Loading...
HomeMy WebLinkAboutCT 94-04; Poinsettia Shores PA 1; Tentative Map (CT) (19)01/26/95 12:13 ©6199318386 KAIZA <•»*. w KAIZA POINSETTIA CORPORATION 7220 Avenida Encinas, Suite 200, Carlsbad, CA 92009 Telephone: (619) 931-9100 Fax: (619) 931-8386 January 26, 1995 Ms. Tonya Nguyen Mestre Greve Associates 280 Newport Center Drive Suite 230 Newport Beach, CA 92660-7528 Re: Area A-l report #94-95 dated 6/14/94 Dear Tonya: As we discussed, this letter shall serve as clarification to the wall requirement along Interstate 5 for Area A-l. To clarify, your study and its exhibit 2 indicates that a wall is required along Interstate 5 such that top of wall is at evaluation 114 and 115 as indicated on exhibit 2. The wall height of 6 feet on exhibit 2 is an approximation, with the actual condition being only that the top of wall, top of burm or natural topography be at elevations 114 or 115 as indicated, to mitigate freeway noise. Thank you for your assistance. Please do not hesitate to call with any questions you may have. Sincerely, Brian Murphy cc: Eric Munoz, City of Carlsbad