June 21, 1999
Hall Investment Company, inc.
2775 Via de la Valle, Suite 208
Del Mar, CA 92014
SUBJECT: CT 9%20/HDP 98-22/CDP 98-go/SDP 99-09 - JAMES CANYON ESTATES
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning
Department has reviewed your tentative map, hillside development and coastal
development permit, applications no. CT 98-20, HDP 98-22, CDP 98-90 and SDP 99-09 as
to their completeness for processing.
The items requested from you earlier to make the subject applications complete have been
received and reviewed by the Planning Department. It has been determined that the
application is now complete for processing. Although the initial processing of your
application may have already begun, the technical acceptance date is acknowledged by the
date of this communication.
Please note that although the application is now considered complete, there may be issues
that could be discovered during project review and/or environmental review. Any issues
should be resolved prior, to scheduling the project for public hearing. In addition, the City
may request, in the course of processing the application, that you clarify, amplify, correct,
or otherwise, supplement the basic information required for the application.
Please contact your staff planner, Anne Hysong, at (760) 438-l 161, extension 4477, if
you have any questions or wish to set up a meeting to discuss the application.
SincerAy, /\
fi PI ann.6 Director
h&H EL J HOLdMILLER
MJH:AH:eh
c: Gary Wayne
Adrienne Landers
Ken Quon, Project Engineer
Bobbie Hoder
File Copy
Data Entry
Planning Aide
2075 La Palmas Dr. - Carlsbad, CA 92009-I 576 l (760) 438-l 161 - FAX (760) 438-0894
ISSUES OF CONCERN
No. CT 98-20/HDP 98-22/CDP 98-go/SDP 99-09
Planning:
1.
2.
3.
4.
5.
6.
7.
8.
9.
During an earlier site inspection, it appeared that the structures shown on the map
have been removed. Please remove all notes that are no longer relevant. This map
must reflect what is being proposed today and should be “cleaned up” so that all
information is clear and legible prior to presenting it to the Planning Commission.
(See engineering comments below).
Please revise the project density to 3.76 du/acre. Density is calculated based on
developable area, i.e, excluding 40% + slopes and one-half of 25% - 40% slopes.
The General Plan allows Zone 1 infill subdivisions to exceed the growth control point
(3.2 du/acre) if findings can be made. Staff is supportive of the proposed density
and findings can be made.
Thank you for overlaying the project on the constraints map. However, the original
constraints map included a slope analysis which identified the areas of 25 - 40%
and 40% + slopes. These must be identified on one map for hillside review.
The biological survey must include a map that identifies the locations of small
patches of southern mixed chaparral. The survey indicates that they do not exist on
25% + slopes where preservation would be required. Please have your biologist use
the constraints map (with slope analysis) discussed in item 1 to show these
locations.
The attached disclosure statement should be corrected. According to the disclosure
statement, Alex J. Santos is the sole owner of the limited partnership, however, the
application is signed by Russell Pogue. These documents have to agree and should
be signed by the owner(s).
A Habitat Management Plan fee may be imposed against any vacant properties
supporting specific habitats including chaparral. The project site contains chaparral
habitat; therefore, the map will be conditioned to pay an HMP fee estimated to
$3,000 to $5,000 per acre of impacted habitat when the City’s adopts the HMP.
The proposed second dwelling unit exceeds the maximum area permitted for second
dwelling units in the City. The maximum size is 640 square feet while the proposed
unit is 760 square feet. Unless the it is reduced in area, the Planning Department
would be unable to support the second dwelling unit.
Lots 4 and 5 are shown with a terraced pad, however, the floor plan for Plan 3
shown on Lot 5 does not accommodate the terrace. Please correct.
Please respond to the comments on the attached landscape plan and return the red-
lined check print with next submittal.
Engineering:
1.
2.
3.
4.
5.
Fire:
1.
Please note that the drainage area along the sideyards is to be designed to provide a
positive drainage of 2% to swale a minimum 5’ away from the face of building. If this is
not possible, the applicants soils engineer must provide a letter indicating their approval
of the proposed drainage design.
Several section lines are referenced on the plan view of the tentative map but their
details are not found on the plans. Please add these details to the plans, especially
section C-C.
Curb outlets are limited to one per lot, as opposed to Lot 4, which is shown as
containing two outlets.
Please provide an explanation for providing and for sizing the detention basin, as it does
not appear in the hydrology report. If the detention basin is definitely required, the
applicant must address how this basin is to be maintained, as the City will not take on
this responsibility.
Please provide on the tentative map detail drawings of the energy dissipator and of the weir at the detention basin.
.All Structures must be protected by approved automatic fire sprinkler systems due to
the inability to conform with the City access and cul-de-sac standards.