRAlNSENSOR • APPLY COMRfTE COVKAGE Of MULCH WITHIN AU PLANTING AREAS • MWNTAIN WT>ROPRlATE M«NTEH«KE . LOW vaUME OB SUBStflVACE MFBGATION SHALL BE USH) TO IRRIGATE ANY VEGETATKW WTHIN 24- OF AN MPERMEARE m*ftm UNLESS Tt« ADJACENT IMPERMEABLE SURFACES ARE (SSlG!«) AND CONSTFWCTHI TO CAUSE WATER TO DRAIN ENTIRELY INTO A UWffiSCAPE AREA. INTERIOR TROPICAL INTHWOR OROjGHT TOLBWfT WATER USE CALCULATKfflS TROPICAL WANTING MODERAtEWATER PLAN! PALETTE HWBRIGATION FOURTH FLOOR INTERIOR DROUQfr TaaWNT 1RCWCAL tow WATER USE PLANTING PALETTE DHPIRRIGATiai TROPICA, low WATER USE- PIANIMG PALEm DRIP IRRiGATfON FOR SHRUBS BUKIER BWGATION FCM TREES ROOF !EIO)(0.«) X 1(0.7 :< U)I * (0.3 « SLA)] - mWA Wtieie Elo » Rcfoenot EvapUrafnpiiadori 0.7 t EM At^uslmora Factor (ETAF) LA - LanchcapB Area 0.62 ~ Conversion FocUy (to gdons por sqiuro fool) SLA >• Special LOKtscspo Area 748 - CwTversiwi Faoor (lo hundrad cuWc fsatj (40.0 It aS2) I [P>.T % 3B4t)1 * {0.3 * 338)1' 749 = «9.3 HCF eSTMATEO TOTAL WATER USAGE (eia)(0.62) K 1(PF Jl HA / lEi • SLAI - ETWU Where Eto " R^ecaoce E\FHpa(ranspi'dlcin (GlUfS) PF Plant Factor (Kc| HA - HydiOTore *ea (squaTS (oQtagel O.eS - Conviersicifi Fudor (to 9iAons por square fool) IE - Itrigaiion System ElflcNmcy SLA • Specut UvKfccflpe Area 748 - Comnision Factor (to huHdrod cuftic tool) ETWU CAtCULATIOMS BY MYDHOZOHE P..:itBflKiat.DKM)Mlotearft &...'P«*./..SiC!B:.JHi*l.:::,SJlA 1(4GJQ X (aea) X {{0^ X T82 r JO) + 0.tq J 748 s 16^ HCF 1(40.0) R (0J2) I ({0.1 * 2M LBO) + Ojq / 748 K 3M HCF 1(40.0) X (0.S2) X l(as N ISOa r JO)« aOl' 748 « 33.11 HCF I{40A) X {0.S2) X 1(0J X 829 / JO) 4 0.0]' 748 - 10J1 HCF 1(40.0) X (0J2) X 1(8.8 X 338 /11338) / 748 > 9 J2 HCF TOTAL-72.7 HCF ETWU=81.4%HAWA ETWU ffa.7 HCF) < MAWA m.% HOT STATE MIXED USE 30 3068 State Street, Carlsbad, CA CONCEPTUAL WATER CONSERVATION PLAN run I m our « SCALE: r = Btr-O- L5 ENVIRONS 1)1 . '9 94