HomeMy WebLinkAboutCT 98-19; Roesch Property Residential Subdivision; Tentative Map (CT) (47)MEMORANDUM
Date: February 18, 2000
To: Associate Engineer - Mike Shirey
From: Associate Planner - Anne Hysong
SUBJECT: CT 98-19 - ROESCH SUBSTANTIAL CONFORMANCE REVIEW
I have completed my review of the proposed substantial conformance exhibit and
have the following comments:
1. The lot areas shown on the substantial conformance exhibit are the same as
those shown on the tentative map although lot configuration has changed.
Please show the correct lot sizes.
2. Please show scale on the SCE.
3. Please show building footprints on a separate exhibit to ensure that setbacks
can still be achieved at all locations.
If the approved structures conform to setback requirements, Planning
Department could approve the proposed changes. The slope should have been
designed so that the Lot 5 lot line is straight rather than sawtoothed. Couldn't
this be accomplished by pulling the toe of slope back onto Lot 5?
CITY OF CARLSBAD
Inter-office Correspondence
DATE:
TO:PLANNING DEPARTMENT/SENIOR MANAGEMENT ANALYST
FROM: Engineering Department
SUBJECT: Review of FINAL/PARCEL MAP
Project Plancheck No.
Attached is one Final/Parcel Map. Please review ahd return your comments to the
Engineering Plancheck Division, attention ryjy ^
within one week.
Thank you for your cooperation.
'- ' ' 1 ~ TJ ' 1?-' _ 4+ _a7 .
SIGNATURE DATE O
CITY OF CARLSBAD
Inter-office Correspondence
DATE:
TO:
FROM:
SUBJECT:
Project IDC
s//ir/oo
PLANNING DEPARTMENT/SENIOR MANAGEMENT ANALYST
Engineering Department
Request for comments to GRADING
Ordinance
^-r £$C ^p? ^T"//- G/ / 6 / / DWG 0 1 T T
PLAN for Hillside Development
"f/ Plancheck No. ^~-T*-~
Project Planner
Attached is a copy of the Grading Plan. Please review andreturn your comments to
the Engineering Plancheck Division, attention /\lbr ff .
/, , // ~-i-—7 \
Failure to respond to this request by '/jz>\ / C/C/ will be interpretedr jx
to mean that the proposed project has your endorsement as submitted (no fee,
deposits, or specific conditions will be required).
Thank you for your cooperation.
Reply:I XI
v^^1-^-^/ /
SIGNATURE U DATE
DEPARTMENT OF PUBLIC WORKS
DEVELOPMENT SERVICES DIVISION
MEMORANDUM
February 15, 2000
TO: ASSOCIATE PLANNER - ANNE HYSONG
FROM: Associate Engineer - Development Services Division
CT98-19: ROESCH
SUBSTANTIAL CONFORMANCE EXHIBIT REVIEW
The above-referenced project has been submitted for tentative map substantial
conformance review. Attached is a copy of the Substantial Conformance Exhibit
(SCE) and a letter from the applicant describing the changes. Please review and
return comments to me by February 25, 2000.
If you have any questions, please either see me or give me a call at extension
2747.
MICHAEL J. SHIREY ^-
Associate Engineer- Development Services Division
attachment
c: Deputy City Engineer - Development Services Division