HomeMy WebLinkAboutCT 85-24; CARLSBAD RESEARCH CENTER UNIT 5; Engineering ApplicationCITY OF WLSBAD - ENGINEERING DEPARTIJT
APPLICATION
FOR ENGINEERING PLAN CHECK OR PROCESSING
Complete all appropriate information. Write N/A when not applicable.
PROJECT NAME: L' /k)Lor,'ñcC DATE: 14
PROJECT DESCRIPTION: jj
PROJECT ADDRESS: ADDRESS:
LOT NO(S).: MAP NO.: APN(S).:
NO. OF DWELLING UNITS: 0 LFMP ZONE: # LOTS: # ACRES:
OWNER: ____ APPLICANT:
Mailing Address: _ Mailing Address: qqY9 5.r i2'1
5/tv D/ç6'11 Q,.. '
Phone Number: (7(L' ) 9 / S Phone Number: ('9)
I certify that I am the legal owner and that all the above
information is true and correct to the best of rpy knowledge
Signature2 ,%c- Date .c/ir/oo Date
CIVIL ENGINEER: hkDaiC la J, k.41VAI SOILS ENGINEER: •-cj/ Cwvv
Firm: PIZ1/VçP1b/Nii14 Firm: C/1/057/4Ai ti/jl &E( L4
Mailing Address: q3'. ).J /9jijj 4j Mailing Address: '!2$ ille,1curjc1 SrneE'r
C4 q'ti ~1M
Phone Number: (559) 6 95" 3 44( Phone Number: (8) 49 6 9,760
State Registration Number: 6. 5j.q 9 State Registration Number: ( OOp'Z,o
ADDITIONAL COMMENTS:
IMPROVEMENT VALUATION
1 What water district is the proposed project located in? (circle one)
arlsbad Municipal Water Distrii Olivenhain Vallecitos
If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15%
contingency fee, for water and reclaimed water improvements (if applicable)? $
What is the total cost estimate, including the 15% contingency fee, for sewer (for Carlsbad
Municipal Water District only), street, public (median) landscape and irrigation, and
drainage improvements (if applicable)? $ .
What is the total cost of landscape and irrigation improvements on private property (if applicable)? $
QUANTITIES GRADING QUANTITIES
cut cy fill cy remedial cy. import/export _________ cy
Ix.csMIsronMs,AppLIcA1ION I: NO, 'LANGI IECK On PROCESSING C_7 ?- REV IOIOG(OE
- FOR CITY USE ONLY
PIancheckJ - Drawing Deposit/ Fees APPLICATION FOR
(/ alI that appIy) ' "Number Type Number Project I.D. 'Paid,
U Adjustment Plat 1 ADJP
U Certificate of Compliance COC
4 Dedicatibn of Easement '- - DOE
Type W*fl
Type
lj Encroachment Permit. '. '.,' . , ENCROACH
U EngineeringStandàrdsVanance ' ESV
U Final Map i . FM
U Gradin PlFick GRPC —
U Grading.. GRADING ,
'Impiovèment Planch'ëck' .. iPC . -
U Parl Map \ t ' PM
U Q'jitclaim of Easment QUITC r.
:Type:
Type
.'-'. • . . . 4 , 4 4. "t
ev U Reversion to Acreage, RTA
- -
U Street Vacation t - SW -ft .. ". . .
U Tentative Parcel Map MS
U Certificate of Correction CCOR -
El 'Covenant f&Easemth,t. S COVE'
U Substantial Conformance Exiiibif \',1 SCE
APPLICATION ACCEPTED By:
MASTER PROJECT ID
-
RECEIPT NUMBER:...., .-
- •
.
tv A
PRELIMINARY SIERRA SYSTEM INPUT INITIAL
SIERRA SYSTEM INPUT INITIAL:
R BASENPUT INITIAL
MASTER FILE NUMBER:' F
U OTHER: S S , DATE STAMP
APPLICATION RECEIVED . - .
A no I'i crt IS PPI IrT ON FMIr Pt ANCIIFCI< OR PROCESSING REV 10/06199
1•
I •.. REJEST FOR APPROVAL TOAEPT S,1eNr'
I EASEMENTS OR COVENANTS FOR EASEMENT (L'1'1 t
Prbjectj'lame:..
Project I No.: [I
1 3. Map/Drawing No.: DWG 294-1S APN:21 1-010-23 and 212-610-14
4. Type of Easement or Covenant:Sewer
Reason for Easement or Covenant:To provide land needed to construct and maintain offsite
sewer from Carlsbad Research Center boundary to the existina South Aaua Hedionda Trunkline.
(SAH3, SAHT313 and SAHT3A. This also includes land for sewer lift station.
6. Required by:
CIVIC Section: No.
Planning Commission Resolution No.2508
City Council Resolution No.8587
Condition of Approval No.54(a)
City Engineer Determination:___________________________________________________________
7. Title Policy Information:
Preliminary Title Report byFirst American Title Insurance Company Dated9/26/89
Subdivision Guarantee by Dated______________
Policy of Title Insurance byFirst Amercian Title Insurance Company Dated9/26/89
8. Subordination Required ( ) YES (x)NO WHY_______________________________________
9. Comments:
Submitted By:
Principal Civil Engineer
Date • ','-'--
Date !A~
Municipal Projects Manager Approval: Date___________________
or
Assistant City Engineer Apal: Date__________________
City Engineer Approva " Date___________________
City Attorney Approval: Date
City Manager Approval: Date_____________________
PLEASE SUBMIT TO CITY CLERK FOLLOWING CITY MANAGER APPROVAL
CASE NO. -
. - DATE:
- .' a- n_ - -S.. •_-* __- .; —. .'- - — - - . . r ENVIRONMENTAL-IMPACT ASSESSMENT FORM PART I - -:
(To be Corpleted by APPLICANT) .
Applicant: Union Pacific Realty
Address of Applicant:, Oakbrôok Plaza, 24422 Avenida De La Carlota,..
Suite 360,-.Laguna.Hills CA. 92653
Phone Number I 714Y 455-0866
Name, address and phone number of;person to be contacted (if other than
Applicant): Ray Martin 5620 Friars Rd., San Dieqo.CA 92110 291-0707 .1
GENERAL INFORMATION: (Please be specific) -
-
Project Description Extension of Halley-Drive from Carlsbad Research Center
to Camino Hills Drive for adistance of approximately 400ft. to provIde
secondary em-ergency access.
. Project Location/Address: Btwen Faaday Ave and El Camino Real, North
'of College Blvd..,,. • - . .
4 -
Assessor Parcel Number: 212 — 05.0 -30 (por) .
General Plan/Zone of Subject Property P1 /CM
- - . • •• •.;. - I
Local Facilities Management Zone Zone 5 -
-
Is the site within Crlsbad's Coastal'ZÔne? yes • •
Please describe the area surrounding the site to the
North Vacant East Mobilehome Park
South: - Mobile home park • ,.West: . Industrial Park -.
4
List all other applicable permits & approvals related to this project
Carlsbad Track No. 85-24, Carlsbd Research-Center,,EI Evans Poin
- •- -• • - • - * •
-
• 2 - - - . .
•
¶ r • • .
••
a - - • . • .4 -
.
—
• - - . . -
-
- • .
(Please be Specifiè. Attach Additional Pages or Exhibits, if necessary)
1. Please describe the project site, including distinguishing natural and
manmade characteristics. Also provide precise slope analysis when a slope
gher:andi:5%' grade- 'or: greater- is - present-on-the-s i te-'---
Proposed road alignment has been approyed. as part 'of tentative map
for Evans Point. The alignment is on property of less than 15%
gradient and consists of mixed aLand an existing dirt road.
2. Please describe energy conservation-measures incorporated 'into the design
and/or operation of the project. '
- Project' construction will be subject to City -of Carlsbad policies
' pertaining to energy conservation.
-
3. PLEASE ATTACH A PROJECT SUMMARY SHEET WHICH SHOWS THE FOLLOWING:
a. If a residential project 'identify the number of units, type of units,
' - schedule of 'unit' sizes, range of saleprices or rents, and type of
household size expected, average daily traffic generation (latest SANDAG
rates). S ' • - S -
Not applicable
'. b. If a comerci'alprojec.t, indicate the exact type, ativity(ies),
square footage of sales area, average daily traffic generation
(latest SANDAG rates), parking provided, and loading facilities.
-
Not applicable. S • ' -
c. If 'an industrial project, indicate the -exact type or industry(ies),
average daily traffic generation (latest SANDAG rates), estimated
employment per. shift, time of shifts, and loading facilities.
- The 'proposed project is to provide secondary emergency access to an
-
' industrial complex. The street will be gated to' allow emergency
access only.
d. If an institutional project, indicate the major, project/site '
-
- function, estimated employment per shift, estimated occupancy,
loading facilities, and community benefits to be derived from the
- project.
Not applicable
- -
S " '•"
5
5 '
4
4,• .- __-.I_ - .'-. --
-.
--
-
/ - - t - -,
- _/ • --- .- ,__ /'_
--- I - - -. - 4- - - • --•
r -
I ENVIRONMENTAL IMPACT ANALYSIS
---- Please---Answer each of the following questionsbyplacing a checkinthe ,----
-S oF .
4app1-opriate space Then, fully discuss and, explain why each item was
'- checked yes -;0r no', Provide support-iig data' if applicable; Attach Additional, sheets as necessary
-I •1.
*
I -
YES NO
1) Could the project signifiantly impact or change *
Present-, or'future landuses 4 in the vicinity of the
activity' .
I - S -
5- •1
I• I
X
_--'•._•:-
EXPLANATION Streethas already been approved with
the tentative map of Eins Point
-. ---I -S
--
• •
£
£•. •
- S.
S•I• 2) I •..
Could the activity affect the use of a recreational
area, or area of aesthetc val ue X
EXPLANATION Street construction will have no
affect on recreational fa'cilities located in
4 the immediate area I
43) Could the activity affect the functioning of an '
established community or neighborhood X
EXPLANATION Street is "non loaded" and therefore,
will not interfere with existing or proosed
community roadways - -. - . - -•• •
5-- ._ - -S. S•
4-
I. --
-*
4) Could the activity result ln!the displacethent off,
community residents'Ix
EXPLANATION No residents are located within
- -I
alignment of the street
;
4.
.'YES NO
Could the activity increase the number.of low and S
moderate cost housing units in the city X
..............................................................
TEXPLANATION: The proposed street will',have
no . affect upon löw.or moderate 'cost housing
units 4
Could the activity significantly affect existing
housing or create; a demand for additional housing?
EXPLANATION: The project is. only providing . . .
• secondary emergency access to an-industrial, '
- project . . •.' ' '' . .
I , ,
.7) . Are any of the natural or,man-made• features in, thé
activity area unique, that is; not found in other
parts of the county, state or nation?'
'- ' '.' EXPLANATION: The EIR Evans' Point did' not
identify any unique feature that would be
affected by this roject.
8) Could the, activity signif.icantJy affect an .
historical or archaeological site or its settings?.,,* X
.5
5
*
EXPLANATION: No historical or archaeologial S
- S
sites were identified in the EIRfor Eians
p
Point that the road would affect
9)' .Could the activity significantly'affectthe
potential use, extraction, or conservation- of a .
'scarce natural resource? ' I S , X
EXPLANATION no scarce natural resource are
known to exist on.the site.
- - S ' S .
.
St •5 S
- . 5
5.
5 5 * • - S
5 , 5 •. ' ' -• • • .
• .,, 4 - .. ... 4 .. - .
.-. .
YES NO
Couldthe activity significantly affect fish,
---- 'wildlifeor- plant resources-- --- - - - -
- • - . -, . . - -
.EXPLANATION: The extension of-Halley Dr. will - .• ..
4 - -
.. , ,• .
4 .. .-4. ,have no-affecton wildlife-and plant resources
of the property
a
Are there any rare or endangered plant or animal -
species-- in the .activity area? •-' - x
EXPLANATION: No. rare or..endangè±edpiant or .
animals are known to exist within the a1ignment
of Halley ,Drive.
4. .. .
2) Could the activity change existing features of any
- $
of the city's stream, lagoOns, - bays, - tidelands - -
or beaches? X
'EXPLANATION:.' Project site is not located ithin
body any water area
.
.- -, -.
- - 4-
- . .
4 •_4 . .-
. -' -
•
4 •. - .4
. ..
.
-
Could the activity result in the erosion or elimin-
ation of agricultural,iands' X
EXPLANATION: Project site-has not bée.n used 4.
for'agicitural'-püposs in recnt years.
Project will b6 subjectto.érosion control..,,
-.
policies. of the City of Carlsbad. • . -.
Could the activity serveto encourage development
of presently undeveloped areas or intensify develop - : -- . -..-•' ment of already developed areas' X
.
. EXPLANATION: 5roject4 only -provides an emergency .,..
S 4 •_4.. . - . secondary access to an already approved projedt.
4
/
-4 .. . -.. -.
4 -4 . .
--4: -4 •47 '
4'-- •. . •.
5 '1
. .': . . -, .4. . -. . $ .. .
- . . • . . --4 .•._t -4- .. • ,..,
- 4.
-- .. . - . • • . -, . . - . 4 4.
4 4 - 4 . .
-3.
-
,. • .
. .. . 5 4
-
. -
- 4 - 1'
•• 4 • .
.
'-
• :- -
. 1',,
NO
15)' Will, the,activ.ityrequire'.a variance from estab :
lishethenvironmental standards (air, water, noise; -
- : ' :tc)?:" X
EXPLANATION No variance from adopted
ènviromental standards ire being.-requested.'
16) Isthè "act ivity carried out as part of a larger
project or series'of projects?. ,
EXPLANATION Roadway is a part of the approved
tentative map of Evans-,Point and Carlsbad
4 . Research Center Unit 5
17.) -Will the activity requ i re certification; authriza-
: tion or issuance of apermit by any local, state
or federal, environmental control agency? '
'
'•'
- EXPLANATION: CRC''js located outside of the
'.
,
Costal zone and is therefore, exempt from
reguirhgq apermit.
18) ,Wi1l the activity .requ.re issuance of a varlanceor' - •
conditional usêpei'mit by the City? • X
EXPLANATION: No variane or CUP' will be •
.- , , • - •
- required. .' ' , ••' " -
19) Will-the actiyity involve the application, use, or - - -'
• : , • dispoa1 ofp6tent-ia11y hazardous materials?,' '- X
- '• .•••
EXPLANATION: No h&zardous materials wi11 need
to be, disposed of. - • , - ' ' '
4 •.' ' ••.
7 - -
- '- .' '- • ' ,
YES NO
Will the activity involve construction of facilities
in-.a flood plain?
X
J.s.,Jbcated outside
V-V -
•V•V •
of any flood plain areas. V
Will the.activVity involve construction of facilities, V
in the area of an active fault? V X
• EXPLANATION.
V,
V
The EIR for Evans Point did not identify
any active .faults in the area of the project. V
• .- V..
V. .-
V
V 22) Could the activity result inthe generation of
V V
V significant amounts of dust?
X V
V EXPLANATION: Through the implementation V V
V
V
V
VV
V V VV \ V
V
of dust control policy the City of Carlsbad
V has adopted no significant dust-probléms should V
•
• occur.
23) V Will the activity involve the burning of brush,
V
V
• trees, or other materials? V
V - V
•
V X
V EXPLANATION: 'No burning activities will
V
V V
V • occur. V
V
V V
• - V •
V
• V -
V
1124) Could the activity result in a significant change
V inthe quality of any portion of the region's, air V •
• or water resources? (Should note surface, ground V V
V V water, off-shore.) • V * V V V XV V V
V EXPLANATION: The project will have .-no change V
-.
• V
in -the regions air quality or -water resources.
V
V
V
VVV
V
V
V
V V . • - V ,
V
4 V V
V •
V
V
. V V V V •
V
V
V •
V
H
V • .
•V
4
h.
. *
- I - + -.
*. •
1
.
'
YES NO
25) Will the project substantially increase fuel.
(electricity,oil, naturai -gas, etc )?
EXPLANATION.- No increase of fuel. comsumption
will be required to implement the project
.26) Will the activity
on a s16pe1 of 25 percent or greater x
-. .
EXPLANATION: Project site for. the alignmentt
of Halley Drive is on land having less than
a15% gradient
z
'27) Will1there be a significant change to existing ' . . , . .
land form' X
- .(a) tlndicate'estimated .grading to be ione -.• *
cubic yards:. 1360 ..- .
Percentage of alteration to the present '
land form: -. 100%.
Maximum height of cut or fill slopes
8'
EXPLANATION:.
4 I..
-
- ..
I - -
:.
44
28) Will the activity result •'in substantial increases. . • '
in the use of utilities, sewers, drains or streets'
EXPLANATION Proiect is only to provide
secondary emergency access. ' ' •
a
- . •• ' -.
- - -I.' : • ' . ' I; ' ,
1' ' I • ,•
1.
a. ' -t I., + •. ' '' , , . -
I , -
'
....;-
a.
- : ---.-. - -? - - --- - -
r ' - '-- . •' -
-- -
+-
.
-,
I , , "
- I-' • .
''A -. . ..• -
a.
4 4.
4444
NO
Will the project signi4ficaitly'increase wind or
water erosion of soils? - - X
EXPLANATION Erosion control measure are
minimize potential .irfipacts.
Could the project significantly affect existing -.
. fish Or wildlife habitat?. - 4- K.
-4
.
EXPLANATION The location of the roadway is not4.
near existing wildlife habitat
$4 A
Will the $project significantly produce new light ¼
or glare?
' EXPLANATION ___Nolight will be p5iecte6 I
4-
:- -"4 .4• . - -. -. . I. - . .4''
: off -site -
- .
•-
+ - -.. 4 4'
- '4' . -4 .4 •. , 44 : * .
4L :' :. •- 4 . .4,.-. :4' - 4-'• . 4.- .
'.4 -4-4'-..'.
. •-. .. , . . _ . 4 1
- - ..
'-,, 4.4
-
4' - - . .. . .4' . .' + 4'- 4., 4.. .- *. 14
-. .' • .4 .- --4 . . .- .4- '• 4. 4. - -4
.4. .4' 4-',-
* :4
4 .
- ,--• - -: •'
4'. -
-'•- ..i 4 44 4 - -
11