Loading...
HomeMy WebLinkAboutCT 89-30; MASADER I; Engineering ApplicationCItY OF CARLSBAD - ENGINEERING DEPAFAENT APPLICATION FOR ENGINEERING PLAN CHECK OR PROCESSING Complete all appropriate information. Write N/A when not applicable. PROJECT NAME: NAME: Masader I DATE: PROJECT DESCRIPTION: Site Grading, Drainage, Pavement & Utilities to develop a town lome project. PROJECT ADDRESS: 6621 Santa Isabel Street Carlsbad, CA 92009 LOTNO(S).: 1 MAP NO.: 13001 APN(S).: 215-330-30 NO. OF DWELLING UNITS: 14 LFMP ZONE: RDM # LOTS: 1 # ACRES: 1.26 OWNER: Sunset West Framing, Inc APPLICANT: Sunset West Framing, Inc. Mailing Address: 1224 Greenfield Dr. Mailing Address: 1224 Greenfield Dr. El Cajon, CA 92021 El Cajon, CA 92021 Phone Number: (619)590-8111 Phone Number: (619).590-8111 I certify that I a the legal owner and that all the above informationi r e a !Vh . e best of my knowledge Signature te//-//? Signatur / Date//—f/ CIVIL ENGINEER: Allan Cooper SOILS ENGINEER: Josep1.Franzone Firm: Cooper Engineering Assoc Firm: Leighton & Associates Mailing Address: 8369 Vickers St., Ste C Mailing Address: 3934 Murphy Canyon,.#B20! San Diego, CA 92111 San Diego, CA 92123 Phone Number: (858) 277-0441 Phone Number: (619)292-8030 State Registration Number: RICE 16685 . State Registration Number: RICE 39552 ADDITIONAL COMMENTS: IMPROVEMENT VALUATION What water district is the proposed project located in? (circle one) Carlsbad Municipal Water District Olivenhain . Vallecitos If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water improvements (if applicable)? $ n/a What is the total cost estimate, includingthe 15% contingency fee, for sewer (for Carlsbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (if applicable)? . $ 5L. What is the total cost of landscape and irrigation improvements on private property (if applicable)? $ qThckUYl -, GRADING QUANTITIES cut 2060 cy fill 275 cy remedial p cy import/export 17gr, cy OOCS/MISFORMS/APPLICATION ENG PLANCHECK OR PROCESSING REV. 10/06/99 S APPLICATION FOR: (/ all that apply) FOR CITY USE ONLY Plancheck Number Type Drawing Number Project LID Deposit/ Fees Paid 0 Adjustment Plat ADJP 0 Certificate of Compliance COC 0 Dedication of Easement Type: DOE Type: 0 Encroachment Permit ENCROACH 0 Engineering Standards Variance ESV 0 Final Map FM 0 Grading Plancheck GRPC 0 Grading ,GRADING 0 Improvement Plancheck IPC 13 Parcel Map PM 0 Quitclaim of Easement QUITO Type: Type: Reversion to Acreage RTA Street Vacation SW 0 Tentative Parcel Map MS 0 Certificate of Correction CCOR O Covenant for Easement COVE O Substantial Conformance Exhibit SCE APPLICATION ACCEPTED BY: ' MASTER PROJECT ID: RECEIPT NUMBER: PRELIMINARY SIERRA SYSTEM INPUT INITIAL: SIERRA SYSTEM INPUT INITIAL: R:BASE INPUT INITIAL: MASTER FILE NUMBER: F 13 OTHER: ' DATE STAMP APPLICATION RECEIVED OOCS/MISFORMS/APPLICATION ENG PLANCHECK OR PROCESSING REV, 10/06/99 , CITY OF CARLSBAD Engineering Department WORKSHEET FEES, DEPOSITS AND SECURIOrEii DURING MAP CHECK AND PLANCHECK PERIOD Project Name: I Prepared By: {t€1a(4' Date____________ s q L - '-L A. FEES AND DEPOSITS REQUIRED WITH FINAL MAP AND PLANS SUBMITTAL (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Computations Amount Final Parcel/Tract Map Fee $ 2.i7 Grading & Erosion Control Plancheck Fee r-• . 13 p Landscape & Irrigation Plancheck Fee . •-_gp 1,--z 1'rj Improvement Plancheck Fee .................... CMWD Plancheck Fee........................._______________________ Other 5ObfkL4IMC4 / 3. FEES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) , 37 1 Final Parcel/Tract Map Fee Balance Grading & Erosion Control Planbheck Fee Balance .... - L?'7 2-.y' '-/(iO SC I Landscape & Irrigation Plancheck fee Balance ........o4 (3s'r3)n7?, ______ Improvement Plancheck Fee Balance .............. .-'/P - - Landscape & Irrigation Inspection Fee - ----- .7 Improvement Inspection Fee .................... EVIL ________________ Duplicate Tracing Fee .......................... r I Street Light Energizing Fee .....................fr'/p-.. Street Light Connection Fee ..................... -'/- Street Sign Deposit ............................ Drainage Area Fee ............................ Park-in-Lieu Fee .............................. Other C. SECURITIES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Grading & Erosion Control Security ............... OCOO Grading & Erosion Control Cash Security .........../cT, 0 0 ___________ Improvement Faithful Performance/Warranty Security .. Improvement Labor & Materials Security ........... 5. Subdivision Monumentation Security .............. 5. Other_____________________________________ D. FEES REQUIRED PRIOR TO GRADING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Grading Permit Fee ... . ................ ........ ZdDDcYi $ Z-YJ I Other____________________________________ E. FEES REQUIRED PRIOR TO RIGHT--OF-WAY PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Right-of-Way Permit Fee ........................ Other_____________________________________ F. FEES REQUIRED PRIOR TO BUILDING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Bridge & Thoroughfare Fee ......................________________________ Pub!ic Facilities Fee ....................... School Fee................................... Traffic Impact Fee ............................. Facilities Management Fee ...................... Sewer Benefit Area Fee ......................... Sewer Service Connection Fee .................. Sewer Lateral Fee ............................ Fire Hydrant Fee .............................. Other____________________________________ NOTE: SOME FEES SHOWN HEREON ARE ESTIMATES OF FUTURE FEES. FEE ARE SUBJECT TO CHANGE. IN SOME INSTANCES, DEVELOPER WILL BE REQUIRED TO PAY NEW FEE AT TIME OF COLLECTION. P:\DOCS\MISFORMS\FRM00025.FRM Rev. 01/14/92 SUBDIVISION LOG 41 StAFF ENGINEER* SUBDIVISION NO. sCT 1-W. SUBDIVISION NAM(, OWN(R/D(V(LOP(Rs 11I*Dei?.. Wil- ['llh1 ENGINEER Or WORKs Lii iWIWPAK: TENTATIVE HAP APPROVAL :.iLAJ9 j I10iO 151 EZI(NSIUN, 2ND (*I(NSiDNs___________ IMPROVEMENT PLAN NO., GRADING PLAN NO., eI ,31c AS BUILISO APPROVEDI GRADING PERMIT NO.s ?62PI EROSION CONTROL PLAN, BONDS AND AGREEMENTS AGREEMENT TITLE EXPIRATION DATE- FAtIHFIJt. PERFORMANCE BONDAHI. LABOR & MATERIALS BOND ANT. HONUHEN— TAVION 00P40ANt. SEcuRity TYPE (CASH, SUREtY,bC) COMMENTS SURETY COMPANYs ADDRESS, CONtACts PHONE, EASEMENTS REPORTS TYPE OF REPORT StAtUS (IN, N/A) CHECKED BY titleRejort - 5u&dlvlilon iuerin[ee traverse Cslcs Hydraulic Cites Hdrolóy Caics Sir ratci SolliRiport WATER DISTRICTS 'VP(LA-C,t1l95 SEWER DIStRICt, L-Xyi SCHOOL DIStRICT, GPjJ tU11D PLANNING AREA, DRAINAGE AREA, t'/P' SPECIAL ZQN(Si(ASS[SSH(Nl, tHOROUGHFARE, PLANNING ACtIONS____________________________ BRIDGE DIStRICtS, COMH(NJSs -- CITY OF CAILSI4 EN611EE1116- FEES AID DEPOSITS VOIKSHEET PREPAREO Rv PROJECT NAME 1rrp:I - - DATE TENTATIVE PARCEL MAP PU . . . . . . . .-. •0, • , • ,, , . . NAP Fit C_1 LOTS)(PARCEL MAP/FINAL MAP N O . O F L O T S ____). . (EXPEDITED/NOT EXPE D I T E D p _ (/2-1—'iC') PARCIL Mae IXTIN$EONcan ... •...... .....,•.. ________ _ _ _ _ IMPROVEMENT PLAN CHICK FEE: DEPOSIT WITH SUBMITTAL _______ ........ . _ _ _ _ _ RECEIPT NO. IMPROVEMIT DESCRIPTION BONDED VALLII TOTAL: PERCENTAGE IMPROVEMENT INSPECTION FEE: ITEM TOTAL: X PERCENTAGE PARK-IN-LIEU FEE (CIRCLE ONE): DWELLING TYPE: SF OR DUP L E X AREA: .1 2 3 4 NUMBER OF UNITS: STREET LIGHT ENERGIZING: HF ((4 UNITS) NF (> 4 U N I T S ) N H 12- X/uv'1 a AREA EE/UNIT 5.800 LUMEN - AT 81.00 0 9.500 LUMEN AT 111.06 a 16.000 LUMEN - AT 152.10 a 20.000 LUMEN 'AT 169.38 a - TOTAL: a GRADING PLAN CHECK PU D E P O S I T RECEIPT NO. (EXPEDITED/NOT EXPEDITED) GRADING PLAN CHECK PU C CUBIC YARDS) . . . . . . .' . . . ----------------------- cnn..... n., .r.•. I I • I I I • I I I I I I I I • 1 I I I I I I _________________________ DUPLICATE TRACING FEE . . . . . . . . . . . . . . . . • . -. . . . . STREET- SIGN DEPOSIT: AT - AT - AT TOTAL: STREET STRIPING DEPOSIT . . . . . . . . . . . . . . . . . . . FRONT LINE OR AREA FEES, ( T Y P E ,. . . . . . . . . . DRAINAGE AREA FEE (AREA N O . ), • . . . . . . . .. •1 TOTAL ACRES: X - AREA FEE. iALUE'OP 3TU DNor AINACC- AS NOTED IN mA4iig DRAINAG E P L A N D O C U M E N T S MULTIPLIED BY CURRENT INFLA T I O N F A C T O R , LINE VALUE X FACTOR • AMOUNT x-- _____ _ _ _ x x a - - TOTAL; DRAINAGE FEE DUE: ODITIONAL . . . ; •- i(dD.(QY TYPE - - TOTAL FEES AND DEPOSITS: • -. • ___________ _ _ _ _ _ _ - (IN ADDITION, A GRADING PERMI T F E E O F - IS - UEUPON rccIt$rr .- -- - - •- --' - - .". .:'• . . . SUBDIVISION GUARANTEE Fee: 500.0.0 No. 902536-S act No. CARlSBAD THAC NO. 89-30 ISSUED BY q TITlE DN4 Guarantees The County of SAN DIEGO * and any City within which said subdivision is located in a sum not exceeding $1000.00 That, according to those public records which, urer the recording laws, . impart constructive notice of matters affecting the title to the land hereinafter described, the only parties having any record ":title interest, in said 1ar1 whose signatures are necessary, under the requirements of the Subdivision Map Act, on the certificates consenting to the recordation of the subdivision map of said 1aii and offering for : dedication any streets,. roads, avenues and other easements offered for dedication by said subdivision rap are: MASADER INVESTMENT, LTD., A NEVADA CORPORATION AS RECORD CNER. BANK OF SADERAT IRAN, NEW YORK AGENCY AS BENEFICIARY OF DEED OF 'EUST RECORDED JULY 17, 1991 as File No. 1991-0351647 of Official Records. " SIGNATURE OF SAN DIEGO GAS & ELECTRIC COMPANY HOLDER OF AN EASEI€NT RECORDED APRIL 21,1982 AS FILE NO. 82-112665 OF OFFICIAL RECORDS, HAS BEEN a4ITTED UNDER THE PROVISIONS OF SECTION 66436,. SUBSECTION (a) (3) (A) (i) OF THE SUBDIVISION MAP. ACT. THEIR flIIT. IS SUCH THAT IT CANNOT RIPEN INTO A FEE TITLE AND THEIR SIGNATURE IS NOT RDJIRED BY THE GOVERNING BODY. THE SIGNATURE OF THE 'CITY OF CARLSBAD HOLDER OF A DRAINAGE. EASEMENT DEDICATED ON NAP NO.6905, HAS BEEN a1ITIED UNDER THE PROVISIONS OF SECTION 66436, SUBSECTION (a) (3) (A) (i) OF THE SUBDIVISION MAP ACT. THEIR INTEREST IS-.SUCH THAT IT CANNOT RIPEN INTO A FEE TITLE AND THEIR. SI(ThURE IS NOT RJThED BY THE GOVERNING BODY.- ME SIGNATURE OF THE CITY OF CARLSBAD HOLDER OF A, SEWER DEDICATED ON MAP 605, HAS BEEN OMITTED UNDER THE PROVISIONS OF SECTION 66436, SUBSECTION. (a) (3) (A) (i) OF THE SUBDIVISION NAP ACT THEIR INrEREST IS SUCH THAT IT CANNOT RIPEN INTO A FEE TITLE AND THEIR SIGNATURE IS NOT REQUIRED BY THE GOVERNING BODY. . - ' ; ' :' ..............