HomeMy WebLinkAboutCT 93-09; Ocean Bluff; Tentative Map (CT) (73)cOCEAN BLUFF PARTNERSHIP
4370 La Jolla Village Drive, Suite 990
San Diego, CA 92122-1233
(619) 453-0505
December 3,1993
Mr. Lloyd Hubbs
City Engineer
CITY OF CARLSBAD
2071 Las Palmas
Carlsbad, California 92008
Dear Lloyd
It has come to my attention that during the consideration of the Aviara Phase III project
at the Planning Commission meeting on December 1, 1993, Mr. and Mrs. McKinney
requested that the Poinsettia Lane alignment be altered to shift the alignment north,
away from their property and on to the Ocean Bluff property. The arguments that were
presented in support of this request could be made by any property owner along the
length of the alignment, resulting in a configuration that would defy sound planning
and engineering principles.
The Ocean Bluff Partners pending subdivision application design is based on City
direction regarding the current Poinsettia Lane alignment The current alignment
resulted from the City's insistence that the alignment respect property lines and
environmental constraints to the greatest extent possible. The alignment was
developed in the early Zone 20 efforts and has been shown as a preferred alignment on
mapping in this area since 1986. The currently proposed alignment was shown
(pending environmental review and further planning studies) along with the original
alignment in the adopted Zone 20 Local Facilities Management Plan (see Exhibit 1).
The original alignment, prepared as a part of the Pacific Rim Master Plan, did not
respect property lines and actually split the McKinney property in half, leaving very
little for future use and development As a participant in the funding the Zone 20
effort, Ocean Bluff Partnership cooperated with the City in its desire to adhere to
policies relating to locations of rights of way. Ocean Bluff accepted the half width
alignment in the City-endorsed design thereby relieving the McKinney's of the land
dedication and improvement obligation for this portion of the roadway, not to mention
the huge impact to the viability of their ownership.
Mr. Lloyd Hubbs
December 3,1993
Page 2
As a part of the recently filed application to subdivide the Ocean Bluff property, Ocean
Bluff has been sharing the costs with several other property owners to develop
engineering plans for the improvement of the much needed Black Rail access. The
McKinney's have been included in briefings on this effort during the past year. They
have repeatedly expressed their concerns over loss of land area.
In the process of coordinating the design of our project with the Black Rail effort, it was
discovered that Poinsettia Lane preliminary alignment studies had established the
intersection of Black Rail too low to avoid encroaching on the existing water tanks. It
was discovered that by shifting slope areas off of the McKinney site on to the Ocean
Bluff site it would be possible to raise the elevation to accommodate the tanks and
further reduce the Poinsettia impact on the McKinney property.
sign effort was taking place as the Specific Plan was being processed. Mr.
lenthorn, or Jack Henthorn & Associates, was asked to prepare an analysis of the
impact of the elevation change on the McKinney property in relationship to other
public easement and right of way constraints. A copy of that analysis is attached as
Exhibit 2.
The alignment of Poinsettia Lane will ultimately include the large water line easement
encumbering the southern portion of the McKinney property (Exhibit 2) leaving a net
public right of way impact of approximately 1.26 acres (25%) and a net usable site area
of 3.76 acres. This includes the Poinsettia Lane setback which could ultimately be used
to calculate density, and meet open space or parking requirements associated with
future development
Given the location of the property at a key intersection and the property's inclusion in
the Zone 20 Specific Plan Commercial Overlay designator, there is ultimate
development potential for clustered residential use or a commercial center of the type
envisioned in the Specific Plan. If the McKinney request is granted, it would enhance
the value of the McKinney site for commercial development by relieving the site of
dedication and improvement obligations and transferring those burdens to the Ocean
Bluff site.
The Ocean Bluff project is already burdened with constraints associated with providing
Black Rail Road (approximately 31,000 square feet), retention of environmentally
sensitive areas (approximately 133,400 square feet), Poinsettia Lane (approximately
23,000 square feet) and an affordable housing site (approximately 33,100 square feet).
These site impacts account for over 5 acres, or 16% of the 31.05 acre site.
Ocean Bluff has been able to meet its affordable housing obligation thus far without
seeking City financial assistance. Shifting the Poinsettia Lane alignment northerly will
Mr. Lloyd Hubbs
December 3,1993
Page 3
result in a loss of market rate units which provide the source of subsidy necessary to
provide the required affordable housing. This will make it necessary to seek City
financial assistance to relieve the additional burden that would be imposed by shifting
the Poinsettia alignment further on to the Ocean Bluff property.
It is not anticipated that Poinsettia Lane will be constructed in the near future. Property
owners with Poinsettia obligations are seeking interim solutions to eliminate the
necessity of huge front end expenditures. If the City is interested in retaining
agricultural uses in this area and is willing to cooperate in interim solutions it would be
several years before full width improvements would be required.
The City's General Plan does not anticipate that this area will remain agricultural in
perpetuity. Provisions have been included in the Specific Plan to insure continued
agricultural uses in Zone 20. By viewing the construction of Poinsettia Lane on a
phased basis and using modified sections in conjunction with the Specific Plan
provisions, the City could extend the McKinney greenhouse operation well into the
future.
If the full improvement of Poinsettia is required before the McKinney's are ready to
develop, the right of way area and related business value would have to be purchased.
Dependent upon the expectations of the McKinney's and the developer, this could be
accomplished through negotiated purchase or through use of the City powers of
eminent domain. In either event, the McKinney's would be entitled to full market
value for land and loss of business goodwill and income (including any loss associated
with being left with areas unsuitable for greenhouse use).
If the City is reconsidering the alignment, and the application of the policy that
originally moved the alignment northerly, possible reconsideration should be given to
the original southern alignment in that it fully eliminates environmental impacts and
reduces the number of property owners impacted from ten to seven.
In summary, under the current alignment proposal, the proportional public land
requirement impacts between the McKinney and Ocean Bluff parcels vary by less than
10%. The ultimate impacts on the greenhouse business that the McKinney's have built
over the last seven years will be offset by the normal increase in land value when they
seek entitlements to develop or by purchase, if the right of way is required before the
property is entitled and developed.
I hope that this information is of assistance to you as you evaluate this issue.
Mr. Lloyd Hubbs
December 3, 1993
Page 4
In closing, it is requested that I be included in any further discussions related to the
potential realignment of Poinsettia Lane that would impact the Ocean Bluff ownership
and its pending development application.
If you have any questions or need additional information, please contact me at your
convenience.
Sincerely,
Robert L. Wineteer
Managing Partner
RLW/mam
cc: David Hauser
Robert Wojick
Michael Holzmiller
Mike Grim
o
o
132'
DeJONG
32.90 ac
OCEANBLUFF
31.05 ac
46 400 Sf POINSETTIA LA
5.02 ac
161,837 sf NET
3.76 ac NET
POINSETTIA LA BLACK RAIL POTENTAL
DRIVEWAY
NET AREA
INCLUDING POINSETTIA SETBACK
KAISER
10.03 ac
C.M.W.D.
mx
X
CO
JACK HENTHORN & ASSOCIATES