HomeMy WebLinkAboutCT 98-14; Thompson/Tabata; Tentative Map (CT) (156)Jack Henthorn & Associates 536sAvenidaEncinas, Suite A Carlsbad, CA 92008 (760) 438-4090 Fax (760) 438-0981 Memorandum To: THOMPSON/TABATA PROJECT TEAM FROM: JAYNE DEAVER SUBJECT: SUMMARY OF 1/13/03 CITY MEETING DATE: JANUARY 15,2003 The following summary organizes the determinations made at the City project meeting held on Monday, January 13. Outstanding issues, including issues resolved at the meeting, are bolded. The agreed-upon resolution, if determined, follows each. • Model Complex Plans o Mylars submitted o Signature waits on: • City Council hearing on 1/21 to decide on winter grading • Posting of demolition bond • Posting of performance bonds Rick submitted requests to City in September. I have a call into Donna Harvey to confirm status • Model complex landscape plan status Larry Black told IVY that a model landscape plan is not necessary. Model plans overlap with Phase i, which is nearly complete. I have confirmed this with Mike Grim—Landscape Phase i will cover Models. Permit may be released even if plans are not signed, provided that the remaining corrections are minor. Joseph believes this to be the case. • Phase i o 2ndplancheck completed o 3rdplancheck to be submitted about 1/17 • Issues: • Appraisal of remaining ROW. Clyde will have Anderson Breyband (sp) issue a letter of estimate for Stan Pac to use to secure transaction. Clyde gave appraisal fee letter ("$4,000 Letter") to Brian U. • Slope easements. These are addressed via CC&Rs, not easements. Clyde OK'd this. • SDG&E quitclaims. Noted on maps, documents prepared. Not an issue. Page i ofi Jack Henthorn & Associates 5365 Avenida Encinas, Suite A Carlsbad, CA 92008 (760) 438-4090 Fax (760) 438-0981 • Retaining Walls: plantable walls. Walls are shown as plantable on Phase ilandscaping. Need detail of plantable wall construction to include in building permit package. Zac is working with Charles to resolve this issue. • Retaining Walls: advance permits. Clyde will prepare a map for Building which authorizes the release of permits for all phase i walls. • Phase 1 performance bonds. Rick St. John had not submitted requests to City to prepare paperwork. As of 1/15/03, he will submit request ASAP. • Phase 2 o PC 2 corrections complete except for improvement plans. Improvement plans given to Rick St. John to complete PC 2. o PC 3 submittal anticipated in 2 weeks. * Issues: • Drainage from Thompson access road to Spinnaker Hill and Vista Pacifica RBFwill create an exhibit illustrating an additional detention basin • Letter to condo association accepting drainage. Clyde agreed that this is unnecessary because project reduces flows (improves current condition). • Tabata alternatives issue Show only the ultimate condition and creation of all legal lots. If situation cannot be resolved prior to completion of Phase i, building pads will not be graded for affected lots. • Trash haul route approval and permit. Clyde will hand-deliver Phase 2 to the traffic department for review of the haul route. Trash removal may begin in advance of Phase 2 grading permit under City's Agricultural Trash clause. To obtain permit, a letter must be submitted to the City detailing: limits of work, equipment to be used, haul route, and section of code exempting this area from standard grading ordinance procedures. JHA will draft letter. • Phase 3 o Submitted for 1st PC on 1/7/03, accepted by City on 1/13/03 • SDP SCE o Redline plan RBF will send a copy to JHA to submit to Clyde so that the confusion is resolved Page 2 of Jack Henthorn & Associates 5365 Avenida Enemas, Suite A Carlsbad, CA 92008 (760) 438-4090 Fax (760) 438-0981 • Alyssum Improvements o RBF is ready to submit mylars • Issues: • "Comply with all conditions of approval" Rick clarified that this was a formality and no conditions were outstanding • Advance grading letter JHA will prepare • Poinsettia Signal & Median o Submitted for second plancheck • Issues: • Interim striping plan RBF will prepare • Median landscaping Ivy needs to submit a separate landscaping plan for the median. I have spoken with Joseph about this. They can turn the plan around in less than a week as long as they have the base. RBF must provide base to Ivy. • Sanchez never saw 1st PC An additional copy of the plan will be submitted for his review If there are any additions or corrections to the summary above, please let me know. Page 3 of