Loading...
HomeMy WebLinkAboutCT 98-17; Hadley Property; Tentative Map (CT) (24)MEMORANDUM November 12, 1998 TO: ASSOCIATE PLANNER JEFF GIBSON FROM: Associate Engineer Steven Jantz- Land Use Review VIA: Principal Engineer Bob Wojcik PROJECT CT 98-17/CDP 98-74/EIA 98-11/HDP 98-19/LCPA 98-07/ZC 98-10 HADLEY PROPERTY COMPLETENESS REVIEW Engineering Department staff have completed a review of the above-referenced project for application completeness. Based on the package of maps and related documents received October 19, 1998, the application and plans submitted for this proposed project are currently complete. The following are conditions based on the review by engineering staff: Traffic and Circulation: 1. The access (Street "A") with Black Rail Road must be coordinated with the other undeveloped parcels along Black Rail. According to the approved Specific Plan, joint access between this parcel and the parcel to the north is proposed with one access roadway. The applicant should prepare an appropriate circulation plan which will provide access to all parcels in compliance with the appropriate intersection spacing outlined in the City Engineering Design standards. 2. Street "G" in the Aviara Phase III area traverses parallel to the southerly boundary of this project. The applicant should consider utilizing this roadway as access. Sewer and Water: 1. Both sewer and water facilities to serve the proposed development will be required. Coordinate design standards and utility locations with CMWD. Grading: 1. A grading permit will be required. 2. A permission to grade letter will be required for the area outside the project boundaries. Drainage: 1. Rip rap will be required at the end of the 18" storm drain. 2. Due to the proposed grading, a ponding effect occurs at the boundary with Tabata. Please propose a solution. CT 98-17: HADLEY PROPERTY COMPLETENESS REVIEW November 12,1998 Miscellaneous: 1. Attached is a red-lined check print of the proposed project for the applicants use in making the requested revisions. This check print must be returned with the project revisions to facilitate continued staff review. If you or the applicant have any questions, please either see or contact me at extension 4354. STEVEN C. JANTZ Associate Engineer - Land Use Review