Loading...
HomeMy WebLinkAboutCT 94-02; Pacific Pointe; Tentative Map (CT) (36)Date: 3-7-95 To: Terri Woods From: Bob Wojcik / Re: Pacific Point Response The Engineering Department offers the following answers to the questions raised by the McQuade's; 1) The North Beach Planning/Traffic Study has addressed the need for emergency access in the area and did not recommend a through connection. 2) The Fire Marshall testified at the public hearing that he did not have a problem with access to the area. 3) Other than on the project site, the only other through access from Olive to Date would be within the railroad/North County Transit District right of way. This would place the access approximately 20 feet away from the tracks if NCTD and the Public Utilities Commission would allow it. 4) To condition this project to provide access for the benefit of the general area may constitute a "taking" of private property. Reimbursement would be required. The condition would also require a complete redesign of the project since the suggested access would not meet Engineering requirements in its present design. 5) The existing lot next to the McQuade's property slopes gently from West to East. The* respective topographic elevations are from 43 to 40 with the average being 41.5 feet. The proposed pad elevation is 43.2 making the average change in elevation 1.7 feet. This places the proposed pad 1.3 feet below the McQuade's pad.