HomeMy WebLinkAboutCT 99-08; Spyglass II; Tentative Map (CT) (71)November 1,1999
TO: VAN LYNCH
From: William Plummer, Deputy City Engineer
SUBJECT: SPYGLASS II, CT 99-08, CMWD NO. 89-C-310
The followings conditions shall apply to the subject project:
1. The water and sewer pipelines shown on the Sheet 2 exhibit map are
acceptable.
2. The water pipeline at the intersection with "proposed" Apian Way and
Carlsbad Village Drive shall be extended easterly in Carlsbad Village Drive to
existing Apian Road, and connected to the existing water pipeline at that
location. The proposed water pipeline shall not be connected to the existing
water pipeline at the intersection of the "proposed" Apian Way and Carlsbad
Village Drive.
3. A 30' wide sewer easement dedicated to the City of Carlsbad is required for
the sewer pipeline planned to extend from the "proposed" Apian Road west to
El Camino Real.
4. The irrigation system for the landscaping in open space lots "A" and "B" shall
be designed to use recycled water in conformance with CMWD standards
and requirements.
Sincerely,
s4tyy
William E. Plummer