HomeMy WebLinkAboutCT 99-13; Steiner Property; Tentative Map (CT) (11)PUBLIC WORKS LAND DEVELOPMENT SECTION
MEMORANDUM
Octobers, 1999
TO: Van Lynch, Associate Planner
FROM: Jeremy Riddle, John Powell &Associates v
SUBJECT: SECOND ENGINEERING ISSUES STATEMENT
CT 99-13, SDP 99-10, HDP 99-12, LCPA 99-05.ZC 99-06
STEINER PROPERTY
Engineering Department staff has completed a second review of the above-referenced subject.
Prior to staff making a determination on the proposed project, the following engineering issues
of concern still must be resolved or adequately addressed by the applicant:
Engineering Issues of ffcneern
1. Revise the map to remove the callout for lots 67 and 74 as "remainder parcels". These
lots were created previously by Map no. 13839, and are currently designated as
legal/serviceable/buildable lots. By adjusting their lot lines (reducing their size) and
calling them remainder parcels triggers the need for a certificate of compliance (an
additional process) prior issuance building permits on either of these lots. To avoid this,
they should be included as standard lots as part of the map (lots 1-11). Revise the
tentative map and lot grading to include these lots as proposed.
2. Provide an updated title report reflecting ownership and easements for Lots 67, 68, and
74 of Map no. 13839. Revise the legal description on the tentative map to include this
land.
3. Provide a letter from the Soils Engineer for the project stating approval the proposed lot
drainage swales measured 3-feet from the footing of the structures.
4. Provide a copy of the revised landscape concept plan. We cannot determine if our
previous issues (redlines) have been incorporated into the new set.
5. Revise the tentative map to reflect the existing facilities on Skimmer Court which will
serve this development. Add reference drawing numbers for these improvements.
6. Revise the tentative map to depict a proposed sewer lateral to serve the Saska parcel
per the previous issues letter.
7. Revise the adjacent property information to reflect map no. 13839 (see redlines).
8. Revise the tentative map to include a reference drawing no. for the improvements for
SECOND ENGINEERING^SSUES STATEMENT
CT 99-13, SDP 99-10, HDP 99-12, LCPA 99-05.ZC 99-06
STEINER PROPERTY; OCTOBER 6,1999
Poinsettia Lane abutting the development.
9. Address the redline comments as noted on the returned check print.
Enclosed is a red-lined check print of the project. This check print must be returned with
the revised plans to facilitate continued staff review.
If you have any questions, please call me at telephone (760) 438-1161, extension 4385.
JEREMY RIDDLE
John Powell & Associates
Attachment
c: Bob Wojcik, Deputy City Engineer