Public Works — Engineering
October 5, 2001
Ray Martin
Hunsaker & Associates
10179 Huennekens Street
San Diego, CA92121
COMPLETION OF GRADING PLANCHECK FOR: DWG 384-4A
PROJECT NAME & NO.: Roesch Property. CT 98-19
This correspondence is to inform you that the City Engineer has signed the Grading Plans for the
project noted above. These plans are now the property of the City of Carlsbad and have been filed
for permanent record with this office.
Signature of your Grading Plans clears the way for issuance of your grading permit subject to the
limitations and requirements of City Ordinances, your conditions of approval (if any) and all
requirements for outside agency permits such as the Coastal Commission.
The approval of these plans by the City of Carlsbad does not authorize the applicant to violate any
federal, state, or city laws, ordinances, regulations or policies including, but not limited to, the
Federal Endangered Species Act of 1973 and any amendments thereto.
Presently, our records indicate your project is clear for grading permit issuance provided the
following items are completed to the satisfaction of this office:
1. Submit proof of a valid Coastal Development Permit from the California Coastal
Commission.
2. Provide the City with three (3) sets of bluelines of the approved grading plans.
3. Apply for a grading permit within the next one (1) year.
4. Provide the City with a copy of this letter.
5. Complete the Grading Permit Application (Attached).
6. Proof of general construction activity Storm Water Permit (Disturbances of five [5]
acres or better).
Provided that all the above requirements have been met, you may now apply for your grading
permit. Please submit all required items to the Engineering Development Services Counter at 1635
Faraday Avenue. Please be aware that fees are subject to change. You may wish to verify permit
fees before coming in and applying for your permit. You may obtain the blueline sets and any other
reproductions you desire through one of several bonded blueprint firms in the area at your cost.
Your grading permit will be issued when all of the above items have been completed. After permit
issuance, contact the Engineering Inspection Request Line at 438-3891 to set up a preconstruction
meeting with your Inspector. The inspector will bring the permit and give you your copy at the
preconstruction meeting. PLEASE DO NOT BEGIN CONSTRUCTION UNTIL YOU HAVE
RECEIVED YOUR PERMIT FROM YOUR PUBLIC WORKS INSPECTOR.
In addition the following items will be required during the construction of your project. Coordinate
the timing of these items with your Construction Inspector:
1635 Faraday Avenue • Carlsbad, CA 92008-7314 - (760) 602-272O • FAX (760) 602-8562
Ray Martin
October 5, 2001
Page 2 of 2
1. An approved Haul Route Permit prior to hauling any construction equipment or
materials onsite or offsite. Allow 2 working days for approval.
2. An approved Traffic Control Plan and a valid Right of Way Permit prior to any work in
the public right of way. Allow one week for approval.
3. Obtain a Retaining Wall Permit from the Building Department.
Thank you for your cooperation and assistance in this matter. It has been a pleasure working with
you through the plancheck process. If you have any questions, please feel free to call me at 760-
602-2400 extension 1420.
In an effort to improve our customer service, the Community Development Department is soliciting
your comments on the service you have received in processing your project. Enclosed is a
Customer Service Survey form. Please take a few minutes to complete this form and return it to the
City. Your help is greatly appreciated.
Respectfully,
MICHAEL SHIR
Project Engineer
c:
Inspection: Senior Office" Specialist
Permit Station - Front Counter
File
Attachments:
Grading Permit Application
Right of Way Permit Packet
Customer Service Survey
DOCS\MISFORMS\GRADING PLANCHECK COMPLETION LTR