Loading...
HomeMy WebLinkAboutCT 93-09; Ocean Bluff; Tentative Map (CT) (67)Hunsaker & Associates San Diego, Inc. Planning • Engineering • Surveying • GPS August 5, 1993 City of Carlsbad Planning Department ,v,^ ^ p +^ 2075 Las Palmas Drive /:- J u a Carlsbad, CA 92009 RE: OCEAN BLUFF: CIRCULATION IMPACT ANALYSIS Dear Sirs: Please find attached ten (10) copies of the Circulation Impact Analysis prepared in conjunction with the filing of the tentative map for the Ocean Bluff Partnership project. The project proposes the development of 92 single family dwelling units (92 units @ 10 trips/unit = 920 total daily trips) and 14 multi-family dwelling units (14 units @ 8 trips/unit) for a total of 106 units and 1,032 project trips per day. From the west, access to the site is taken via eastbound Poinsettia to its current terminus at Alga Road, then southeast on Alga to Black Rail Road, and finally north on Black Rail to the site. From the east, access to the site is provided via El Camino Real either north or south to Alga Road, then eastbound on Alga to Black Rail Road and, again, north on Black Rail to the subject property. Although several residents and commercial flower growers currently reside and/or conduct business in the area, and front Black Rail between the project and Alga Road, no formal analysis has been performed to measure their circulation characteristics. However, because of the relatively limited volumes, their impact on this analysis is considered to be minimal. t()r<) linennel^us Street • San Diego, CA <)212t • (6/9; 5W./5M • /-AY: (61')) ?5«-/•//•/ Offices: San Diego • Irvine • Riverside/Sail Uernardino David H(inini(ir • Jack Hill CITY OF CARLSBAD August 5, 1993 Page #2 With regard to trip distribution, one hundred percent (100%) of the trips to or from the project will use Black Rail to or from Alga Road. From that intersection, this analysis assumes an equal or fifty percent (50%) distribution both east to El Camino Real and West to Poinsettia. Based upon this analysis, it is our opinion that the project total north and south ADTs on Black Rail of 1,032 and Alga ADTs of 516 even when added to existing a.m. and p.m. peak volumes, will not adversely impact current levels of service which are currently within acceptable City limits above LOS D. If you have any questions, or require any additional information, please don't hesitate to contact me. Very truly yours, HUNSAKER & ASSOCIATES SAN DIEGO, INC. Glen Van Peski, P.E. Project Manager GVP:se Enclosures wo: 1326-1 wp:1326.5A OCEAN BLUFP ACCESS I05Z APT 1 JJ^W=olP 17- 1 ( nNORTH HJ (J I 400 0 400 ^"—— 1 SCALE IN FEET X//'\ & \x^5^|*UTUW2. f^OAD £5f OTHPRSx /$* \\ / / ?\ \ ^^ ^ S^*\C ^ ^ \ I APT SUMMART ^^r:^^^^ 92 5^00 S 10 = 92.0 ^^^\ / 14- M^DU <e & - 112 «^O\r < 1032. ACT TOTAL SI&ADrf ^^»J^ [2- ccess -£ruru^t^~~~7^Xx */ X-^.// ^\1 T 1JO2>Z ADT (lOO?i) \\%1 ^ \ 1 ^AMtT5^(|Q^e2^- &=*> 5lfoAOT^%\ V\.Z4 /HJT IH .qr>ys- ^O\ \%-AS3 ADT OLTT C50/.) ^xX ^^^ ov x> oe= A ix (\s~Gf ST\ n .si\ — - \ \ v\J\ S3 ADT IN2.1 ADT OUT TRAFFIC IMPACT ANALYSIS PREPARED BY: tnsakef 'ssociateg' 3m*D*t**5- OCEAN BLUFF CITY OF CARLSBAD, CA. 1 SCALE: DATE _ W.O: 132g±L I'-IOO* OCEAN BLUFF - 980 TRIPS ") EXISTING DAILY TRAFFIC ULTIMATE DAILY TRAFFIC PROJECT ONLY DAILY TRAFFIC LEGEND PRIMS ARTERIAL - EXIST. MAJOR ARTERIAL - EXIST. SECONDARY ARTERIAL - EXIST. PRIME ARTERIAL - PROP. MAJOR ARTERIAL - PROF. SECONDARY ARTERIA. - PROF. NOTES: 1. Existing and Ultimate Volumes were taken from the draft Traffic Study by Wildan Associates for the Zone 20 EIR. 2. Directional Distribution was taken from the Traffic Study by Weston Pringle and Associates aated 6/17/BS. 2. Project Trip Generation estimated at 10 trips per residence. TRAFFIC VOLUME STUDN OCEAN BLUFF DWELLING UNITS IO6 W.O. #1326-1 DATE: 5/25/93