Loading...
HomeMy WebLinkAboutCT 98-14; Thompson/Tabata; Tentative Map (CT) (142)Corporate Office 16486 Bernardo Center Drive, #124 San Diego, CA 92128 Phone/Fax: (858) 451-3505 / (858) 451-0946 www.iseinc.ws October 28,2002 T^TilT "if1" i"r. ; —j i • • Ms. Kathy Baker Standard Pacific Homes f I 5750 Fleet Street, Suite 200 j Carlsbad, CA 92008 RE: RECENT CHANGES TO THE ACOUSTICAL STUDIES STANDARD PACIFIC POINSETTIA PROPERTY - CARLSBAD CA Dear Ms. Baker: The purpose of this letter is to quantify the recent changes to the acoustical studies for the Thompson/Tabata TPM development by Standard Pacific Homes. These changes reflect the latest engineering considerations consisting of pad elevation (slope) changes and updates to the project area traffic generation rates. Based upon the latest City approved traffic numbers provided by LLG Engineers (dated 2002), traffic volumes along Aviara Parkway increased by 3,000 ADT, while the volume along Poinsettia Lane decreased by approximately 10,000 trips per day. This change equated to a noise increase along Aviara Parkway from 70.7 to 71.3 dBA at 50 feet from the roadway centerline. Levels along Poinsettia Lane were found to decrease from 73.5 to 72.0 dBA at 50 feet from the centerline. These traffic changes, along with the aforementioned slope edge changes equated to an overall beneficial noise condition within the project site resulting in a reduction/elimination of some of the project noise walls. In addition, a reduction of the structural STC requirements for the proposed residential units was also obtained. Should you have any questions, please do not hesitate to contact me at (858) 451-3505. Sincerely, Rick Tavares, Ph.D. Project Principal Investigative Science and Engineering, Inc. Cc: Jeremy Louden, ISE