Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCT 99-02; Poinsettia Properties Planning Area 7; Tentative Map (CT) (31)<•*,,,-
Hofman Planning
Associates
Memorandum
Planning Project Management Fiscal Analysis
DATE: May5,1999
TO: Barbara Kennedy
FROM: Stuart Fisk
SU B J ECT: Percentage and Location of Units in Planning Area 7 of the Poinsettia
Properties Specific Plan with Long Driveways
Dee had previously asked for an analysis of the units in Planning Area 8 of the Poinsettia
Properties Specific Plan which will have the longer driveways and I thought that you might like to
have the same information for Planning Area 7.
In Planning Area 7, floor plans 1 and 3 will have the long driveways, and the proposed project
will include 22 of the Plan 1 units and 36 of the Plan 3 units. The total number of units with the
long driveways is 58, and the total number of units proposed for the entire planning area is 117.
Therefore, the percentage of units with the longer driveways is 49.6%. As you can see on the
attached copy of the site plan (with long driveways highlighted), the units with longer driveways
are dispersed evenly throughout the project.
Per our discussion yesterday, I have confirmed that Fieldstone has made arrangements with the
North County Transit District for construction of a trail between Planning Area 7 and the
Poinsettia Transit Station. As requested, pedestrian signage will be added to the trail at the north
end of the project indicating the connection the Transit Station. If you have any questions or need
any additional information please call me at 438-1465.
5900 Pasteur Court • StelSO • Carlsbad • CA • 92008 • 760-438-1465 • Fax 760-438-2443