A 177 7/™ RECEIVEDApril 22, 2003
A DD ^ &*"< f **•)*• t'?.Mike Grim APR 2 w ^...:0
City of Carlsbad Q,jy Qp CARLSBAD
1635 Faraday Avenue PLANNING DEPTCarlsbad, CA 92008 |-LMINNIN^ Utr I.
Subject: DWG 401-9C: Substantial Conformance
Dear Mr. Grim:
Submitted for your review are the revised sheets of CT 98-14 which reflect the changes discussed
in our meeting with Clyde Wickham on April 16, 2003. Per Mr. Wickham's direction, we are
submitting the TM sheet for the revisions which affect the Lonicera Street portion of Phase 2
because there are no site-plan impacts, and the SDP sheet for the revisions which affect the
Lemon Leaf Drive portion. When approved, we understand that replacement mylar sheets for
both sheets of both the TM and SDP will be submitted (four sheets, total).
The modifications requested include the following:
• Revised grading of lots 31 through 35
This change is made in accordance with on-going negotiations with Mr. Tabata to resolve
outstanding easement and accesses issues affecting the both his property and the subject property.
The proposed change will resolve a boundary issue between the two owners and does not affect
the Thompson/Tabata Site Development Plan.
• Deletion of the single-family residential unit on lot 40 and replacement with a storm
water detention basin
Due to off-site constraints, the storm water detention basin previously located on the off-site
parcel immediately east of lot 40 must be located within the project's boundaries. As a result, the
residential unit originally planned for lot 40 will be removed from the Site Development Plan and
will therefore reduce by one the total number of units to be constructed within the project. The
total number of lots will not decrease, as Lot 40 will remain a legal lot, just not a residential lot.
• Addition and/or realignment of storm drains to and from Lot 40.
The relocation of the detention basin necessitated the realignment of storm drains to channel
storm water to the basin and then out to the existing storm drain in Poinsettia Lane. The drain
lines have been designed to lay perpendicular to the slope to facilitate installation. The basin has
been engineered such that there will be no increase in flows into the existing Poinsettia drain.
-1-
•-"'X
• Lot line shifts for lots 36 through 47, and the addition of three retaining walls.
This modification was necessary to accommodate the mandatory 20' access road for
maintenance. The plotting of the residential units was adjusted with the lot line changes.
If you have any questions regarding the proposed modifications, please contact us at your earliest
convenience. We may be reached at (760) 438-4090.
Sincerely,
Jayne Deaver
Associate Planner
encl.
CC: file Documentl
-2-
^ ."X
)srek Henthorn & Associates
5365 Auenida Encinas, Suite A
Carlsbad, California 92008
(760) 438-4090
Fax (760) 438-0981
April 22, 2003
Mike Grim
City of Carlsbad
1635 Faraday Avenue
Carlsbad, CA 92008
Subject: DWG 401-9C: Substantial Conformance
Dear Mr. Grim:
Submitted for your review are the revised sheets of CT 98-14 which reflect the changes discussed
in our meeting with Clyde Wickham on April 16, 2003. Per Mr. Wickham's direction, we are
submitting the TM sheet for the revisions which affect the Lonicera Street portion of Phase 2
because there are no site-plan impacts, and the SDP sheet for the revisions which affect the
Lemon Leaf Drive portion. When approved, we understand that replacement mylar sheets for
both sheets of both the TM and SDP will be submitted (four sheets, total).
The modifications requested include the following:
• Revised grading of lots 31 through 35
This change is made in accordance with on-going negotiations with Mr. Tabata to resolve
outstanding easement and accesses issues affecting the both his property and the subject property.
The proposed change will resolve a boundary issue between the two owners and does not affect
the Thompson/Tabata Site Development Plan.
• Deletion of the single-family residential unit on lot 40 and replacement with a storm
water detention basin
Due to off-site constraints, the storm water detention basin previously located on the off-site
parcel immediately east of lot 40 must be located within the project's boundaries. As a result, the
residential unit originally planned for lot 40 will be removed from the Site Development Plan and
will therefore reduce by one the total number of units to be constructed within the project. The
total number of lots will not decrease, as Lot 40 will remain a legal lot, just not a residential lot.
• Addition and/or realignment of storm drains to and from Lot 40.
The. relocation of the detention basin necessitated the realignment of storm drains to channel
storm water to the basin and then out to the existing storm drain in Poinsettia Lane. The drain
lines have been designed to lay perpendicular to the slope to facilitate installation. The basin has
been engineered such that there will be no increase in flows into the existing Poinsettia drain.
-1-
• Lot line shifts for lots 36 through 47, and the addition of three retaining walls.
This modification was necessary to accommodate the mandatory 20' access road for
maintenance. The plotting of the residential units was adjusted with the lot line changes.
If you have any questions regarding the proposed modifications, please contact us at your earliest
convenience. We may be reached at (760) 438-4090.
Sincerely,
Jayne Deaver
Associate Planner
encl.
CC: file Document 1
-2-
PROJECT NAME:
PRELIMINARY REVIEW APPLICATION
Thompson/Tabata: Phase 2
OWNER (Print or type)
* Standard Pacific Homes
APPLICANT (Print or type)
Standard Pacific Homes
Address 5750 Fleet Street. Suite 200 Address 5750 Fleet Street. Suite 200
City, State & Zip Carlsbad. CA 92008
Telephone (760) 602-6800
Signature
City, State & Zip Carlsbad. CA 92008
Telephone (760) 602-6800
Signature
Print Name Print Name
*Owner's signature indicates permission to conduct a preliminary review for a development proposal.
PROJECT ASSESSOR'S PARCEL NUMBER(S) (APN): 214-140-44: 214-170-36. 09. 73 -76. 58. 59.46. 77
DESCRIPTION OF PROPOSAL (ADD ATTACHMENT IF NECESSARY):
Site Development Plan Substantial Conformance Exhibit for Phase 2. DWG 4Q1-9C and TTM CT 98-14
WOULD YOU LIKE TO ORALLY PRESENT YOUR PROPOSAL TO YOUR ASSIGNED STAFF
PLANNER/ENGINEER?YES NO
PLEASE LIST THE NAMES OF ALL STAFF MEMBERS YOU HAVE PREVIOUSLY SPOKEN TO
REGARDING THIS PROJECT. IF NONE, PLEASE SO STATE.
Clyde Wickham—meeting on 4/16/03
FOR CITY USE ONLY
PROJECT NUMBER:£ D^-a|.
FEE REQUIRED/DATE FEE PAID:
RECEIPT NO.:
RECEIVED BY: ( /( lX_xU
Routing: Planning Engineering Fire Water Other
FRM0025 12/99 PAGE 3 of 3
JA<C HENTHORN & ASSOCIATES
LETTER OF TRANSMIT!AL
Phone:
Fax:
To: Mike Grim
Of: City of Carlsbad
1635 Faraday Avenue
Carlsbad, CA 92008
602-4623
From: Jayne Deaver
Of: Jack Henthorn & Associates
5365 Avenida Encinas, Suite A
Carlsbad, CA 92008
Phone: (760) 438-4090
Fax: (760) 438-0981
Date: 4/23/03 Time: 1:20 PM
RE: CT 98-14 SDP Substantial Conformance Exhibit
FORWARDED BY:
D HAND DELIVERY D U.S. MAIL D FAX D COURIER D PRINTER D PICK-UP
Pages Description
1 Transmittal
1 Preliminary Review Application
1 Fees
2 copies Letter of Justification
3 copies each Phase 2 SCE (1 SDP sheet, 1 TM sheet)
COMMENTS:
Mike,
Please find the enclosed packet submitted for your review of the SDP substantial conformance exhibit for
CT 98-14, Phase 2.
I've included the TM SCE sheet even though there are no SDP issues associated with the proposed
changes. If you have any questions or need any additional information, please feel free to call our office
at (760) 438-4090.
Thanks,
Jayne
Copies to: File RECEIVED
APR 2 3 2003
CITY OF CARLSBAD
PLANNING DEPT.
City of Carlsbad
1635 Faraday Avenue Carlsbad CA 92008
Applicant: STANDARD PACIFIC CORP
Description
PRE03021
3484 04/23/03 0002 01 02
Amount CGP 460,00
460.00
Receipt Number: R0034058
Transaction Date: 04/23/2003
Pay Type Method Description Amount
Payment Check 14034095 460.00
Transaction Amount: 460.00