April 26, 1999
Ms. Dee Landers
City of Carlsbad
Planning Department
2075 Las Palrnas Drive
Carlsbad, CA 92009
Reference: Noise Effects of Carlsbad Boulevard Reconfiguration (RECON Number 2966N)
Dear Ms. Landers:
Mr. Paul Barnes at Shea Homes asked that I provide you with an assessment of the effect of a
modified configuration for Carlsbad Boulevard on the Poinsettia Shores project. To that end, I have
calculated the effect of placing the north bound roadway to the east of the existing street and
compared the results with the noise analysis we prepared in December of 1997.
As I understand the potential configuration of the roadway, the current northbound lanes will become
southbound lanes, new northbound lanes will be constructed east of the existing roadway, and the
present southbound roadway will be eliminated. The curb line of the new northbound roadway will
be 50 feet from the rear property lines of the lots adjacent to the road. I assumed that future roadway
grades would be similar to the existing elevations.
Using (he same input parameters employed in the previous noise report, the reconfiguration of the
road would result in an increase to noise levels on the project site of between 1 and 2 decibels over
the earlier prediction. The enclosed table provides the predicted future noise levels with the
condition analyzed in the earlier report and those resulting from the reconfiguration.
Based on these assumptions, the reconfiguration of the roadway does not result in noise levels
exceeding 65 decibels and does not change the conclusions provided in the earlier noise report. If
you have any questions please call.
Sincerel
Charles Bull
President
CSB:arh
Enclosure
cc/enc: Paul Barnes, Shea Homes
Mike Howse, Hofman Planning Associates
4241 Jutland Drive, Suite 201
San Diego, CA 92117-3653
619/270-5066
fax 270-5414
Table 1
Receiver
Number
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Projected Noise Level with 6'
Noise Barriers Along
Circulation Element Roadways
(CNEL)
Existing Potential
Configuration Configuration
60 58
59 59
60 60
62 63
62 64
62 63
62 64
62 64
62 64
62 64
62 64
62 64
62 64
62 63
Hofman Planning
Associates
Planning Project Management Fiscal Analysis
April 28,1999
David Hauser
City of Carlsbad
2075 Las Palmas Drive
Carlsbad, CA 92009
Subject: Carlsbad Boulevard Realignment
Dear David:
This letter has been prepared at the request of our clients in response to our ongoing efforts to
address the City's desire to cause the realignment for Carlsbad Boulevard. We appreciate the
time that has been allotted in allowing us to move forward with our exciting project while
addressing the City's desire to realign Carlsbad Boulevard improvements.
Although exceeding the requirements of our project as outlined in the Specific Plan, it is our
understanding that we have reached a mutual agreement on how these improvements can be
completed. The essence of the agreement would include our coordination and construction of the
Carlsbad Boulevard realignment and paying an amount up to the Developer Contributions
attached hereto. The remainder of the costs will be paid by the City on a progress payment
reimbursement agreement during construction.
The enclosed cost estimate addresses the costs associated with the realignment of Carlsbad
Boulevard, west of Planning Areas 7, 8, and 1. This cost estimate does not address the possible
required overlay hi order to adjust for existing cross slope. An estimate of this cost is $120,000
for Planning Area 7, and $80,000 for Planning Areas 1 and 8. Through future coordination with
the City of Carlsbad, a reimbursement agreement will be drafted.
Thank you once again, and we look forward to meeting shortly and creating a project that
everybody will be proud of.
Sincerely,
Mike Howes
c: Lloyd Hubbs
Bob Wojcik
Ken Quon
Dee Landers
5900 Pasteur Court • Suite 150 Carlsbad CA 92008 • (760) 438-'M6;
PROJECT
Realignment North of
Poinsettia Lane (PA-7)
Realignment South of
Poinsettia Lane (Pa -8 & Pa-1)
TOTAL COST
Estimated Costs to Complete
Realignment Improvements
$ 1,193,832.00
$ 1,055,640.00
$ 2,249,472.00
Developer
Contributions*
$ 570,226.00
$ 463,749.00
$ 1,033,975.00
City of Carlsbad
Funding Sources
$ 623,606.00
$ 591,891.00
$ 1.215,497.00
4/26/99
Page 1 of 1
* Developer Contributions to be capped at, or below, the amount shown hereon.
TENIGR'WO/CORRESPONDENCn/CITYDELTA.Xl.S
4/26/99
Page 1 of 1
ESTIMATED COSTS TO COMPLETE REALIGNMENT
IMPROVEMENTS SOUTH OF POINSETTIA LANE (PA-8 & PA-1)
Description
A. Hard Cost
Sidewalk (continuous or meandering)
Curb & Gutter along parkway
Median Curb & Gutter (east side)
Median Curb & Gutter (west side)
Pavetnent(5"AC-H5" Base+6" Sub-Base)
Clear & Grub
Excavate for Coast HWY
Finishing for Coast HWY
Remove ex Fence
Franchise Utilities
Saw Cut ex. Pavement
Remove existing pavement
Landscape and irrigation (East of Carlsbad Blvd)
Landscape and irrigation (median)
Street Lights
Poinsettia Traffic Signal Modification j
New signalized intersection
Striping and signage
Traffic Control (during construction)
Temporary K-rail
Drainage Improvements
Sub-TOTALB. son cost
Civil Consultant (Design * Survey)
Geotechnical Consultant
Franchise Utilities Consultant
Traffic consultant
1/2 of 4 month construction-Project Supervision
Sub-TOTAL
10% Contingency
10% Contingency-unknown
IMPROVEMENT TOTAL
C. Deduction for project entry temp. imp.
Remove temporary pavement
Signal relocation
Sub-TOTAL
10% Contingency
Sub-TOTAL
IMPROVEMENT GRAND TOTAL
Unit Price Total
6,300 SF
1,450 LF
1,320 LF
1.510LF
89,300 SF
1.8 AC
5,700 CY
89,300 SF
1,400 LF
1.240 LF
1,370 LF
29,700 SF
23,200 SF
22,300 SF
6EA
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
2 mo
2,000 SF
LS
$
$
$
$
5
$
$
$
$
$
$
$
$
$
$
$
$
$
$
S
s
1.55
7.00
7.00
7.00
2.60
2.000.00
8.00
0.25
2.00
50.00
1.00
1.00
2.50
2.50
2,500.00
50,000
4,000.00
3,200.00
15.000.00
8,110.00
0/0
$
$
S
$
$
ss$$$s
5
$
$
$
$
S
S
$s
ss
5
S
S
s$s$
5
$
S
s
$
$$I*
10,395
10,150
9,240
10,570
232,180
3,600
45,600
22,325
2,800
62,000
1,370
29,700
58,000
55,750
15.000
50,000
100,000
10,000
25,000
15,000
60,000
828,680
50.000
4,000
3,200
15,000
16,220
88,420
91,710
91,710
1,100,520
300
40,000
40,800
4,080
44,880
1,055,640 |
T:ENOFU1430>CORRESPONDENCe/CARLSBADPA8.XLS
4/26/99
Page 1 of 1
DEVELOPER CONTRIBUTIONS REALIGNMENT
SOUTH OF POINSETTIA LANE (PA-8 & PA-1)
Description
A. Realignment Improvements
Curb & Gutter along parkway
Median Curb & Gutter (east side)
8 foot Shoulder Reconstruction
Franchise Utilities
Landscape (10 foot east of Carlsbad BK/d)
Median Landscape (half width)
Street Lights
Civil Consultant (design and survey)
Geotechnical Consultant
Franchise utilities consultant
Landscape Architect
Project supervision (5% required improvements )
Sub-total
Sub-total
10% Contingency
TOTAL
B. Intersection Improvements
Sidewalk (continuous or meandering)
Curb and Gutter
Pavement(5"AC*-i5" Base+6" Sub-Base)
Finishing for Coast HWY
Remove ex. Fence
Saw Cut ex. Pavement
New signalized intersection
Striping and signage
Drainage Improvements
Traffic Control (during construction)
Sub-total
Civil Consultant (design and survey)
Geotechnical Consultant
Traffic consultant
Project supervision (5% intersection improvements )
Insurance (1% intersection improvements)
Submittal Fees
Sub-total
10% Contingency
TOTAL
IMPROVEMENT GRAND TOTAL
Quantity Unit Price Cost
1.310 LF
1,370 LF
10,960 SF
1,240 LF
13,000 SF
19,000 SF
8EA
LS
LS
LS
LS
6,300 SF
490 LF
3,750 SF
3.750 SF
1.400LF
600 LF
LS
LS
LS
LS
LS
LS
LS
$
$
$
$
$
$
S
$
$
$
$
$
$
$
$
S
S
5
S
S
7.00
7.00
3.15
50.00
2.00
2.50
2,500.00
8,000.00
1.500.00
3,000.00
3.000.00
1.65
7.00
2.60
0.25
2.00
1.00
10,000.00
500.00
2,000.00
S
S$
$
$
S$
$
$
S$$$
S
$$$
S
5
$
$
$
$
$
$
5
$
S
S
S
S
$
S
S
I s
9,170
9,590
34,524
62,000
26,000
47,500
20.000
208.784
8.000
1,500
3.000
3,000
10,439
23,472
10,395
3,430
9,750
938
2,800
600
100,000
1,000
10,000
2,000
140,913
10,000
500
2,000
7,046
1,409
25,000
45,955
18,687
205,554
463,749
T:ENGR/1430/CORRESPONDENCE/PA 8 Specific Plan Costs.xis
4/26/99
Page 1 of 1
ESTIMATED COSTS TO COMPLETE REALIGNMENT
IMPROVEMENTS NORTH OF POINSETTIA LANE (PA-7)
Description
A. Hard Cost
Sidewalk (continuous or meandering)
Curb & Gutter along parkway
Median Curb & Gutter (east side)
Median Curb & Gutter (west side)
Pavement (5"AO15" Base+6" Sub-Base)
Clear & Grub
Excavate for Coast H WY
Finishing for Coast HWY
Remove ex. Fence
Remove ex. Headwalte
Franchise Utilities
Saw Cut ex. Pavement
Remove existing pavement
Landscape and irrigation (East of Carlsbad Blvd)
Landscape and irrigation (median)
Street Lights
Poinsettia Traffic Signal Modification
New signalized intersection
Striping and signage
Traffic Control (during construction)
Temporary K-rail
Drainage Improvements
Sufa-TOTAL
B. Soft Cost
Civil Consultant (Design + Survey)
Geotechnical Consultant
Franchise Utilities Consultant
Traffic consultant
1/2 of 4 month construction-Project Supervision
Sub-TOTAL
10% Contingency
10% Contingency-unknown
IMPROVEMENT TOTAL
C. Deduction for project entry temp. imp.
Remove temporary pavement
Signal relocation
Sub-TOTAL
10% Contingency
Sub-TOTAL
IMPROVEMENT GRAND TOTAL
Quantity Unit Price Total
6,300 SF
2,280 LF
1,800 LF
1.950LF
104,650 SF
2.3 AC
6,000 CY
104,650 SF
1.765 LF
2EA
1,670 LF
1,805 LF
37,000 SF
17,400 SF
19,300 SF
9 EA
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
2 mo
2,000 SF
LS
$
$
$
$
S
$
$
S$$
S$$$$$
$$$$
$
$
1.65 $
7.00 $
7.00 $
7.00 $
2.75 $
2,000.00 $
8.00 $
0.25 $
2.00 $
500.00 $
50.00 $
1.00 $
1.00 $
2.50 $
2.50 $
2,500.00 $
$
S
S
S
5
$
$
70,000 $
6.000.00 $
4,800.00 $
15,000.00 $
8,110.00 $
$
$
S$
0.40 S
S
5
$
$
I*
10,395
15,960
12,600
13,650
287,788
4,600
48,000
26,163
3,530
1000
83,500
1,805
37,000
43,500
48,250
22..500
50,000
100,000
10,000
25,000
15,000
60.000
920,240
70.000
6,000
4,800
15,000
16,220
112,020
103,226
103,226
1,238,712
800
40,000
40,800
4,080
44,880
1,193,832 |
T:ENGRn430/CORRESPONDeNC&CARLSaADPA7.XLS
4/26/99
Page 1 of 1
DEVELOPER CONTRIBUTIONS REALIGNMENT
NORTH OF POINSETTIA LANE (PA-7)
Description
A. Realignment Improvements
Curb & Gutter along parkway
Median Curb & Gutter (east side)
8 foot Shoulder Reconstruction
Franchise Utilities
Landscape (10 foot east of Carlsbad Blvd)
Median Landscape (half width)
Street lights
Sub-total
Civil Consultant (design and survey)
Geotechnical Consultant
Franchise utilities consultant
Landscape Architect
Project supervision (5% required improvements)
Sub-total
10% Contingency
TOTAL
B. Intersection Improvements
Sidewalk (continuous or meandering)
Curb and Gutter
Pavement (5"AC+15" Base+6" Sub-Base)
Finishing for Coast HWY
Remove ex Fence
Saw Cut ex. Pavement
New signalized intersection
Striping and signage
Traffic Control (during construction)
Drainage Improvements
Sub-total
Civil Consultant (design and survey)
Geotechnical Consultant
Traffic Consultant
Project supervision (5% intersection improvements)
Insurance (1% intersection improvements)
Submittal Fees
Sub-total
10% Contingency
TOTAL
IMPROVEMENT GRAND TOTAL
Unit Price Total
1.660 LF
1,680 LF
13,500 SF
1,670 LF
15,500 SF
26.400 SF
11 EA
LS
LS
LS
LS
6,300 SF
1.185 LF
8.600 SF
8.600 SF
1,765 LF
760 LF
LS
LS
LS
LS
LS
LS
LS
S
$
S
$
$$$
$$
S
$
$
$$$$
S
$
$
S
7.00
7.00
3.15
50.00
2.00
2.50
2,500.00
9.000.00
1,500.00
4.000.00
3,000.00
1.65
7.00
2.75
0.25
2.00
1.00
10,000.00
800.00
6.000.00
$
S
S
S
S
$
$$$$
$$$$
$
S
$$
$$
S
5
$
$
5
$
$
$
5
$
$
$
S
S
S
5|s
11,620
11,760
42.525
83,500
31,000
66,000
27,500
273,905
9,000
1,500
4,000
3,000
13.695
31.195
30,510
335,610
10,395
8,295
23,650
2.150
3,530
760
100,000
1.000
2,000
10,000
161,780
10,000
800
6,000
8,089
1,618
25,000
51,507
21,329
234,615
570,226 |
T:ENGR/143CVCORRESPONDENCE<PA 7 Specific Plan Costs.xs
04/26/99 08:42 NO.401 001
FAX TRANSMITTAL
TO:
FAX NO.:
Dee Landers
760/438-0894
DATE:
TIME:
04/26/99
8:30 am
FROM: Charles Bull/arh JOB NO.: 2966N
FAX NO.: (619)270-5414 PHONE NO.: (619)270-5066
NUMBER OF PAGES: 3 (including transmittal page)
DESCRIPTION OF MATERIALS BEING FAXED:
Letter regarding Poinsettia Shores project noise
COMMENTS:
Please call with questions or comments
Cc: Paul Barnes, Shea Homes (FAX 619/549-0112)
Mike Hows®, Hofman Planning Assoc. (FAX 760-438-2443)
Hard copy to follow For review and comment
04/26/99 08:42 NO.401 P02
April 26,1999
Ms. Dee Landers
City of Carlsbad
Planning Department
2075 Las Palmas Drive
Carlsbad, CA 92009
Reference; Noise Effects of Carlsbad Boulevard Reconfiguration (RBCON Number 2966N)
Dear Ms. Landers:
Mr, Paul Barnes at Shea Homes asked that I provide you with an assessment of the effect of a
modified configuration for Carlsbad Boulevard on the Poinsettia Shores project. To that end, I have
calculated the effect of placing the north bound roadway to the east of the existing street and
compared the results with the noise analysis we prepared in December of 1997.
As 1 understand the potential configuration of the roadway, the current northbound lanes will become
southbound lanes, new northbound lanes will be constructed east of the existing roadway, and the
present southbound roadway will be eliminated. The curb line of the new northbound roadway will
be 50 feet from the rear property Hnes of the lots adjacent to the road, I assumed that future roadway
grades would be similar to the existing elevations.
Using the same input parameters employed in the previous noise report, the reconfiguration of the
road would result in an increase to noise levels on the project site of between 1 and 2 decibels over
the earlier prediction, The enclosed table provides the predicted future noise levels with the
condition analyzed in the earlier report and those resulting from the reconfiguration.
Based on these assumptions, the reconfiguration of the roadway does not result in noise levels
exceeding 65 decibels and does not change the conclusions provided in the earlier noise report. If
you have any questions please call.
Sincerel'
Charles Bull
President
CSB;arh
Enclosure
cc/enc: Paul Barnes, Shea Homos
Mike Howse, Hofraan Planning Associates
4241 Jutlard Drive, Suits 201
San Diego, CAS2117-3653
G19/Z70-5065
fax 270-5414
04/26/99 08:42 NO.401 P03
Table 1
Receiver
Number
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Projected Noise Level with 6'
Noise Barriers Along
Circulation Element Roadways
(CNEL)
Existing Potential
Configuration Configuration
60 58
59 59
60 60
62 63
62 64
62 63
62 64
62 64
62 64
62 64
62 64
62 64
62 64
62 63