Loading...
HomeMy WebLinkAboutCT 94-02; Pacific Pointe; Tentative Map (CT) (42)LAND USE REVIEW DIVISION PROJECT REPORT PROJECT ID: CT 94-02/PUD 94-01 PREPARED BY: Kenneth Quon PROJECT NAME: Pacific Pointe APPROVED BY: fi/kA^ LOCATION: Between Olive Avenue and Date Avenue, east of Garfield Street, west of the railroad tracks. BRIEF DESCRIPTION: A six-unit residential subdivision on seven lots. ENGINEERING ISSUES AND DISCUSSION TRAFFIC AND CIRCULATION Projected Average Daily Traffic (ADT): 10ADT/unit x 6 units = 60 ADT There are no major traffic issues associated with this project. Each of the 6 residential lots will contain a driveway with direct access to either Olive Avenue or Date Avenue. Conditions of this project will require street improvements along the project frontage on both Olive Avenue and Date Avenue. These improvements will include paving, sidewalk, curb, gutter, and street lights. Each residential lot will also contain one guest parking space. A private 4' wide easement will be provided for pedestrian access to the recreational area. SEWER Sewer District: Carlsbad Municipal Water District Sewer EDU's Required: 1 EDU/unit x 6 units = 6 EDU's Sewer service to this project will be provided by existing sewer lines on both Olive Avenue and Date Avenue. WATER Water District: Carlsbad Municipal Water District EDU's Required: 220 GPD/EDU x 6 EDU = 1,320 GPD Water service to this project will be provided by existing water lines on both Olive Avenue and Date Avenue. GRADING Quantities: Cut: 20 cy Fill: 1,500 cy Import: 1,480 cy Permit Required: YES Offsite Approval required NO Hillside Grading Requirements met: YES Preliminary Geotechnical Investigation performed by: Geocon, Inc., January 14, 1994 No major grading or geotechnical issues were identified or discussed in the geotechnical report. DRAINAGE AND EROSION CONTROL Drainage Basin: Agua Hedionda Watershed Erosion Potential: Low There are no major drainage issues associated with this project. Half of this project will drain towards Olive Avenue, which drains easterly to an existing outlet structure and storm drain located at the end of the cul-de-sac. The other half of this project will drain towards Date Avenue, which drains in an easterly direction. There are no existing storm drain structures on Date Avenue. LAND TITLE Conflicts with existing easement: NO Easements dedication required: YES Site boundary coincides with Land Title: NO This project includes the dedication to the City of areas along the project frontage on both Olive Avenue and Date Avenue to provide standard right-of-way widths. Additionally, a 12.5' wide public easement will be dedicated to the City for an existing sewer line that runs along the western edge of the project site. IMPROVEMENTS: Offsite improvements: YES Standard Variance Required: NO Nearly one half of the cul-de-sac bulb on Olive Avenue was previously improved as a condition of the condominium development located on the opposite side of the street. Conditions of this project will require the construction of offsite improvements to complete this cul-de-sac bulb.