Loading...
HomeMy WebLinkAboutCT 93-09; Ocean Bluff; Tentative Map (CT) (39)w' City of Carlsbad Planning Department March 30, 1995 Jack Henthorn & Associates Mr. Jack Henthom 5431 Avenida Encinas, Suite G Carlsbad, CA 92008 SUBJECT: CT 93-09/HDP 93-09/SDP 93-07/ZC 93-04 - OCEANBLUFF SUBDIVISION Dear Jack: Thank you for your March 7, 1995 resubmittal of plans for the subject project. In addition to the issues raised by our March 22, 1995 letter, the following project issues remain or have not been addressed as requested by our previous correspondence (June 23, 1994). Planning: 1. In accordance with the recommended open space in the Zone 20 EIR, the entire open space lot (Lot "A") must be shown within the open space easement. As previously indicated, the developable acreage was included in the total developable acreage used to calculate density; therefore, no additional development shall be permitted within this acreage. This recommendation is consistent with the EIR mitigation requiring substantial conformance with Figure 3.4-3 (Biological Mitigation Map) which is the preferred open space network system. 2. Revise the map to show lot lines for Lots 78 through 86 extending to the Poinsettia Lane right of way with an easement over the 50' structural setback. As staff has repeatedly requested, show the 20' wide trail easement on the map within the required 50' setback (easement) along the entire on-site and off-site Poinsettia Lane roadway. 3. As previously stated, the phasing shown on the tentative map must account for the need to construct the affordable housing units prior to Phase HI. Although the actual timing will be determined by the affordable housing agreement required prior to approval of the first final map, the proposed phasing must not preclude development of the site as part of the first phase. 4. Please submit an addendum to the noise study verifying that projected exterior noise levels will not exceed 60dBA in accordance with City standards for Lots 86 and 87 (wall height has been reduced from 7' to 6' on plans), and provide the projected noise levels for Lots 78 through 84 along future Poinsettia Lane resulting from the currently proposed design. 2O75 Las Palmas Drive • Carlsbad, California 92OO9-1576 •(619) 438-1161 CT 93-09/HDP 93-09/SD[ 93-07/ZC 93-04 OCEANBLUFF SUBDIVISION APRIL 5, 1995 PAGE 2 5. The Housing and Redevelopment Director (HRD) has completed a review of the project proforma with regard to the requested density increase, and it appears that the requested increase is justified. However, the HRD questions the economic feasibility of constructing a 16 unit apartment project at the proposed location. The Planning Department therefore recommends that the applicant pursue discussions with the Housing and Redevelopment Director regarding the feasibility of a first-time home buyer option in this subdivision. The applicant's earlier request to allow an option to purchase credits in a combined affordable housing project was included as a part of your previous housing proposal, however, this proposal was not updated with the March 7, 1995 submittal. Please resubmit a proposal describing the requested option(s) along with written justification in accordance with Item 3c on Page 44 of the Zone 20 Specific Plan for the off-site option including: 1) why the onsite contribution is not appropriate based upon the physical or economic characteristics of the site; 2) how the offsite alternative better achieves the goals and objectives of the General Plan, Zone 20 Specific Plan, and Mello n LCP; and 3) that unique opportunities exist to achieve a greater contribution off-site, i.e., a greater number of units affordable to the very low income group targeted in the project proforma. Project conditions will include a requirement that any on-site affordable housing project is constructed concurrent with the first phase or prior to the second phase of development in accordance with the Inclusionary Housing Ordinance. 6. Specify on the landscape plan some type of recreational use on the area designated as lawn area. The Planning Department recommends that concrete picnic tables with permanent barbeque areas and a possible tot lot be provided in this area. 7. The grades shown on the tentative map for Lot 93 differ from those shown on the site development plan. The tentative map indicates an "A" Street elevation of 311.8' at the entry to the multifamily project while the site development plan indicates a pad grade of approximately 320'. The site development plan and tentative map show an approximate 3.5' slope at the driveway entry, although an elevation change from 311.8' to 320' would require a 6-7' high slope. This change in elevation would also require a steeper driveway than City standards permit. Please correct plans so that they are consistent and in accordance with City standards. 8. The corrections shown on the attached redlined landscape check print should be incorporated into the final landscape plans. The checkprint must be returned with the final landscape plan submittal. Engineering; 1. As previously requested, show an offer to dedicate portions of Lot 21 and 22 for general access and utilities easement (minimum 56 feet wide) to serve APN 212-040-30, CT 84- 32, Cobblestone. CT 93-09/HDP 93-09/SD[ 93-07/ZC 93-04 OCEANBLUFF SUBDIVISION APRIL 5, 1995 PAGE 3 If you have any questions regarding the above, please contact me at (619) 438-1161, extension 4477 at your convenience. Sincerely, ANNE HYSONG ' Assistant Planner \J c: Evan Becker Chris DeCerbo Michael Holzmiller Gary Wayne Attachment CT93WA.LTR