Dear Anne:
Enclosed please find the following items in response to comments provided during the on
going review of the Ocean Bluff project, CT 93-09:
• Additional biological survey information relating to the placement of the desiltation
basin and related structures and access.
• A letter from the project biologist regarding secondary access impact on potential
open space corridors.
• Colorized 100 scale mapping (same scale as tentative map) exhibits showing grading
limits in the area of the remainder parcel in relationship to vegetation and slopes
• Proposed condition wording relating to view impacts from Palomar Airport Road;
hazardous materials; Fish and Wildlife Service consultation; biological buffer
restrictions; structural setbacks along Poinsettia Lane; Trail System easements:
• Four prints of the revised landscape plan. The basin location, fire suppression areas
and plant pallette have been revised to address issues raised during the review
process.
• Four prints of the revised tentative map showing basin location, open space areas, D
street temporary opening to Black Rail,; pedestrian access to Black Rail; all wall
locations; eastern drainage solution.
• Four prints of Site Sections and Street Profiles.
• Four prints of the emergency secondary access alignment with stationing, grades and
connection to Camino de las Ondas.
o
Ms. Anne Hysong
May 11, 1994
Page - 2
• Letter from project engineer addressing D Street temporary connecton to Black Rail
and secondary access requirements.
• One copy of noise study addendum.
• One copy of the updated affordable housing submittal.
The open space issue along Poinsettia Lane is being addressed under separate cover.
Requests for preliminary access, grading and drainage permission are being reviewed by
affected property owners and will be provided within the next few weeks.
Please contact me at your convenience after reviewing this material so that we can identify
issues that have been closed as well as any requiring addtional work. In the meantime, if
you have any questions or need additional information please contact me.
incerely,
:k E. Henthorn
'President
JEH/wpc
enclosure: Revised application package
cc: Jim Davis
Robert Wineteer
Tony Lawson
Lex Williman