Loading...
HomeMy WebLinkAboutCT 97-15; Lohf Property; Tentative Map (CT) (4)City of Carlsbad Planning Department September 15, 1999 Darren Warren Western Pacific Housing 2385 Camino Vida Roble, Suite 107 Carlsbad CA 92009 SUBJECT: SDP 99-01/CDP 99-01 - LOHF PROPERTY The. Planning Department has received and reviewed your proposed construction phasing plan for the Lohf Property (Viadana). As you know, the Site Development Plan was conditioned to require approval of a construction phasing plan prior to issuance of any building permits (Condition No. 18 of Planning Commission Resolution No. 4610). The proposed phasing appears to reduce the amount of traffic conflicts between future residents and construction activities while accommodating the concerns of Pavoreal residents regarding development of the southern portion in the first phase. Therefore, the proposed phasing plan, as shown in the attached letter and diagram, dated September 1, 1999, is hereby APPROVED and condition no. 18 of Resolution No. 4610 is considered satisfied. Please contact your project planner, Mike Grim, at (760) 438-1161, extension 4499 if you have any questions. MICHAEL JT HOCZMILLER Planning Director MJH:MG: mh /Attachment Gary Wayne Bob Wojcik Chris DeCerbo Mike Peterson /File Copy 2075 Las Palmas Dr. • Carlsbad, CA 92009-1576 • (760) 438-1161 • FAX (760) 438-0894 12)002^mI Western ] Pacific M Housing 61180 B I » I I I 0 N ^ September 9, 1999 Lloyd Hubbs City Engineer City of Carlsbad 2075 Las Palmas Drive Carlsbad, CA 29009 Subject: Lohf project - CT 98-15 Poinsettia Lane Reimbursement Agreement Dear Lloyd: At the request of the City staff, Western Pacific Housing agreed to a condition < "project approval requiring construction of the portion of off site Poinsettia Lane between , ic Lohf property and El Camino Real. The basis for the City request was the City's desire tc ;xpedite this connection although it was not necessary to serve the proposed subdivision. The C I / agreed that certain on site and off site costs would be reimbursed subject to the execu: on of a reimbursement agreement prior to construction. These provisions are contained in fanning Commission Resolution 4427 conditions 47, 53 - ON-SITE IMPROVEMENTS - A,,' • - OFF- SITE IMPROVMENTS - A and 53 REIMBURSEMENT AGREEMENTS. At the City Council meeting, additional language was added requiring the imp :< vements to be constructed within one year of final map recordation. Western Pacific submitted a reimbursement agreement draft nearly one year ag j [October 1, 1998), Comments were provided by David Hauser in February of 1999 and 1i>, revised document was resubmitted following several redrafts'in June of 1999. We have conl s. tied with design, acquisition and construction activities as demonstration of good faith in antic p ttion that the agreement would be expeditiously processed and put into place. Recent discussions with Mr. Hauser indicate that the agreement is not a high f ri> dry item du$ to the on going evaluation of the financial status of Bridge and Thoroughfare Ben tf t District #2. Western Pacific is well into the process of grading and installing infrastructure < »n the Lohf project. We have cleared Poinsettia Lane and need to begin grading and improver IB its in the roadway immediately. Furthermore, we have been negotiating the acquisition of ri jh s of way from the Steiner, Levatino and Saska ownerships as a part of the required off site Poi \s< ttia Lane construction. Given the timing of our construction activity, it is now necessary to have ht required reimbursement agreement in place. We feel that we have been diligently pursuing tf e i greement and that we have met the intent of conditions 47 and 53 arid demonstrated our co; on itment to comply with the City Council's direction to have Poinsettia connected within one yi ar following the recordation of our final map. -1- 2385 Camino VitU Roble, Suite lOV.CarUbud, California 92009 7*0.929.1600 Fax 760.929.16 H »./»/_.. _WH,_ie:10 PAIjr.0 43! r«2 WESTERN PACIFIC i)003 However, we are unable to incur additional costs for the construction of Poinserl a in the absence of an executed agreement since the condition is clear that the agreement must be in place prior to construction of the improvements. Therefore, we are revesting that all require nents as set forth in conditions of approval associated with the construction of Poinsettia be set z Hde and that all time frames be extended on a day for day basis from th'j date of the recordatio \ of our final map until a reimbursement agreement is in place. I am available to meet with you to discuss this matter at your convenient , In the meantime, we have placed all Poinsettia Lane activities, including negotiations for right of way, in abeyance pending completion of the reimbursement agreement. Sincerely, ianflstrony Pr/sidept'of Development cc: file David Hauser, Deputy City Engineer Bob Wojcik, Deputy City Engineer Marty Orenyak, Community Development Director Ray Patchett, City Manager F:\LOHF\Poins slay.dou -2- IWestern PacificHousing * * rt u i c v, rt i% t w i « i ft u *— September 1, 1999 ECO DIVISION City of Carlsbad Planning Department 2075 Las Palmas Drive Carlsbad, CA 92009 Attn: Mike Grim Re: Lohf Property (Viadana), CT 97-15 Proposed Construction Phasing Plan Dear Mike: As you are aware, our Site Development Plan (SDP 99-01 and CDP 99-01) for the Lohf Property was approved by the Planning Commission on August 18, 1999, subject to approval of our phasing plan by the Planning Director. In response to this requirement we are hereby submitting the attached phasing for your review and approval. At the meeting of August 18, 1999, the Planning Commissioners expressed concerns about how the surrounding community and new homebuyers would be affected by construction nuisance, on-going construction operations, construction traffic, and sales traffic. The phasing plan we are proposing offers the best solution for addressing those concerns. The phasing concept is to complete the homes in the southeasterly portion of the property first, adjacent the Pavoreal subdivision, the new City Library, Mimosa Drive and Dove Lane. We have modified our original plan, switching Phases 2 and 3. This was proposed by the Planning Commission and we are in agreement with the logic of this change. Under our currently proposed phasing, we minimize the impact on the adjacent homeowners, new homeowners and on the City Library patrons by decreasing the duration of the construction nuisance in these sensitive areas. In addition, Phases 1 and 2 are now at the subdivision access points (Mimosa Drive and Dove Lane) allowing sales and homeowner traffic to enter the subdivision without passing through a construction zone (another concern of the Planning Commission). It is likely that Phase 1 homeowners will use Mimosa Drive, while Phases 2 and 3 and our models will be accessed via Dove Lane. Please keep in mind that not all of the Planning Commissions concerns can be addressed at all times. There are situations in the early phases when sales traffic will pass through construction zones or construction traffic may pass by new homes. However, the strength of this plan is that once Poinsettia Lane is graded, all construction traffic can access via Poinsettia Lane. Phases 4, 5 and 6 will progress without homeowners passing through construction areas or construction traffic passing homeowner sites. 2385 Camino Vicla Roble, Suite 107,Carlsbad, California 92009 760.929.1600 Fax 760.929.1601 Mike Grim Page 2 Given the concerns of the Planning Commission, the adjacent property owners and the City of Carlsbad staff, we believe that we have proposed the most efficient and effective phasing solution, and are respectfully requesting Planning Director approval. Since: Darren Warren, PE Land Development Manager Cc: Scot Sandstrom, Vice-President of Development Encl: Reduced Phasing Exhibit 2385 Camino Vida Roble, Suite 107,Carlsbad, California 92009 760.929.1600 Fax 760.929.1601 SITE PLAN/PHASING EXHIBIT "VIADANA" - LOHF PROPERTY CITY OF CARLSBAD, CALIFORNIA TOTAL UNIT SUMMARY PLAN 1 = 20 PLAN 2 = 25 PLAN 3 = 28 TOTAL = 73 * LOT NUMBERING SHOWN HEREON REFLECTS THE NUMBERING AS ON THE FINAL ENGINEERING DRAWINGS AND FINAL MAP AND NOT ON THE APPROVED TENTATIVE MAP. HUNSAKER & ASSOCIATES SAN D I E C O, INC PLANNING 10179 Huenwten St Sute 200 ENONfflUNC Sar Diego, Ca 92121 SURVEYING PH(619)55MSOO • R(619)S5a-MM 1751-13 DATE: 3/19/99 Hie: R: \0025\0025X021.dwg Desc. &X21-Colored Site Plan Reduced September 1, 1999 Western Pacific Housing SAN DIEGO DIVISION City of Carlsbad Planning Department 2075 Las Palmas Drive Carlsbad, CA 92009 Attn: Mike Grim Re: Lohf Property (Viadana), CT 97-15 Proposed Plotting Revision Dear Mike: Per our recent telephone conversation, I am requesting your approval of a revision to our plotting plan for the above referenced project. The approved plot plan (SDP 99-01) indicated Plan 3 homes on adjacent lots 16 & 17 and 64 & 65. In order to eliminate this redundancy, we are proposing an exchange of plan types between lots 15 & 16 and lots 63 & 64. The exchange is best illustrated in the table below: Lot 15 16 63 64 Current Plotting Plan 2 Plan3R Plan 1R Plan3R Proposed Plotting Plan 3 Plan2R Plan3R Plan 1R Attached is the revised plotting for the affected lots indicating compliance with setback and driveway slope requirements. Please note that the intent of this change is solely to provide a more varied streetscape. The change does not effect the product mix, the phasing, or any other elements of the SDP. Please review the attached information and provide direction on the process to finalize this requested change. Once again, thank you for your assistance. Respectfully, Darren Warren, PE Land Development Manager Cc: Scot Sandstrom, Vice-President of Development Ray Martin, Hunsaker & Associates 2385 Camino Vida Roble, Suite 107,Carlsbad, California 92009 760.929.1600 Fax 760.929.1601 76 P=241.J FF=241.8 P=240.7 FF=241.2 enm- <s UD i-»I\J Scn c inT> enon men P=265.0 FF=265.5 P=263.1 FF=263.6 IB m73 tn AUGUST 19, 1999 WESTERN PACIFIC HOUSING 2385 CAMINO VIDA ROBLE, STE 107 CARLSBAD, CA 92009 ATTN: DARREN WARREN DEAR DARREN, CONFIRMING RECEIPT OF YOUH LETTER DATED AUGUST 11, 1999. I HEREWITH REQUEST AN EXTENSION FROM AUGUST 23, 1999(NOT MARCH 23, 1999, AS WAS STATED IN YOUR LETTER), TO SEPTEMBER 06, 1999, TO REVIEW YOUR DETAILED EXPLANATION. I WOULD JUST LIKE TO MENTION THAT $10,600. FOR 0.127 ACRES OF MY PROPERTY IS AN INSULT! AFTER ALL, YOU WILL ACTUALLY NEED 0.5145 ACRES OF MY LAND TO COMPLETE POINSETTIA LANE!! IN ADDITION , WE SEE NO SIGN OF THE PROMISED SAFE ENTRY/ EXIT TO MY PROPERTY?! RESPECTFULLY YOURS/, ISABEL R. SASKA MAXOK BUD LEWIS GALEN PETERSON YMIKE GRIM CLYDE WICKHAM HUN SAKE R ^ASSOCIATES SAN DIEGO, INC. PLANNING ENGINEERING SURVEYING IRVINE LAS VEGAS RIVERSIDE SAN DIEGO July 12, 1999 Mr. Mike Grim Planning Department City of Carlsbad 2075 Las Palmas Drive Carlsbad, CA 92009 Dear Mr. Grim: The stakes provided the week of June 28, 1999, for the Lohf property delineated the limits of grading and environmental habitat areas to be preserved as shown on the approved grading plans. As of this date, we certify that the grading completed on the Lohf property falls within the aforementioned limits of grading. Please contact me if you have any questions. Hunsaker & Associates San Diego, Inc. David A. Hammar, R.C.E. President DAVE HAMMAR JACK HILL LEX WILLIMAN 10179 Huennekens St. Suite 200 San Diego, CA 92121 (619) 558-4500 PH (619)558-1414 FX www.hunsaker.com lnfo@HunsnkerSD.com Rm:kd k:\1751\1999\d92.doc w.o. 1751-19 Pacific Housing 2385 Camino Vida Roble, Suite 107, Carlsbad, CA 92009 (760)929-1600 FAX (760) 431-7842 Memo To: Clyde Wickham City of Carlsbad From: Darren Warren \ Land Development Manager CC: Mike Grim, City of Carlsbad Scot Sandstrom, WPH Ray Martin, Hunsaker& Assoc. Jeff Fulton, Berryman & Henigar Date: 06/08/99 Re: Lohf/Viadana - Meeting of 6/8/99 attended by Clyde Wickham, Mike Grim, Ray Martin, Scot Sandstrom and Darren Warren Our understanding of the issues and resolutions discussed at this morning's meeting are as follows: Grading and Improvement Plans for the above referenced project were submitted to the City for final plan check the week of 5/24/99. The plans were rejected as incomplete by the City's consultant, Berryman & Henigar. The outstanding issues cited by B&H and the resolution to those issues are described below. 1) Comment: Planning department approval must be obtained before proceeding. Resolution: Mike Grim has signed off on Planning Department issues. Outstanding conditions are in process for completion and will be completed prior final map recording. 2) Comment: Complete the design of improvements for Skimmer Court and Oriole Court extensions; provide cost estimates for bonding purposes. Resolution: Grading design is complete and on grading plans. Centeriine precise alignment has been established, which is all that is necessary to complete road design. ROW will be dedicated on the final map. Water has been stubbed to the existing ROW line. Sewer is not relevant, as the project is upgrade from adjacent parcels. Cost estimates will be provided. 3) Comment: Design and bond for traffic signal at Poinsettia Lane and El Camino Real intersection. Resolution: Signal is not a condition of development for this project and should be omitted. All other minor comments have been addressed. Based on these understandings, you agreed that final plan check shall commence immediately, and you will direct B&H to proceed. Please contact me if you have questions or comments regarding this memorandum of understanding. Thank you. Pavoreal Homeowner's Association c/o Don Holmes, President 6943 Mimosa D1WINDA nm Carlsbad, CA 92009 February 4, 1999s Honorable Mayor Bud Lewis Councilmember Ramona Finnila gjj Councilmember Matt Hall Councilmember AnnKulchin Councilmember Julie Nygaard 1200 Carlsbad Village Drive, Carlsbad, CA 92008 RE: Lohf Subdivision - Request for" Emergency Access Gate" Only at North Terminus of Mimosa Drive in the "Pavoreal" Community We want to thank each of you for meeting with us prior to the February 9, 1999 City Council meeting regarding the Lohf Development and the proposed extension of Mimosa Drive. We hope that you have had an opportunity to visit our community and drive Mimosa Drive from top to bottom. During our meetings, we became aware of the need to correct mis-stated facts and clarify information regarding the application of City Planning and Engineering Standards and "Policies" to the Pavoreal development. Also, we have become aware of the recent City Council" Approval "of The Terraces At Sunny Creek development which by precedence supports our request for an"Emergency Access Only" at the North terminus of Mimosa Drive. Regarding the design of Mimosa Drive and its designation on the City of Carlsbad General Plan as a "Residential" (Local) Street. A. In accordance with the "Approved" Map CT 85-34 for Pavoreal: 1. Mimosa Drive has a 60 foot right-of-way and 40 foot curb-to-curb distance. 2. Mimosa Drive slopes from an elevation of 246 feet at the North (top) end to 178 feet at the South (bottom) end of the street. The slope of the straight street has a grade of 12%. 3. Blue Orchid Lane, a loop street, intersects Mimosa Drive twice, 244 feet North of the intersection of Mimosa Drive & Aviara Parkway and 130 feet South of the terminus of Mimosa Drive. 4. All "Pavoreal" neighborhood streets are Residential (Local) Streets nol designated in anyway as future Collector or Arterial Streets. B. In accordance with the City of Carlsbad Circulation Element of the General Plan : 1. Local Streets: ( page 3, Table l:Street Classifications) * provide immediate access to adjoining properties * are designed to discourage through-traffic * carry a minimum amount of traffic (estimated average daily trips: 500 maximum) 2. Goals, Objectives, and Implementing Policies and Action Programs (page 4) a. Goals: a.l "A City with an integrated transportation network serving local and regional needs which accommodated a balance of different travel modes based on safety, convenience, attractiveness, costs, environmental and social impacts." b.Objectives! b.2. "To design streets for the safe and efficient movement ofjzeopk, goods and services within and through the City in the most environmentally sound and aesthetically pleasing manner possible." C. In accordance with The City of Carlsbad Department of Engineering Street Design Criteria, Table A: 1. Local Streets: *ADT Ranges (Limits) = 1200 ADT *Design Speed = 25 MPH *Maximum Centerline Grade = 12% D. In accordance with the City of Carlsbad Engineering Department Street Alignment Standards: 1. Mimosa Drive does not fall under the "Cul-De-Sac" Standards because it is intersected twice by Blue Orchid Lane, a loop street. E. In accordance with the City's new Concern that all developments have two accesses for emergency situations such as a reoccurrence of a "Santa Ana wind fueled La Costa Fire": 1. Pavoreal has a Primary access off of Aviara Parkway and will have a Secondary Emergency Access when connected to the Lohf development with a" 20 foot Emergency Access Easement with 16 foot paved and gated access road". 2. Pavoreal should not be likened to the areas of La Costa which burned because: a. Pavoreal is or soon will be surrounded to the North, South and East with major roads and residential & commercial development (not grassy hills). b. Pavoreal homes and all new neighboring developments are constructed of stucco and have concrete tile roofs. The Pavoreal Map CT 85-34 was approved by the City of Carlsbad without any requirements for a "secondary access". Also, there were not any contingency requirements for any future connection of Mimosa to any future development or future road system. The residents of Pavoreal (90 homes) have lived without incident for almost 8 years. Although there is no mention of our community's interaction with the City of Carlsbad Planning and Engineering Departments and the Developer of the Lohf property prior to the Planning Commission Meeting, we want you to know that our Homeowner Association/Neighborhood has been in communication with The City Departments and the Developer via letters, petitions and numerous personal meetings ever since we became aware of the proposed development in July 1997! We have 90 homeowners who do not want the road opened as a throughfare for health and safety issues ( consider the configuration and the slope (12% grade) of the road) . The Lohf development will have three Primary road access points and does not need to utilize our portion of Mimosa Drive as a fourth "access". At the Planning Commission meeting on December 2, 1998, the Pavoreal neighborhood, the Developer of the Lohf property and the City Planning and Engineering Departments agreed, that an Emergency Access would be very acceptable between Pavoreal and the Lohf Development. The Planning Commission's 3-3 vote was perplexing because all parties involved were in agreement with the "Emergency Access only" decision. On November 17, 1998 the City Council Approved the Terraces at Sunny Creek, CT 96-02 & SDP 97-02 ( hi addition to appropriate Zone Changes and General Plan Amendments). This development is designed with 172 single-family dwelling units with 28 attached secondary dwelling units and a development of 50 affordable housing apartment units. All of these dwelling units are being constructed off of one primary access and a secondary emergency access with a street configuration consisting of a number of loop streets and cul-de-sacs. In our conversations with the Engineering Department, the design of the project is similar to Pavoreal only on a much greater scale (3 tunes larger). With the use of the loop streets and emergency access road, the development qualifies to have two accesses and does not fall under the Department of Engineering's restrictive "Cul-De-Sac" Standards. Our request of a "Emergency Access Only" at the North terminus of Mimosa Drive is not only consistent with all City of Carlsbad Planning and Engineering Department Standards and Policies but also consistent with past and most recent City Council precedence setting decisions. If you have any questions regarding the information presented by our Pavoreal committee or in this letter, please contact me or the Committee Members at the following numbers: Don Holmes (760) 431-3737, Jams Libuse (760) 931-1057 or Kelly Cox (619) 692-1800. Sincerely, Don Holmes President, Pavoreal Homeowner's Association cc City of Carlsbad, City Manager LEGEND Symbol Descriplion 10' private drainage case men I over portions on lots 67,(>H. W m |x> maintained by community as,vocialum 100' access casement over a pod ion of loi 91 to San Uic^iK.ai & Electric and the city of Carlsbad. ,ind A p.itril arcvi% laid iruiMlainrd by SDC& E. 15' drainage easement to tiV cily ol Orlshjd. in be mamljincd by community association. Portion of Lot 2011 x 60') reserved lor possible luiuu- r*ii mum ol Mimosa to Dove Lane, to be maintained by rnnumimi) a-.sno.Hion '•'!'-,', ''^ I l'riv.ileO|ieMS|M«vF.wiiii-nl ni.uiil. -.1 by ininiiiunily .i-.-.u, 1.1 (7*;i*i'" • i Easement fur lit i IK: const) iirliun JIK| iiijniicnjiu e JUKI HIM-:, tu City |*»;t;^I; j of CatIsbad and Avura l^ii.d Associates. ;•• t| Uil 91-Owned and maintained by tntnmiiiniy a>s>ciJiiuii .is ***!!!it!;l pcnnancnl ojx-n space. (Aiva within the %ymU>l line-. Duly ) Prior lo issuance of a building JH-IIHJI there sltjll IK* a detxl resiiicinm placed on Ihedeed lo lots l-l9.ind 44 49 subft-<i tc* the satisfaction of the n.tnning Director nolifymj', .ill intcn-slnt ii-ulir.s .iml • ••-•-ui-. In lull H •-( lh.it (AirJ within tin -.ymt^.l Inn" Ij I A. IV distance between the original siniiiuicsdcpuiod on Exhibits "A" - "CC" 9/28/90, and side pioperty line shall become (he established side yard set back for each lot and supersede Uie existing underlying R I Zone's side yard setback standard. No Further development is permitted in this side yard setback. B. All room additions and add ons shall maintain a rear yard minimum distance of IS feel from the lop of any tear y.ird slope, except patio covers and detached accessory structures which must maintain a minimum distance ol five Icrt from the tup of any rear yard slope. Fences <md walls are excluded ft inn this ri^quttenienl. Maintenance Responsibility and Easement Locations ;8TEIIN NATIONAL HOMES V O R E NOT TO SCALE June 1941 PA«li 1 C ( Element t IKL 11. I Tlt>.\ /:7.0/fc\T TABLE 1: STREET CLASSIFICATIONS Local Streets: * provide immediate access to adjoining properties * are designed to discourage through-traffic * carry a minimum amount of traffic (estimated average daily tnps: 500 maximum) Collector Streets; * provide immediate access to adjoining properties * serve as the connecting link for traffic between local and arterial streets * generally carry light to moderate traffic volumes (estimated average daily trips: 500 to 5,000) Controlled Collectors: * provide no access or United access to adjacent properties * serve as a major connecung link for traffic between local and arterial streets * carry moderate traffic volumes (estimated average daily trips: 5,000 to 10,000) Secondary Arterials; * provide limited access to adjacent properties * serve to move traffic between collector streets and larger anerials or the freeways * have two traffic lanes in each direction with a painted median * carry moderate traffic volumes (estimated average daily trips: 10,000 to 20,000) Major Arterials; * prohibit access to adjacent properties unless no other alternative exists * provide intra-city circuiadon and connections to freeways and regional roads * have a minimum of two ^affic lanes in each direction with a raised median * carry moderate to heavy traffic volumes (estimated average daily trips: 20,000 to 40,000) Prime Arterials; * prohibit access to adjacent properties unless no other alternative exists * provide for regional anc intra-city circulation and connections to freeways and other regional roads * carry very heavy traffic volumes (estimated average daily trips: 40,000 or more) CIRCULATION PLAN S 5 CFTY OF CARLSBAD CIRCULATION PLAN RAILROAD FREEWAY PRIME ARTERIAL MAJOR ARTERIAL SECONDARY ARTErJAL COLLECTOR STREET MAPI Page 11 M TABLE A CITY OF CARLSBAD STREET DESIGN CRITERIA DCSIGN CLASSIFlCftTIDH ADT RANGES {LIMITS) Design Speed Hinimin Spacing of Intersections (including right-turn in/out) (in feet) Right-Of-UBy Width (in feet) Access to Adjoining Property Curb-to-Curb Distance (in feet) Minimum Traffic Index Minimum Structural Section ' (in inches) Stopping Sight Distance45' (in feet) Minimum Centerline Radius (in feet) Maximum Cepterllne Grade (not thru Intersec.r*' Minimum Moulin* Crad«(0> PRIMEARTERIAL 40.00008 MORE 60 MPH 2600 126 NONE 106 (18' median) 9 6 AC 6 AB 580 2400(6> 7X 1.0X MAJOR ARTERIAL . 29,000 TO 40.000 50 MPH 1200 102 NONE 82 (181 median) 8.5 5 AC 6 AB 430 1400<6) 7X 1.0X SECONDARY ARTERIAL tO.OOOTO 20,000 40 MPH 600 84 Where no other access Is possible 64 8.0 4 AC 6 AB 300 670 10X 1.0X COLLECTOR STREET . 1,20070 10,000 30 MPH 300 60 or 68 Limited subject to approval 40 or 48 6.0 4 AC 6 AB 200 300 12X<3) 1.0X INDUSTRIAL STREET *»**. 30 MPH 300 72 Limited subject to approval 52 7.0 4 AC 6 AB 200 300 ex 1.0X LOCAL STREET 1,200 MAX, 25 MPH 150 T's others 200 60 O.K. 40 5.0 4 AC 4 AB 150 200 12X 1.0X CUL-DE-SAC STREET 500 MAX* 25 MPH 150 T's others 200. 56 O.K. 36 4.5 4 AC 4 AB 150 200 12X 1.0X ALLEY to**.*. .... 24 O.K. 24 4.0 5-1/2" PCC*B) .... 1.0X HILLSIDE I STREET 1 1 20 MPH 150 1 46-56 1 Limited 1 subject to approval 32(D 5.0 4 AC 4 AB 125(2> 200 15X 1.0X A-™~— — ^a_ v-ij— — ^g^B MOTES; Parking limited to one side. Reduction to 100* with approval of City Engineer. Grades greater than 10X will require specific approval, chip seal, etc. Not to exceed 6X thru Intersections. Local, cul-de-sac and hillside may increase grade through Intersections up to 8X, provided that CALTRANS guidelines for sight distance and vertical curves are complied with. REVISED 11/90 (5) (6) (8) This is based upon less than 2X grades. Intersection stopping sight distance per CALTRANS guidelines and Section 8 on Page 8. Assumes no superelevations; includes standard crossfall. Minimum grade of 2.OX is encouraged. If 1.0X mininun is not possible, special construction may be used with City Engineer approval. Gutter line of cul-de-sac bulbs and knuckles shall have Minium grade of 1.0X. Typical centerline grades at the upper reach of cul-de-sacs shall be 2X minimum. 'Alley sections shall conform to SDRSD G-21. F. All street widening plans shall include working copies of cross-sections not to exceed 50* on center. Additional cross-sections may be required where design situations develop. 3. ALIGNMENT A. Streets shall normally intersect at right angles. Local streets shall have at least 50' of tangent adjacent to an intersection, measured from extension of the curb face. Collectors shall have at least 100'. Arterials will require special design. An angle of intersection more than 10° from a right angle requires special approval and design. Hillside terrain will require special design. B. The centerline of streets entering upon opposite sides of any given street shall normally be offset by at least 200' for local residential streets measured from centerline to centerline. Cul-de-sac streets shall normally be designated as'T type intersections, and may be offset at 150'. C. Cul-de-sacs shall be permitted when the cul-de-sac street meets the following standards: "1) A 30-foot or 32-foot curb-to-curb private street, a 36-foot or 40-foot curb-to-curb residential street and all the following conditions are met: a) Length of street does not exceed 600 feet.* b) Traffic volume at entrance does not exceed 500 ADT. c) Number of dwelling units does not exceed 50. 'Length may be increased to a maximum of 1200 feet with special permission of the City Engineer under the following conditions: 2) A 40-foot curb-to-curb local street and ajl of the following conditions are met: a) Driveway and street intersections are spaced 150 feet or more apart. b) The length along streets from entrance to most remote point does not exceed one-half mile(i^°o JA^ c) Traffic volume at entrance does not exceed 1200 ADT. d) Number of dwelling units does not exceed 120. 3) A 4-iane secondary or major arterial with a raised median and all of the following conditions are met: a) The length of street does not exceed one-half mile. b) Traffic volume at entrance does not exceed 3000 ADT. c) The net buildable lot area served by the street does not exceed 25 acres. (H UNIT iriniCAIES SHEET NUMBER INDICA1ES UNir BOUNDARf INDICATES SHEET BOUNDARY INDICA1ES AFrORDAOLE DWElLinC UNIt I'MINIMK HH'»lllUtHT AHt'lKI. •• 'III IIV ol (.V,|(|;;|IAII|| •;.• 1 FM II 'A' II II VI!HII!: CAI! W Bl! IAI)'II1UAC:'II'INIC I.,! M i 4!; PJIJ1, 9CM1?! CCNtRAL NOUS: AT SUNNY CFIEHK I tOAl DCSCRIPHOH: VICINITY MAP DWHIR/SUBDIVIOCR: - ..-.,»„ tzzsi'l. ,i • t (««e -, f .. . V . J ',,^.7*'^.,..,.„>.., ,| ,., 1 ,„ ,IX ^' '- .^..j?—': ••--^" ''*<•(.•*'*! • r>.n '. *• n*« .SIBlll.ilCIIOM OWNER: .3IBIU StCIIOIC INCINttR Or WORK: ICCtMO: |m/b ?i| 'in. >.,, v v I I' t !• "f" . f l'» .»."t i-—.- im Western Pacific Housing IAN DIIGO DIVISION January 28, 1999 City of Carlsbad ATTN: Jordan Planning Department 2075 Las Palmas Drive Carlsbad, CA 92009-1576 Re: Proposed Street Names for Lohf Project (SDP 99-01). Jordan, We are hereby requesting street name approvals for our Lohf property (CT 97-15/SDP 99-01) located in the City of Carlbad west of El Camino Real and northwest of Dove Lane. Please find attached two reduced copies of our site plan which indicate all proposed street names. The existing Dove Lane will extend into and terminate in the project site. Additionally, Poinsettia Lane will extend westerly from El Camino Real through the site to provide access. A series of four public residential streets will provide access to the individual lots. The proposed names for these streets are indicated below along with alternative names. Proposed Street Names (4) Shoveler Court (Street A) Mallard Avenue (Street B) Brant View (Street C) Whimbrel Way (Street D) Alternative Street Names Skimmer Court Dunlin Court Heron Lane Moorhen Avenue Turnstone Drive Siskin Drive Stilt View Oriole Way Phoebe Lane Sora Drive Please contact me at 760-929-1600 if you need any additional information or have questions. Sincerely WESTERN PACIFIC HOUSING Sondra Harris Assistant Forward Planner cc: Ryan Green, WPH 2385 Camino Vida Roble, Suite 107,Carlsbad, California 92009 760.929.1600 Fax 760.929.1601 Mike Grim, City of Carlsbad Clyde Wickham, City of Carlsbad Ray Martin, Hunsaker and Associates Melissa Allen, Jack Henthorn & Associates 2385 Camino Vida Roble, Suite 107,Carlsbad, California 92009 760.929.1600 Fax 760.929.1601 H.CLA. aw s>Mf Q a! JANUARY 13, 1999 TO: CITY MANAGER VIA: Planning Director FROM: Associate Planner CIRCULATION MAPS FOR COUNCILMEMBER HALL'S MEETING ON LOHF PROJECT Councilmember Hall will be meeting this Friday afternoon, January 15, 1999, with citizens from the Pavoreal neighborhood concerning the Lohf Subdivision. The Lohf Subdivision was recently approved by the Planning Commission and is pending scheduling for the City Council hearing. Since the topic of the meeting will be traffic circulation and roadway connections, Councilmember Hall requested maps that would show the existing and future circulation in and around the Lohf project site. Attached are four maps. These maps are as follows: » A composite map showing existing and future roadways in the area of Pavoreal and the Lohf project site; » A copy of the Tentative Tract Map for the Lohf Subdivision showing the proposed roadway layout; » A copy of the Viewpoint subdivision map (now known as Pavoreal) showing the existing roadway layout and indicating the future extension of Mimosa Drive; » A copy of the proposed Kevane subdivision (currently in process with the Planning Department) showing the proposed roadway layout. I am available to attend the Friday afternoon meeting with Councilmember Hall and the citizens from Pavoreal should he want staff assistance. Please feel free to contact me at extension 4499 if you have any questions or require additional information. Thank you. MICHAEL GRI Attachments